HomeMy WebLinkAboutAQ_F_1000117_20200110_CMPL_InspRpt NORTH CAROLINA DIVISION OF Wilmington Regional Office
AIR QUALITY Novant Health Brunswick Medical Center
NC Facility ID 1000117
Inspection Report County/FIPS: Brunswick/019
Date: 01/10/2020
Facility Data Permit Data
Novant Health Brunswick Medical Center Permit 10031 /R01
240 Hospital Drive North East Issued 10/15/2014
Bolivia,NC 28422 Expires 9/30/2022
Lat: 34d 1.8390m Long: 78d 15.6670m Classification Small
SIC: 8062/General Medical & Surgical Hospitals Permit Status Active
NAICS: 62211 /General Medical and Surgical Hospitals Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
John Melcher Shelbourn Stevens John Melcher NSPS: Subpart Dc, Subpart Ell
Facility Supervisor President Facility Supervisor
(910)721-1005 (910)721-1005
910 279-4056 cell 910 279-4056 cell
Compliance Data
Comments: Inspect facility as scheduled.
Inspection Date 01/06/2020
Inspector's Name Scott Sanders
Inspector's Signature: Scott Sanders C� _ Operating Status Operating
�- Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: 1/10/2020 On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PMIO *HAP
2013 0.3750 0.0350 4.90 0.2750 4.12 0.2800 ---
* Highest HAP Emitted inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s) Tested
*** Directions to the facility are as follows: From Wilmington,take the US-17/Shallotte/Myrtle Beach exit onto Ocean
Highway East(US-17 South). Go 21.5 miles. Turn right onto Brunswick Medical Center Drive. Park in the parking
lot behind the facility and enter the premises through the shipping/receiving area.
Novant Health Brunswick Medical Center
January 10,2020
1. Contact was made with John Melcher, Supervisor Plant Engineering Services.
2. Applicable regulations for Novant Health Brunswick Medical Center are as follows:
2D .0202 "Permit Renewal and Emission Inventory Requirement"
2D .0503 "Particulates from Fuel Burning Indirect Heat Exchangers"
2D .0515 "Particulates from Miscellaneous Industrial Processes"
2D .0516"Sulfur Dioxide Emissions from Combustion Sources"
2D .0521 "Control of Visible Emissions"
2D .0524 "40 CFR 60, Subpart Dc and Subpart 1111(41)"
2D .0535"Excess Emissions Reporting and Malfunctions"
2D .0540"Fugitive Dust Control Requirement"
2D .1111 1140 CFR 63 Subpart ZZZZ(4Z)—Reciprocating Internal
Combustion Engines"
2Q .0317 "40 CFR Part 63 Subpart JJJJJJ(6J) Avoidance"
3. The following equipment is contained in Permit No. 10031 RO1:
Emission Emission Source Control Control System
Source ID Description System ID Description
ES-1 (NSPS) one boiler(2009 model,
natural gas/No. 2 fuel N/A N/A
oil fired,400 hp/16.8
MM Btu/hr heat input)
ES-2 (NSPS) one boiler(2009 model,
natural gas/No. 2 fuel N/A N/A
oil fired,400 hp/16.8
MM Btu/hr heat input)
ES-3 (NESHAP, one emergency back-up
NSPS) generator(2009 model,
No. 2 diesel fueled, N/A N/A
rated at 1,500 kw/2,328
hp)
ES-4 (NESHAP, lone emergency back-up
NSPS) generator(2009 model,
o. 2 diesel fueled, N/A N/A
rated at 1,500 kw/2,328
hp)
4. This facility opened and started receiving patients on July 31, 2011. The boilers were
manufactured in December 2008 and delivered to the facility in September 2009.
Testing for the boilers began on May 1, 2010 with the ultra-low sulfur No. 2 fuel oil <
15 ppm (.0015%). Conversion and startup of the boilers to natural gas occurred on
November 8, 2010. Compliance was achieved with the NSPS startup notifications for
the boilers.
Page 2 of 5
Novant Health Brunswick Medical Center
January 10,2020
5. The first-time air permit renewal was done on October 15, 2014. The emissions
inventory report was completed on time. The facility requested a name change from
Brunswick Novant Medical Center to Novant Health Brunswick Medical Center.
