Loading...
HomeMy WebLinkAboutAQ_F_0800102_20200522_CMPL_InspRpt NORTH CAROLINA DIVISION OF Washington Regional Office AIR QUALITY East Carolina Regional Solid Waste Landfill NC Facility ID 0800102 Inspection Report County/FIPS:Bertie/015 Date: 05/22/2020 Facility Data Permit Data East Carolina Regional Solid Waste Landfill Permit 08849/T08 1922 Republican Road Issued 10/27/2016 Aulander,NC 27805 Expires 9/30/2021 Lat: 36d 6.9563m Long: 77d 4.1832m Class/Status Title V SIC: 4953/Refuse Systems Permit Status Active NAILS: 562212/Solid Waste Landfill Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP/Title V Matt Einsmann,P.E. Shane Walker Matt Einsmann,P.E. MACT Part 63: Subpart AAAANSPS: Subpart WWW Environmental Manager Area President Environmental Manager (919)354-3227 (980)430-8511 (919)354-3227 Compliance Data Comments: A partial compliance evaluation(PCE)was completed for the facility via file review and facility contact interview. The PCE was conducted during the Inspection Date 05/22/2020 Covid-19 teleworking period. No issues were discovered. Inspector's Name Kurt Tidd Operating Status Operating Inspector's Signature: Compliance Code Compliance-inspection Action Code PCE On-Site Inspection Result Compliance Date of Signature: 05/22/2020 Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2018 6.64 3.21 33.71 13.92 123.92 6.64 6100.05 2017 6.62 3.22 33.65 13.44 123.69 6.62 6088.25 2016 7.24 3.47 36.15 12.98 135.08 7.24 6656.00 *Highest HAP Emitted inpounds) Five Year Violation History:None Performed Stack Tests since last FCE:None FACILITY LOCATION: This facility is located on 1922 Republican Road. From WaRO take Hwy 17 to Williamston and continue on Hwy 13/17 towards Windsor. Take a left onto Rte 308 towards Drew at the stoplight just 1 https://ncconnect.sharepoint.com/sites/DAQ-WaRO/FacilitiesBertieO8/00102/20200522.al 6.docx past the FORD dealership (on right will be a convenience store). Republican Road(SSR 1225) comes up on the right within 2 miles. Follow Republican Road for approximately 9 miles (will have to cross School Road) and the facility will be on the right. Take note that Republican Road will veer to the left approximately 1.1 miles before the facility. PROCESS DESCRIPTION: East Carolina Regional Solid Waste Landfill (ECRSWL) is a municipal solid waste landfill owned by Republic Services of North Carolina that receives municipal solid waste, construction/demolition debris, and non-hazardous special wastes. The landfill is lined with a geomembrane material. Landfill gas is collected and flared. FACILITY SUMMARY: A second flare (CD-Flare2)was installed and became operational on August 23, 2012. After the issue of T06, an appeal was filed and a Special Order of Consent became effective on August 6, 2012. In the Review for Permit T07, CISWI was determined to be non-applicable. Revised Permit 08849T07 was issued with an effective date of August 7, 2013 and expired February 28, 2017. Permit 08849T08 was issued on October 27, 2016 and expires on September 20, 2021. FACILITY SAFETY: A reflective safety vest is always required at the facility. A hardhat is required when in the landfill area. PERMITTED SOURCES: Emission Source ID Emission Source Control Device ID Control Device Description No. Description No. ES-01 Municipal solid waste CD-GCCS1 One landfill gas collection (NSPS,MACT) landfill and control system CD-Flarel One landfill gas-fired open flare (3000 scfin maximum flow rate) CD-Flare2 One landfill gas-fired open flare (3000 scfin maximum flow rate) Insignificant Sources: Emission Source ID No. Emission Source Description IES-04 Diesel engines for miscellaneous landfill support IES-05 Welding operations 2 https://ncconnect.sharepoint.com/sites/DAQ-WaRO/FacilitiesBertieO8/00102/20200522.al 6.docx IES-06 Diesel storage tank IES-07 Two leachate storage tanks INSPECTION OBSERVATIONS/RESULTS: On 05/22/2020 I conducted a Partial Compliance Evaluation (PCE) of ECRSWL by telephone with Matt Einsmann, the Environmental Manager. Mr. Einsmann stated that there have been no environmental issues at the facility. The flares are running all the time and there have been no issues with them. They continue to have elevated temperatures in some of the wellheads, RCO is currently working on variance for these wells. They have been working on removing as much gas and liquid as possible to keep the landfill operating correctly. Mr. Einsmann said that there has been a decrease in the rubbish due to the Outer Banks being shutdown due to the Covid 19 crisis. I reviewed the I Beam database and did not see any non-compliance issues. A partial compliance evaluation (PCE) was completed for the facility via file review and facility contact interview. The PCE was conducted during the Covid-19 teleworking period. No issues were discovered. 3 https://ncconnect.sharepoint.com/sites/DAQ-WaRO/FacilitiesBertieO8/00102/20200522.al 6.docx