Loading...
HomeMy WebLinkAboutAQ_F_0000057_20220112_CMPL_InspRpt (4) 1 a � r F NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY APAC-Atlantic, Inc. -Burnsville NC Facility ID 0000057 Inspection Report County/FIPS: Yancey/199 Date: 01/14/2022 Facility Data Permit Data APAC-Atlantic, Inc. -Burnsville Permit 00161 /R14 1964 West Highway 19E Issued 10/11/2017 Burnsville,NC 28714 Expires 9/30/2025 Lat: 35d 54.7465m Long: 82d 21.0495m Class/Status Synthetic Minor SIC: 2951 /Paving Mixtures And Blocks Permit Status Active NAICS: 324121 /Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Don Mason Don Mason Don Mason Environmental Environmental Environmental Compliance/Quality Compliance/Quality Compliance/Quality Control Control Control (828)524-5455 (828)524-5455 (828)524-5455 Compliance Data Comments: ivi compl iavice b4 shtn+-dowvl. Inspection Date 01/12/2022 Inspector's Name Lisa Whitaker Inspector's Signature: Operating Status Operating Compliance Status Compliance-inspection Action Code FCE Date of Signature:J"avwar� 14, 2.022 Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 * HAP 2016 --- --- --- 2011 --- --- --- *--- Highest HAP Emitted(inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested DIRECTIONS: From Asheville take Hwy. 19123 north towards Mars Hill. Approx. 1-mile past Mars Hill turn right onto Hwy. 19. The Facility will be on the left just before entering Burnsville. 2 Process Description APAC-Atlantic, Inc. operates,when it operates at all, a batch-mix asphalt plant which is permitted to produce 485,000 tons of asphalt per twelve-month period. APAC receives crushed stone from off-site. Inspection Observations On January 12, 2022, I(Lisa Whitaker)traveled to the site to determine the current operating status of APAC Atlantic Inc. in Burnsville,North Carolina and conduct an inspection if it was found to be operational. The lot remained overgrown; gates continue to be locked with contact phone numbers posted. It appeared that the equipment was not operational and in long term shut-down. The authorized, facility and technical contact Mr. Don Mason, Environmental Compliance/Quality Control,was emailed regarding future facility operations on September 29,2021. Mr. Mason responded at the time that `there are no plans to operate the facility in the near future'. Mr. Mason was not contacted for the 2022 inspection because no evidence was observed to indicate a change of plans. The current permit expires in 2025 and can be evaluated for renewal at that time. Reporting Requirement Air Quality Permit 00161R14 limits the production of asphalt to 485,000 tons per twelve consecutive months. The 2020 annual report was received on January 11, 2021 and reported production as zero (0) tons. The 2021 report was received on January 11, 2022 and reported Facility reported 0 tons of production and stated, "Plant did not operate in 2021, no fuel combusted". This facility has not been operated in approximately 15 years. Five-Year Compliance History There have been no compliance issues documented at this facility in the past five years. Conclusion APAC-Atlantic, Inc., at Burnsville appeared to be in compliance by shutdown at the time of this site visit.