HomeMy WebLinkAboutAQ_F_0200018_20191126_CMPL_CAV-Rpt NORTH CAROLINA DIVISION OF Mooresville Regional Office
AIR QUALITY ARGOS USA LLC-Taylorsville Plant
NC Facility ID 0200018
Inspection Report County/FIPS:Alexander/003
Date: 11/26/2019
Facility Data _ Permit Data
ARGOS USA LLC-Taylorsville Plant Permit n/a
79 Railroad Street Issued n/a
Taylorsville,NC 28681 Expires n/a
Lat:35d 55.3800m Long: 81d 10.0210m Class/Status Permit Exempt
SIC: 3273/Ready-Mixed Concrete Permit Status Inactive
NAICS: 32732/Ready-Mix Concrete Manufacturing Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Larry Palmer Steve Simonsen Steve Simonsen
Operations Manager Environmental Manager Environmental Manager
(704)872-5901 (678)392-2130 (678)392-2130
Compliance Data
Comments:
Inspection Date 11/26/2019
/ Inspector's Name Matthew Hill
Inspector's Signature: /� Operating Status Operating
/// Compliance Code Compliance-inspection
// Action Code FCE
Date of Signature: I zly/Z b t 9 ' � On-Site Inspection Result Compliance
Total Actual emissions in ((TONS/YEAR:
TSP S02 NOX VOC CO PM10 *HAP
2014 0.1430 --= --- --- -=- 0.0690 0.0248
2009 1.67 --- --- --- --- 0.5000 0.1440
Highest HAP Emitted inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
Argos USA,LLC—Taylorsville Plant
November 26,2019
Page 2
Type Action: _Full Compliance _Partial Compliance —Complaint X Other: Compliance Assurance,
Evaluation Evaluation/Reinspection Investigation Visit
Data Tracking: X Date submitted for initial review 11/26/2019 _IBEAM WARNING/OB,NOD,NOV,NRE,
X IBEAM Inspection,list date inspected X IBEAM Document
X IBEAM Inspection,list date draft is submitted X IBEAM LAT/LONG,Facility Locked
X IBEAM Inspection,pollutants/programs checked X IBEAM LAT/LONG,Coordinates checked
IBEAM Complaint
X IBEAM Planning,Next Inspection Date l l/l/2021
Directions: From Mooresville travel I-77 North to I-40 West.Take 1-40 West to NC Highway 90 (Exit
148). Take right off Exit ramp and travel 0.5 miles and take right onto NC Highway 90 West towards
Taylorsville.Travel approx. 16.2 miles on Hwy 90 West into Taylorsville and take right onto Railroad
Street.Facility is on the right.
Safety Equipment: Steel toe shoes,hard hat, safety glasses, and safety vest are required.
Safety Issues: Inspector should be cautious of vehicle traffic at this facility.
Lat/Long Coordinates: The facility coordinates were checked in IBEAM and are locked. The facility
coordinates were checked using the NC DAQ Facility Finder tool, and the coordinates are correct. No
changes are needed.
Email Contacts: The emails for the facility, authorized,technical, and invoice contacts were verified by
Mr.Jeremy Sigmon,Plant Manager. No changes to the email addresses in IBEAM are needed.
Inspection:
1. The purpose of this site visit was to conduct a routine air quality compliance assurance visit.This
facility is a truck mix concrete batch plant rated at 100 cubic yards per hour. This company
operates 10 hours per day,two to three days per week, 50 weeks per year. The operational
schedule,of this facility is dependent upon weather conditions and customer orders.The plant has
slowed production drastically in the last few months of 2019 due to increased need for employees
and work in the Statesville and Hickory facilities. Mr.Jeremy Sigmon,Plant Manager
accompanied me during the visit.
2. Facility Contact Information:
During the inspection,I verified the facility contact information in IBEAM.
3. Compliance history file review:
No problems have been noted in the last five years by DAQ prior to this visit. The compliance
assurance visit is discussed in the following section.
