Loading...
HomeMy WebLinkAboutAQ_F_1900030_20200604_PRMT_Permit RGY COOPER ';;�."sra"r`;-•. e GovernorT ��R. � •�. MICHAEL S. REGAN ( Secrelmy MICHAEL A.ABRACZINSKAS NORTH CAROLINA ❑irecroi• Environmental Quality June 4, 2020 Mr. Brian Reddy Plant Manager Arclin USA, LLC 790 Corinth Rd Moncure, NC 27559 Subject: Air Permit No. 04162R22 Arclin USA, LLC Moncure, Chatham County,North Carolina Permit Class: Synthetic Minor Facility ID# 1900030 Dear Mr. Reddy: In accordance with your completed application received April 6, 2020,we are forwarding herewith Permit No. 04162R22 to Arclin USA, LLC, Moncure, Chatham County,North Carolina for the construction and operation of air emissions sources or air cleaning devices and appurtenances. Additionally, any emissions activities determined from your air permit application as meeting the exemption requirements contained in 15A NCAC 2Q .0102 have been listed for information purposes as an "ATTACHMENT" to the enclosed air pen-nit. Please note the records retention requirements are contained in General Condition 2 of the General Conditions and Limitations. If any parts,requirements, or limitations contained in this permit are unacceptable to you, you have the right to request a formal adjudicatory hearing within 30 days following receipt of this permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of the entire permit. This hearing request must be in the form of a written petition, conforming to G.S. 150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings. Unless a request for a hearing is made pursuant to G.S. 150E-23, this air permit shall be final and binding. You may request modification of your air permit through informal means pursuant to G.S. 150B-22. This request must be submitted in writing to the Director and must identify the specific provisions or issues for which the modification is sought. Please note that the permit will become final and binding regardless of a request for informal modification unless a request for a hearing is also made under G.S. 150B-23. Raleigh Regional Office-Division of Air Quality 3800 Barrett Drive,Raleigh,North Carolina 27609 Phone:919-791-4200 I FAX:919-881-2261 Internet:www.ncdenr.aov An Equal Opportunity IAffrmAve Action Employer-Made in part by recycled paper Brian Reddy June 4, 2020 Page 2 Unless exempted by a condition of this permit or the regulations,construction of new air pollution sources or air cleaning devices, or modifications to the sources or air cleaning devices described in this permit must be covered under a permit issued by the Division of Air Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143- 215.114B. This permit shall be effective from dune 4, 2020 until June 30, 2022, is nontransferable to future owners and operators, and shall be subject to the conditions and limitations as specified therein. Changes have been made to the permit stipulations. The Permittee is responsible for carefully reading the entire permit and evaluating the requirements of each permit stipulation. The Permittee shall comply with all terms, conditions, requirements, limitations and restrictions set forth in this permit.Noncompliance with any permit condition is grounds for enforcement action, for permit termination, revocation and reissuance, or modification,or for denial of a permit renewal application. Specific changes and additions are summarized below (note: this list may not include all changes and additions): • Rule 2D .0521 has been updated with most current version. • Rule 2D .0611 has been updated with most current version. ■ Rule 2D .0958 has been removed from the permit since it is no longer applicable to facilities in attainment areas as of November 1, 2016. • Rule 2D .2100 was added to make the facility's 112(r) status clear in the pen-nit. ■ Rule 2Q .0102 was added to make the facility aware that there are federal rules regarding the diesel-fired fire pump(ID No. IES-FP-1) that the facility should abide by that have not been included in the permit. • Reference in rule 2Q .0315 section (a)(i) changed from X(d)(iv) to (d)(v). • Added two urea unloading systems with new vacuum technology(ID Nos. ES-U I and ES-U2), with a new baghouse each (ID Nos. CD-BH-U1 and CD-BH-U2 respectively) (7I3 square feet filter area each). ■ Replaced existing resin kettle(ID No. ES-K-1) as a like-for-like replacement. • Replaced urea weigh tank hopper(ID No. ES-WT-1) as a like-for-like replacement. The urea weigh tank hopper will also be renamed to ID No. ES-WT-112 to make clear that the equipment services both kettles K-I and K-2. ■ Replaced baghouses ID Nos. CD-BH-1-A and CD-BH-1-B as like-for-like replacements. The baghouses were also renamed to ID Nos. CD-BH-112-A and CD-1311-112-13 respectively to make clear that the equipment services both kettles K-I and K-2. ■ Renamed the urea weigh tank ID No. ES-WT-5 to ID No. ES-WT-516 to make clear that the equipment services both kettles K-5 and K-6. ■ Replaced baghouse ID No. CD-BH-5 as a like-for-like replacement. The baghouse was also renamed to ID No. CD-BH-5i6 to make clear that the equipment services both kettles K-5 and K-6. • Removed 50,000-gallon urea fonnaldehyde resin tank (ID No. M-24), which has already been removed from the site. ■ Removed urea weigh tank(ID No. ES-WT-4) and associated baghouse (602 square feet of filter area) (ID No. CD-BH-4), as they are no longer in service and have been replaced by the melamine storage silo (100 ton storage capacity) (ID No. ES-MS-6) and associated bagfilter (165 square feet filter area) (ID No. CD-BH-6). Brian Reddy June 4, 2020 Page 3 Should you have any questions concerning this matter,please contact Sindy Huang at 919-791- 4276. Sincerely, V&- �V William T. Wike, Jr., Acting Regional Supervisor Division of Air Quality,NC DEQ SH Enclosures c: Raleigh Regional Office Brian Reddy June 4, 2020 Page 4 This page intentionally left blank. