Loading...
HomeMy WebLinkAboutAQ_F_0400028_20200610_CMPL_CAV-Rpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Concrete Supply Co.,LLC-Wadesboro NC Facility ID 0400028 Inspection Report County/FIPS: Anson/007 Date: 06/10/2020 Facility Data Permit Data Concrete Supply Co.,LLC-Wadesboro Permit n/a Rt 4 Box 110 Issued n/a Wadesboro,NC 28170 Expires n/a Lat: 34d 58.6320m Long: 80d 5.5620m Class/Status Permit Exempt SIC: 3273/Ready-Mixed Concrete Permit Status Inactive NAICS: 32732/Ready-Mix Concrete Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Johnie Alexander Henry Batten Johnie Alexander Environmental Manager President Environmental Manager (704)372-2930 (704)372-2930 (704)372-2930 Compliance Data Comments: Inspection Date 06/10/2020 Inspector's Name Mike Turner Inspector's Signature: (�fZvv"1 Operating Status Operating Compliance Code Compliance-inspection f Action Code FCE �� Date of Signature: G t On-Site Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2010 --- --- --- -- 2006 2.79 --- --- --- 0.8400 0.2410 * Highest HAP Emitted(inpounds) Five Year Violation History:None Date Letter Tyne Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested I I. DIRECTIONS TO SITE: From FRO,take Hwy 401 South to Wagram. Turn right at Old Wi�c Road (Hwy 144)and continue—1 1 '/z miles to Laurel Hill. Turn right onto Hwy 74 West and travel 435 miles to Wadesboro. Continue through town,the facility is on the left,—50 yards past the Hwy 52 intersection. 1I. SAFETY: Standard FRO safety gear is required. III. FACILITY DESCRIPTION: Concrete Supply Co.,LLC.,-Wadesboro is a dormant concrete batch plant located in Wadesboro,Anson County. The facility has not been operational in years. Silos,conveyors and raw material bunkers remain on site. The facility's air quality permit was rescinded on 09 August 2016 under the newly adopted 2Q .0102(d)exemption. IV. INSPECTION SUMMARY: On 10 June 2020, I, Mike Turner of FRO DAQ, called Johnie Alexander, Environmental Manager,of the Concrete Supply Co.,LLC.,- Wadesboro location.The purpose of my call was to conduct a partial compliance evaluation in lieu of on-site inspections due to Covid-19.According to Mr.Alexander this facility has not operated in years and there are no plans to operate the plant in the future. V. NON-COMPLIANCE HISTORY SINCE 2010: The facility does not have a history of non-compliance. VI. 112R APPLICABILITY: The facility does not store any of the listed chemicals above the threshold quantities, and is not required to maintain a written Risk Management Plan (RMP). VH. CONCLUSION AND RECOMMENDATIONS: Concrete Supply Co.,LLC—Wadesboro appeared to be complying with applicable air quality regulations on 10 June 2020. PINK SHEET ADDITIONS: None. /wmt