HomeMy WebLinkAboutAQ_F_0400037_20210707_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY The Quikrete Companies-Peachland Plant
NC Facility ID 0400037
Inspection Report County/FIPS:Anson/007
Date: 07/20/2021
Facility Data Permit Data
The Quikrete Companies-Peachland Plant Permit 06907/R10
13471 Highway 74 West Issued 12/14/2020
Peachland,NC 28133 Expires 10/31/2022
Lat: 34d 59.3110m Long: 80d 17.8790m Class/Status Synthetic Minor
SIC: 3272/Concrete Products,Nec Permit Status Active
NAICS: 32739/Other Concrete Product Manufacturing Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Leroy Bean Leroy Bean Braden Keiger
Plant Manager Plant Manager
(704)272-7677 (704)272-7677 (678)234-3344
Compliance Data
Comments:
Inspection Date 07/07/2021
Inspector's Name Mike Thomas
Inspector's Signature: Operating Status Operating
Compliance Status Compliance-inspection
�W-J , -,� Action Code FCE
Date of Signature: Inspection Result Compliance
Ze —Z/
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 *HAP
2013 1.87 --- 0.8400 0.1300 0.9700 0.7441 ---
2008 0.4870 --- 1.78 0.1400 1.03 0.2750 ---
Highest HAP Emitted inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
I.. Directions:
From FRO,head south on Green St toward Maiden Ln. At the traffic circle,take the 2nd exit onto Gillespie
St. Turn right onto W Russell St. Turn left onto Robeson St. Use the left 2 lanes to turn left onto Raeford Rd
and continue for 10 miles. Just past Wagram,turn right onto Old Wire Road(NC Hwy 144).Turn right onto
Old Wire Road(Hwy 144)and go— 11 1/2 miles to Laurel Hill. Merge onto HWY 74 W.and continue for 65
miles to Peachland. The facility is on the left right before the Union County line.
-II. Safety Considerations:
Standard DAQ safety equipment.Be alert to trucks entering and exiting property.
III. Facility and Process Description:
The Quikrete Companies-Peachland is a dry concrete mixing facility that dries and packages play sand,
concrete,mortar and mason mix,and grout. This facility is permitted under Air Permit No. 06907RO9,
effective from 25 November 2014 until 31 October 2022.
The facility receives cement and mortar in powder form and stores these materials in silos. The facility
dries sand and gravel in a rotary dryer and stores these materials in silos. The facility has single silos
for dry sand/gravel, all-purpose sand, and play sand. The fourth is a"split" silo that holds masonry
cement,fly ash, and Portland cement. The materials are metered out of the silos and mixed prior to
packaging in 50 pound bags or large bulk bags. Particulate emissions from the silos,the dryer and the
mixing/packaging operation are controlled by a total of seven bagfilters.
The packaging system for filling bags is located inside a building. There is a central dust collection
system that captures dust that comes from bag filling and from several other points along the packaging
process.
The company has 45 employees(including drivers)and operates one 12-hour shift a day, 6:OOAM-6:30 PM, 7
days/week, 52 weeks/year.Half of the employees work 12-hours a day three days/week,the remaining
employees work 12-hour days four days/week. The following week the employees switch so the employees
who worked three days/week work four days/week.
IV. Permitted Emission Sources:
Omni=
i t
One LPG-fired rotary dryer
140 tons per hour maximum throughput Bagfilter
ES-1 20 mmBtu/hr maximum heat-input CD-8 (3,240 square feet of filter area)
Operating 0%V.E.
Cement packaging operation Bagfilter
ES-4 Operating 0%V.E. CD-2 (2,403 s quare feet of filter area)
-----
-------------
-------
ES-6 One Sand silo CD-14 Bagfilter
Operating 0%o V.E. (125 square feet of filter area)
One compartment of split silo Bagfilter
ES-9S1 (cement or flyash) CD-9 (125 square feet of filter area)
Operating 0%V.E.
One compartment of split silo Bagfilter
ES-9S2 (cement or flyash) CD-9
Operating 0%V.E. (125 square feet of filter area)
One compartment of split silo Bagfilter
ES-11 S (cement or flyash) CD-11 (125 square feet of filter area)
Operating 0%V.E.
One compartment of split silo Bagfilter
ES-12S (cement or flyash) CD-12 (125 square feet of filter area)
Operating 0%V.E.
ES-13 S Two sand/aggregate silos CD-13 Bagfilter
FOperating 0%V.E. (250 square feet of filter area)
V. Inspection Conference:
On 7 July 2021,I,Mike Thomas of FRO DAQ, conducted a compliance evaluation inspection of the
Quickrete Companies—Peachland Plant. I met Leroy Bean,Plant Manager. We discussed the
following:
a) I verified the FACFINDER information;no changes are required.
b) I reviewed the facility's bagfilter logbooks. Entries are arranged by process and appeared to be
complete and up to date.
c) Mr.Bean stated that production has been higher than expected the last 6 or 8 months.
