Loading...
HomeMy WebLinkAboutAQ_F_1200086_20220311_PRMT_Permit t,�s.STATE ROY COOPER � Governor ELIZABETH S. BISER Secretary - � eMn an+^ tsse paM,n3f'` MICHAEL A. ABRACZINSKAS NORTH CAROLINA Director Environmental Quality March 11, 2022 Mr. Scott Bartlett Head of Operations Siegwerk EIC LLC 1 Quality Products Road Morganton, NC 28655-4759 Subject: Air Permit No. 05478R13 Siegwerk EIC LLC Morganton, Burke County,North Carolina Permit Class: Small Facility ID# 1200086 Dear Mr. Bartlett: In accordance with your completed application received March 9, 2022, we are forwarding herewith Permit No. 05478R13 to Siegwerk EIC LLC, Morganton, Burke County, North Carolina for the construction and operation of air emissions sources or air cleaning devices and appurtenances. Additionally, any emissions activities determined from your air permit application as meeting the exemption requirements contained in 15A NCAC 2Q .0102 have been listed for information purposes as an "ATTACHMENT" to the enclosed air permit. Please note the records retention requirements are contained in General Condition 2 of the General Conditions and Limitations. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to request a formal adjudicatory hearing within 30 days following receipt of this permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of the entire permit. This hearing request must be in the form of a written petition, conforming to G.S. 150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings. Unless a request for a hearing is made pursuant to G.S. 15013-23,this air permit shall be final and binding. You may request modification of your air permit through informal means pursuant to G.S. 150B-22. This request must be submitted in writing to the Director and must identify the specific provisions or issues for which the modification is sought. Please note that the permit will become final and binding regardless of a request for informal modification unless a request for a hearing is also made under G.S. 15013-23. North Carolina Department of Environmental Quality Division of Air Quality Asheville Regional Office 1 2090 U.S.Highway 70 Swannanoa,NC 28778 NCR�rH(,'A�ROL. .P- DeqarMwdolE"Ao-°"tal0`0tyy a� 828 296.4500 T 1 828.299.7043 F Mr. Scott Bartlett March 11, 2022 Page 2 Unless exempted by a condition of this permit or the regulations, construction of new air pollution sources or air cleaning devices, or modifications to the sources or air cleaning devices described in this permit must be covered under a permit issued by the Division of Air Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143- 215.114B. This permit shall be effective from March 11, 2022 until February 28, 2030, is nontransferable to future owners and operators, and shall be subject to the conditions and limitations as specified therein. Changes have been made to the permit stipulations. The Permittee is responsible for carefully reading the entire permit and evaluating the requirements of each permit stipulation. The Permittee shall comply with all terms, conditions, requirements, limitations and restrictions set forth in this permit. Noncompliance with any permit condition is grounds for enforcement action, for permit termination, revocation and reissuance, or modification, or for denial of a permit renewal application. Specific changes and additions are summarized below (note: this list may not include all changes and additions): • The bagfiflter (ID No. DC-2) installed on the waterborne ink manufacturing operations has been modified to reflect the new filter size; • 15A NCAC 2D .0958 "Work Practices for Sources of Volatile Organic Compounds" has been removed because this regulation is no longer applicable; • The natural gas boiler has been removed from the "Insignificant/Exempt Activities" list; and • The natural gas fired emergency generator has been added to the "Insignificant/Exempt Activities" list. Should you have any questions concerning this matter, please contact Michael Koerschner at 828- 296-4550. Sincerely, Brendan G. Davey, P.E., Regional Supervisor Division of Air Quality, NC DEQ BGD:mfk Enclosures c: Asheville Regional Office NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF AIR QUALITY AIR PERMIT NO. 054781113 Issue Date: March 11, 2022 Effective Date: March 11, 2022 Expiration Date: February 28,2030 Replaces Permit: 05478R12 To construct and operate air emission source(s) and/or air cleaning device(s), and for the discharge of the associated air contaminants into the atmosphere in accordance with the provisions of Article 2 1 B of Chapter 143, General Statutes of North Carolina(NCGS) as amended, and