HomeMy WebLinkAboutAQ_F_0400053_20210330_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Boggs Materials,Inc.-Pee Dee Asphalt Plant NC Facility ID 0400053 Inspection Report County/FIPS:Anson/007 Date: 04/07/2021 Facility Data Permit Data Boggs Materials,Inc.-Pee Dee Asphalt Plant Permit 09882/R04 481 Pee Dee Road Issued 11/17/2017 Lilesville,NC 28091 Expires 10/31/2025 Lat: 34d 56.0450m Long: 79d 53.2263m Class/Status Synthetic Minor SIC: 2951/Paving Mixtures And Blocks Permit Status Active NAILS: 324121 /Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Tim Melton Tim Melton Tim Melton NSPS: Subpart I Asphalt Plant Manager Asphalt Plant Manager Asphalt Plant Manager (704)634-3491 (704)634-3491 (704)634-3491 Compliance Data Comments: n // YIy,IT Inspection Date 03/30/2021 Inspector's Name Mike Thomas Inspector's Signature: Operating Status Operating ljlic � n K%`� Compliance Status Compliance-inspection /''(�,j�2 !�+ e Action Code FCE Date of Si• nature: Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 * HAP 2016 --- --- --- --- --- -- 2011 2.00 3.69 2.60 2.00 5.50 1.10 262.00 * Highest HAP Emitted inpounds) Five Year Violation History: Date Letter Tvue Rule Violated Violation Resolution Date 02/17/2017 NOV 2D .1100 Control of Toxic Air Pollutants 02/09/2017 02/17/2017 NOV 2Q.0315 Synthetic Minor Facilities 02/09/2017 Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested I. Location/Directions: From FRO,take Green St. and at the roundabout continue onto Gillespie St., continue for 1.3 miles and merge onto NC 87 N and continue for 0.21 miles and take the exit for US401 south and continue 37 miles towards Wagram;just outside of Wagram take a right onto NC144 and drive 12 miles through Laurel Hill. Just past Laurel Hill,take US74 west—36 miles into Anson County. Less than 1 mile into Anson County,turn south(left)onto NC 145. After 0.3 miles,turn left onto County Road 1842 at the Boggs Paving sign; it later becomes Pee Dee Road. The plant is on left just past the railroad tracks. IT. Safety Considerations: Standard FRO safety gear.Main concern is truck traffic. III. Facility and Process Description Boggs Materials,Inc. -Pee Dee Asphalt Plant is a portable continuous drum-type hot mix asphalt plant with a screen and feed system for adding recycled asphalt pavement(RAP). IV. Permitted Emission Sources: Portable uritinu6us Drum Type IIot 1VIix Asp t 1ti�Plabt,3$5 tons per hour capacity,cans Ung of: Natural gas/No. 2 fuel oil/No. 2 recycled Horizontal cyclone ES 1 CD2 (120 inch wide,fuel oil/No.4 fuel oil/No. 4 recycled fuel : In series with in series with 108 inch high) (NSPS) oil-fired aggregate drum dryer/mixer (120 mmBtu/hr maximum heat input rate) CDl baghouse (12,390 square feet of filter area)'', ES3 Surge bin F1 Truck loadout operation N/A N/A ES4 Lime Silo CD3 Bagfilter 60 Ton Capacity 265 square feet of filter area t{ccled e. ent System193 forts per hour capac ennsisiol F2 Three RAP conveyors N/A N/A F3 Two RAP screens N/A N/A V. Inspection Summary: On 30 March 20211 Mike Thomas of FRO DAQ,conducted a compliance inspection of this facility. This plant has not operated since 2011. 1 verified that all permitted equipment,dryer,surge bin,silo,conveyor,and screens have been removed from the property.Before conducting the inspection,I called the facility contact, Tim Melton and inquired if there were any plans to reopen the facility. Mr.Melton stated that there were no plans to reopen the plant in the near future. VI. 112R Status This facility does not store any of the listed chemicals above the threshold quantities, and therefore is not required to maintain a written Risk Management Plan(RMP). VII. Non-compliance History Since 2010 2/17/17 NOD for late reporting. 2/25/14 NOD for late reporting. VIII. Comments and Compliance Statement Boggs Materials,Inc. -Pee Dee Asphalt Plant appeared to be in compliance with the specific conditions found in the facility's current Air Permit on 30 March 2021. Pink Sheet Notes:None /mst