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF AIR QUALITY AIR PERMIT NO. 041521 22 Issue Date: June 4, 2020 Effective Date: June 4, 2020 Expiration Date: June 30,2022 Replaces Pen-nit: 04162R21 To construct and operate air emission source(s) and/or air cleaning device(s), and for the discharge of the associated air contaminants into the atmosphere in accordance with the provisions of Article 21 B of Chapter 143, General Statutes of North Carolina(NCGS) as amended, and other applicable Laws, Rules and Regulations, Arclin USA, LLC 790 Corinth Road Moncure, Chatham County,North Carolina Permit Class: Synthetic Minor Facility ID# 1900030 (the Permittee)is Hereby authorized to construct and operate the air emissions sources and/or air cleaning devices and appurtenances described below: Emission Emission Source Control Control System Source ID Description System ID Description Methanol-Formaldehyde Conversion Plant No.l (MF-1) j ES-A-I formaldehyde absorption system CD-1 regenerative thermal oxidizer Methanol-Formaldehyde Conversion Plant No.2 (MF-2) ES-A-2(NSPS) jabsorber column(M-F plant no.2) 'CD-2 Ither7nal oxidizer ES-A-3 (NSPS) jabsorber column(M-F plant no.2) ICD-2 Ithermal oxidizer Resin Fettles j ES-K-1 iresin kettle with a vapor condenser system CD-1 regenerative thermal oxidizer ES-K-2 Iresin kettle with a vapor condenser system CD-1 ;regenerative thermal oxidizer ES-K-3 iresin kettle with a vapor condenser system CD-1 Iregenerative thermal oxidizer ES-K-4 iresin kettle with a vapor condenser system I CD-1 Iregenerative thermal oxidizer ES-K-5 Iresin kettle with a vapor condenser system CD-1 regenerative thermal oxidizer ES-K-6 iresin kettle with a vapor condenser system CD-1 regenerative thermal oxidizer 'Loading and Unloading Operations ES-TR-1 formaldehyde truck loading and unloading CD-1 regenerative thermal oxidizer area I ES-RC-1 1phenol and caustic railcar unloading area jCD-1 regenerative thermal oxidizer ES-RC-3 methanol unloading/formaldehyde loading CD regenerative thermal oxidizer railcar area Permit No. 04162R22 Page 2 Emission Emission Source Control Control System auS rce ID Description System ID Description ES-P-5 lurea vacuum unloading system —�iNrA NIA ES-U1 vacuum urea unloading system CD-BH-U1 bagfilter(713 square feet of filter area) ES-U2 vacuum urea unloading system CD-BH-U2 bagfilter(7l3 square feet of j filter area) ES-RCC-1 (NSPS) Irail car cleaning operation CD-1 regenerative thermal oxidizer ES-RCC-2_(NSPS)_.rail_car_loading opgMtiQn_ CD-I regenerative thermal oxidizer Miscellaneous Sources 1 ES-FUG IFugitive emissions from MF-2 Plant NIA NIA Solid Raw Material Storage ES-SB-1 salt bin CD-BH-7 bagfilter(125 square feet of 1 I filter area) ES-WT-112 urea weigh tank CD-BH-112-A, bagfilter(183 square feet of 1 CD-BH-112-B filter area)(CD-BH-112-A)in I parallel with bagfilter(183 4 I ,square feet of filter area)(CD- 1 BH-112-B) ES-WT-3 urea weigh tank CD-BH-3 bagfilter(602 square feet of filter area) ES-WT-516 urea weigh tank CD-BH-516 'bagfilter(602 square feet of filter area) ES-MS-6 melamine storage silo(100 ton storage CD-BH-6 bagfilter(165 square feet of capacity) _ _ filter area) ,Storage Tanks ES-M-10 urea formaldehyde storage tank(50,000 CD I regenerative thermal oxidizer gallon storage capacity) ES-M-14 formaldehyde storage tank(10,000 gallon CD-1 regenerative thermal oxidizer storage capacity) ES-M-15 urea-formaldehyde pre-polymer storage CD-1 lregenerative thermal oxidizer tank(250,000 gallon capacity) ES-M-16 urea formaldehyde polymer storage tank CD-1 regenerative thermal oxidizer 1(250,000 gallon storage capacity) F—ES-M-17 formaldehyde storage tank(125,000 gallon CD-1 regenerative thermal oxidizer storage capacity) ES-M-18 formaldehyde storage tank(125,000 gallon CD-I regenerative thermal oxidizer ,storage capacity) E5-M-20 urea formaldehyde resin storage tank (50,000 gallon storage capacity) NIA I NIA �ES-M-21 urea formaldehyde resin storage tank NIA NIA (50,000 gallon storage capacity) 1 ES-M-22 urea formaldehyde resin storage tank N/A N/A '(50,000 gallon storage capacity) ES-M-23 lurea formaldehyde resin storage tank (50,000 gallon-storage capacity) _ NIA NIA ES-M-25 urea formaldehyde resin storage tank i(5 0,00 0 gallon storage capacity) I NIA NIA ES-M-26 urea formaldehyde resin storage tank J (50,000 gallon storage capacity) NIA N/AJ Permit No. 04152R22 Page 3 Emission Emission Source Control Control System Source ID Description System ID Description ES-M-27 urea formaldehyde resin storage tank {50,000 gallon storage capacity] N'4 NIA ES-M-28 urea formaldehyde resin storage tank {27,000 gallon storage capacity] N/A NIA ES-M-29 urea formaldehyde resin storage tank .NIA N/A 1(27,000 gallon storage capacity) ES-M-30 urea formaldehyde resin storage tank NIA NIA �(22,000 gallon storage capacity) ES-M-31 phenol storage tank(50,000 gallon storage CD-1 regenerati�e thermal oxidiser capacity) i ES-M-34 methanol storage tank(500,000 gallon .NIA N A storage capacity) ES-M-35 phenol formaldehyde resin storage and/or glycerin storage tank(13,000 gallon storage NIA NIA capacity) ES-M-36 urea formaldehyde resin storage tank NIA NIA 1(20,000 gallon storage capacity) ES-M-37 (NSPS) urea formaldehyde resin storage tank NIA NIA 1(17,500 gallon storage capacity) ES-M-39(NSPS) urea formaldehyde resin storage tank NIA NIA 1(17,500 gallon storage tank) ES-M-45(NSPS) urea or phenol-formaldehyde resin storage N/A NIA tank(23,000 gallon storage capacity] ES-M-46(NSPS) urea or phenol-formaldehyde resin storage N/A NIA tank(23,000 gallon storage capacity) ES-M49 (NSPS) urea or phenol-formaldehyde resin storage N/A I NIA tank(30,000 gallon storage capacity} I ES-M-50(NSPS) urea or phenol-formaldehyde resin storage N/A NIA tank(30,000 gallon storage capacity) ES-M-51 (NSPS) urea or phenol-formaldehyde resin storage NIA N/A tank(30,000 gallon storage capacity) ES-M-52(NSPS) urea or phenol-formaldehyde resin storage NIA N/A tank(30,000 gallon storage capacity) ES-M-53 (NSPS} urea or phenol-formaldehyde resin storage NIA NIA tank(23,000 gallon storage capacity) ES-M-54(NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(30,000 gallon storage capacity) ES-M-55(NSPS) urea or phenol-formaldehyde resin storage N/A NIA tank(30,000 gallon storage capacity) ES-M-56(NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(33,000 