Loading...
HomeMy WebLinkAboutAQ_F_0400050_20200825_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY NCEMC-Anson Plant NC Facility ID 0400050 Inspection Report County/FIPS:Anson/007 Date: 09/08/2020 Facility Data Permit Data NCEMC-Anson Plant Permit 09492/T09 749 Blewett Falls Road Issued 7/14/2020 Lilesville,NC 28091 Expires 6/30/2025 Lat: 34d 58.0837m Long:79d 55.3361m Class/Status Title V SIC: 4911 /Electric Services Permit Status Active NAICS: 221112/Fossil Fuel Electric Power Generation Current Permit Application(s)TV-Reopen for Cause Contact Data Facility Contact Authorized Contact Technical Contact Program.Applicability Shawn Fowler John Cook Khalil Porter SIP/Title V NSPS: Subpart KKKK Manager,Combustion VP,Asset Management Environmental Scientist Turbine Generation (919)875-3046 (919)875-3088 (919)975-7101 Compliance Data Comments: Inspection Date 08/25/2020 Inspector's Name Evangelyn Lowery-Jacobs Inspector's Signature, Operating Status Operating Compliance Code Compliance-inspection Action Code FCE Date of Signature: 0?10E3 f-7vLo On-Site Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2019 2.70 --- 48.86 6.98 59.21 2.70 750.92 2018 11.04 --- 177.02 22.70 195.99 11.04 2767.89 2017 5.16 --- 85.82 11.44 98.41 5.16 1341.98 *HjEjiest HAP Emitted(inpounds) Fsve Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested NCEMC—Anson Plant Compliance Inspection Report Page 2 of 7 I. DIRECTIONS- From FRO take 401 S.to Wagram. Turn right on Old Wire Road(NC 144)just south of Wagram. Drive approximately 12.2 miles,then turn right onto Highway 74. Drive approximately 23.5 miles. Just after crossing the Pee Dee River,turn right onto Power Plant Road. Drive approximately 2 miles,then turn left onto Blewett Falls Road. Drive approximately 2.5 miles. The facility will be on the right. H. SAFETY CONSIDERATIONS: Typical FRO safety gear is required, including safety shoes, safety glasses,hardhat, and hearing protection. Do not open any doors and do not touch any plumbing while the turbine is in operation. 111. FACILITY/PROCESS DESCRIPTION: This facility has six simple-cycle,natural gas-fired(low sulfur No.2 fuel oil backup)Pratt and Whitney FT-8 Swift-Pac combustion turbines generating electricity in Anson County. The facility can produce 340 MW of electrical power to retail distribution during periods of high demand or during emergencies. Each of the six units consists of two turbines,each equipped with water injection,and one generator. The two turbines associated with each FT-8 do not have to operate simultaneously. The double-ended configuration allows for greater efficiency during partial load usage. This plant operates as a"peaking"facility to meet peak power demands on a daily or seasonal basis. Pollution control is demineralized water injection to control NOx. "Simple cycle gas turbine" means any stationary gas turbine that does not recover heat from the gas turbine exhaust to either preheat the inlet combustion air or to heat water or generate steam. The Plant Information(PI)System was installed at this facility for plant-wide monitoring and analysis. The system handles the collection, storage,and retrieval of parametric data. It also acts as a data server for Microsoft Windows-based client applications that operators,engineers,managers,and other plant personnel use to view the plant data stored in the PI Data Archive. The facility chooses to use a predictive emission monitor system(PEM)to monitor NOx emissions in lieu of CEMs. The predictive emission monitor systems have been proven to be as accurate as the CEMs and are in fact more economical from the cost and maintenance. The facility uses this software program to monitor and determine NOx emissions from the gas turbines in real time. Continuous NOx emission rate is determined based on vendor's data and turbine operating parameters. 