Loading...
HomeMy WebLinkAboutAQ_F_1300101_20200522_ST_RvwLtr STATE �e AP ROY COOPER - Governor MICHAEL S.REGAN - p Secretary MICHAEL ABRACZINSKAS n D reaor NORTH CAROLINA Environmental Quality May22,2020 Mr. Frank Blythe, Member Manager Blythe Brothers Asphalt Company, LLC 1415 East Westinghouse Boulevard Charlotte,NC 28273 Subject: Particulate Matter and Visible Emissions Testing of the Asphalt Plant(ID No. ES-1)Performed on June 20, 2019 Blythe Brothers Asphalt Co., LLC-Concord Plant Concord, Cabarrus County,North Carolina Facility ID No. 1300101 Air Permit No. 07449RI I Tracking No. 2019-158ST Dear Mr. Blythe: Particulate matter and visible emissions testing was performed on the natural gas/No. 2 fuel oil/recycled No. 2 fuel oil/recycled No. 4 fuel oil-fired hot mix asphalt plant(ID No. ES-1) at Blythe Brothers Asphalt Co., LLC - Concord Plant located in Concord,Cabarrus County,North Carolina on June 20, 2019. The test was performed in accordance with the requirements of Air Permit No. 07449RI 1, Specific Condition and Limitation No. A.9. The Stationary Source Compliance Branch of the North Carolina Division of Air Quality has completed a review of the referenced test. It was determined that the testing is an acceptable demonstration of compliance. Please find enclosed a copy of the test review memorandum. If you have any questions with reference to this matter, please do not hesitate to contact Ms.Donna Cook or me at(704) 663-1699. Sincerely, `�en�se ,�cu�es Denise Hayes Environmental Engineer DFH:Ihe Enclosure c: MRO File hups://nceonnect.shuepoint.com/sites/DAQ-MRO/Counties/CABARRUS/00101/STK LET 20200522.docx North Carolina Department of Environmental Quality I Division of Air Quality Mooresville Regional Office 1610 East Center Avenue.Suite3011 Mooresville,North Carolina 28115 .wmraaxn DIVISION OF AIR QUALITY May 15, 2020 MEMORANDUM To: Bruce Ingle, Mooresville Regional Office Kk Fro m: James E. Hammond, Stationary Source Compliance Branch Subject: Blythe Brothers Asphalt Plant, LLC Concord, Cabarrus County, North Carolina Facility ID 1300101, Permit No. 07449R11 Total Particulate Matter and Visible Emissions Testing of Asphalt Plant ES-1 Performed June 20, 2019 by Integrity Air Monitoring, Inc. DAQ Tracking No. 2019-158st The Stationary Source Compliance Branch has reviewed the subject emissions testing. The results are acceptable and demonstrate that ES-1 was operating in compliance with the applicable particulate matter (PM) and visible emissions (VE) limits during the testing period. ES-1 is a counter-flow drum mix type, natural gas/No. 2 fuel oil/recycled No. 2 fuel oil/recycled No. 4 fuel oil-fired hot mix asphalt plant controlled by cyclone CD-1 installed in series with bagfilter CD-2. The maximum permitted capacity is 350 tons per hour(tph). 40 CFR 60 Subpart I Standards of Performance for Hot Mix Asphalt Facilities, 15A NCAC 2D .0506 Particulates From Hot Mix Asphalt Plants and 15A NCAC 2D .0521 Control of Visible Emissions apply to ES-1. 60 Subpart I limits filterable PM to 90 milligrams per dry standard cubic meter (mg/dscm) and limits VE to 20% opacity. 2D .0506 limits total PM based on actual production rate. The test results and emissions limits are tabulated below. Pollutant Results Emission Limit Standard Compliance 18.23 mg/dscm 90 mgldscm 60 Subpart I Indicated Filterable PM 0.0081 r/dsc 0.04 r/dsc 1.22lb/hr --- --- --- Condensible PM 0.29 Ib/hr -- --- --- Total PM 1.51 Ib/hr 60.0 Ib/hr 2D .0506 Indicated Visible Emissions 0.8% 20% Opacity 60 Subpart I Indicated Highest 6-min average The average production rate during testing reported by Blythe personnel was 337 tons per hour. The tested production rate is acceptable. For production rates >_300 tons/hr the total PM limit is 60.0 lb/hr. The test results demonstrate compliance with the applicable standards. If you have any questions regarding the results of this review, please contact me at(919) 707-8412 or james.hammond@ncdenr.gov. cc: Central Files, Cabarrus County IBEAM Documents— 1300101