gallon storage capacity) ES-M-57(NSPS) urea or phenol-fonnaldehyde resin storage N/A NIA tank(30,000 gallon storage capacity) ES-M-58 (NSPS) urea orphenoI-forma ldehyde resin storage NIA NIA tank(33,000 gallon storage capacity) ES-M-59(NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(33,000 gallon storage capacity) ES-M-61 phenol formaldehyde storage tank(15,000 CD-1 regenerative thermal oxidizer gallon storage capacity) Permit No. 04162R22 Page 4 Emission Emission Source Control Control System Source ffl Description System-ID—�—Description ES-M-63 urea formaldehyde storage tank(19,000 CD-I regenerative thermal oxidizer gallon storage tank) ES-M-64(NSPS) urea or phenol formaldehyde resin storage NIA NIA tank(35,000 gallon storage capacity) ES-M-65(NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(35,000 gallon storage capacity} ES-M-66(NSPS) urea or phenol-formaldehyde resin storage NIA NIA__. tank(34;000 gallon storage"capacity}� ES-M-67(NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(34,000 gallon storage capacity) ES-M-68(NSPS) urea or phenol-formaldehyde resin storage NIA N A tank(34,000 gallon storage capacity) ES-M-69(NSPS) urea or phenol-formaldehyde resin storage NIA N A tank(34,000 gallon storage capacity) ES-M-70(NSPS) urea or phenol-formaldehyde resin storage NIA N A tank(34,000 gallon storage capacity) ES-M-71 (NSPS) urea or phenol-formaldehyde resin storage 1 NIA NIA tank(34,000 gallon storage capacity} ES-M-72(NSPS) urea or phenol-Formaldehyde resin storage NIA k NIA tank(34,000 gallon storage capacity} Ik ES-M-73(NSPS) urea or phenol-formaldehyde resin storage NIA I NIA tank(34,000 gallon storage capacity) ES-M-74(NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(34,000 gallon storage capacity) ES-M-75 (NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(27,500 gallon storage capacity} ES-M-76(NSPS) urea or phenol formaldehyde resin storage NIA NIA tank(27,500 gallon storage capacity) ES-M-77(NSPS) urea or phenol-formaldehyde resin storage NIA NIA tank(41,000 gallon storage capacity) ES-M-78 (NSPS) phenol storage tank(41,454 gallon storage CD-1 Iregenerative thermal oxidizer capacity) ES-M-94(NSPS) methanol distillate storage tank(20,000 NIA NIA gallon storage capacity) ES-M-95 (NSPS) methanol distillate storage tank(20,000 NIA NIA gallon storage capacity) ES-M-99(NSPS) formaldehyde resin 1 washwater storage NIA NIA tank(20,000 gallon storage capacity) ES M-100(NSPS) formaldehyde storage tank(75,000 gallon CD-i regenerative thermal oxidizer storage capacity) ES-M-101 (NSPS) formaldehyde storage tank(75,000 gallon CD-1 regenerative thermal oxidizer storage capacity) ES-M-102(NSPS) formaldehyde storage tank(75,000 gallon CD-1 regenerative thernial oxidizer storage capacity) ES7M=1-03-(NSPS)—fomialdehyde-storage-tank-(75;000-gallon CD=l regenerative-thermal-oxidizer storage capacity) in accordance with the completed application 1900030.20B received April 6, 2020 including any plans, specifications,previous applications, and other supporting data, all of which are filed with the Department of Environmental Quality, Division of Air Quality (DAQ) and are incorporated as part Permit No. 04162R22 Page 5 of this permit. This permit is subject to the following specified conditions and limitations including any TESTING REPORTING OR MONITORING REQUIREMENTS: A. SPECIFIC CONDITIONS AND LIMITATIONS 1. Any air emission sources or control devices authorized to construct and operate above must be operated and maintained in accordance with the provisions contained herein. The Permittee shall comply with applicable Environmental Management Commission Regulations, including Title 15A North Carolina Administrative Code(NCAC), Subchapter 2D .0202,2D .4515, 2D .0521, 2D .0524, 2D .0535, 2D .0540, 2D .0611, 213 .0948, 2D .0949,2D .0958, 2D .1100, 2D .1806, 2D .2100, 2Q .0102, 2Q .0315 and 2Q .0317 (Avoidance). 2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT- The Permittee, at least 90 days prior to the expiration date of this permit, shall request permit renewal by letter in accordance with 15A NCAC 2Q .0304(d) and(f). Pursuant to 15A NCAC 2Q .0203(i),no permit application fee is required for renewal of an existing air permit (without a modification request). The renewal request(with application Form A) should be submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration date of this permit, the Permittee shall submit the air pollution emission inventory report (with Certification Sheet)in accordance with 15A NCAC 2D .0202, pursuant to N.C. General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ and shall document air pollutants emitted for the 2021 calendar year. 3. PARTICULATE CONTROL REQUIREMENT-As required by 15A NCAC 213 .0515 "Particulates from Miscellaneous Industrial Processes," particulate matter emissions from the emission sources shall not exceed allowable emission rates. The allowable emission rates are, as defined in 15A NCAC 2D .0515, a function of the process weight rate and shall be determined by the following equation(s), where P is the process throughput rate in tons per hour(tonslhr) and E is the allowable emission rate in pounds per hour(lbslhr). E =4.10 * (P)°67 for P <= 30 tonslhr, or E= 55 * (P)° ' -40 for P>30 tons/hr 4. VISIBLE EMISSIONS CONTROL REQUIREMENT-As required by 15A NCAC 2D .0521 "Control of Visible Emissions," visible emissions from the emission sources, manufactured after July 1, 1971, shall not be more than 20 percent opacity when averaged over a six-minute period, except that six-minute periods averaging not more than 87 percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period. However, sources which must comply with a visible emissions standard in 15A NCAC 2D .0524 "New Source Performance Standards" or .1110 "National Emission Standards for Hazardous Air Pollutants" shall meet that standard instead of the 2D .0521 visible emissions standard. 5. 