Argos USA,LLC—Taylorsville Plant
November 26,2019
Page 3
4. Source Observations:
This facility has one bagfilter(170 square feet of filter area)installed on one flyash storage silo(57
tons capacity); one bagfilter(125 square feet of filter area) installed on a cement storage silo (145
tons capacity); and one bagfilter(18 square feet of filter area) installed on a concrete weigh hopper
(3500 pounds maximum) and a truck loadout. These sources were not in operation during the
compliance assurance visit. No tanker truck unloading of cement or fly ash into the silos was
occurring.
5. Exemption Qualification:
Since this facility is a truck mix concrete batch plant with controls on the truck loadout,they can
produce up to 78,586 cubic yards of concrete a year and still conservatively qualify for exemption.
The records provided during the permit exemption process showed that the concrete production was
15,249 cubic yards in 2016.The production was 6,196.25 cubic yards in 2017, and 6,355 cubic yards
in 2018. Mr. Sigmon indicated that production during 2016 was abnormally high due to a large job
that year. In addition, no changes or modifications have been made to the equipment since the last
visit. Therefore,the facility still qualifies for exemption.
6. NSPS/NESHAP Review
The facility has no generators, boilers, fire pump engines, or gasoline storage tanks.
7. Compliance determination:
The facility is doing weekly, monthly and annual bagfilter inspections and maintenance. Based on
my observations, this facility appeared to be in compliance with the air quality rules (2D .0515-
particulates from miscellaneous industrial processes;2D .052 1-visible emissions;2D .0535-excess
emissions and 2D .0540-fugitive dust emissions)at the time of the visit. The compliance assurance
visit checklist is attached on pages 4-5.
MWH:lhe
c: MRO File
https://neconnect.sharepoint.com/sites/DAQ-MRO/Counties/ALEXANDER/0001'8/fNSPECT 20191126 CAV.docx
Argos USA,LLC—Taylorsville Plant
November 26,2019
Page 4
-Compliance Assurance-Visit Checklist rev.11/03/16
Facility Name: Argos USA LLC-Taylorsville Plant .
Physical Site Address: 79-Railroad Street
City: Taylorsville,NC Zip Code: 28681 County: Alexander
Facility Contact: Larry Palmer Title: Operations Manager
Phone No.: 704-400-0533
Mailing Address: 2289 Salisbury Road,Statesville,NC 28625
Facility Contact Email Address: Ipalmer@argos-us.com
Is the facility contact the person that you met? If not,fill outthe following:
Contact Name: JeremySigmon Title: Plant Manager
Phone No.:
Mailing Address:
Email Address:
Safety requirements:safety shoes(yes)--safety glasses(yes)-hearing protection(no)-hardhat(yes)
other(please describe):
Normal operating schedule(hr/d,d/wk,wk/yr): 10 hours per day,2-3 days per week
Opacity(%)-indicate any non-zero opacities•observed: None
Odors-indicate if any objectionable odors were detected beyond the property boundary: None
Fugitive dust-indicate whether fugitive dust-was observed leaving property boundary: None
Since last inspection,have there been any changes in equipment or operation? None
Throughput and/or fuel usage with units: 6196.25 cubic yards(2017),6355 cubic yards(2018)
Control device(s)(list): Three Bagfilters
Properly operated and'maintained? Yes
For a permit exempt facility found to be improperly operating or maintaining plant equipment:1)provide compliance
assistance as a first option;2)initiate enforcement action in egregious/repeat cases;3)re-evaluate facility's emissions using a
more representative control efficiency/emission factor;4)If re-evaluated actual emissions result in a classification/registration
change,follow enforcement guidelines for operation,without a permit/registration;and 5)increase compliance visit frequency.
Notes or calculation space.
Permit Exemption:
•Actual emissions from the previous year(s)(and projected actual)of PM10,S02,NOx,VOCs,CO,HAPs,and TAPs
are each'<5 tpy and whose actual total aggregate of these emissions are<10 tpy
•Can be subject to 40 CFR Part 63(MACT or GACT)and 40 CFR Part 60(NSPS)
•Cannot be subject to Rule 2Q.0315(Synthetic Minor Facilities)or 2Q.0500(Title V Procedures)
Notes or calculation space-
Concrete Batch Plant-'
Actual annual production(cV/yr): 6355(2018)
Truck mix or Central mix plant?: Truck Mix (circle.one) Controls? Baghouse