other applicable Laws, Rules and Regulations, Siegwerk EIC LLC 1 Quality Products Road Morganton, Burke County,North Carolina Permit Class: Small Facility ID# 1200086 (the Permittee) is hereby authorized to construct and operate the air emissions sources and/or air cleaning devices and appurtenances described below: Emission Emission Source Control Control System Source ID Description System ID Description ES-1 laboratory pigment blending operations DC-1 one bagfilter(250 square feet of filter area) ES-2 lwaterborne ink manufacturing operations I DC-2 lone bagfilter(2100 square feet of filter area) ES-4 Idispersion manufacturing operations DC-6 lone bagfilter(2,480 square feet of filter area) in accordance with the completed application 1200086.21A received March 9, 2022 including any plans, specifications, previous applications, and other supporting data, all of which are filed with the Department of Environmental Quality, Division of Air Quality (DAQ) and are incorporated as part of this permit. This permit is subject to the following specified conditions and limitations including any TESTING, REPORTING, OR MONITORING REQUIREMENTS: A. SPECIFIC CONDITIONS AND LIMITATIONS 1. Any air emission sources or control devices authorized to construct and operate above must be operated and maintained in accordance with the provisions contained herein. The Permittee shall comply with applicable Environmental Management Commission Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter Permit No. 05478R13 Page 2 2D .0202, 2D .0515, 2D .0521, 2D .0535, 2D .0540, 2D .0611, 2D .1100, 2D .1806, 2Q .0102 and 2Q .0711. 2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT -The Permittee, at least 90 days prior to the expiration date of this permit, shall request permit renewal by letter in accordance with 15A NCAC 2Q .0304(d) and (f). Pursuant to 15A NCAC 2Q .0203(i), no permit application fee is required for renewal of an existing air permit (without a modification request). The renewal request (with application Form A) should be submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration date of this permit,the Permittee shall submit the air pollution emission inventory report (with Certification Sheet) in accordance with 15A NCAC 2D .0202, pursuant to N.C. General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ and shall document air pollutants emitted for the 2029 calendar year. 3. PARTICULATE CONTROL REQUIREMENT - As required by 15A NCAC 2D .0515 "Particulates from Miscellaneous Industrial Processes," particulate matter emissions from laboratory pigment blending operations (ID No. ES-1), waterborne ink manufacturing operations (ID No. ES-2) and dispersion manufacturing operations (ID No. ES-4) shall not exceed allowable emission rates. The allowable emission rates are, as defined in 15A NCAC 2D .0515, a function of the process weight rate and shall be determined by the following equation(s), where P is the process throughput rate in tons per hour(tons/hr) and E is the allowable emission rate in pounds per hour(lbs/hr). E=4.10 * (P) 0-" for P <=30 tons/hr, or E = 55 * (P) 0��1 -40 for P >30 tons/hr 4. VISIBLE EMISSIONS CONTROL REQUIREMENT -As required by 15A NCAC 2D .0521 "Control of Visible Emissions," visible emissions from the air emission sources manufactured after July 1, 1971 shall not be more than 20 percent opacity when averaged over a six-minute period, except that six-minute periods averaging not more than 87 percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period. However, sources which must comply with a visible emissions standard in 15A NCAC 2D .0524 "New Source Performance Standards" or .1110 "National Emission Standards for Hazardous Air Pollutants" shall meet that standard instead of the 2D .0521 visible emissions standard. 5. NOTIFICATION REQUIREMENT - As required by 15A NCAC 2D .0535, the Permittee of a source of excess emissions that last for more than four hours and that results from a malfunction, a breakdown of process or control equipment or any other abnormal conditions, shall: a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time of the Division's next business day of becoming aware of the occurrence and describe: i. the name and location of the facility, ii. the nature and cause of the malfunction or breakdown, Permit No. 05478R13 Page 3 iii. the time when the malfunction or breakdown is first observed, iv. the expected duration, and V. an estimated rate of emissions. b. Notify the Director or his designee immediately when the corrective measures have been accomplished. This reporting requirement does not allow the operation of the facility in excess of Environmental Management Commission Regulations. 