HomeMy WebLinkAboutAQ_F_1400164_20200123_CMPL_InspRpt (4) 1HDo164 �41b
NORTH CAROLINA DIVISION OF Asheville Regional Office
AIR QUALITY Pine Mountain Finishing,Inc.
NC Facility ID 1400164
Inspection Report County/FIPS: Caldwell/027
Date: 02/03/2020
Facility Data Permit Data
Pine Mountain Finishing,Inc. Permit 01475/R18
2670 Alfred Hartley Road Issued 8/24/2017
Lenoir,NC 28645 Expires 7/31/2025
Lat: 35d 52.9420m Long: 8 1 d 28.7140m Class/Status Small
SIC: 2511 /Wood Household Furniture Permit Status Active
NAICS: 337122/Nonupholstered Wood Household Furniture Manufacturing Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact LScott
Contact Technical Contact SIP
MACT Part 63: Subpart 6J
Gary Scott Gary Scott
President President
(828)726-8002 (828)726-8002
Compliance Data
Comments:
Inspection Date 01/23/2020
Inspector's Name Richard Morris
Inspector's Signature: C2� �(1/2�/ Operating Status Operating
Compliance Code Compliance-inspection
_ Action Code FCE
Date of Signature: / J /' On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 *HAP
2016 0.2100 13.00 --- 0.0200 2077.00
2011 0.2500 --- --- 10.16 --- 0.0300 2684.00
* Highest HAP Emitted(in pounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date .Test Results Test Method(s) Source(s)Tested
Inspection Report:
1) Location: Pine Mountain Finishing,Inc. is located at 2670 Alfred Hartley Road in Lenoir,
NC. Caldwell County.
Directions: From Lenoir,take Hwy 321 south and turn left onto Mt. Herman Road(just
before Caldwell Community College). Travel approx. 1 mile to a four way stop sign and
turn left onto Freezer Locker Road, which turns into Alfred Hartley Road. The facility
will be on the right.
2)Description: Pine Mountain Finishing repairs/refinishes imported wood furniture, contracts
raw wood finishing, and refinishes furniture for antique dealers. This facility is permitted under
Air Permit No. 01475R18, effective from August 24, 2017,until July 31,2025. Last
compliance inspection conducted on January 29, 2019 by Richard Morris.
Current throughputs: 2020
Employees: 15-20
Hours: 36-40 hrs/wk, 51 wks/yr
3) Pre-inspection Conference: On January 23,2020, I, Richard Morris met with Gary Scott,
facility contact and co-owner. Based on my conversation with him, we discussed the following:
a) Verified the contacts based on FACFINDER printout.
b) We talked about the bagfilter system and record keeping. They use an outside
contractor to maintain and repair the bagfilter system monthly. I told them they could
use the invoice as their logbook to demonstrate inspection and maintenance log
keeping records.
4) Process Description
This facility repairs/refinishes imported wood furniture, contracts raw wood finishing,
and refinishes furniture for antique dealers.
5) Inspection: All booths are not labeled by number.
ID No. Description NYC Comments
1 One dry filter-type spray booth installed on 1 Observed in operation,applying a water-based
metal and wood finishing operations. stain.
2 One dry filter-type spray booth installed on 1 Observed in operation. This is currently a wash
metal and wood finishing operations. coat booth.
3 One dry filter-type spray booth installed on I Observed not in operation. This is currently a
metal and wood finishing operations. glaze booth. Filter needs changing
4 One dry filter-type spray booth installed on I Observed not in operation. This is currently a
metal and wood finishing operations sealer/toner booth.
5 One dry filter-type spray booth installed on I Observed t in operation. This is currently a
metal and wood finishing operations. lacquer booth.
6 One dry filter-type spray booth installed on I Observed in operation. This is currently a
metal and wood finishing operations. lacquer/shade booth. No VEs were observed
7 One dry filter-type spray booth installed on Y Observed not in operation. This is currently a
metal and wood finishing operations. lacquer booth.
8 One dry filter-type spray booth installed on y This booth is not installed.
metal and wood finishing operations.
ID No. Description Ni,P' Comments
Two wash-off tanks installed on metal and
9& 10 wood finishing operations. Y one tank has been removed.
