Loading...
HomeMy WebLinkAboutAQ_F_0400028_20190620_CMPL_CAV-Rpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Concrete Supply Co.,LLC-Wadesboro NC Facility ID 0400028 Compliance Assurance Visit County/FIPS:Anson/007 Date: 06/25/2019 Facility Data Permit Data Concrete Supply Co.,LLC-Wadesboro Permit n/a Rt 4 Box 110 Issued n/a Wadesboro,NC 28170 Expires n/a Lat: 34d 58.6320m Long: 80d 5.5620m Class/Status Permit Exempt SIC: 3273/Ready-Mixed Concrete Permit Status Inactive NAICS: 32732/Ready-Mix Concrete Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Johnie Alexander Henry Batten Johnie Alexander Environmental Manager President Environmental Manager (704)372-2930 (704)372-2930 (704)372-2930 Compliance Data Comments: Inspection Date 06/20/2019 Inspector's Name Mike Thomas Inspector's re: Operating Status Operating Q/�/s�— Compliance Code Compliance-inspection Action Code FCE Date�ozgig�inl�, Ze�: On-Site Inspection Result Compliance Z — Total Actual emissions in TONS/YEAR: TSP SO2 NOX VOC CO PMIO *HAP 2010 --- --- --- --- --- 2006 2.79 --- --- --- --- 0.8400 0.2410 * Highest HAP Emitted(in pounds) Five Year Violation History:None Date Letter Tvvee Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested I. DIRECTIONS TO SITE: From FRO,take Hwy 401 South to Wagram. Turn right at Old Wire Road (Hwy 144)and continue—1 1 'h miles to Laurel Hill. Turn right onto Hwy 74 West and travel—35 miles to Wadesboro. Continue through town,the facility is on the left,—50 yards past the Hwy 52 intersection. H. SAFETY: Standard FRO safety gear is required. III. FACILITY DESCRIPTION: Concrete Supply Co.,LLC., -Wadesboro is a dormant concrete batch plant located in Wadesboro,Anson County. The facility has not been operational in years. Silos, conveyors and raw material bunkers remain on site. The facility's air quality permit was rescinded on 09 August 2016 under the newly adopted 2Q .0102(d) exemption. IV. INSPECTION SUMMARY: On 20 June 2019,I Mike Thomas of FRO DAQ, conducted a compliance assurance visit of the Concrete Supply Co., LLC., - Wadesboro location. The facility remains unused and there appeared to be no signs of activity to suggest reopening in the near future. I spoke to Mr. Johnie Alexander,Environmental Manager,who stated that there are no plans to operate the plant in the future. V. NON-COMPLIANCE HISTORY SINCE 2010: The facility does not have a history of non- compliance. VI. 112R APPLICABILITY: The facility does not store any of the listed chemicals above the threshold quantities, and is not required to maintain a written Risk Management Plan(RMP). VIL CONCLUSION AND RECOMMENDATIONS: Concrete Supply Co.,LLC—Wadesboro appeared to be complying with applicable air quality regulations on 20 June 2019 PINK SHEET ADDITIONS: None. /mst