Loading...
HomeMy WebLinkAboutAQ_F_0400028_20210614_CMPL_CAV-Rpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Concrete Supply Co.,LLC-Wadesboro NC Facility ID 0400028 Compliance Assurance Visit Report County/FIPS: Anson/007 Date: 06/14/2021 Facility Data Permit Data Concrete Supply Co.,LLC-Wadesboro Permit n/a Rt 4 Box 110 Issued n/a Wadesboro,NC 28170 Expires n/a Lat: 34d 58.6320m Long: 80d 5.5620m Class/Status Permit Exempt SIC: 3273/Ready-Mixed Concrete Permit Status Inactive NAICS: 32732/Ready-Mix Concrete Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Johnie Alexander Henry Batten Johnie Alexander Environmental Manager President Environmental Manager (704)372-2930 (704)372-2930 (704)372-2930 Compliance Data Comments: Inspection Date 06/14/2021 Inspector's Name Mike Turner Inspector's Signature: Mju 7r t, w\ Operating Status Operating Compliance Status Compliance-inspection Action Code FCE Date of Signature: C 14Ia0") Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP SO2 NOX VOC CO PM10 *HAP 2010 --- --- --- --- --- -- 2006 2.79 --- --- --- --- 0.8400 0.2410 * Highest HAP Emitted(inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested I. DIRECTIONS From FRO,head south on Green St toward Maiden Ln for 0.1 mile.At the traffic circle,take the 2nd exit onto Gillespie St for 0.2 miles.Turn right onto W Russell St for 0.5 miles.Turn left onto Robeson St for 2.4 miles.Use the left 2 lanes to turn left onto Raeford Rd/US 401.Follow Raeford Rd./US 401 for 30.1 miles to Wagram,NC. Tom right onto NC-144 W/Old Wire Rd for 6.2 miles.At the traffic circle,take the 2nd exit onto NC-144,continue 5.4 miles,then take a slight right onto NC-1319 for 0.7 miles,then a slight right onto US-74 W for 6.7 miles. Continue onto I-74 W/US-74 W(signs for Rockingham)for 10.5 miles. Continue onto US-74 W for 19.0 miles. In Wadesboro,approx. 500 feet on the left past the intersection of US 74 and NC 52 N,take a left before the Waffle House. H. SAFETY Standard FRO safety gear is required. III. FACILITY DESCRIPTION Concrete Supply Co.,LLC.,-Wadesboro is a dormant concrete batch plant located in Wadesboro,Anson County. The facility has not been operational in years. Silos, conveyors and raw material bunkers remain on site. The facility's air quality permit was rescinded on 09 August 2016 under the newly adopted 2Q .0102(d)exemption. IV. COMPLIANCE ASSURANCE VISIT SUMMARY On 14 June 2021,I,Mike Turner,of the Fayetteville Regional Office of DAQ, called Johnie Alexander, Environmental Manager of the Concrete Supply Co.,LLC., -Wadesboro facility. The purpose of my call was to schedule a compliance assurance visit. Mr.Alexander stated to me this facility has not operated in years and there are no plans to operate this facility in the future. On 16 June 2021,1 drove by the facility and confirmed this facility is not operating. V. NON-COMPLIANCE HISTORY SINCE 2010 The facility does not have a history of non-compliance. VI. 112r APPLICABILITY The facility does not store any of the listed chemicals above the threshold quantities, and is not required to Maintain a written Risk Management Plan (RMP). VH. CONCLUSION AND RECOMMENDATIONS Concrete Supply Co.,LLC—Wadesboro appeared to be complying with applicable air quality regulations on 14 June 2021. Since no concrete was produced at this facility in CY 2020,there were no emissions. Thus,this facility still qualifies for exemption from permitting. PINK SHEET ADDITIONS: None. /wmt