These items are on site but 3 are not hooked up or
N/A Four bagfilters N used. One is used for the woodworking company
inside the building. Records are maintained
monthly.
This boiler is listed on an attachment to the permit
as exempt/insignificant activity. This item was
Il One No.2 oil-fired boiler(2.6 MBtu/I-Iour) N
only used for heating in the winter;however,it is
currently disabled and not operational. Mr.
Chandler stated that it has not operated in the past
three years. Disconnected.
7 drying ovens(5 with small electric elements
a Gb -r--'''en' These items are listed
and 2 used for air drying l None of the g only).I3 N on an attachment to the permit as exempt/
electric elements were operating during insignificant activities. None operating today.
inspection.
ES-2: I inspected the woodworking operation and found good connections to duct work from
collection system. I looked at the bagfilter exhaust and observed no visible emissions. They
have installed a new trailer dust collection system. Sawdust drops from the cyclone into the top
of trailer where it is augured to the front of the trailer. This is a good improvement over the
previous collect ion system. I did not observe any dust accumulating around the sides of the
trailer. The cyclone was operating with 5% VE.
6) Stipulation Review:
A.3 2D.0512—Particulate control from Wood Finishing Plants. In compliance. All
sources appeared to be adequately controlled.
A.4 2D.0515 —Particulate Control from Misc. Industrial Processes. In compliance.
All spray booths appeared to have adequate control.
A.5 2D.0521 —Visible.Emissions. In compliance. I did not observe any visible
emissions during my inspection.
A.6 2D.0524—NSPS (furniture finishing). In compliance. This facility does not paint
metal.
A.8 2D.0540—Fugitive Dust Control. In compliance. I did not observe excess dust
from haul roads or other fugitive dust sources..
A.9 2D.0611 —Fabric Filter Requirements.
a. Inspection and Maintenance Requirements - To comply with the
provisions of this permit and ensure that emissions do not exceed the
regulatory limits, the Permittee shall perform, at a minimum, an annual
(for each 12-month period following the initial inspection) internal
inspection of each bagfilter system. In addition, the Permittee shall
perform periodic inspections and maintenance as recommended by the
equipment manufacturer.
b. Recordkeeping Requirements - The results of all inspections and any
variance from manufacturer's recommendations or from those given in this
permit (when applicable) shall be investigated with corrections made and
dates of actions recorded in a logbook. Records of all maintenance
activities shall be recorded in the logbook. The logbook (in written or
electronic format) shall be kept on-site and made available to DAQ
personnel upon request.
In compliance. Logbook last monthly entry was recorded on 11/2019. Last
annual performed on 11/15/2019.
A.10 GACT Subpart HHHHHH—Miscellaneous Surface Coating that utilize coatings
that contain compounds of chromium (Cr), lead (Pb), manganese (Mn), nickel
(Ni), or cadmium(Cd)to coat a plastic and/or metal substrate on a part or
product. In compliance. This facility uses no coatings that contain any of the
heavy metals.
A.I I 2D.1806—Odors. Permittee shall not operate the facility without implementing
management practices or installing and operating odor control equipment
sufficient to prevent odorous emissions from the facility from causing or
contributing to objectionable odors beyond the facility's boundary. In
compliance. I did not detect any odors before entering property.
A.12 2Q.0711 —TAP Emission Limit Requirement. Appeared in compliance. Last
permit review indicates compliance.
A.13 2Q.0803 —Exclusionary Rule Requirements. In compliance. Last annual report
indicated compliance. Last submittal was received on 2/26/19.
A.14 Subpart JJJJJJ. In compliance. Facility states they are not subject to this rule.
Boiler is disconnected.
7) Reporting requirements:
Annual report due by March 1 for VOC. Received by ARO on 2/26/19 and
demonstrated compliance.
8) 112R Status: Based on the facility's inventory, it was decided that they are not subject to
112R reporting requirements
I
9) Comments and Compliance Statement:
Pine Mountain Finishing appeared in compliance with all permit conditions on January
23, 2020.
I
10) 5 Year Compliance History:
There have been no documented violations at this facility in the past 5 years.
/rem
I