Specific Condition a. 9 was added to the permit—40 CFR Part 60,NSPS Subpart IIII
for the two existing 2009 model generators. The previous permit version (R00)
included the adhoc 4I language, which explained the requirements of 4I very
thoroughly with the 4Z header. In this permit, the regulations pertaining to 41 from
permit writer were added as the new A.9 condition. Also,Specific Condition A.11 was
added to include 40 CFR Part 63 Subpart JJJJJJ(6J)Boiler GACT avoidance condition
(2Q .0317) for the two existing boilers. The previous permit (R00) included the 4I
requirements, but when that permit was initially drafted the permit writer did not have
any specific language for the 4I requirements and an adhoc condition explaining the 4I
requirements was added in the permit — under the 4Z NESHAP heading (former
condition A.8.). Specific Condition A.8 in the previous permit revision for the
NESHAP Subpart ZZZZ will remain as a header and will explain that compliance with
the 4Z NESHAP will be demonstrated by meeting the 4I NSPS rule. This revision
(ROI)will use the language already existing in the permit writer(see Specific Condition
A. 9. for 4I). The 2Q .0317 Avoidance Condition for Area Sources subject to 40 CFR
Part 63 Subpart JJJJJJ (6J) is added in this permit(see Specific Condition A.11) since
the two boilers burn natural gas. If the boilers are switched to No. 2 fuel,they will be
subject to the Boiler GACT Subpart JJJJJJ(6J)requirements.
6. On April 5, 2017,the facility began operating a newer and smaller 150 hp boiler. The
400 hp boilers are too large for a facility that is sized this small. This new 150 hp boiler
normally runs as lead and one of the 400 hp boilers normally serves as backup. Boiler
No. 2 (ES-2)was dry stored in September of 2017. All the fluids were drained out and
dried at that time. Dean Carroll (DAQ WiRO Permit Coordinator) was notified about
the addition of the new 150 hp boiler before it began operating. It was determined that
this new boiler would be allowed to operate without a permit modification per the 2Q
.0318 rule — "Changes Not Requiring a Permit Revision". Refer to a previously
attached email between John Melcher and Dean Carroll. The following info was
obtained from the new boiler's nameplate: 150 hp, date 2015, 150 psi, 5,175 lb/hr,
natural gas/# 2 oil, Model WB-A2-3P, Serial No. 15150P-WBLGL-08. A new and
efficient Limpsfield burner is installed on the unit. This 150 hp boiler was not operating
during the inspection. The 400 hp boiler (ES-1) was observed operating during the
inspection. It was being fired with natural gas and was operating at 0% opacity. This
facility only runs one boiler at a time(mainly the new 150 hp)and will rotate the usage
to the 400 hp boiler once every two (2) weeks for three (3) hours. The rotation to the
400 hp boiler occurred at the time of the inspection. The boilers use natural gas as a
primary fuel unless curtailment occurs. Brady Boiler Services does quarterly
inspections and annual maintenance on the boilers.
7. The facility is in compliance with their semi-annual NSPS recordkeeping and reporting
requirements pertaining to the boilers. The first semi-annual report was due by January
30, 2012 and was received on time. Subsequent reports have been received on time
and have indicated compliance. A copy of the last semi-annual report is attached(time
Page 3 of 5
Novant Health Brunswick Medical Center
January 10,2020
period July 1, 2019—December 31,2019). The facility last got curtailed for 72 hours
during very cold weather from January 7, 2017 @ 10:00 am to January 10, 2017 @
10:00 am. 2,160 gallons of ultra low sulfur No. 2 fuel oil were burned in each boiler
(4,320 total gallons)during that time. Each boiler burns approximately 120 gallons of
ultra low sulfur No. 2 fuel oil(4 hours)during each semi-annual period due to required
quarterly periodic testing.
