Loading...
HomeMy WebLinkAboutAQ_F_0400036_20210707_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY B.V.Hedrick Gravel and Sand Co. -Lilesville Plant NC Facility ID 0400036 Inspection Report County/FIPS:Anson/007 Date: 07/15/2021 Facility Data Permit Data B.V.Hedrick Gravel and Sand Co.-Lilesville Plant Permit 06725/R05 Ingram Mountain Road-SR 1704 Issued 1/10/2014 Lilesville,NC 28091 Expires 12/31/2021 Lat: 34d 59.9820m Long: 79d 58.5360m Class/Status Small SIC: 1423/Crushed And Broken Granite Permit Status Active NAICS: 212313/Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Jason Conner Jeffrey Goodman Jason Conner VP and Management President VP Land Management (828)686-3844 (828)277-7030 (828)686-3844 Compliance Data Comments: Inspection Date 07/07/2021 Inspector's Name Mike Thomas Inspector's Signature: Operating Status Operating �. Compliance Status Compliance-inspection Action Code FCE Date of Signaturje• Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2012 --- --- --- --- --- --- --- 2008 --- --- --- --- --- --- --- *Hi hest HAP Emitted inpounds) Five Year Violation History:None Date Letter Ty Rule Violated Violation Resolution Date pe Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested 1) DIRECTIONS: From FRO,head south on Green St toward Maiden Ln. At the traffic circle,take the 2nd exit onto Gillespie St. Turn right onto W Russell St. Turn left onto Robeson St. Use the left 2 lanes to turn left onto Raeford Rd and continue for 10 miles. Just past Wagram,turn right onto Old Wire Road(NC Hwy 144).Turn right onto Old Wire Road(Hwy 144)and go— 11 V2 miles to Laurel Hill. Merge onto HWY 74 W.and continue for 44 miles to Lilesville. In Lilesville,turn right at the flashing caution light onto 51 Street(at elementary school).Follow 5'Street,and bear left to continue on Wall Street,go—V2 mile to Stanback Ferry Road.Turn right and go V2 mile to Ingram Mountain Road,turn right and go—1 mile. Proposed quarry site is located on the left past gate. 2) SAFETY CONSIDERATIONS: Currently there are no mining activities taking place at this facility. Standard DAQ safety gear will be required if mining operations ever commence. 3) FACILILTY PROCESS AND DESCRIPTION: This facility has never been built. The following description is what was proposed for the facility originally. This facility is a 350 ton per hour throughput capacity crushing/screening operation that processes granite aggregate products,using a primary jaw crusher with a capacity of 250 tons per hour. The granite is mined from the quarry by drilling and blasting the material. Material from the quarry is loaded into haulage trucks via power shovel or front end loader and conveyed to the primary crusher. A grizzly feeder is utilized to remove undersize material,and oversize material is fed to the primary crusher,which is described as a jaw crusher, 250 tons.per hour maximum throughput with a 6-inch crusher setting. Discharged material from the crusher is sent to various secondary screens and a secondary crusher in order to obtain various sizes of aggregate materials. The materials are stored in piles on site, and loaded into trucks via front end loader for shipment to the customer. There is no washing of product at this site. Particulate emissions are controlled by water sprays on the crusher, screens,and conveyor transfer points. There are no stationary reciprocating internal combustion engines at this site. 4) PERMITTED EMISSION SOURCES: • f l Ntb� t + ia+ ri p` es$ Phan 3SlI tUd� �ct� tttilizie S� ressipn wi;11 U,.a` +er tr++ Ong• 3 E ES Crush Crushing Operations N/A N/A Not installed ES Screen Screening Operations N/A N/A Not installed ES Convey Conveying Operations N/A N/A Not installed 5) INSPECTION SUMMARY: On 10 March 2020,I Jeff Nelson, of FRO DAQ conducted a compliance evaluation inspection of this facility. This facility has not been constructed. I spoke to the facility contact,Jason Connor by telephone.Mr. Conner informed me that there are currently no plans to construct anything at the site. He also stated that the facility would retain the current air permit at this time.I offered my assistance with the facility's emissions inventory and air permit renewal,but Mr. Connor declined. 6) PERMIT STIPULATIONS: a) A.2 2Q .0304 PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT—Entire facility subject. Submit permit renewal application and EI at least 90 days prior to permit expiration. Appeared to. in compliance—The facility's next deadline for emissions inventory and permit renewal will be in September of 2021 for the 2020 calendar year. The other stipulations in this permit could not be evaluated for compliance as the facility has never been constructed. 7) 112R Status The facility does not store any of the listed chemicals above the threshold quantities,and is not required to maintain a written Risk Management Plan(RMP). 8) Non-compliance History Since 2010 None. 9) Comments and Compliance Statement B.V.Hedrick Gravel and Sand Co.—Lilesville Plant appeared to be in compliance with the conditions of the facility's current air permit on 10 March 2020. Pink Sheet:No comments. /mst