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" - For the methanol-formaldehyde conversion plant (ID No. MF-2) consisting of two formaldehyde absorbers (ID Nos. ES-A-2 and ES-A-3)the Permittee shall comply with all applicable provisions, including the notification, testing, reporting, record keeping, and monitoring Permit No. 04162R22 Page 6 requirements contained in Environmental Management Commission Standard 15A NCAC 2D .0524, "New Source Performance Standards" (NSPS) as promulgated in 40 CFR 60, Subpart III [Standards of Performance for Volatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry(SOCMI) Air Oxidation Unit Processes], and including Subpart A "General Provisions". a. NSPS Emissions Limitations-As required by 15A NCAC 2D .0524 and 40 CFR Part 60,612,the following permit limits shall not be exceeded: i. The thermal oxidizer(ID No.CD-2)installed on the formaldehyde absorbers (ID nos. ES-A-2 and ES-A-3) shall reduce emissions of total organic compounds or TOC (minus methane and ethane)by 98 weight percent or to a TOC (minus methane and ethane) concentration of 20 ppmv on a dry basis corrected to 3 percent oxygen, whichever is less stringent. b. NSPS Monitoring of Emissions and Operations-As required by 15A NCAC 2D .0524 and 40 CFR Part 60.613, the following requirements shall be met: i. The Permittee shall install, calibrate, maintain, and operate according to manufacturer's specifications the following equipment: A. A temperature monitoring device equipped with a continuous recorder and having an accuracy of plus or minus one percent of the temperature being monitored expressed in degrees Celsius, or plus or minus 0.5 degrees Celsius, whichever is greater. B. A flow indicator that provides a record of vent stream flow to the incinerator at least once every hour for each affected facility. The flow indicator shall be installed in the vent stream from each affected facility at a point closest to the inlet of the incinerator and before being joined with any other vent stream. C. NSPS Reporting and Record keeping Requirements - As required by 15A NCAC 2D .0524 and 40 CFR Part 60.615, the following requirements shall be met: i. The Permittee shall keep up-to-date, readily accessible records of the following data measured during each performance test, and also include the following data in the report of the initial performance test required under 40 CFR Part 60.8. A. The average temperature of the firebox measured at least every 15 minutes and averaged over the same time period of the performance testing. B. The percent reduction of TOC determined as specified in 40 CFR Part 60.614(b)achieved by the incinerator, or the concentration of TOC (ppmv, by compound) detennined as specified in 40 CFR Part 60.614(b) at the outlet of the control device on a dry basis corrected to 3 percent oxygen. Permit No. 04162R22 Page 7 ii. The Permittee shall keep up-to-date, readily accessible continuous records of the equipment operating parameters specified to be monitored under 40 CFR Part 60.613(a) as well as up-to-date,readily accessible records of periods of operation during which the parameter boundaries established during the most recent performance test are exceeded. The Regional Supervisor, DAQ, may at any time require a report of these data. For the incinerator, the periods of operation during which the parameter boundaries established during the most recent performance test are exceeded are defined as follows: A. All 3-hour periods of operation during which the average combustion temperature is more than 28 degrees C. (50 degrees F)below the average combustion temperature during the most recent performance test at which compliance with 40 CFR Part 60.612(a)was determined iii. The Permittee shall keep up-to-date, readily accessible records of all periods when the vent stream is diverted from the control device or has no flow rate. iv. The Permittee shall submit to the Regional Supervisor,DAQ, semiannual reports of the following information as specified in 40 CFR Part 60.6150) A. Exceedances of monitoring parameters recorded above in paragraph c.ii above, and in 40 CFR Part 60.615(c). B. All periods recorded above in paragraph c.iii above,and in 40 CFR Part 60. 615(d),when the vent stream is diverted from the control device or has no flow rate. 6. 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" -For the equipment in the process unit described as the methanol-fonnaldehyde conversion plant (ID No.MF-2), the Permittee shall comply with all provisions, including the notification, testing, and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC 2D .0524 "New Source Performance Standards" (NSPS) as promulgated in 40CFR60, Subpart VV, Standards of Performance for Equipment Leaks in the Synthetic Organic Chemicals Manufacturing Industry. a. STANDARDS -The Permittee shall comply with the requirements of the leak standards in 60.482-1 through 60.482-10 as applicable for all equipment in the affected facility. The Permittee may elect to comply with the alternative standards for valves in 60.483-1 and 2 and/or request a determination of equivalence of a means of emission limitation as provided in 60.484. b. RECORDKEEPING REQUIREMENTS - The Pennittee shall comply with the recordkeeping requirements in 60.486(a) through (h). Affected facilities applying for exemptions from this subpart per 60.480(d) must comply with the recordkeeping requirements in 60.486(i). Pen-nit No. 04162R22 Page 8 All records shall be kept in a log in a readily accessible location. C. REPORTING REQUIREMENTS -The Permittee shall submit semiannual reports to the Air Quality Regional Supervisor, Division of Air Quality. All semiannual reports shall include a summary of the recordkeeping requirements detailed in 60.486. If electing to comply with the provisions in 60.483-1 and 60.483-2 the Pennittee shall notify the Air Quality Regional Supervisor, Division of Air Quality of the alternative standard selected 90 days before implementing either of the provisions. 