1V. INSPECTION SUMMARY: On Tuesday 08/25/2020,I,Evangelyn Lowery-Jacobs of DAQ FRO,met with Mr. Shawn Fowler, plant manager at the Anson facility to conduct an air quality compliance inspection,consisting of a records review. The facility was not operating at the time of the inspection but was expected to be operating later in the day as the temperatures rose. Mr.Fowler proposed a tour of the facility to get an overview of operations. We proceeded outside and inspected the interior of one of the twelve turbines,while not in use. Mr. Fowler explained the individual components and the operational aspects of the facility,before returning to the office building for records review. NCEMC-Anson Plant Compliance Inspection Report Page 3 of 7 Mr.Fowler provided a copy of the facility's current permit and reviewed the FacFinder,which was accurate and required no changes. All records were readily available for review,as required by the permit. Note that all twelve turbines(six gen sets)are under contract with Duke/Progress Energy and are all run as close to equal time as possible,in order to maintain their"peaking" status for federal rule applicability. V. PERMITTED EMISSION SOURCES: Emission - 1 Control Device - Source Emissions Source Description ID No. Control Device Description ID No. -y - - ES-tA and ES-1B, CD-lA,CD-IB Twelve Pratt& Whitne FT8 Swift-Pac ES-2A and ES-2B, CD-2A, CD-2" simple-cycle gas turbines(300 million Btu j ES-3A and ES-3B, CD-3A,CD-3B i per hour nominal heat input capacitywhen 1 ES-4A and ES-413, CD-4A,CD-4B firing natural gas, and 281 million Btu per All j ES-5A and ES-511, CD-5A,CD-5B hour nominal heat input capacity when ES-6A and ES-6B CD-6A,CB-6B firing No.2 fuel oil(5 0.002% sulfur by wt), each)and one generator per pair of (NSPS,Subpart KKKK;PSD) turbines NOT OPERATING Insignificant Activities per 15A NCAC 2Q.0503(8): ID Nos Emission Source Description -. _ - - --- -- gas-fired- - - - -- PPP g ._. _ _. IES-f l j One natural heater for warmingu pipeline natural as used in NOT OPERATING combustion turbines OPERATING One 500,000 gallon No 2 fuel oil storage tank ----- ------ _:-- I OPERATING One 500,000 gallon No. 2 fuel oil storage tank Vt. PERMIT CONDITIONS&LIMITATIONS: A. 15A NCAC 2D.0521: CONTROL OF VISIBLE EMISSIONS-Subject sources:twelve turbines(ID Nos.ES-IA and B through ES-6A and B). VE is limited to 20%opacity for each turbine when averaged over a six-minute period,except during startup, shutdown and malfunctions.However, six-minute averaging periods may exceed 20 percent not more than once in any hour and not more than four times in any 24-hour period. In no event shall the six-minute average exceed 87 percent opacity. APPEARED IN COMPLL4NCE-The facility combusts primarily natural gas, and it combusts No. 2 fuel oil only as a backup. Both of these fuels are clean burning, so the opacity should always be in compliance with the 20%opacity limit The turbines were not operating during the time of inspection. NCEMC—Anson Plant Compliance Inspection Report Page 4 of 7 B. 15A NCAC 2D.0524: NSPS,40 CFR PART 60,SUBPART KKKK—Subject sources: twelve turbines(ID Nos.ES-lA and B through ES-6A and B). i. The permittee shall comply with the notification,testing,recordkeeping, and monitoring requirements for S02.The SOZ emission limit can be met by demonstrating that the sulfur content is less than 0.05%in the No.2 fuel oil used and less than 20 grains per 100 scf in the natural gas.A semi-annual summary report is required, including deviation report and excess emission/monitor downtime/startup, shutdown,and malfunction report. APPEARED INCOMPLAINCE—The facility initially demonstrated compliance with the NSPS limits based on source tests that were reviewed and approved by the Raleigh Central Office. Fuel oil suour content is determined by representative sampling after adding loads to the storage tank, in accordance with 40 CFR Part 75 Appendix D Section 2.2.4.2. In addition, quarterly sampling is conducted whether fuel oil has been received or not. The most recent analysis shows 6.7 ppm su fux in Tank#1 and 9.9 ppm suer in Tank Q. The NG sulfur content is guaranteed to be less than 20 grains per 100 scf by the current contract with Piedmont Natural Gas. The most recent semi-annual and excess emissions/monitor