8. The facility is subject to the NSPS IIII rule since the generators were constructed after
June 12, 2006. Compliance with the rule has been achieved. By complying with the
NSPS 41 Cl RICE regulations, the facility will also be in compliance with the
requirements of the NESHAP ZZZZ (4Z) regulations. The last load of No. 2 fuel oil
was received on September 12, 2018 from INA Oil in Southport ahead of impending
Hurricane Florence. 1,000 gallons of No. 2 fuel oil were received at that time. The
facility typically receives one delivery every two years just to top off their tanks or if
there is an impending hurricane. Certifications of the No. 2 fuel oil indicate that the
sulfur PPM < 15 and the cetane index is > 40 and are attached to the semi-annual
reports. This ultra low sulfur No. 2 fuel oil is used in the generators and is also used
for boiler backup fuel. There are two(2) 1 0,000-gallon storage tanks at the facility that
store the No. 2 fuel oil. The No. 2 fuel oil is sampled two times per year (refer to
attachments). The generators were equipped with a non-resettable hour meter prior to
startup of the engines to comply with NSPS IIII. The generators are each limited to
100 hours per year for maintenance checks and readiness testing per NSPS IIII. Each
generator only runs about thirty (30) minutes per month for maintenance checks and
readiness testing. This is done on the last Thursday of every month. On one day every
third year(36 months),each generator must nm four(4)hours continuously under load
at 30%of the nameplate rating for maintenance checks and readiness testing. This was
done on a day in March 2018, so this won't occur again until next year (2021). The
100-hour limit on each generator for maintenance checks and readiness testing per
NSPS IIII is easily being obtained. Generator No. I has operated 280.2 total hours
since startup of the unit. Generator No. 2 has operated 286.3 total hours since startup
of the unit. 180 gallons of ultra low sulfur No. 2 fuel oil are typically used in each
generator during each semi-annual period (30 gallons per month X 6 months). The
generators were not operating during this inspection. The generators operated for 48
hours during Hurricane Florence in September 2018. Gregory Poole performs
quarterly maintenance on the generators.
9. The facility is not subject to the Boiler GACT (6J) because it burns natural gas as a
primary fuel unless it is curtailed. It will become subject to 6J if it switches to burning
No. 2 fuel oil as the primary fuel. It would then have 180 days to do a one-time energy
assessment. An initial boiler tune up will be required soon thereafter. The facility does
not think the fuel switch will ever happen unless the price of No. 2 fuel oil becomes
much lower.
10. 5-year compliance history — Compliance has been achieved during this time period.
No NOD's,NOV's, or NRE's have been issued to this facility.
Page 4 of 5
Novant Health Brunswick Medical Center
January 10,2020
11.Novant Health Brunswick Medical Center was operating in compliance with Air
Quality regulations during the inspection.
Page 5 of 5
Sanders, Scott
From: Melcher, John V<jvmelcher@novanthealth.org>
Sent: Monday, July 01, 2019 10:20 AM
To: Sanders, Scott
Subject: [External] NHBMC Air Quality July
Attachments: Air Quality January 2916.docx
Scott,
Here is the Bi annual from January to date. No curtailment.
Thanks
JOHN V MELCIIER
Facility Supervisor
Novant Health
Brunswick Medical Center
240 Hospital Dr
Bolivia NC 28422
0.910 721 1005
Fax. 910 7211014
C.910 279 4056
jvmelcher@ nova nthealth.ore
CUSTOMER SERVICE IS AN ATTITUDE NOT A DEPARTMENT
-----------------------------------------This message and any included attachments are from NOVANT HEALTH INC. and are
intended only for the addressee(s). The information contained herein may include trade secrets or privileged or
otherwise confidential information. Unauthorized review, forwarding, printing, copying, distributing, or using such
information is strictly prohibited and may be unlawful. If you received this message in error, or have reason to believe
you are not authorized to receive it, please promptly delete this message and notify the sender by email. If you believe
that any information contained in this message is disparaging or harassing or if you find it objectionable please contact
Novant Health, Inc.at 1-844-266-8268 or forward the email to reports@novantheaIth.org.Thank you.
