HomeMy WebLinkAboutAQ_F_0400053_20210330_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY Boggs Materials,Inc.-Pee Dee Asphalt Plant
NC Facility ID 0400053
Inspection Report County/FIPS:Anson/007
Date: 04/07/2021
Facility Data Permit Data
Boggs Materials,Inc.-Pee Dee Asphalt Plant Permit 09882/R04
481 Pee Dee Road Issued 11/17/2017
Lilesville,NC 28091 Expires 10/31/2025
Lat: 34d 56.0450m Long: 79d 53.2263m Class/Status Synthetic Minor
SIC: 2951/Paving Mixtures And Blocks Permit Status Active
NAILS: 324121 /Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Tim Melton Tim Melton Tim Melton NSPS: Subpart I
Asphalt Plant Manager Asphalt Plant Manager Asphalt Plant Manager
(704)634-3491 (704)634-3491 (704)634-3491
Compliance Data
Comments: n //
YIy,IT Inspection Date 03/30/2021
Inspector's Name Mike Thomas
Inspector's Signature: Operating Status Operating
ljlic � n K%`� Compliance Status Compliance-inspection
/''(�,j�2 !�+ e Action Code FCE
Date of Si• nature: Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 * HAP
2016 --- --- --- --- --- --
2011 2.00 3.69 2.60 2.00 5.50 1.10 262.00
* Highest HAP Emitted inpounds)
Five Year Violation History:
Date Letter Tvue Rule Violated Violation Resolution Date
02/17/2017 NOV 2D .1100 Control of Toxic Air Pollutants 02/09/2017
02/17/2017 NOV 2Q.0315 Synthetic Minor Facilities 02/09/2017
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
I. Location/Directions: From FRO,take Green St. and at the roundabout continue onto Gillespie St.,
continue for 1.3 miles and merge onto NC 87 N and continue for 0.21 miles and take the exit for US401
south and continue 37 miles towards Wagram;just outside of Wagram take a right onto NC144 and
drive 12 miles through Laurel Hill. Just past Laurel Hill,take US74 west—36 miles into Anson County.
Less than 1 mile into Anson County,turn south(left)onto NC 145. After 0.3 miles,turn left onto
County Road 1842 at the Boggs Paving sign; it later becomes Pee Dee Road. The plant is on left just
past the railroad tracks.
IT. Safety Considerations: Standard FRO safety gear.Main concern is truck traffic.
III. Facility and Process Description
Boggs Materials,Inc. -Pee Dee Asphalt Plant is a portable continuous drum-type hot mix asphalt plant with a
screen and feed system for adding recycled asphalt pavement(RAP).
IV. Permitted Emission Sources:
Portable uritinu6us Drum Type IIot 1VIix Asp t 1ti�Plabt,3$5 tons per hour capacity,cans Ung of:
Natural gas/No. 2 fuel oil/No. 2 recycled Horizontal cyclone
ES 1 CD2 (120 inch wide,fuel oil/No.4 fuel oil/No. 4 recycled fuel : In series with in series with
108 inch high)
(NSPS) oil-fired aggregate drum dryer/mixer
(120 mmBtu/hr maximum heat input rate) CDl baghouse
(12,390 square feet of filter area)'',
ES3 Surge bin
F1 Truck loadout operation N/A N/A
ES4 Lime Silo CD3 Bagfilter
60 Ton Capacity
265 square feet of filter area
t{ccled e. ent System193 forts per hour capac ennsisiol
F2 Three RAP conveyors N/A N/A
F3 Two RAP screens N/A N/A
V. Inspection Summary:
On 30 March 20211 Mike Thomas of FRO DAQ,conducted a compliance inspection of this facility. This
plant has not operated since 2011. 1 verified that all permitted equipment,dryer,surge bin,silo,conveyor,and
screens have been removed from the property.Before conducting the inspection,I called the facility contact,
Tim Melton and inquired if there were any plans to reopen the facility. Mr.Melton stated that there were no
plans to reopen the plant in the near future.
VI. 112R Status
This facility does not store any of the listed chemicals above the threshold quantities, and therefore is not
required to maintain a written Risk Management Plan(RMP).
VII. Non-compliance History Since 2010
2/17/17 NOD for late reporting.
2/25/14 NOD for late reporting.
VIII. Comments and Compliance Statement
Boggs Materials,Inc. -Pee Dee Asphalt Plant appeared to be in compliance with the specific
conditions found in the facility's current Air Permit on 30 March 2021.
Pink Sheet Notes:None
/mst