HomeMy WebLinkAboutAQ_F_0000041_20200520_CMPL_CAV-Rpt (4) p000�U��I I • �/-4V NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY Southern Concrete Materials,Inc. -Burnsville NC Facility ID 0000041 Compliance Assurance Visit(CAV)Report County/FIPS:Yancey/199 Date: 05/20/2020 Facility Data Permit Data Southern Concrete Materials,Inc. -Burnsville Permit n/a 129 Depot Street Issued n/a Burnsville,NC 28714 Expires n/a Lat: 35d 54.9010m Long: 82d 16.7930m Class/Status Permit Exempt SIC: 3273/Ready-Mixed Concrete Permit Status Inactive NAICS: 32732/Ready-Mix Concrete Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Wayne Nash Jeff Lamm Jeff Lamm Plant Manager Vice Vice (828)682-2298 President/Environmental President/Environmental Affairs Affairs (828)253-6421 (828)253-6421 Compliance Data Comments: CAV Date 05/20/2020 Inspector's Name Bob Graves Inspector's Signature: ��(s -✓ Operating Status Operating Compliance Code Compliance—procedural requirements Date of Signature: /2,Ly � � Action Code PCE Off-Site CAV Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2012 2.57 --- --- --- 0.7700 0.2212 2007 0.5770 --- --- --- --- 0.2650 J0.15816 *Highest HAP Emitted(in ounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested 1. Directions: From Swannanoa,take I-40W to exit 53B to 1-240 to I-26 N via Exit 4A toward Woodfin/Weaverville. Take exit 9 toward Burnsville,travel to Burnsville and turn.right onto Depot Street. The facility is located on the left. 2. Safety Equipment: Safety shoes,hearing and eye protection 3. Facility Contacts: correct as listed above. 4. Facility Description: Southern Concrete Materials-Burnsville is a truck mix concrete batch plant(maximum concrete process rate of 80 cubic yards per hour). 5. Facility Narration: On May 20,2020,at approximately 1:45PM,I(Bob Graves)called the facility to perform a partial compliance evaluation(PCE). I spoke with Mr.Terryl Ponder,Plant Operator. The facility contact Mr. Wayne Nash,Plant Manager,was not available. Mr.Ponder said there are no compliance issues, and no equipment changes have been made since the last on-site visit. Note: I did not go on-site and therefore; no on-site observations were made. 6. The facility has the following emission sources: Emission Emission Source LIontrol— ! Control System Source ID Description tem ID Description one truck mix concrete batch plant(maximum concrete process rate of 80 cubic yards per hour) consisting of the following: ES-1 one cement storage silo(150 tons of CD-1 one bagfilter(170 square feet of filter cement storage capacity area) F-2one flyash storage silo (40 tons CD 2 one bagfilter(80 square feet of filter flyash storage capacity) _I� area) _ ES-3 one cement/flyash weigh hopper(1.5 CD-3 one bagfilter(52 square feet of filter tons of holding capacity) area) ES4one concrete truck load-out ----j EYKN/A Other emission sources: Sand and aggregate delivery to ground storage and transfers by conveyor, and transfers to elevated storage. During previous on-site visits,no dust concerns were observed. Compliance is expected. 7. Haul roads and storage piles: During my last on-site visit,no fugitive dust emissions were observed from the haul roads or the storage.piles. Compliance is expected. 8. Control of Visible Emissions: During my last on-site visit,no visible emission concerns were observed. Compliance is expected. 9. Odor: During my last on-site visit, no odor concerns were observed. Compliance is expected. 10. 2019 Concrete production: The facilities production records document that it produced 16,326 cubic yards of concrete in 2019. 11. Baghouse Record Keeping(Optional): The facility no longer is required to keep an inspection and maintenance logbook. The facility usually performs inspections monthly,but are not always documented in the logbook. Mr. Ponder said the last internal inspection was on March 18, 2020. 12. Compliance History: No NOV's have been issued to the facility in the last five years. 13. Compliance Assistance: none at this time. 14. Permit Rescission: The facility requested the rescission of their air permit. A permit rescission approval letter dated July 22,2016 was sent to the facility. 15. Recommendation/Compliance Statement/Conclusion: • Recommendations: none at this time. • Conclusion: This facility appears to be in compliance with applicable air quality rules. This facility appears to be exempt from air permitting requirements per 2Q .0102(d).