Loading...
HomeMy WebLinkAboutAQ_F_2000121_20210309_CMPL_Fac-Ltr Cl 0 March 9, 2021 RECEIVED MAR 1 5 2021 Mr. Brendan Davey PE Division of Air Quality Regional Air Quality Supervisor Asheville Regional Office North Carolina Department of Environmental Quality M F/E 2090 US Highway 70 Swannanoa, North Carolina 28778 RE: Add KPI-JCI Mobile Screening Unit For Riverbend Construction Start-up and Updated Equlipment List and Current Configuration Flow Diagram Air Permit No. 8786R08 Facility ID# 2000121 Cherokee County Quarry •- Harrison Construction Company Division of APAC Atlantic Inc. Cherokee County, Murphy, North Carolina Dear Mr. Davey, As per Air Permit No. 8786R08, A., Specific Conditions and Limitations, 6, a. Please consider this letter written notification Riverbend Construction Services LLC, a contractor for Harrison Constructions has added KPI-JCI Mobile Screening Unit consisting of equipment No.F-3 Feeder, SC-6 Screen, C-25 Belt, C-26 Belt, C-27 Belt, C-28 Belt and C-29 Belt. Riverbend Construction did not notify Harrison Construction of the new screening unit, the Unit was delivered to the sight on approximately December 16, 2020. 1 can only assume start-up was the same day. NSPS testing will be performed within 60 days of achieving maximum production but no later than 180 days. Start-up December 16, 2020 P.O. Box 449 (28744) • 136 Rock Quarry Road • Franklin, NC 28734 •Tel: 828-524-5455 • Fax: 828-524-9314 A Division of APAC-Atlantic, Inc. An Equal Opportunity Employer iI aw Enclosed with this letter are 2 copies of the updated current configration FLOW CHART and EQUIPMENT LIST. If you have any questions or need more information, please call me at 828-421-0448, e-mail at dlmason@harrisoncc.com or write to me c/o Harrison Construction Company., P.O. Box 449, Franklin, NC 28744. Thank you. Sin �elly, (� Do Aso ° Envir nmental Compliance P.O. Box 449(28744) • 136 Rock Quarry Road • Franklin, NC 28734•Tel:828-524-5455• Fax: 828-524-9314 A Division of APAC-Atlantic, Inc. An Equal Opportunity Employer Riverbend Construction Services LLC Mobile Plant-Equipment List-Revised 3-5-2021 Equip ID Equipment Description Mfg Date NSPS Status NSPS Test Comments CR-3 KPI-JCI Jaw Crusher 2017 Yes 7-16-2018 Water Spray CR-1 Metso LT-106Jaw Crusher 2017 Yes 5-28-2019 Water Spray CR-8 Metso LT-300 Cone Crusher 2017 Yes 7-16-2018 Water Spray CR-10 Metso LT-220 Cone Crusher 2018 Yes 5-28-2019 Water Spray Screens SC-1 5x16 DD Screen 2016 Yes 7-16-2018 SC-2 Sx16 DD Screen 2018 Yes 5-28-2019 SC-3 5x16 DD Screen 2018 Yes 5-28-2019 SC-4 Metso Wash Screen 2018 N/A Wet Process SC-6 KPI-JCI 5x16 DD Screen Yes Conveyors C-1 42" Conveyor 2018 Yes 7-16-2018 Water Spray C-1A 42" Conveyor 2018 Yes 5-28-2019 Water Spray C-2A 36" Conveyor 2018 Yes 5-28-2019 Water Spray C-4 36" Conveyor 2018 Yes 5-28-2019 Water Spray C-5 36" Conveyor 2017 Yes 7-16-2018 C-6 42" Conveyor 2017 Yes 7-16-2018 Water Spray C-7 42" Conveyor 2017 Yes 7-16-2018 C-8 48" Conveyor 2018 Yes 7-16-2018 C-8A 48" Conveyor 2018 Yes 5-28-2019 C-10 42" Conveyor 2018 Yes 7-16-2018 C-10A 42" Conveyor 2018 Yes 5-28-2019 C-12 48" Conveyor 2018 Yes 7-16-2018 Water Spray C-12A 48" Conveyor 2018 Yes 5-28-2019 Water Spray C-13 24" Conveyor 2018 Yes 7-16-2018 Water Spray C-13A 24" Conveyor 2018 Yes 5-28-2019 Water Spray C-14W 54" Conveyor 2018 N/A Wet Process C-15W 48" Conveyor 2018 N/A Wet Process C-16W 24" Conveyor 2018 N/A Wet Process C-17W 24" Conveyor 2018 N/A Wet Process C-18W 24" Conveyor 2018 N/A Wet Process C-19 36" Conveyor 2017 Yes 5-28-2019 C-20 36" Conveyor 2018 Yes 5-28-2019 C-21 42" Conveyor 2018 Yes 5-28-2019 C-22 54" Conveyor 2018 Yes 5-28-2019 Water Spray C-23 30" Conveyor 