7. I5A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" -For storage tanks listed in the table below,the Permittee shall comply with all applicable provisions, including the notification, testing,reporting, record keeping, and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC 2D .0524, "New Source Performance Standards" (NSPS) as promulgated in 40 CFR 60, Subpart Kb, including Subpart A "General Provisions." RECORDKEEPING REQUIREMENTS - Per 40 CFR 60.116b(a) and (b), the Permittee shall keep records showing the dimension of each storage vessel and an analysis showing the capacity of each storage vessel readily accessible for the life of the source. No. ID No. No.7 ID No. No. ID No. No. ID No. 1 ES-M-37 11 ES-M-55 21 ES-M-69 31 ES-M-94 2 ES-M-39 12 ES-M-56 22 ES-M-70 32 ES-M-95 3 ES-M-45 13 ES-M-57 23 ES-M-71 33 ES-M-99 4 ES-M-46 1 14 ES-M-58 24 ES-M-72 34 ES-M-100 5 ES-M-49 15 ES-M-59 25 ES-M-73 35 ES-M-101 6 ES-M-50 16 ES-M-64 26 ES-M-74 36 ES-M-102 7 ES-M-51 17 ES-M-65 27 ES-M-75 37 ES-M-103 8 ES-M-52 is ES-M-66 28 ES-M-76 9 ES-M-53 19 ES-M-67 29 ES-M-77 10 ES-M-54 20 ES-M-681 30 ES-M-78 S. NOTIFICATION REQUIREMENT -As required by 15A NCAC 2D .0535, the Pennittee of a source of excess emissions that last for more than four hours and that results from a malfunction, a breakdown of process or control equipment or any other abnonnal conditions, shall: a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time of the Division's next business day of becoming aware of the occurrence and describe: i. the name and location of the facility, ii. the nature and cause of the malfunction or breakdown, iii. the time when the malfiinction or breakdown is first observed, Permit No. 04152R22 Page 9 iv. the expected duration, and V. an estimated rate of emissions. b. Notify the Director or his designee immediately when the corrective measures have been accomplished. This reporting requirement does not allow the operation of the facility in excess of Enviromnental Management Commission Regulations. 9. FUGITIVE DUST CONTROL REQUIREMENT-As required by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. If substantive complaints are received or excessive fugitive dust emissions from the facility are observed beyond the property boundaries for six minutes in any one hour(using Reference Method 22 in 40 CFR, Appendix A), the owner or operator may be required to submit a fugitive dust plan as described in 2D .0540(f). "Fugitive dust emissions" means particulate matter that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas,process areas stockpiles, stock pile working,plant parking lots, and plant roads (including access roads and haul roads). 10. FABRIC FILTER REQUIREMENTS including cartridge filters baghouses, and other dry filter particulate collection devices -As required by 15A NCAC 2D .0611,particulate matter emissions shall be controlled as described in the permitted equipment list. a. Inspection and Maintenance Requirements -To comply with the provisions of this permit and ensure that emissions do not exceed the regulatory limits, the Permittee shall perform, at a minimum, an annual (for each 12 month period following the initial inspection) internal inspection of each particulate collection device system. In addition,the Permittee shall perform periodic inspections and maintenance as recommended by the equipment manufacturer. b. Recordkegping Re uirements - The results of all inspections and any variance from manufacturer's recommendations or from those given in this permit (when applicable) shall be investigated with corrections made and dates of actions recorded in a logbook. Records of all maintenance activities shall be recorded in the logbook. The logbook(in written or electronic forinat) shall be kept on-site and made available to DAQ personnel upon request. 11. VOC EMISSIONS FROM TRANSFER OPERATIONS -As required by 15A NCAC 2D .0948 "VOC Emissions from Transfer Operations," the Penmittee shall not load in any one day more than 20,000 gallons of volatile organic compounds with a vapor pressure of 1.5 pounds per square inch or greater under actual conditions into any tank-truck, trailer or railroad tank car from any loading operation unless the loading operation uses submerged loading through boom loaders that extend down into the compartment being loaded or by other methods that are at least as efficient based on source testing or engineering calculations. Permit No. 04162R22 Page 10 12. STORAGE OF MISCELLANEOUS VOLATILE ORGANIC COMPOUNDS- As required -by 15A NCAC 2D .0949•-"Storage-of-Miscellaneous Volatile Organic Compounds," the Permittee shall not place, store, or hold in any stationary tank, reservoir, or other container with a capacity greater than 50,000 gallons, any liquid volatile organic compound that has a vapor pressure of 1.5 pounds per square inch or greater under actual storage conditions unless such tank, reservoir, or other container: a. is a pressure tank capable of maintaining working pressures sufficient at all times to prevent vapor gas loss into the atmosphere; or b. is designed and equipped with one of the following vapor loss control devices: i. a floating pontoon, double deck type floating roof or internal pan type floating roof equipped with closure seals to enclose any space between the cover's edge and compartment wall; this control equipment shall not be permitted for volatile organic compounds with a vapor pressure of 11.0 pounds per square inch or greater under actual storage conditions; all tank gauging or sampling devices shall be gas-tight except when tank gauging or sampling is taking place; ii. a vapor recovery system or other equipment or means of air pollution control that reduces the emission of organic materials into the atmosphere by at least 90 percent by weight; all tank gauging or sampling devices shall be gas-tight except when tank gauging or sampling is taking place. 