1
■ NOVANT
■ HEALTH
Brunswick Medical Center
240 Hospital Drive NE
Bolivia,NC 28422
July 1, 2019
Mr. Scott Sanders
Division of Air Quality—Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Subject: Biannual Reporting-Air Permit No. 10031R00
Novant Health Brunswick Medical Center
240 Hospital Drive North East
Bolivia, Brunswick County, NC
Permit Class: Small
Facility ID# 1000117
Dear Mr.Sanders,
Pursuant to 15A NCAC 2D .0524 "New Source Performance Standards" and in keeping with NSPS as
Promulgated in 40 CFR60,Subpart Dc, including Subpart A"General Provisions" Please see Attached
"Dyed Ultra Low Sulfur Diesel Certification"generated by our No. 2 fuel oil vendor, INA Oil Company.
The certification states our delivered No. 2 diesel has a tested sulfur content of< 15 PPM, Cetane
Index content of>40 and an Aromaticity(%Volume) content of< 31.7.
Report Period:
January 1, 2019—July 1, 2019
Emission Source ID: Emission Source Description:
A. ES-1 One Boiler(2009 Model, natural gas/No.2 fuel (NSPS-Subpart DC)Oil Fired,
400 HP/16.8MM Btu/hr heat input)
*Gallons No. 2 Diesel Fuel oil burned (4 hrs.—Quarterly Periodic testing): 120
* Gallons No.2 Diesel Fuel oil burned (0 hrs. -Required Curtailment):0
-Curtailment Beginning: N/A
-Curtailment Ending: N/A
B. ES-2 One boiler(2009 model, natural gas/No.2 fuel( NSPA-Subpart Dc)Oil Fired,
400 HP/16.8 MM Btu/hr. Heat input)
*Gallons No.2 Diesel Fuel oil burned (4hrs. -Quarterly Periodic Testing): 120
*Gallons No.2 Diesel Fuel oil burned (Ohrs.—Required Curtailment):0
-Curtailment Beginning: N/A
-Curtailment Ending: N/A
1/2
' C. ES-3 One Boiler( 2015 Model, natural gas/No 2 fuel (NSPS-Subpart DC)Oil Fired,
150 HP/ /16.8MM Btu/hr heat input
Gallons No. 2 Diesel Fuel oil burned (4 hrs.—Quarterly Periodic testing): 120
* Gallons No.2 Diesel Fuel oil burned (0 hrs. -Required Curtailment):0
-Curtailment Beginning: N/A
-Curtailment Ending: N/A
Thank You in Advance
John Melcher
Supervisor, Plant Engineering Services
Novant Health Brunswick Medical Center
212
Sanders, Scott
From: Melcher, John V<jvmelcher@novanthealth.org>
Sent: Wednesday, January 01, 2020 7:34 AM
To: Sanders, Scott
Subject: [External] NHBMC Air Quality January 2020
Attachments: Air Quality January 2916.docx
Scott,
Hope you had a great Holiday.
Thanks
JOHN V MELCHER
Facility Supervisor
Novant Health
Brunswick Medical Center
240 Hospital Dr
Bolivia NC 28422
0.910 7211005
Fax.910 7211014
C.910 279 4056
ivmelcher@novanthealth.org
CUSTOMER SERVICE IS AN ATTITUDE NOT A DEPARTMENT
---------------------------------------This message and any included attachments are from NOVANT HEALTH INC.and are
intended only for the addressee(s).The information contained herein may include trade secrets or privileged or
otherwise confidential information. Unauthorized review,forwarding, printing, copying,distributing, or using such
information is strictly prohibited and may be unlawful. If you received this message in error,or have reason to believe
you are not authorized to receive it, please promptly delete this message and notify the sender by email. If you believe
that any information contained in this message is disparaging or harassing or if you find it objectionable please contact
Novant Health, Inc. at 1-844-266-8268 or forward the email to reports@novanthealth.org.Thank you.
1
r
N ■ NOVANT
■ HEALTH
Brunswick Medical Center
240 Hospital Drive NE
Bolivia,NC 28422
January 1, 2020
Mr. Scott Sanders
Division of Air Quality—Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
Subject: Biannual Reporting -Air Permit No. 10031R00
Novant Health Brunswick Medical Center
240 Hospital Drive North East
Bolivia, Brunswick County, NC
Permit Class: Small
Facility ID# 1000117
Dear Mr. Sanders,
Pursuant to 15A NCAC 2D .0524 "New Source Performance Standards' and in keeping with NSPS as
Promulgated in 40 CFR60, Subpart Dc, including Subpart A"General Provisions" Please see Attached
"Dyed Ultra Low Sulfur Diesel Certification" generated by our No. 2 fuel oil vendor, INA Oil Company.