d) Throu h uts:
2020 27,473,020 129215,880 141,600,460 669587,669 226,800
2019 2805,862 1315555280 —107,234,000 4757855,700 —45300,000
2018 —255315,000 —6,752,000 —10752345000 —59,915,00 —45300,000
2017 —2552755000 —695255000 —1075000,000 —59,800,000 —453005000
2016 —2553005000 —6,600,000 —107,006,000 —59,800,000 —4,3005000
2015 —25,3005000 —6,600,000 —107,000,000 —59,800,000 —4,300,000
2014 —2553005000 —65600,000 —107,000,000 —59,800,000 —4,300,000
2013 2854065000 81954,000 112569400 65,974,000 4,324,000
2012 25,298,000 6,602,000 107,164,000 59,752,000 4,294,000
2011 243000,000 6,000,000 99,866,000 58,5565000 318345000
VI. Inspection Summary:
Mr. Bean led me on a tour of the facility,which was operating, starting at the dryer and proceeding to the
silos. I did not observe any indications of excess emissions. The duct work all appeared to be in good
working order with no leaks or compromises. The facility was very clean. Due to the large increase in
production currently,the facility has finished product stacked on pallets around the yard. Travel ways at the
facility appeared to be in good shape and there was no indication of trucks tracking material onto the highway
as they are leaving the facility.
VII. Permit Stipulations:
A.2 15A NCAC 2D .0202 &2Q .0304-PERMIT RENEWAL AND EMISSION INVENTORY
REQUIREMENT-The facility shall submit a permit renewal request and a completed air
emissions inventory at least 90 days prior to permit expiration.
APPEARED IN COMPLIANCE—The next renewal and inventory are due Aug 8,2022,for
calendar year 2021.
A.3 15A NCAC 2D .0515 PARTICULATE CONTROL REQUIREMENT—"Particulates from
Miscellaneous Industrial Processes",particulate matter emissions from the emission sources
shall not exceed allowable emission rates.
APPEARED IN COMPLIANCE—Compliance was determined during the most recent permit
review based on operating the source as described in the permit conditions. No changes have
been made to operations since that determination.
A.4 15A NCAC 2D .0516 SULFUR DIOXIDECONTROL REQUIREMENT—Sulfur dioxide
emissions from Dryer(ID No.ES-1) shall not exceed 2.3 pounds per mmBtu heat input.
APPEARED IN COMPLIANCE—The facility combusts LP gas in their 20 mmBtu rotary
dryer. The AP-42 SO2 EF is 0.001 lb/mmBtu resulting in emissions well below their limit.
A.5 15A NCAC 2D .0521 VISIBLE EMISSIONS REQUIREMENT-"Control of Visible
Emissions",visible emissions from the emission sources manufactured after July 1, 1971, shall
not be more than 20%opacity.
APPEARED IN COMPLIANCE—I observed 0%V.E. from all operating emission sources.
A.6 15A NCAC 2D .0535 NOTIFICATION REQUIREMENTS—The Permittee of a source of
excess emissions lasting more than four hours and that results from a malfunction,breakdown of
process or control equipment or any other abnormal conditions shall notify the Director or his
designee.
APPEARED IN COMPLIANCE—Mr.Bean stated that there were no instances of excess
emissions requiring notification.
A.7 15A NCAC 2D .0540 FUGITIVE DUST CONTROL REQUIREMENT-Facility shall not
cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess
emissions beyond property boundary.
APPEARED IN COMPLIANCE—No dust was observed leaving the boundaries of the facility
and Mr. Bean stated that there have been no dust complaints.No dust complaints have been
received by FRO.I did not see any indications of dust on the highway in front of the facility.
1
A8 15A NCAC 2D .0611 FABRIC FILTER REQUIREMENTS—Particulate matter emissions
shall be controlled as described in the permitted equipment list. The permittee shall perform,at a
minimum, an annual internal inspection of each particulate collection system. The permittee
shall also perform periodic inspections and maintenance as recommended by the equipment
manufacturer. The results of all inspections and maintenance activities shall be recorded in the
logbook and kept onsite.
APPEARED IN COMPLIANCE—Logbooks are kept and are grouped according to process.
Last internal inspections: Interior BH(CD-2)=packaging 5/12/21,Dryer BH(CD-8)2/12/21,
Rock/Sand silo BH(CD-13)3/25/21,Rock/Sand silo BH(CD-14)2/26/2021, and Flyash/Lime
silo BH(CD-9)3/4/21,(CD-11)3/4/21, (CD-12)3/4/21.
A.9 2Q .0315 LIMITATION TO AVOID 15A NCAC 2Q.0501—Pursuant to 15A NCAC 2Q
.0315 "Synthetic Minor Facilities," facility-wide PMIo emissions shall be less than 100 tons per
consecutive 12-month period. Facility complies with this limitation by properly operating and
maintaining their bagfilters and record keeping in accordance with 15A NCAC 2D .0611
BAGFILTER REQUIREMENTS.
APPEARED IN COMPLIANCE-Facility met the requirements by performing the required
inspections,maintenance, and record keeping as prescribed in 15A NCAC 2D .0611
BAGFILTER REQUIREMENTS.
VIH. Non-compliance History Since 2010:
10/21 —NOD for replacement of equipment without a permit.
IX. 112R Status:
This facility does not store any of the listed chemicals above threshold quantities,and is not required to
maintain a written Risk Management Plan(RMP).
X. Comments and Compliance Statement:
On 7 July 2021,The Quikrete Companies-Peachland Plant appeared to be IN COMPLIANCE with the
conditions outlined in their current Air Permit.
Pink Sheet:No comments.
/mst