downtime report was received on 0712312020 and appeared complete. I The permittee shall comply with the notification,testing,recordkeeping,and monitoring requirements for NOx. The maximum NOx emission limits are 25 ppm at 15%OZ when firing NG and 74 ppm at 15%OZ when firing No.2 fuel oil;The permittee can demonstrate compliance using the NOx emission estimation following 40 CFR Part 75 Appendix E, including re-certifying NOx emissions rate versus heat input rate correlation curve every 5 years.The permittee must demonstrate"peaking"status using the average capacity factor of no more than 10%during three previous calendar years and no more than 20%during each of those individual years. The permittee must keep records for the following: hourly records of time, load to unit, fuel flow rate, heat input,and hourly calculated NOx emissions. The permittee shall submit semi-annual excess emissions/monitor downtime reports for all periods including startup, shutdown,and malfunction. APPEARED IN COMPLIANCE—The facility was not operating during the inspection. Records show that each turbine is maintaining its `peaking"status with the highest three- year average capacity factor of any turbine being 5.9%during the past year. The highest 1- year capacity factor of any turbine was 1.9916. The facility chooses to use a Predictive Emissions Monitoring System (PEMS) that uses a water-to-fuel ratio curve, which is established via testing at least every 5 years (last test was conducted in 2018) to predict hourly NOx emissions. The fuel and water flow meters were last calibrated in September 2015 and are re-calibrated at least every 5 years (depending on capacity used per turbine, quarterly)so the next calibration is scheduled for mid-September 2020. The PEMS activates an alarm if NOx emissions exceed 25/74 ppm(gas/oil)for more than 60 seconds (once water flow is established) and if at 720 seconds the emissions still exceed then the unit automatically shuts down in order to avoid exceeding the NOx limit for the rolling 240- minute period. There have been no periods ofNOx emissions exceeding the established limits since the last inspection. The most recent semi-annual summary/deviation report and excess emission/monitor downtime report was received on 0712312020 and appeared complete. NCEMC—Anson Plant Compliance Inspection Report Page 5 of 7 C. 15A NCAC 2D.0530 PREVENTION OF SIGNIFICANT DETERIORATION—Subject sources:twelve turbines(ID Nos.ES-lA and B through ES-6A and B). CO total emissions shall not exceed 405.5 tons per consecutive 12-month period. Each unit shall not exceed 1,230 hrs run time on natural gas or 710 hrs run time on No. 2 fuel oil(d=0.002% S)annually,not including startup/shutdown time. Semi-annual reporting of hours of operation when firing natural gas and No.2 fuel oil on a monthly and rolling 12-month total is required. APPEARED IN COMPLIANCE—The highest 12-month rolling total CO emissions during the past year was 183.96 tons. The highest 12-month rolling total runtime on natural gas during the past year was 614.43 hours, which was due to extremely cold temperatures in early 2019. The highest 12-month rolling total runtime on No. 2 fuel oil during the past year was 4.06 hours. CO emissions are calculated based on predictive monitoring based on stack testing of the turbines. The most recent semi-annual report was received on 0712312020 and appeared complete. D. 15A NCAC 2Q.0317 PSD AVOIDANCE—Subject sources:twelve turbines(ID Nos.ES-lA and B through ES-6A and B). The NOx limit is 245 tons per consecutive 12-month period. The permittee must record the number of startup/shutdowns per day and monitor NOx emissions in accordance with 40 CFR Part 60 Subpart IW"K(item B,above). The permittee must calculate NOx emissions from each turbine daily(including start-up and shut-down and daily load),and calculate combined NOx emissions from all turbines monthly and on a 12-month rolling basis. Semi-annual reporting of monthly and 12-month rolling total NOx emissions is required. APPEARED IN COMPLIANCE—Daily records of