The certification states our delivered No. 2 diesel has a tested sulfur content of< 15 PPM, Cetane
Index content of>40 and an Aromaticity (%Volume) content of< 31.7.
Report Period:
July 1, 2019—January 1, 2020
Emission Source ID: Emission Source Description:
A. ES-1 One Boiler(2009 Model, natural gas/No.2 fuel (NSPS-Subpart DC)Oil Fired,
400 HP/16.81MM Btu/hr heat input)
*Gallons No. 2 Diesel Fuel oil burned (4 hrs.—Quarterly Periodic testing): 120
* Gallons No.2 Diesel Fuel oil burned (0 hrs. -Required Curtailment):0
-Curtailment Beginning: N/A
-Curtailment Ending: N/A
B. ES-2 One boiler(2009 model, natural gas/No.2 fuel( NSPA-Subpart Dc)Oil Fired ,
400 HP/16.8 MM Btu/hr. Heat input)
*Gallons No.2 Diesel Fuel oil burned (4hrs. -Quarterly Periodic Testing): 120
*Gallons No.2 Diesel Fuel oil burned (Ohrs.—Required Curtailment):0
-Curtailment Beginning: N/A
-Curtailment Ending: N/A
2/2
C. ES-3 One Boiler( 2015 Model, natural gas/ No 2 fuel (NSPS-Subpart DC) Oil Fired,
150 HP/ /16.8MM Btu/hr heat input
Gallons No. 2 Diesel Fuel oil burned (4 hrs.—Quarterly Periodic testing): 120
* Gallons No.2 Diesel Fuel oil burned (0 hrs. - Required Curtailment): 0
-Curtailment Beginning: N/A
-Curtailment Ending: N/A
Thank You in Advance
John Melcher
Supervisor, Plant Engineering Services
Novant Health Brunswick Medical Center
NOVANT4 H COMPANYNAME- CAROLINA CAT POWER SYSTEM4 SNOPIOB NUM SC752354
JOHN 1AELCHER CUSTOMEREQUIPNUM IZJ00623 COMPSERIALNUM
COMPARTMENT NAME. ENGINE(iEN$ET COMPARTMEM MODFL. Gregory Poole ta
SERIAL NUMBER CNF00/8 CNI
3 COMP MANUFARER
FAX MANUFACRfRFR: CATERPILLAR SAMPIELARELNUM Fluid Analysis Laboratory
PHONE MODEL. 3506 FLUID BRAND/WFIGiTI': CATDE0115W40 P.O.BOX 469
SAMPLFTYPE: OIL IOSSM, HENDERSON MEM.HOSP. FLUID TYPE: Raleigh,NC 27602
SAMPLE SIDPTIME(&ysl V EXTWARRNUMBEIt EXT WARR EXPIRE DATE. 919-836449I OR$00.451-7278 '
http:1Igmgorypoole.caLcoRY
LAB CONTROLNURDIER SAMPLE DATE PROCESS DATE EQUIPMENn-METER MLTERONmm FI.Um Cl1ANG[D MARE TIP FLUID MAKEUPPLUM"M FlurER('RANCED
Di"H914719 01-JI1-2019 10JuQ019 1025 HR 1025 HR Yes Yes
NH Ac1Ln ReglWetl ALL TESTS APPEAR NORMAL. MORE SAMPLES ARE NEEDED TO ESTABLISH A TREND.CONTINUE SAMPLING AT NORMAL INTERVAL
Cu Fe Cr A Po Sn 51 Ila K b W G M9 2n P Ba
Dlffi 9191D119 1 2 0 1 0 0 5 1 0 1 0 R2e 319 1510 1M2 0
3T om WT SUL W A F PFC V100
0 M e 18 N N N ZA 14.0
AQ=Saer.A•AUanMMn,B=Boren,G=CNGm,p=CNwNim,G•Copper,Fe=Imn.P=PoOeplwrue.K=Pdafpam.Me=MaelNaean.MO=Md,SOwlun.Na=SaOYxA Ni=NtkN,Po=Leath.SY=SNCM.Sn•Tn,
V=VaiaHMm,Zn=ZMc.A•AdMaee,F•Fuel,WW,Her,P=P ".N-Neeapve.T=Tra,E•ExceaNw.NIT=NWNwn.O%I=Osggbn,5T:Sod,b1A=bdWlon,I50=I50 RNee,PFC•Parted FuelGotham.
