Loading...
HomeMy WebLinkAboutAQ_F_1400163_20211117_CMPL_CAV-Rpt (4) cpl' NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY Boone Lumber,Inc. NC Facility ID 1400163 Compliance Assurance Visit(CAV)Report County/FIPS: Caldwell/027 Date: 11/19/2021 Facility Data Permit Data Boone Lumber, Inc. Permit n/a 2000 Valway Drive Issued n/a Lenoir,NC 28645 Expires n/a Lat: 35d 55.4500m Long: 8 1 d 33.2500m Class/Status Permit Exempt SIC: 2421 /Sawmills &Planing Mills General Permit Status Inactive NAICS: 321113 /Sawmills Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Kevin Greene Sid Greene Sid Greene Facilities Manager General Manager General Manager (828)757-3813 (828)757-3813 (828)757-3813 Compliance Data Comments: CAV Date 11/17/2021 �? Inspector's Name Bob Graves Inspector's Signature: �-'��"' Operating Status Operating Compliance Status Compliance—procedural requirements Date of Signature: i 2� 'Z '2—) Action Code FCE CAV Result Compliance Total Actual emissions in TONSIYEAR: TSP S02 NOX VOC CO PM10 * HAP 2011 2.83 --- --- --- --- 0.8100 --- 2006 0.8800 --- --- --- --- 0.3700 --- Highest HAP Emitted(in pounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested 1) Location: Boone Lumber, Inc. is located at 2000 Valway Drive in Lenoir,NC. Caldwell County Directions: From the ARO, follow I-40East to exit 103 (Morganton/Rutherfordton). Turn left onto US 64 and follow to the intersection with Hwy. 70. Make a left onto Hwy. 70 (W. Fleming Drive/US 64 BYP) and continue to follow US 64 BYP. Turn left onto US-64 E/NC-18 E. Turn left onto US-321/131owing Rock Blvd. Turn left onto US-321 ALT/N. Main St. Turn right onto NC-90Nalway Road. Facility is located on the right. Safety: Safety shoes and eye protection Facility Description: Boone Lumber, Inc. is a sawing and planning operation that finishes lumber for commercial builders. Dried lumber of all dimensions is procured and stacked on site. The lumber is cut by saws to length and width then planned to meet customer specifications. Wood waste is handled through a duct system that is controlled by a cyclone. The wood waste is blown into collection trailers. The facility's production was estimated to be approximately 50% planning and 50% sawing, but currently the demand is approximately 60% rough lumber. The facility also sprays paint and/or stamps each end of the lumber for identification purposes. Current throughputs: 2021 Hours: 40 hrs/wk Employees: 12 The facility's normal operating hours are Monday-Thursday from Sam to 5:30pm with half days on Friday. The facility currently has 12 employees including office staff. Exempt from Air Permitting: This office received a written request and supporting documentation from Boone Lumber, Inc. on September 16, 2016 requesting rescission of Air Permit No. 07444R04. This office reviewed the request and on November 18, 2016 Boone Lumber Inc. became exempt from air permitting. This rule states that any facility whose actual emissions of particulate matter(PM10), sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, hazardous air pollutants, and toxic air pollutants are each less than five tons per year and whose actual total aggregate emissions are less than 10 tons per year shall not be required to obtain a permit pursuant to 15A NCAC 02Q .0300. 2021 Production: The facility reported 2021 throughput of 4,212,300 board feet and 221.55 tons of shaving. AQ Emissions Spreadsheet with the information supplied by the facility is TSP 3.42 Tons, and PM10 1.26 Tons. For 2020 the facility reported 6,889,045 board feet and 258.61 tons of shaving. The facility reported the tonnage of wood waste for 2018 as 295.11 total tons. Mr. Chris Scott ran the AQ Emissions Spreadsheet with the information supplied by the facility. Estimated 2018 facility-wide emissions are 1.67 tons PM10 and 4.56 tons TSP. The facility appears to remain below the air permitting threshold given the reported throughput. The facility appears to remain below the air permitting threshold given the reported throughput. Facility Contacts: I reviewed the IBEAM FacFnder report with Mr. Kevin Greene. Mr. Sid Greene is the new General Manager and Technical Contact. No other changes or updates need to be made at this time. Site Visit Narrative: On November 17, 2021, I traveled to Boone Lumber, Inc. to conduct a routine compliance assurance visit. I contacted the facility prior to my visit to prearrange my visit. I met and toured the facility with Mr. Kevin Greene, Facilities Manager. I arrived on site around 1:00pm and was on site for approximately 30 minutes. The facility was last inspection by Angel