13. TOXIC AIR POLLUTANT EMISSIONS LIMITATION AND REPORTING REQUIREMENT - Pursuant to 15A NCAC 2D .1100 "Control of Toxic Air Pollutants," and in accordance with the approved application for an air toxic compliance demonstration, the following permit limits shall not be exceeded:- Emission Sources Formaldehyde Phenol Emission Emission Limits Limits(pounds per (pounds perhour hour Regenerative thermal oxidizer ID No. CD-1 4.33 5.62 Thermal oxidizer ID No.CD-2 3.28 NIA ES-M-45,46 and 53 5.74E-05 (each) 2.84E-03 (each) ES-M-49, 50,51, 52,54,55 and 57 6.74E-05(each) 3.34E-03 (each) ES-M-56,58 and 59 7.45E-05(each) 3.69E-03(each) ES-M-64 and 65 7.37E-05(each) 3.65E-03(each) ES-M-66 through 71 8.39E-05 (each) 4.16E-03 each) ES-M-99 l.81E-06 3.t2E-03 ES-M-72 and 73 6.36E-05 (each) 3.28E-03 (each) ES-M-74 9.29E-05 4.46E-03 ES-M-75 and 76 6.61E-05(each) 3.28E-03 (each) ES-M-77 9.00E-05 4.46E-03 ES-M-78 NIA 0.004 ES-M-20,21,22,23,25,26 and 27 3.43E-06(each) 5.90E-03-(each) ES-M-28 and 29 2,02E-06(each) 3.47E-03 (each) ES-M-30 1.75E-06 3.02E-03 ES-M-36 5.28E-05 2.79E-03 Phenol formaldehyde resin storage tank ID No. ES-M-35 4.1 E-05 2,03E-02 Urea formaldehyde resin storage tanks ES-M-37 and 39 4.69E-05 each 2.48E-03(each) Permit No. 04162R22 Page 11 a. Operations Restrictions - To ensure emissions do not exceed the limitations above, the following operating restrictions(scenarios) shall apply during control device(s) maintenance downtime. All sources at facility inay operate as requested in the application during control device(s)maintenance downtime except as described below: Scenario A Scenario B Scenario C Scenario D Scenario E RTO down RTO down RTO down (Q%DRE) {0%DRE} RTO in RTO in (O%DRE) operating at operating at operation operation f operating at gas flow of gas flow of gas flow off gas flow of gas flow of 6,000 acfm 6,000 acfm fi,004 acfm 6,Q0Q acfm (minimum) (minimum) 6,000 acfm minimum minimum minimum TO down TO down TO down {exhausting TO in (exhausting TO in (exhausting through bypass operation at through bypass operation at through bypass stack)with gas gas flow of stack)with gas gas flow of stack)with gas flow of 7,324 26,201 acfm flow of 7,324 26,201 acfm flow of 7,324 acfm (minimum) acfm (minimum) acfm minimum minimum minimum Only one OF Only one OF Only one OF Only one OF Six kettles in resin kettle in resin kettle in resin kettle in resin kettle in operation,not operation operation operation operation during the during the during the during the during the vacuum step vacuum step vacuum step vacuum step vacuum ste Plant MF-1 not Plant MF-1 not in o eration in operation b. Recordkeeping Requirements- During periods of control device(s)maintenance downtime, the Permittee shall record: i. the flow rates to the RTO and TO hourly; ii. the number of process kettles producing urea-formaldehyde resin operating in the vacuum strip step; Records in i. and ii. shall be recorded in a log book. The logbook(in written or electronic form) shall be kept on-site and made available to DAQ personnel upon request. 14. CONTROL AND PROHIBITION OF ODOROUS EMISSIONS -As required by 15A NCAC 2D .1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not operate the facility without implementing management practices or installing and operating odor control equipment sufficient to prevent odorous emissions from the facility from causing or contributing to objectionable odors beyond the facility's boundary. 15. 40 CFR Part 68 "ACCIDENTAL RELEASE PREVENTION REQUIREMENTS: RISK MANAGEMENT PROGRAMS UNDER THE CLEAN AIR ACT SECTION 112 r " -The Permittee shall comply with all applicable requirements in accordance with 40 CFR Part 68 including submitting a Risk Management Plan to EPA pursuant to 40 CFR 68.150 or as specified in 40 CFR 68.10. Pen-nit No. 04162R22 Page 12 16. Federal and State Rules Applicable to Sources Exempted from Air Permitting Requirements -Your facility is subject to the following federal and state rules: 40 CFR 63 -NESHAPlMACT -- Subpart ZZZZ -- Stationary Reciprocating Internal Combustion Engines which are applicable to some of the emission sources at your facility listed on the "Insignificant/Exempt Activities" list attached to this pen-nit. The purpose of this permit condition is to inform you of your compliance obligations to these applicable rules as they are enforceable. 17. LIMITATION TO AVOID 15A NCAC 2Q .0501 - Pursuant to 15A NCAC 2Q .0315 "Synthetic Minor Facilities," to avoid the applicability of 15A NCAC 2Q .0501 "Purpose of Section and Requirement for a Permit," as requested by the Permittee, facility-wide air pollutant emissions shall be less than the amounts tabulated below per consecutive 12-month period. Pollutant Emission Limit tons per consecutive 12-monthperiod) Volatile Organic Compounds(VOCs) 100 tons Carbon Monoxide 100 tons Formaldehyde and Methanol 10 tons each Sum of all Hazardous Air Pollutants (HAPs) 25 tons total a. Operations Restrictions - To ensure emissions do not exceed the limitations above, the following restrictions shall apply: i. Carbon monoxide, formaldehyde,methanol,total VOC and total HAP emissions shall be controlled by the regenerative thermal oxidizer(ID No. CD-1) and thermal oxidizer(ID No. CD-2) as described in the equipment list with downtime allowances as described in section (d)(v)below. b. Recordkeevina Requirements - The Permittee shall record monthly and total annually the following: i. the facility-wide carbon monoxide, formaldehyde, methanol,total VOC and total HAP emissions. The Pennittee shall keep each record on file for a minimum of three years. c. Reporting Requirements - Within 30 days after each calendar year,regardless of the actual emissions, the Pennittee shall submit the following to the Regional Supervisor, DAQ, in writing: i. the monthly carbon monoxide, formaldehyde, methanol,total VOC and total HAP emissions for the previous 12 months; and Permit No. 04152R22 Page 13 i. the total carbon monoxide, formaldehyde, methanol, total VOC and total HAP emissions for the previous 12 months. d. REOENRATIVE THERMAL OXIDIZER RTO AND THERMAL OXIDIZER(TO) REQUIREMENTS - Carbon monoxide, formaldehyde,methanol,total VOC and total HAP emissions shall be controlled by the regenerative thermal oxidizer(ID No. CD-1) and thermal oxidizer(ID No. CD-2) as described in the equipment list with downtime allowances as described in paragraph(d)(v)below. i. Inspection and Maintenance Requirements -To comply with the provisions of this permit and ensure that emissions do not exceed the regulatory