PoI=P,Heee OaMMAin9 Mex,NHW=SY WKar.FL%=F1eN Ptl'H,TAN=TOW AtlH Nvr4v.TBN=TaW Base Hamper.M20=NaH Fehr MM.V100=Mecovly®1000.VW=Vispoapy®e0C
NIMro.TNIs aleyels Is HBNetl b en,M In peealnp madulxTil wear. NO 9aararHee,eHxaMeH a erpee0.ls moat e9MW M1iMre d IMa pbu depgmMH or a cemporoN Herod.
NOVANT H114 COMPANY NAME CAROLINA CAT POWER SYSTEMS snoemei M SC752349
JOHN NIELCHER CUSIOMEREQUIPNUM GENSET3 COMPSF]DALNUM-1 Gregory Poole L
COAO'ARTMENTNAME ENGINE GENSET COMPARTMEN mM .
SERIAL.NUMBER CNF00162 COMP MANUFACTURER
FAX NANUFA(NRER CATERPILLAR SAI.OIE LABEL HUM Fluid Analysis Laboratory
PHONE MoDFT. 3508 FLUID BRANDM'IX'MT CATDEO/15W-40 P.O.Box 469
SAMPLETYPE: OFL ins sin HENDERSON MEAL HOSP. HUD)TYPE Raleigh,NC 27602
SAMPLE SHIPTIME(&p) 9 EXTWARRNUMBFR EXT WARE EXPIRE.DATE 919-836-4494 OR 800-451-7278
http:llgregorypoole.catcoml
LABCOMROLNUMDER SAMPLE DATE PROCESS DATE EQUB'MENTMEEER METER ON FLUID FI.Un)C1IANGED NAKEUPFLUID MAKE UPFLUID(FNTTs FB.TER CHANGED
DIS04MI-0736 01 W2019 10J11F2019 1056IR 1056 HR Yes Yes
No Abal RequieE ALL TESTS APPEAR NORMAL MORE SAMPLES ARE NEEDED TO ESTABLISH A TREND. CONTINUE SAMPLING AT NORMAL INTERVAL
Cu Fa Cr AI Po Sn m Na K Ro Ni Ca all Zo P 6
)AC49191073E 1 2 0 1 0 1 5 0 0 2 0 ZrIA 312 IMI 1Z73 0
in OM NR SAL W A F PFC V100
D150A)NIa7 6 0 14 5 Is N N N 276 13A
Ag=9..A=AAlmaum.B=Bann.Ca Cl .U=CNaMan.Cu.Copper,Fe=Imn.P=PNospl .K=PgaelMm,MO-MagMa Mo=MoAl6eman,Na.Satin.NI-NkNx -LNKI.9=$icon.Sn=Th.
V=V Iium.Zn=ZM.A=ArNNae,F=Fuel,W=M(w..P-PaeaM,N-Ne,r .T-Trace.E=Eacevle.NR=NarnBan.OXI=01M ,ST-Saul.SIA=SWNkn.1W-IBORbl PFC-PM FWCai
MI=Pa Ouaail ghee.NaW=S WYM,RR=FBM PNN.TM.T 1b NM ,TBN=Td Bean Finl6er.IQO=Ka0 FeNsreui.V100=V My®I=,Vo=VlemaiAPM
NNlae.lnN anayvala lMen0e0aa al eM In gealGnq mecNnlul rex. Fb puerrllae,egnevM or lr,glbE,ie meEe apiiM M1Yure al Ws aea alapulpnwawacomparo111 tl1neol