Loading...
HomeMy WebLinkAboutAQ_F_0600049_20200219_CMPL_CAV-Rpt (4) OG000t1q �Fv NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY Banner's Cabinets, Inc. NC Facility ID 0600049 Compliance Assurance Visit(CAV)Report County/FIPS: Avery/0I I Date: 02/20/2020 Facility Data Permit Data Banner's Cabinets,Inc. Permit n/a 299 Watauga Street Issued n/a Newland,NC 28657 Expires n/a Lat: 36d 5.2130m Long: 81d 55.3850m Class/Status Registered SIC: 2434/Wood Kitchen Cabinets Permit Status Inactive NAICS: 33711 /Wood Kitchen Cabinet and Countertop Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Joseph Banner Joseph Banner Joseph Banner President President President (828)733-2031 (828)733-2031 (828)733-2031 Compliance Data Comments: CAV Date 02/19/2020 Inspector's Name Bob Graves Inspector's Signature: i3e L tiC^ L — Operating Status Operating Compliance Code Compliance—procedural requirements Date of Signature: a (Z,c ZO 2 o Action Code FCE On-Site CAV Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2010 0.1600 --- --- 5.59 --- 0.1600 350.00 2005 0.3400 --- --- 12.25 --- 0.3400 1636.40 *Highest HAP Emitted(in pounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested 1. Directions: - From Hwy 221,follow Hwy. 194 into Newland. Turn right at the light onto Hwy. 181. Follow Hwy. 181 one mile and turn left onto Watauga Street(in the curve). Go about one mile;facility is on the right. 2. Facility Overview: • Safe -Required Safety Equipment:None. There are no safety issues/concerns currently for this facility. • Discussion: On February 19,2020,I went to the facility to conduct a compliance assurance visit(CAV). I arrived and met with Mr.Joseph(Joe)Banner, Jr.,Plant Manager. Mr. Banner gave a tour of the facility and access to records. The facility's current hours of operation are Monday to Thursday, 10 hours per day, and Friday for 8 hours,48 hours per week, and have—35 employees. • Registration No. 0600049X00: On June 29,2016,the facility submitted a registration application. The registration became effective on October 21,2016. • 2019 Annual Throughputs(Estimates): i. Paint/Coatings: 963 gallons ii. Furnace(used for comfort heat only): 1221 gallons No. 2 fuel oil. iii. Propane: 1891 gallons. • Facility Contacts: correct as listed. • Facility Description: The Company manufactures custom high-quality cabinets and does not employ an assembly line as in a typical furniture factory. 3. Emission Source and Regulatory Review: Source Listing: CAV will divide facility into two parts: • Paint booths. • Woodworking permitted items. i. Paint/finish Booths Permitted Items-observed as follows: Paint/finish spray booths: The paint/finish booths are divided into 2 types of booths: filter-type controlled and positive pressure paint spray booths. All of the booths utilize a different type of paint/finish at any given time. Often only one type of paint/fmish will be used for a given job and not used again. The facility has a computerized paint system. This system saves on paint cost, since the facility can purchase smaller quantities of paint for specific projects and no longer have to purchase 55-gallon drums of paint. The facility has labeled all spray booths with their permit ID numbers. During the CAV, all observed filters were in good condition. I did not observe any VE's from the outside stacks. Spray Booths: ID No.From FhsComments/Observafions: Above: /Uncontrolled 01 [Filter-type Controlled [Not in operation. 02 Filter- type Controlled In operation, no visible emission(VE) from outside stacks. 03 Filter-type Controlled In operation,no visible emission(VE) from outside stacks. 04F Filter-type Controlled In operation, no visible emission(VE) from outside stacks. 05F Filter-type Controlled In operation, no visible emission(VE) from outside stacks. 06F Filter-type Controlled In operation,no visible emission(VE) from outside stacks. 07F Filter-type Controlled Not in operation, used for (positive pressure) located special projects only upstairs 08F Filter-type Controlled Not in operation, used for (positive pressure) located special projects only upstairs 09F Filter-type Controlled Not in operation, used for (positive pressure) located special projects only upstairs l OF Filter-type Controlled.Located Not in operation upstairs 1117 Filter-type Controlled. Located Not in operation upstairs 12F n/a Not installed ii. Wood working operation: Emission Source Control Control System Source ID Description System ID Description Fl, one bagfilter(2,000 square feet of filter area), WD I one wood dust collection system 13A1 j one simple cyclone(90 inches in diameter) --------------- Wood Dust Collection System(ID No. WD) This system consists of a bagfilter in series with a cyclone. The system typically vents back inside the building but does have the capability to vent outside. This wood dust collection system appears to be well maintained. i. The wood working operation equipment was observed in operation. I observed the bagfilter and cyclone in operation with no VE's. The cyclone is closed looped. The bagfilter rarely exhaust outside but does have the capability to do so. During the CAV,I observed the control system venting inside the building. • Record Keeping: The facility maintains a bagfilter and cyclone Inspection& Maintenance(I&M)logbook. During this CAV,the logbook was reviewed, and the documentation was found to be adequate and up to date. o I&M activities documented for 2019: • 12/2/2019—inspection and maintenance. • 11/19/2019—inspection and maintenance. • Control of Visible Emissions During this CAV, no visible emissions concerns were observed. Compliance is indicated. • Particulates from Fugitive Dust Emission Sources-During this CAV, no fugitive dust emissions concerns were observed. Compliance is indicated. • Odor: During this CAV,no odor concerns were observed. Compliance is indicated. • Other Sources: One electrically heated lumber kiln: I observed the kiln not in operation. In the past due to heating cost, this kiln was only used during the warmer(hot)months of the year(mainly summer). This kiln was last operated approximately 8 years ago. 4. Five Year Compliance History: No NOV's have been issued to this facility in the last 5 years. 5. Recommendation/Compliance Statement/Conclusion: • Recommendations: n/a • Conclusion/Compliance Statement: This facility appears to be in compliance with applicable air quality rules. This facility appears to be exempt from air permitting requirements per 2Q .0102 (e).