Loading...
HomeMy WebLinkAboutAQ_F_1600155_20201029_CMPL_Ext-Rqst Qry�,yw>� ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secrerory MICHAEL ABRACZINSKAS Director October 29, 2020 Mr. Alonzo Collins, Owner Collins Tree Service Pit 159 Oscar Hill Road Newport,NC 28570 Subject: Approval of Extension Request for Initial NSPS Opacity Testing on Air Curtain Incinerator Collins Tree Service Pit Newport, Carteret County,North Carolina Facility ID No. 1600155; Air Permit No. 10655G00 Dear Mr. Collins: The Division of Air Quality(DAQ)has reviewed the information provided in your letter dated October 13, 2020, in which your company makes a force majeure claim citing COVID-19 related issues and requests a 60-day extension to the deadline to complete New Source Performance Standard(NSPS)visible emissions (opacity) testing for your air curtain incinerator(ACI). The ACI at the Newport location is subject to NSPS Subpart EEEE -Standards of Performance for Other Solid Waste Incineration Units for which Construction is Commenced after December 9, 2004, or for which Modification or Reconstruction is Commenced on or after June 16, 2006. Section 2.l.A.2. of Air Permit No. 10655G00 summarizes the specific NSPS Subpart EEEE requirements applicable to your facility, including the requirement to conduct EPA Method 9 testing for visible emissions within 60 days after the ACI reaches the charge rate at which it will operate,but no later than 180 days after its initial startup (Section 2.1.A.2.d). According to information you have provided to DAQ,the ACI at the Newport location began operation on April 20, 2020 but has only operated intermittently since initial startup. Therefore, the deadline for conducting the initial NSPS opacity testing would have been October 17, 2020, unless an extension is granted. The COVID-19 pandemic and resulting state restrictions on travel and business operations have impacted companies throughout North Carolina. Specifically, your company has experienced intermittent operations of the ACI due to COVID-19 related issues. Additionally,your company had staff scheduled to attend Smoke School in Wilmington,NC in May 2020 to receive certification as an official EPA Method 9 observer; however, Eastern Technical Associates(ETA) delayed the Wilmington Smoke School until June 2020 and limited attendance due to COVID-19 concerns. The next Smoke School classes in the Wilmington area are scheduled for November 3-5, 2020, and you have staff registered to attend this session. Your company plans to complete the initial NSPS opacity testing for the ACI at the Newport location shortly thereafter. D- FW oM"� F.•.�A/OuYpr� North Carolina Department of Environmental Quality I Division of Air Quality 217 West Jones Street 11641 Mail Service Center I Raleigh.North Carolina 276"-1641 919.707.8400 Collins Tree Service Pit October 29,2020 Page 2 of 2 After considering the specific impacts of COVID-19 on your company, the DAQ considers your force majeure claims as stated in your October 13, 2020 letter to be valid. Therefore, your request for an extension to the deadline to conduct the initial NSPS visible emissions testing is granted. The new deadline to complete the required EPA Method 9 test on the ACI at the Newport location is December 16, 2020. If you are not able to complete the required performance testing by the new deadline, you may request an additional extension but must make a new and updated force majeure claim at that time. The granting of this extension to the specific NSPS visible emissions testing deadline does not relieve your company of the legal responsibility for compliance with any other applicable provisions of your air quality permit or with any other applicable federal, state, or local requirements. Due to the COVID-19 restrictions on DAQ office operations, the mailing of this letter may be delayed. In the meantime, an electronic copy(e-copy)will be provided to you via email. If you have any questions,please contact Gary Saunders, Stationary Source Compliance Branch Supervisor, or me at 919-707-8400. Sincerely, d4e L Stephen G. Hall Section Chief, Technical Services Division of Air Quality,NC DEQ cc: Brad Newland, WIRO Air Quality Supervisor(e-copy and hard copy) IBEAM Documents (1600155) North Carolina Department of Environmental Quality I Division of Air Quality 217 West Jones Street 11641 Mall Service Center I Raleigh,North Carolina 27699-1641 919.707.8400