Hopper,on March 23, 2020. The facility has upgraded their wood waste trailer handling and trailer system including the duct work. This upgrade was done to improved efficiency and to prevent dusting and leaks. Emission Emission Source Control Control System Source ID Description System ID Description ES-1 one wood waste transfer and [CA one simple cyclone jtrailer collection system (84 inches in diameter) Emission Sources and Observations: The facility was previously permitted to operate one wood waste transfer and trailer collection system controlled by a simple cyclone (84 inches in diameter). The woodworking operation in operation with no visible emissions at the time of my site visit. The cyclone and duct work appeared to be in good conditions. The facility uses spray paint cans to mark the incoming month on ends each of the boards. The spray painting was not observed. Requirements Review: Particulates from Wood Products FinishingPlants. This facility appears to be able to adequately control any particulates generated by the woodworking operations with the installed ductwork and control devices. In compliance. Control of Visible Emissions. Visible emissions from the wood waste transfer and trailer collection system manufactured after July 1, 1971, should not be more than 20 percent opacity when averaged over a six-minute period, except that six-minute periods averaging not more than 87 percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period. The cyclone and wood waste transfer and trailer collection system were observed in operation with no visible emissions. In Compliance. Fugitive Dust Control. The facility is not to cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. "Fugitive dust emissions" means particulate matter that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas, process areas stockpiles, stock pile working, plant parking lots, and plant roads (including access roads and haul roads)." I did not observe any fugitive dust during my visit. In compliance Control and Prohibition of Odorous Emissions: No objectionable odors were observed on the facility property or in the area near the facility. In compliance. Reporting and Record Keeping Requirements: Boone Lumber, Inc. currently has no reporting or record keeping requirements. Compliance History Review: There have been no documented violations in past 5 years. Stack Test Review: There are no requirements for stack testing at this facility. 112R Status: The facility is not subject to 112R requirements Compliance Assistance: None needed at this time. Recommendations: NONE Compliance Statement: The facility appeared to be operating in compliance with all applicable air quality regulations and standards at the time of the site visit. Boone Lumber, Inc. Annual BF : Shavings BF Sold # Loads Shavings 2018 330605001 27 215.41 Tons 2019 377961390 22 242.93 Tons 2020 678897045 23 258.61 Tons 2021 47212,300 20 221 .55 TonsYt Boone lumber, Inc. Annual Shavings Tonnage 2021 Shavings 2020 Shavings 2019 Shavings ©ate t�leigh .Tonnage 1N Date" etg( Tflnnage_ crate Wetgitt Tar�nagQ 1/7/2021 28,360 14.18 1/3/2020 201-060 10.03 1/2/2019 27,040 13.52 1/28/2021 22,620 11.31 1/17/2020 24,460 12.23 1/24/2019 17,180 8.59 2/18/2021 24,840 12.42 2/5/2020 22,020 11.01 1/29/2019 15,920 7.96 3/9/2021 221740 11.37 2/21/2020 24,620 12.31 2/14/2019 19,120 9.56 3/24/2021 25,780 12.89 3/18/2020 25,280 12.64 2/20/2019 23,020 11.6 4/9/2021 20,960 10.48 3/27/2020 22,500 11.25 3/7/2019 181,760 9.38 4/23/2021 19,460 9.73 4/10/2020 18,960 9.48 3/15/2019 211700 10.85 5/10/2021 22,820 11.41 4/28/2020 17,240 8.62 3/27/2019 18,780 9.39 5/25/2021 27,060 13.53 5/19/2020 20,760 10.38 4/10/2019 22,960 11.48 6/8/2021 19,360 9.68 6/5/2020 24,860 12.43 4/25/2019 23,260 11.63 6/12/2021 18,780 9.39 6/25/2020 25,120 12.56 5/10/2019 18,640 9.32 6/25/2021 19,020 9.51 7/9/2020 26,420 13.21 5/23/2019 20,220 10.11 7/14/2021 24,560 12.28 7/23/2020 18,720 9.36 6/14/2019 241,120 12.06 7/27/2021 21,560 10.78 8/7/2020 22,960 11.48 6/28/2019 25,040 12.52 8/10/2021 221480 11.24 8/21/2020 26,380 13.19 7/23/2019 23,400 11.7 8/23/2021 19,960 9.98 9/1/2020 24,580 12.29 8/7/2019 22,040 11.02 9/8/2021 20,880 10.44 9/11/2020 19,850 9.925 8/29/2019 23,280 11.64 9/21/2021 24,060 12.03 10/7/2020 271400 13.7 9/23/2019 20,220 10.11 10/4/2021 21,780 10.89 10/23/2020 16,860 8.43 10/10/2019 22,140 11.07 10/19/2021 16,020 8.01 11/6/2020 23,020 11.51 10/24/2019 24,420 12.21 11/19/2020 22,960 11.48 11/19/2019 26,180 13.09 12/9/2020 231160 11.58 12/11/2019 28,240 14.12 12/22/2020 19,020 9.51 23 loads @ 11.43 tons avg 22 loads @ 11.04 tons avg