6. FUGITIVE DUST CONTROL REQUIREMENT - As required by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. If substantive complaints are received or excessive fugitive dust emissions from the facility are observed beyond the property boundaries for six minutes in any one hour (using Reference Method 22 in 40 CFR, Appendix A),the owner or operator may be required to submit a fugitive dust plan as described in 2D .0540(f). "Fugitive dust emissions" means particulate matter that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas, process areas stockpiles, stock pile working, plant parking lots, and plant roads (including access roads and haul roads). 7. FABRIC FILTER REQUIREMENTS includingcartridge artridge filters, baghouses, and other dry filter particulate collection devices -As required by 15A NCAC 2D .0611, particulate matter emissions shall be controlled as described in the permitted equipment list. a. Inspection and Maintenance Requirements - To comply with the provisions of this permit and ensure that emissions do not exceed the regulatory limits,the Permittee shall perform, at a minimum, an annual (for each 12 month period following the initial inspection) internal inspection of each particulate collection device system. In addition,the Permittee shall perform periodic inspections and maintenance as recommended by the equipment manufacturer. b. Recordkeeping Requirements - The results of all inspections and any variance from manufacturer's recommendations or from those given in this permit(when applicable) shall be investigated with corrections made and dates of actions recorded in a logbook. Records of all maintenance activities shall be recorded in the logbook. The logbook (in written or electronic format) shall be kept on-site and made available to DAQ personnel upon request. 8. TOXIC AIR POLLUTANT EMISSIONS LIMITATION AND REPORTING REQUIREMENT- Pursuant to 15A NCAC 2D .1100 "Control of Toxic Air Pollutants," and in accordance with the approved application for an air toxic compliance demonstration, the permit limits in the table below shall not be exceeded. The Permittee has submitted a toxic air pollutant dispersion modeling analysis dated for the facility's toxic air pollutant emissions as listed in the below table. The modeling analysis was reviewed and approved by the DAQ Air Quality Analysis Branch(AQAB) in 1991. Placement of the emission sources, Permit No. 05478R13 Page 4 configuration of the emission points, and operation of the sources shall be in accordance with the submitted dispersion modeling analysis and should reflect any changes from the original analysis submittal as outlined in the AQAB review memo. Affected Source(s) Toxic Air Pollutant Emission Limit'. ink manufacturing ' Ammonia(as NH3) 20.12 lb/hr operations (7664-41-7) Recordkeeping Requirements - To ensure compliance with the above limit, the Permittee shall track ammonia emissions on a daily basis by monitoring ammonium hydroxide usage. Records of the estimated daily ammonia emissions shall be maintained at the facility, and shall be made available to Division of Air Quality personnel upon request. 9. CONTROL AND PROHIBITION OF ODOROUS EMISSIONS - As required by 15A NCAC 2D .1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not operate the facility without implementing management practices or installing and operating odor control equipment sufficient to prevent odorous emissions from the facility from causing or contributing to objectionable odors beyond the facility's boundary. 10. Federal and State Rules Applicable to Sources Exempted from Air Permitting_Requirements - Your facility is subject to the following federal rule: 40 CFR 63 Subpart ZZZZ [RICE MACT] which is applicable to the natural gas fired emergency generator (Emission Source ID I- GEN) listed on the "Insignificant/Exempt Activities" list attached to this permit. The purpose of this permit condition is to inform you of your compliance obligations to these applicable rules as they are enforceable. 