limits,the Permittee shall perform periodic inspection and maintenance(I&M) as recorninended by the manufacturer. As a minimum,the Permittee shall perform an annual internal inspection of the primary heat exchanger and associated inlet/outlet valves to ensure structural integrity. ii. Recordkeeping Requirements- The results of all inspections and any variance from manufacturer's recommendations or from those given in this permit(when applicable) shall be investigated with corrections made and dates of actions recorded in a logbook. Records of all maintenance and monitoring activities shall be recorded in the logbook. The logbook(in written or electronic forin) shall be kept on-site and made available to DAQ personnel upon request. ii. RTO Monitoring Requirements-The Permittee shall ensure the proper performance of the RTO (ID No. CD-1)by monitoring the following operational parameters: A. The Permittee shall record the maximum temperature measured inside the unit but in the second half of the oxidizer(away from the flame zone) monthly. The allowable range is between 1,400 and 1,700 degrees Fahrenheit. B. The Permittee shall record the gas flowrate to the RTO daily. The maximum. allowable flowrate is 11,800 standard cubic feet per minute, except during periods of thermal oxidizer maintenance downtime. iv. TO Monitoring Requirements -The Permittee shall ensure the proper performance of the TO(ID No. CD-2)by monitoring the following operational parameters: A. The Permittee shall record the maximum temperature measured inside the unit but in the second half of the oxidizer(away from the flame zone) monthly. The minimnum temperature is 1,280 degrees Fahrenheit. B. The Permittee shall record the gas flowrate to the TO daily. The maximum allowable flowrate is 11,414 standard cubic feet per minute, except during periods of maintenance downtime. V. RTO and TO Downtime Allowance-As requested by the Permittee, emission sources listed in the permit equipment list controlled by the RTO (ID No. CDA) Permit No. 041 62R22 Page 14 or TO (ID No.CD-2)may operate uncontrolled according to the conditions listed below. This provision for operation of emission sources without their associated control equipment is limited only to satisfying maintenance requirements of the RTO and/or TO. However, under no circumstances shall facility-wide emissions exceed the Synthetic Minor limitations set forth above. A. Control Device Downtime RecordkeLepmg Requirements-The Pennittee shall keep records of the dates and number of hours for each maintenance downtime of the RTO and/or the TO. Included with these records shall be calculations for emissions resulting from each RTO and/or TO downtime and 12-month facility-wide totals for the Synthetic Minor pollutants(carbon monoxide, formaldehyde, methanol, total VOCs and total HAPs). B. Control Device Downtime Reporting Requirements-The Pennittee shall provide a written report to the Regional Supervisor, Division of Air Quality, within 7 days of conclusion of each control device maintenance downtime. This report shall contain a summary of all RTO and/or TO maintenance downtime over the previous twelve-month period and calculations showing facility-wide emissions of all Synthetic Minor pollutants over the previous 12-month period. 18. LIMITATION TO AVOID 15A NCAC 2D .0530 "PREVENTION OF SIGNIFICANT DETERIORATION" - In accordance with 15A NCAC 2Q .Q317, to comply with this permit and avoid the applicability of 15A NCAC 2D .0530 "Prevention of Significant Deterioration," as requested by the Pennittee, emissions shall be limited as follows: Affected Source(s) (Pollutant Em� Limit(Tons Per ConsecutiveY12-months Period) ;Facility Wide CO 100 Facility Wide VOC F1 00 Permit No. 04162R22 Page 15 B. GENERAL CONDITIONS AND LIMITATIONS 1. In accordance with G.S. 143-215.108(c)(1),TWO COPIES OF ALL DOCUMENTS, REPORTS TEST DATA MONITORING DATA NOTIFICATIONS REQUESTS FOR RENEWAL AND ANY OTHER INFORMATION REQUIRED BY THIS PERMIT shall be submitted to the: Acting Regional Supervisor North Carolina Division of Air Quality Raleigh Regional Office 3800 Barrett Drive Raleigh,NC 27609 919-791-4200 For identification purposes, each submittal should include the facility name as listed on the permit, the facility identification number, and the permit number. - 2. RECORDS RETENTION REQUIREMENT- In accordance with 15A NCAC 2D .0605, any records required by the conditions of this permit shall be kept on site and made available to DAQ personnel for inspection upon request. These records shall be maintained in a form suitable and readily available for expeditious inspection and review. These records must be kept on site for a minimum of 2 years, unless another time period is otherwise specified. 3. ANNUAL FEE PAYMENT-Pursuant to 15A NCAC 2Q .0203(a), the Permittee shall pay the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a timely manner will cause the DAQ to initiate action to revoke the permit. 4. EQUIPMENT RELOCATION - In accordance with 15A NCAC 2Q .0301, a new air permit shall be obtained by the Permittee prior to establishing, building, erecting,using, or operating the emission sources or air cleaning equipment at a site or location not specified in this permit. 5. REPORTING REQUIREMENT- In accordance with 15A NCAC 2Q .0309, any of the following that would result in previously unpermitted, new, or increased emissions must be reported to the Regional Supervisor, DAQ: a. changes in the information submitted in the application regarding facility emissions; b. changes that modify equipment or processes of existing permitted facilities; or c. changes in the quantity or quality of materials processed. If appropriate, modifications to the permit may then be made by the DAQ to reflect any necessary changes in the permit conditions. In no case are any new or increased emissions allowed that will cause a violation of the emission limitations specified herein. 