HomeMy WebLinkAboutAQ_F_0400036_20200310_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY B.V.Hedrick Gravel and Sand Co. -Lilesville Plant
NC Facility ID 0400036
Inspection Report County/FIPS:Anson/007
Date: 03/10/2020
Facility Data Permit Data
B.V.Hedrick Gravel and Sand Co.-Lilesville Plant Permit 06725/R05
Ingram Mountain Road-SR 1704 Issued 1/10/2014
Lilesville,NC 28091 Expires 12/31/2021
Lat: 34d 59.9820m Long: 79d 58.5360m Class/Status Small
SIC: 1423/Crushed And Broken Granite Permit Status Active
NAICS: 212313/Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Jason Conner Jeffrey Goodman Jason Conner
VP Land Management President VP Land Management
(828)686-3844 (828)277-7030 (828)686-3844
Compliance Data
Comments:
Inspection Date 03/10/2020
Inspector's Name Jeffrey Nelson
Inspector's Signature: �fh Operating Status Operating
( Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: I [a 12-QZ G On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 * HAP
2012 --- --- --- --- --
2008 --- --- --- --- -- --
*Highest HAP Emitted(in pounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
1) DIRECTIONS:
From FRO take Green Street to Gillespie and merge onto 195 BUS/301 S. Merge onto 301 S.,then take
a right onto NC 71. Continue to follow signs for NC 71. Merge onto HWY 74 W.and continue for 44
miles to Lilesville. In Lilesville,turn right at the flashing caution light onto 5' Street(at elementary
school).Follow 5'Street,and bear left to continue on Wall Street,go—Y2 mile to Stanback Ferry Road.
Turn right and go %mile to Ingram Mountain Road,turn right and go--1 mile. Proposed quarry site is
located on the left past gate.
2) SAFETY CONSIDERATIONS:
Currently there are no mining activities taking place at this facility. Standard DAQ safety gear will be
required if mining operations ever commence.
3) FACILILTY PROCESS AND DESCRIPTION:
This facility has never been built. The following description is what was proposed for the facility
originally. This facility is a 350 ton per hour throughput capacity crushing/screening operation that
processes granite aggregate products,using a primary jaw crusher with a capacity of 250 tons per hour.
The granite is mined from the quarry by drilling and blasting the material. Material from the quarry is
loaded into haulage trucks via power shovel or front end loader and conveyed to the primary crusher. A
grizzly feeder is utilized to remove undersize material, and oversize material is fed to the primary
crusher,which is described.as a jaw crusher, 250 tons per hour maximum throughput with a 6-inch
crusher setting. Discharged material from the crusher is sent to various secondary screens and a
secondary crusher in order to obtain various sizes of aggregate materials. The materials are stored in
piles on site, and loaded into trucks via front end loader for shipment to the customer. There is no
washing of product at this site. Particulate emissions are controlled by water sprays on the crusher,
screens,and conveyor transfer points.
There are no stationary reciprocating internal combustion engines at this site.
4) PERMITTED EMISSION SOURCES:
Non-MetalhlItnera)Processing Plant,350 tons per houutdlzing water Jnpprcs46n with no other control -
devices,xip4lntSgg+,
ES Crush Crushing Operations N/A N/A
Not installed
Screening Operations
ES Screen N/A N/A
Not installed
Convey ng Operations
ES Convey N/A N/A
Not installed
5) INSPECTION SUMMARY:
On 10 March 2020,I Jeff Nelson, of FRO DAQ conducted a compliance evaluation inspection of this
facility. This facility has not been constructed. I spoke to the facility contact,Jason Connor by
telephone. Mr. Conner informed me that there are currently no plans to construct anything at the site.
He also stated that the facility would retain the current air permit at this time.
6) PERMIT STIPULATIONS:
a) A.2 2Q .0304 PERMIT RENEWAL AND EMISSIONINVENTORY REQUIREMENT—Entire
facility subject. Submit permit renewal application and EI at least 90 days prior to permit expiration.
Appeared to be in compliance—The facility's next deadline for emissions inventory and permit renewal
will be in September of 2021 for the 2020 calendar year.
The other stipulations in this permit could not be evaluated for compliance as the facility has never been
constructed.
7) 112R Status
The facility does not store any of the listed chemicals above the threshold quantities, and is not required
to maintain a written Risk Management Plan (RMP).
8) Non-compliance History Since 2010
None.
9) Comments and Compliance Statement
B.V. Hedrick Gravel and Sand Co.—Lilesville Plant appeared to be in compliance with the
conditions of the facility's current air permit on 10 March 2020.
Pink Sheet: No comments.
/jln