11. TOXIC AIR POLLUTANT EMISSIONS LIMITATION REQUIREMENT - Pursuant to 15A NCAC 2Q .0711 "Emission Rates Requiring a Permit," for each listed toxic air pollutants (TAPs) except ammonia(NH3), the Permittee has made a demonstration that facility-wide actual emissions, where one or more emission release points are obstructed or non-vertically oriented, do not exceed the Toxic Permit Emission Rates (TPERs) listed in 15A NCAC 2Q .0711(a). The facility shall be operated and maintained in such a manner that emissions of any listed TAPs from the facility, including fugitive emissions, will not exceed TPERs listed in 15A NCAC 2Q .0711(a). a. A permit to emit any of the below listed TAPs shall be required for this facility if actual emissions from all sources will become greater than the corresponding TPERs. b. PRIOR to exceeding any of these listed TPERs, the Permittee shall be responsible for obtaining a permit to emit TAPs and for demonstrating compliance with the requirements of 15A NCAC 2D .1100 "Control of Toxic Air Pollutants". Permit No. 05478R13 Page 5 c. In accordance with the approved application, the Permittee shall maintain records of operational information demonstrating that the TAP emissions do not exceed the TPERs as listed below: B. GENERAL CONDITIONS AND LIMITATIONS 1. In accordance with G.S. 143-215.108(c)(1), TWO COPIES OF ALL DOCUMENTS, REPORTS, TEST DATA, MONITORING DATA, NOTIFICATIONS, REQUESTS FOR RENEWAL, AND ANY OTHER INFORMATION REQUIRED BY THIS PERMIT shall be submitted to the: Regional Supervisor North Carolina Division of Air Quality Asheville Regional Office 2090 U.S. Highway 70 Swannanoa,NC 28778 828-296-4500 For identification purposes, each submittal should include the facility name as listed on the permit,the facility identification number, and the permit number. 2. RECORDS RETENTION REQUIREMENT - In accordance with 15A NCAC 2D .0605, any records required by the conditions of this permit shall be kept on site and made available to DAQ personnel for inspection upon request. These records shall be maintained in a form suitable and readily available for expeditious inspection and review. These records must be kept on site for a minimum of 2 years, unless another time period is otherwise specified. 3. ANNUAL FEE PAYMENT - Pursuant to 15A NCAC 2Q .0203(a), the Permittee shall pay the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a timely manner will cause the DAQ to initiate action to revoke the permit. 4. EQUIPMENT RELOCATION - In accordance with 15A NCAC 2Q .0301, a new air permit shall be obtained by the Permittee prior to establishing, building, erecting,using, or operating the emission sources or air cleaning equipment at a site or location not specified in this permit. 5. REPORTING REQUIREMENT - In accordance with 15A NCAC 2Q .0309, any of the following that would result in previously unpermitted, new, or increased emissions must be reported to the Regional Supervisor, DAQ: a. changes in the information submitted in the application regarding facility emissions; b. changes that modify equipment or processes of existing permitted facilities; or c. changes in the quantity or quality of materials processed. Permit No. 05478R13 Page 6 If appropriate, modifications to the permit may then be made by the DAQ to reflect any necessary changes in the permit conditions. In no case are any new or increased emissions allowed that will cause a violation of the emission limitations specified herein. 6. In accordance with 15A NCAC 2Q .0309,this permit is subject to revocation or modification by the DAQ upon a determination that information contained in the application or presented in the support thereof is incorrect, conditions under which this permit was granted have changed, or violations of conditions contained in this permit have occurred. In accordance with G.S. 143-215.108(c)(1),the facility shall be properly operated and maintained at all times in a manner that will effectuate an overall reduction in air pollution. Unless otherwise specified by this permit, no emission source may be operated without the concurrent operation of its associated air cleaning device(s) and appurtenances. 7. CHANGES NOT REQUIRING PERMIT REVISIONS - Pursuant to 15A NCAC 02Q .0318, changes to the facility that are not exempt pursuant to 15A NCAC 02Q .0102 may be allowed without first modifying an applicable air permit if the change(s) meet(s) the requirements of 15A NCAC 02Q .0318(b)(1)through (b)(5) and the owner or operator notifies the Director in writing, using forms provided by the Division, seven calendar days before the change is made. Within 10 business days of receipt of the notice, the Division shall notify the owner or operator of its determination of whether the change(s) meet(s) the requirements of 15A NCAC 02Q .0318(b)(1) through(b)(5). 8. In accordance with G.S. 143-215.108(c)(1), this permit is nontransferable by the Permittee. Future owners and operators must obtain a new air permit from the DAQ. 9. In accordance with G.S. 143-215.108(c)(1),this issuance of this permit in no way absolves the Permittee of liability for any potential civil penalties which may be assessed for violations of State law which have occurred prior to the effective date of this permit. 