2018 Yes 5-28-2019 Water Spray C-24 30" Conveyor 2018 Yes 5-28-2019 Water Spray C-25 36" Conveyor 2020 Yes TBA Water Spray C-26 48" Conveyor 2020 Yes TBA Water Spray C-27 36" Conveyor 2020 Yes TBA Water Spray C-28 56" Conveyor 2020 Yes TBA C-29 48" Conveyor 2020 Yes TBA Water Spray ST-1 36" Conveyor 2017 Yes 7-16-2018 Wet Process ST-2 36" Conveyor 2017 Yes 7-16-2018 Water Spray ST-3 36" Conveyor 2017 Yes 7-16-2018 Water Spray ST-4 36" Conveyor 2018 Yes 5-28-2019 Water Spray ST-5 36" Conveyor 2018 Yes 5-28-2019 Water Spray ST-6 36" Conveyor 2018 Yes 5-28-2019 Water Spray ST-7 36" Conveyor 2017 Yes 7-16-2018 Water Spray Feeders F-1 48" x 120" Grizzly Feeder 2018 Yes 7-16-2018 F-IA 42" x 120" Grizzly Feeder 2017 Yes 5-28-2019 F-2 42" x 96"Grizzly Feeder 2017 Yes 7-16-2018 F-3 48'x 120' Belt Feeder 2020 Yes TBA RIVEReENU CONSTRUCrIOW CURRENT SLANT Cogp-t & uKATjoKl AT H�kRlsoNS CHEWFE r'o, ROUXI G '*S7 ro e -7 b STO�4' ASHE Fzs� sc V cP's CG}t r r c6 C7 04 ciz _� & ciz RIVER13ENU COWSTRLYCTION RA T FI& RAT ]] C 25 ®® Fl C� sc 6 cit c2 �� Riverbend Construction Services LLC Mobile Plant-Equipment List-Revised 3-5-2021 Equip ID Equipment Description Mfg Date NSPS Status NSPS Test Comments CR-3 KPI-JCI Jaw Crusher 2017 Yes 7-16-2018 Water Spray CR-1 Metso LT-106Jaw Crusher 2017 Yes 5-28-2019 Water Spray CR-8 Metso LT-300 Cone Crusher 2017 Yes 7-16-2018 Water Spray CR-10 Metso LT-220 Cone Crusher 2018 Yes 5-28-2019 Water Spray Screens SC-1 5x16 DD Screen 2016 Yes 7-16-2018 SC-2 5x16 DD Screen 2018 Yes 5-28-2019 SC-3 5x16 DD Screen 2018 Yes 5-28-2019 SC-4 Metso Wash Screen 2018 N/A Wet Process SC-6 KPI-1CI 5x16 DD Screen Yes Conveyors C-1 42" Conveyor 2018 Yes 7-16-2018 Water Spray C-IA 42" Conveyor 2018 Yes 5-28-2019 Water Spray C-2A 36" Conveyor 2018 Yes 5-28-2019 Water Spray C-4 36" Conveyor 2018 Yes 5-28-2019 Water Spray C-5 36" Conveyor 2017 Yes 7-16-2018 C-6 42" Conveyor 2017 Yes 7-16-2018 Water Spray C-7 42" Conveyor 2017 Yes 7-16-2018 C-8 48" Conveyor 2018 Yes 7-16-2018 C-8A 48" Conveyor 2018 Yes 5-28-2019 C-10 42" Conveyor 2018 Yes 7-16-2018 C-10A 42" Conveyor 2018 Yes 5-28-2019 C-12 48" Conveyor 2018 Yes 7-16-2018 Water Spray C-12A 48" Conveyor 2018 Yes 5-28-2019 Water Spray C-13 24" Conveyor 2018 Yes 7-16-2018 Water Spray C-13A 24" Conveyor 2018 Yes 5-28-2019 Water Spray C-14W 54" Conveyor 2018 N/A Wet Process C-1SW 48" Conveyor 2018 N/A Wet Process C-16W 24" Conveyor 2018 N/A Wet Process C-17W 24" Conveyor 2018 N/A Wet Process C-18W 24" Conveyor 2018 N/A Wet Process C-19 36" Conveyor 2017 Yes 5-28-2019 C-20 36" Conveyor 2018 Yes 5-28-2019 C-21 42" Conveyor 2018 Yes 5-28-2019 C-22 54" Conveyor 2018 Yes 5-28-2019 Water Spray C-23 30" Conveyor 2018 Yes 5-28-2019 Water Spray C-24 30" Conveyor 2018 Yes 5-28-2019 Water Spray C-25 36" Conveyor 2020 Yes TBA Water Spray C-26 48" Conveyor 2020 Yes TBA Water Spray C-27 36" Conveyor 2020 Yes TBA Water Spray C-28 56" Conveyor 2020 Yes TBA C-29 48" Conveyor 2020 Yes TBA Water Spray ST-1 36" Conveyor 2017 Yes 7-16-2018 Wet Process ST-2 36" Conveyor 2017 Yes 7-16-2018 Water Spray ST-3 36" Conveyor 2017 Yes 7-16-2018 Water Spray ST-4 36" Conveyor 2018 Yes 5-28-2019 Water Spray ST-5 36" Conveyor 2018 Yes 5-28-2019 Water Spray ST-6 36" Conveyor 2018 Yes 5-28-2019 Water Spray ST-7 36" Conveyor 2017 Yes 7-16-2018 Water Spray Feeders F-1 48"x 120" Grizzly Feeder 2018 Yes 7-16-2018 F-1A 42"x 120" Grizzly Feeder 2017 Yes 5-28-2019 F-2 42" x 96" Grizzly Feeder 2017 Yes 7-16-2018 F-3 48' x 120' Belt Feeder 2020 Yes TBA IBC STD IAR �p 4T < 0 CZ3 00 C 25- - - I Ci C2- C °� A:- AT N R IsoNS rREp&FE Co, ING *S � o -7 S STaM 74, SC4 FZ 3 C6J �-T Ll Ck c � C7 ` �{ 5 clz d pppp 1 i lie � ►3