Loading...
HomeMy WebLinkAboutAQ_F_1300029_20210616_CMPL_CmpltRpt Complaint Investigation Report County: Cabarrus Region: MRO NC Dept. of Environmental Quality Suspect: Galvan Industries, Inc. Division of Air Quality Facility ID# 1300029 Record# 23368 Regional Investigator: Wolanin,Melinda Suspect: Galvan Industries,Inc. Regional Co-investigator: Suspect Contact: Harshad Londhe Partner Agency: Physical Location: 7320 Galvan Way-Harrisburg Date Complaint Received: 06/09/2021 Mailing Address: Post Office Box 369 Received By: Ingle,Bruce City/State/Zip: Harrisburg NC 28075 Date assigned: 06/09/2021 Telephone: (704)455-5102 Alternate Telephone: Complainant: Anonymous Investigation date: 06/09/2021 Follow-up date: Complainant Address: Report submit date: 06/16/2021 City/State/Zip: Telephone(H): Complaint type: OTHER Telephone(W): Complaint description: VE at night and"rust" on Call Back Required? No Response Requested cars Referral to DAQ: Local/state/fed agency Situation Dangerous: Violation documented: Occurring Now: NCFS Permit: Type Action: _Full Compliance _Partial Compliance X Complaint Other: Evaluation Evaluation/Reinspection Investigation Data Date submitted for initial review 06/16/2021 _IBEAM WARNING/OB or NOV or NOV/NRE Tracking: X IBEAM Document IBEAM Inspection,list date inspected _IBEAM LAT/LONG,Facility Locked IBEAM Inspection,list date draft is submitted _IBEAM LAT/LONG,Coordinates checked IBEAM Inspection,pollutants/programs checked _IBEAM Complaint IBEAM Planning,Next Inspection Date Signature: Xc64d4 Z o J:EF Report Date: 0611612021 Comments/Directions: No onsite investigation was conducted by DAQ. See facility file. Summary of investigation: 1. On June 9,2021,Bruce Ingle of this office received an anonymous complaint forwarded by Wendell Reed of EPA Region 4. The complaint indicated that there were visible emissions occurring at night and rust on cars from operations at Galvan Industries, Inc. 2. On June 9,2021,around 4:OOpm, I called and spoke with Harshad Londhe, Plant Manager. He indicated that there had been no upset conditions or changes at the facility. The most recent inspection of the facility,conducted by Karyn Kurek, occurred on December 4,2020,with compliance indicated. 3. No further action will be taken by DAQ at this time. MJW: https://ncconnect.sharepoint.comlsitesIDAQ-MROICountiesICABARRUS1000291COM_INV'EST_20210609.docx