10. In accordance with G.S. 143-215.108(c)(1),this permit does not relieve the Permittee of the responsibility of complying with all applicable requirements of any Federal, State, or Local water quality or land quality control authority. 11. In accordance with 15A NCAC 2D .0605, reports on the operation and maintenance of the facility shall be submitted by the Permittee to the Regional Supervisor, DAQ at such intervals and in such form and detail as may be required by the DAQ. Information required in such reports may include, but is not limited to, process weight rates, firing rates, hours of operation, and preventive maintenance schedules. 12. A violation of any term or condition of this permit shall subject the Permittee to enforcement pursuant to G.S. 143-215.114A, 143-215.114B, and 143-215.114C, including assessment of civil and/or criminal penalties. 13. Pursuant to North Carolina General Statute 143-215.3(a)(2), no person shall refuse entry or access to any authorized representative of the DAQ who requests entry or access for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out his official duties. Refusal of entry or access may constitute grounds for permit revocation and assessment of civil penalties. Permit No. 05478RI3 Page 7 14. In accordance with G.S. 143-215.108(c)(1), this permit does not relieve the Permittee of the responsibility of complying with any applicable Federal, State, or Local requirements governing the handling, disposal, or incineration of hazardous, solid, or medical wastes, including the Resource Conservation and Recovery Act (RCRA) administered by the Division of Waste Management. 15. PERMIT RETENTION REQUIREMENT - In accordance with 15A NCAC 2Q .0110, the Permittee shall retain a current copy of the air permit at the site. The Permittee must make available to personnel of the DAQ, upon request,the current copy of the air permit for the site. 16. CLEAN AIR ACT SECTION 112(r) REQUIREMENTS - Pursuant to 15A NCAC 2D .2100 "Risk Management Program," if the Permittee is required to develop and register a risk management plan pursuant to Section 112(r) of the Federal Clean Air Act,then the Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part 68. 17. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I Part A Section 112(r)(1) of the Clean Air Act "Hazardous Air Pollutants - Prevention of Accidental Releases - Purpose and General Duty," although a risk management plan may not be required, if the Permittee produces, processes,handles, or stores any amount of a listed hazardous substance, the Permittee has a general duty to take such steps as are necessary to prevent the accidental release of such substance and to minimize the consequences of any release. This condition is federally-enforceable only. 18. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS - If emissions testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing to the DAQ in support of a permit application or to demonstrate compliance,the Permittee shall perform such testing in accordance with 15A NCAC 2D .2600 and follow all DAQ procedures including protocol approval, regional notification, report submittal, and test results approval. Additionally, in accordance with 15A NCAC 2D .0605, the Permittee shall follow the procedures for obtaining any required audit sample and reporting those results. Permit issued this the I Ith of March, 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Brendan G. Davey, P.E. Regional Supervisor By Authority of the Environmental Management Commission Air Permit No. 05478R13 ATTACHMENT to Permit No. 05478R13, March 11, 2022 Insignificant/Exempt Activities Source Exemption Source of Source of Title Regulation TAPs? V Pollutants? I-GEN -natural gas-fired emergency generator (17 kW output) —40 CFR 63 2Q .0102 (h)(5) Yes Yes Subpart ZZZZ [RICE MALT] 1. Because an activity is exempted from being required to have a permit or permit modification does not mean that the activity is exempted from an applicable requirement or that the owner or operator of the source is exempted from demonstrating compliance with any applicable requirement. 2. When applicable, emissions from stationary source activities identified above shall be included in determining compliance with the permit requirements for toxic air pollutants under 15A NCAC 2D .1100 "Control of Toxic Air Pollutants" or 2Q .0711 "Emission Rates Requiring a Permit." 3. Sample permit conditions showing the regulatory requirements for exempt sources subject to NESHAP,NSPS, and NCAC rules may be found here: https://deq.nc.gov/aqper itconditions