Loading...
HomeMy WebLinkAboutAQ_F_1800446_20210205_CMPL_InspRpt NORTH CAROLINA DIVISION OF Mooresville Regional Office AIR QUALITY Martin Marietta Materials,Inc. -Maiden Quarry NC Facility ID 1800446 Inspection Report County/FIPS:Catawba/035 Date: 02/05/2021 Facility Data Permit Data Martin Marietta Materials,Inc. -Maiden Quarry Permit 08004/R06 1575 West Maiden Road Issued 9/14/2018 Maiden,NC 28650 Expires 9/30/2021 Lat: 35d 35.2032m Long: 81d 14.5518m Class/Status Small SIC: 1423/Crushed And Broken Granite Permit Status Active NAILS: 212313/Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Brian Hamrick Ronald Kopplin Jay Nivens NSPS: Subpart 000 Plant Manager President-East Div Manager Environmental (828)322-8386 (910)510-4777 Engineering (704)409-1475 Compliance Data Comments: KAK Inspection Date 02/05/2021 Inspector's Name Ryan Mills Inspector's Signature: Jal2 e Operating Status Operating Compliance Status Compliance-inspection Date of Signature: Jdmttaw .5, 2V21 Action Code FCE Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2012 0.1900 --- --- --- --- 0.0700 --- 2007 --- --- --- --- * --- Highest HAP Emitted inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested Martin Marietta Materials, Inc. -Maiden Quarry February 5,2021 Page—2 - Type Action: X Full Compliance _Partial Compliance _Complaint Other: Evaluation Evaluation/Reinspection Investigation Data Tracking: Date submitted for initial review 2/5/2021 _IBEAM WARNING/OB,NOD,NOV,NRE X IBEAM Document X IBEAM Inspection,list date inspected X IBEAM LAT/LONG,Facility Locked X IBEAM Inspection,list date draft is submitted X IBEAM LAT/LONG,Coordinates checked X IBEAM Inspection,pollutants/programs checked _IBEAM Complaint _IBEAM Planning,Next Inspection Date 2/l/2023 Directions: From MRO,travel Hwy. 150 west toward Lincolnton. Just past the Hwy. 16 intersection,turn right onto E. Maiden Road. Travel approximately 12 miles to Maiden. Go through town on Hwy. 321 Business to the stoplight where Hwy. 321 Business turns right. Go straight,travel approximately 3 miles and the facility is located on the left. Safety Equipment: Hardhat, safety glasses and safety shoes will be required. The facility also requires all vehicles to be chocked. MRO chocks are located in a box beside the storage cabinets and the facility also has permanent concrete chocks on site. Safety Issues• No safety issues were noted. Lat/Long Coordinates: A review of the"Facilities Regulated by Air Quality"on the DAQ website indicated the facility's location is accurate and matches the facility's latitude and longitude coordinates listed in IBEAM.No changes to the latitude and longitude coordinates of this facility are needed in IBEAM. Email: Email addresses were verified with no changes needed. 1. The purpose of this site visit was to conduct a routine air quality inspection. This quarry crushes stone using portable equipment that is only onsite for a short period of time to produce enough stone for retail sales. The equipment was in Maiden from September of 2019 through mid-May of 2020. Mr.Nivens and I spoke on the phone on February 2,2020 and he stated that there are no plans to have the portable equipment back in Maiden in 2021. I also drove by the facility on February 5,2021 to verify that no equipment was on-site. 2. Facility Contact Information: During the inspection, I verified the facility contact information in IBEAM.No changes were needed. Martin Marietta Materials, Inc. -Maiden Quarry February 5,2021 Page—2 - 3. COVID-19Information: Currently visitors are not encouraged at the facility. However,if an inspection is required masks would be required and the inspector's temperature would be taken and then allowed onto the property with no fever. Employees are required to wear face masks. Before my drive-by on February 5,2021,I filled out the NC DEQ"NC Employee Screening for Employees Reporting Onsite"questionnaire on my cell phone. 4. Compliance history file review: No problems have been noted in the last five years by DAQ,prior to this inspection. The current compliance status is discussed in the following sections. 5. Observations of permitted air emission sources and control devices: I drove by the quarry on February 5,2021 to verify that no equipment was on-site. I did not find any equipment located at the facility. 6. Observations of insignificant air emission sources and control devices listed on the current >l ennit: None noted. 7. Observations of air emission sources and control devices not listed on the current permit: None noted. 8. Compliance with specific permit conditions and limitations: a. Condition A.2.—"Emissions Inventory Requirement". At least 90 days prior to the expiration date of the permit,the Permittee shall submit the air pollution emission inventory report. The report shall be submitted to the Regional Supervisor,DAQ. The report shall document air pollutants emitted for the 2020 calendar year. Observed: The Air Permit will be expiring on September 30,2021. I reminded Mr. Nivens that the permit renewal application must be submitted at least 90 days prior to the permit expiring. The permit renewal application must also include an emission inventory for calendar year 2020. 1 instructed Mr.Nivens to contact DAQ-MRO if he has any questions or concerns regarding the permit renewal. b. Condition A.6.— 15A NCAC 2D .0524 NSPS Subpart 000 Observed: As required by NSPS subpart 000,the facility is required to conduct monthly spray nozzle inspections.Mr.Nivens supplied me(via email)with the monthly spray nozzle inspections performed by the facility while the equipment was onsite between September of 2019 and May of 2020. Martin Marietta Materials, Inc. -Maiden Quarry February 5,2021 Page—2 - 9. NSPS/NESHAP Review: No boilers, generators, or fire pumps are located at the facility. Mr.Nivens also stated that the facility did not have any gasoline storage tanks located on the property. 10. Summary of changes needed to the current permit: None. 11. Compliance assistance offered duringthe h�pection: None. 12. Section 112(r)applicability: This facility does not appear to be subject to the requirements of the Chemical Accident Release Prevention Program, Section 112(r)of the Clean Air Act. 13. Compliance determination: Based on my observations,this facility appeared to be in compliance with the applicable air quality regulations at the time of the inspection RCM: c: MRO File Https://ncconnect.sharepoint.com/sites/DAQ-MRO/Counties/CATAWBA/00446/INSPECT 20210205.docx