startuplshutdowns and calculated daily/monthly112-month rolling total NOx emissions per turbine appeared valid and complete. NOx emissions are calculated using predictive monitoring based on stack testing of the turbines. The highest 12-month rolling total NOx emissions during the past year was 113.41 tons. The mast recent semi-annual report was received on 0712312020 and appeared complete. E. 15A NCAC 2Q.0400:PHASE 11 ACID RAIN REQUIREMENTS—Subject sources: twelve turbines(ID Nos.ES-1A and B through ES-6A and B). There are no specified S02 Allowance Allocations under this rule. The DAQ allocates tons of S02 allowances from a general fund for new sources. APPEARED 17V COMPLIANCE—EPA's Air Markets Program Data website shows the facility held an allowance of"0"tons of SO2 at the beginning of 2019 and reported emissions of"0"tons of S02 at the end of 2019. They carried over an allowance of"0"tons for 2020. F. CROSS STATE AIR POLLUTION RULES(CSAPR)PERMIT REQUIREMENTS—The permittee shall comply with all applicable requirements of 40 CFR 97 Subparts 5A, 513,and 5C. i. 40 CFR 97 Subpart 5A—ANNUAL TRADING PROGRAM—NOx APPEARED IN COMPLIANCE—The facility participates in the NOx Trading program. According to EPA's Air Markets Program Data website, they held an allowance of 155 tons NOx at the beginning of 2019 and reported emissions of 22 tons of NOx at the end of 2019. They carried over an allowance of 133 tons NOx into 2020. NCEMC—Anson Plant Compliance Inspection Report Page 6 of 7 ii. 40 CFR 97 Subpart 5B—OZONE SEASON TRADING PROGRAM—NOx APPEARED IN COMPLIANCE—The facility no longer participates in NOx trading during ozone season as the entire State is now listed as in attainment. iii. 40 CFR 97 Subpart 5C—GROUP 1 TRADING PROGRAM—SOz APPEARED IN COMPLIANCE—The facility participates in the SOz Group I Trading program. According to EPA's Air Markets Program Data website, "0"SOz allowances were used in 2019, and the facility had "0"SOz allowances available for trading at the end of 2019. G. PERMIT GENERAL CONDITION LA and LB REPORTING REQUIREMENTS FOR EXCESS EMISSIONS AND PERMIT DEVIATIONS—The facility is required to report excess emission events and malfunctions that last more than 4 hours per the requirements of 15A NCAC 2D .0535. APPEARED IN COMPLIANCE—Mr. Fowler indicated that the facility has had no excess emissionlmalfunction events and therefore no notification has been required. H. PERMIT GENERAL CONDITION P—COMPLIANCE CERTIFICATION REQUIREMENT: The facility is required to submit an Annual Compliance Certification (ACC) report postmarked before March 1 of each year,stating compliance with all permit conditions or noting any deviations during the previous calendar year. APPEARED IN COMPLIANCE—The most recent ACC report was received on 211712020 and appeared to be complete. L PERMIT GENERAL CONDITION X—ANNUAL EMISSION INVENTORY REQUIREMENTS Facility shall submit an Annual Emission Inventory postmarked on or before June 30th of each year. APPEARED IN COMPLIANCE—The facility's 2019 AQEI was received on 0 413 012 02 0 and appeared to be complete and accurate. J. PERMIT GENERAL CONDITION DD—PREVENTION OF ACCIDENTAL RELEASES— SECTION 112(r)-The facility does not store any of the listed chemicals in amounts that exceed the threshold quantities. Therefore,they are not required to maintain a written Risk Management Plan(RMP). K. PERMIT GENERAL CONDITION MM—FUGITIVE DUST CONTROL REQUIREMENT—The Permittee shall not cause of allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. APPEARED IN COMPLIANCE—Mr. Fowler stated that no dust complaints had been received by the facility, and FRO has not received any dust complaints. VI. NON-COMPLLANCE HISTORY SINCE 2010: There have been no instances of non-compliance at this facility since 2010. NCEMC—Anson Plant Compliance Inspection Report Page 7 of 7 VIII. COMPLIANCE STATEMENT AND RECOMMENDATION: The NCEMC -Anson Plant appeared to be operating IN COMPLIANCE with their air quality permit at the time of inspection on 08/25/2020. IX. PINK SHEET ITEMS: No additional comments. /elj