HomeMy WebLinkAboutAQ_F_1300029_20210616_CMPL_CmpltRpt Complaint Investigation Report County: Cabarrus
Region: MRO
NC Dept. of Environmental Quality Suspect: Galvan Industries, Inc.
Division of Air Quality Facility ID# 1300029
Record# 23368
Regional Investigator: Wolanin,Melinda Suspect: Galvan Industries,Inc.
Regional Co-investigator: Suspect Contact: Harshad Londhe
Partner Agency: Physical Location: 7320 Galvan Way-Harrisburg
Date Complaint Received: 06/09/2021 Mailing Address: Post Office Box 369
Received By: Ingle,Bruce City/State/Zip: Harrisburg NC 28075
Date assigned: 06/09/2021 Telephone: (704)455-5102
Alternate Telephone:
Complainant: Anonymous
Investigation date: 06/09/2021
Follow-up date: Complainant Address:
Report submit date: 06/16/2021 City/State/Zip:
Telephone(H):
Complaint type: OTHER Telephone(W):
Complaint description: VE at night and"rust" on Call Back Required? No Response Requested
cars
Referral to DAQ: Local/state/fed agency
Situation Dangerous: Violation documented:
Occurring Now: NCFS Permit:
Type Action: _Full Compliance _Partial Compliance X Complaint Other:
Evaluation Evaluation/Reinspection Investigation
Data Date submitted for initial review 06/16/2021 _IBEAM WARNING/OB or NOV or NOV/NRE
Tracking: X IBEAM Document
IBEAM Inspection,list date inspected _IBEAM LAT/LONG,Facility Locked
IBEAM Inspection,list date draft is submitted _IBEAM LAT/LONG,Coordinates checked
IBEAM Inspection,pollutants/programs checked _IBEAM Complaint
IBEAM Planning,Next Inspection Date
Signature: Xc64d4 Z o J:EF Report Date: 0611612021
Comments/Directions: No onsite investigation was conducted by DAQ. See facility file.
Summary of investigation:
1. On June 9,2021,Bruce Ingle of this office received an anonymous complaint forwarded by Wendell
Reed of EPA Region 4. The complaint indicated that there were visible emissions occurring at night and
rust on cars from operations at Galvan Industries, Inc.
2. On June 9,2021,around 4:OOpm, I called and spoke with Harshad Londhe, Plant Manager. He indicated
that there had been no upset conditions or changes at the facility. The most recent inspection of the
facility,conducted by Karyn Kurek, occurred on December 4,2020,with compliance indicated.
3. No further action will be taken by DAQ at this time.
MJW:
https://ncconnect.sharepoint.comlsitesIDAQ-MROICountiesICABARRUS1000291COM_INV'EST_20210609.docx