6. In accordance with 15A NCAC 2Q .0309, this permit is subject to revocation or modification by the DAQ upon a determination that information contained in the application or presented in the support thereof is incorrect, conditions under which this permit was granted have changed, or violations of conditions contained in this permit have occurred. In Permit No. 04162R22 Page 16 accordance with G.S. 143-215.108(c)(1), the facility shall be properly operated and maintained at all times in a manner that will effectuate an overall reduction in air pollution, Unless otherwise specified by this permit, no emission source may be operated without the concurrent operation of its associated air cleaning device(s) and appurtenances. 7. In accordance with G.S. 143-215.108(c)(1),this permit is nontransferable by the Permittee. Future owners and operators must obtain a new air permit from the DAQ. 8. In accordance with G.S. 143-215.108(c)(1), this issuance of this permit in no way absolves the Permittee of liability for any potential civil penalties which may be assessed for violations of State law which have occurred prior to the effective date of this permit. 9. In accordance with G.S. 143-215.108(c)(1), this pen-nit does not relieve the Pennittee of the responsibility of complying with all applicable requirements of any Federal, State, or Local water quality or land quality control authority. 10. In accordance with 15A NCAC 2D .0605,reports on the operation and maintenance of the facility shall be submitted by the Permittee to the Regional Supervisor, DAQ at such intervals and in such form and detail as may be required by the DAQ. Information required in such reports may include,but is not limited to,process weight rates, firing rates, hours of operation, and preventive maintenance schedules. 11. A violation of any term or condition of this permit shall subject the Pennittee to enforcement pursuant to G.S. 143-215.114A, 143-215.114B, and 143-215.114C, including assessment of civil and/or criminal penalties. 12. Pursuant to North Carolina General Statute 143-215.3(a)(2), no person shall refuse entry or access to any authorized representative of the DAQ who requests entry or access for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out his official duties. Refusal of entry or access may constitute grounds for pen-nit revocation and assessment of civil penalties. 13. In accordance with G.S. 143-215.108(c)(1), this pen-nit does not relieve the Permittee of the responsibility of complying with any applicable Federal, State, or Local requirements governing the handling, disposal, or incineration of hazardous, solid, or medical wastes, including the Resource Conservation and Recovery Act (RCRA) administered by the Division of Waste Management. 14. PERMIT RETENTION REQUIREMENT- In accordance with 15A NCAC 2Q .0110, the Pennittee shall retain a current copy of the air permit at the site. The Permittee must make available to personnel of the DAQ, upon request, the current copy of the air permit for the site. 15. CLEAN AIR ACT SECTION 112 r REQUIREMENTS - Pursuant to 15A NCAC 213 .2100 "Risk Management Program," if the Pennittee is required to develop and register a risk management plan pursuant to Section 112(r) of the Federal Clean Air Act, then the Pennittee is required to register this plan with the USEPA in accordance with 40 CFR Part 68. Permit No. 04162R22 Page 17 16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I Part A Section 112(r)(1) of the Clean Air Act "Hazardous Air Pollutants - Prevention of Accidental Releases - Purpose and General Duty," although a risk management plan may not be required, if the Pennittee produces, processes, handles, or stores any amount of a listed hazardous substance, the Permittee has a general duty to take such steps as are necessary to prevent the accidental release of such substance and to minimize the consequences of any release. This condition is federally-enforceable only. 17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS - If emissions testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing to the DAQ in support of a permit application or to demonstrate compliance, the Permittee shall perform such testing in accordance with 15A NCAC 2D .2600 and follow all DAQ procedures including protocol approval, regional notification,report submittal, and test results approval. Additionally, in accordance with 15A NCAC 2D .0605, the Permittee shall follow the procedures for obtaining any required audit sample and reporting those results. Permit issued this the 4'h of June, 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION William T. Wike, Jr. Acting Regional Supervisor By Authority of the Environmental Management Commission Air Permit No. 04162R22 Pen-nit No. 04162R22 Page 18 ATTACHMENT to Permit No. 04162R22, June 4, 2020 Insignificant 1 Exempt Activities Exemption Source of Source of Source Regulation TAPS? Title V Pollutants? IES-M-40 - potassium hydroxide storage 2Q 0102 (g)(4) No Yes tank(10,000..gallon storage capacity)_____. 1 IES-M-96 - diesel fuel storage tank(2,000 2Q 0102 (g)(4) Yes Yes gallon capacity) IES-QCL - Quality control laboratory 12Q .0102 (g)(3)(B) Yes Yes IS-B-1 - natural gas-fired boiler(25 million 2Q 0102 (h)(I)(A) Yes Yes Btu per hour maximum heat input rate) IS-B-2 -natural gas-fired boiler(20.08 million Btu per hour maximum heat input 2Q .0102 (h)(1)(A) Yes Yes rate) I i IES-FP-1 -diesel-fired fire pump (255 2Q 0102 (h)(5) No No horsepower) (NESHAP Subpart ZZZZ) 1. Because an activity is exempted from being required to have a permit or permit modification does not mean that the activity is exempted from an applicable requirement or that the owner or operator of the source is exempted from demonstrating compliance with any applicable requirement. 2. When applicable, emissions from stationary source activities identified above shall be included in determining compliance with the permit requirements for toxic air pollutants under 15A NCAC 2D .1100 "Control of Toxic Air Pollutants" or 2Q .0711 "Emission Rates Requiring a Permit." 3. Sample permit conditions showing the regulatory requirements for exempt sources subject to NESHAP, NSPS, and NCAC rules may be found here: htt s://de .nc.gov/aqpermitconditions