Loading...
HomeMy WebLinkAboutAQ_F_1900134_20220425_ST_RvwMemo (4) DIVISION OF AIR QUALITY April 25, 2022 MEMORANDUM To: Taylor Hartsfield, EIT, CPM, Raleigh Regional Office From: Shannon Vogel, Stationary Source Compliance Branch Subject: Duke Energy Progress LLC—Cape Fear STAR® Facility Moncure, Chatham County, North Carolina Facility ID 1900134, Permit No. 10583R01 Emissions Testing of ES-9 External Heat Exchanger Performed January 26, 2021 by Grace Consulting, Inc. Tracking No. 2021-327st Grace Consulting performed EPA Method 5/202 total particulate matter (PM)testing of the external heat exchanger (EHE) ES-9. The total PM emissions test results demonstrate compliance with the applicable total PM emissions limit as discussed below. Emissions Source ES-9 the external heat exchanger B with a 70 ton per hour nominal capacity. Emissions from ES-9 are controlled by baghouse CD-9. 15A NCAC 2D .0515 Particulates From Miscellaneous Industrial Processes applies to ES-9. The reported process rate averaged 34.8 tons per hour (tph). The 2D .0515 total PM emissions limit for this rate is 42.2 pounds per hour (lb/hr). The test results are acceptable. Pollutant Test Result Emissions Limit Standard Compliance Filterable PM 0.53 Ib/hr --- --- --- Condensible PM 0.92 Ib/hr --- --- --- Total PM 1.45 Ib/hr 42.3 Ib/hr 2D .0515 Yes Process Rate 34.8 tph --- --- --- Compliance was demonstrated. If you have any questions or comments, please contact me at shannon.vogel i or 919-707-8416. cc: IBEAM Documents 1900134