HomeMy WebLinkAboutAQ_F_8400101_20230310_PRMT_CmbPrmtFile_R18ROY COOPER
Governor
ELIZABETHS BISER Si
Secretary
Quam
MICHAEL A. ABRACZINSKAS NORTH CAROLINA
Environmental Quality
March 10, 2023
Mr. Stephen Filippone
General Manager
Fiber Composites, LLC dba Fiberon
181 Random Drive
New London, NC 28127
Subject: Air PermitNo. 08834R18
Fiber Composites, LLC dba Fiberon
New London, Stanly County, North Carolina
Permit Class: Synthetic Minor
Facility ID# 8400101
Dear Mr. Filippone:
In accordance with your application received September 2, 2022, we are forwarding
herewith Permit No. 08834R18 to Fiber Composites, LLC dba Fiberon, New London, Stanly
County, North Carolina for the construction and operation of air emissions sources or air cleaning
devices and appurtenances. Additionally, any emissions activities determined from your air permit
application as meeting the exemption requirements contained in 15ANCAC 2Q .0102 have been
listed for mformation purposes as an "ATTACHMENT" to the enclosed air permit.
If any parts, requirements, or limitations contained in this permit are unacceptable to you,
you have the right to file a petition for contested case hearing in the North Carolina Office of
Administrative Hearings. Information regardmg the right, procedure, and time limit for permittees
and other persons aggrieved to file such a petition is contained in the attached "Notice Regarding
the Right to Contest a Division of Air Quality Permit Decision."
Unless exempted by a condition of this permit or the regulations, construction of new
air pollution sources or air cleaning devices, or modifications to the sources or air cleaning
devices described in this permit must be covered under a permit issued by the Division of Air
Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may
subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143-
215.114B.
This permit shall be effective from March 10, 2023 until Febraary 28,2031, is
nontransferable to future owners and operators, and shall be subject to the conditions and limitations
as specified therein.
North Carolina Department of Environmental Quality j Division of Air Quality
Mooresville Regional Office | 610 East Center Avenue, Suite 301 | Mcoresville, NC 28115
^â– cer-icAPOLiPiA ^
704 663 1699 T I 704 663 6040 F
Stephen Filippone
March 10,2023
Page 2
Changes have been made to the permit stipulations. The Permittee is responsible for
carefully reading the entire permit and evaluating the requirements of each permit
stipulation. The Permittee shall comply with all terms, conditions, requirements, limitations
and restrictions set forth in this permit. Noncompliance with any permit condition is grounds
for enforcement action, for permit termination, revocation and reissuance, or modification, or
for denial of a permit renewal application. Specific changes and additions are summarized
below (note: this list may not include all changes and additions):
The permit condition for visible emissions per 02D .0521 has been updated to no longer
require a malfunction abatement plan and recordkeeping. This requirement was originally
placed m the permit in R03 issued March 3, 2005 as a result of multiple wood flour spills;
however, the facility has not had significant issues in recent years. If there are significant
issues with dust complaints/visible emissions in the future, a similar requirement may he
added back to the permit if it is determined to be necessary.
Should you have any questions conceming this'matter, please contact Jemufer Manning at 704-235-
2224.
Sincerely,
Melinda Wolanin, Regional Supervisor
Division of Air Quality, NC DEQ
JAM
Enclosures
c: Laserfiche
https //ncconnect sharepoint com/sites/DAQ-MRO/Counties/STANLY/00101/R18_PERMIT docx
NOTICE REGARDING THE RIGHT TO CONTEST A DIVISION OF AIR QUALITY
PERMIT DECISION
Right of the Permit Applicant or Permittee to File a Contested Case: Pursuant to NCOS 143-
215.108(e), a permit applicant or permittee who is dissatisfied with the Division of Air Quality's
decision on a permit application may commence a contested case by filing a petition under
NCOS 150B-23 in the Office of Administrative Hearings within 30 days after the Division
notifies the applicant or permittee of its decision. If the applicant or permittee does not file a
petition within the required time, the Division's decision on the application is final and is not
subject to review. The filing of a petition will stay the Division's decision until resolution of the
contested case.
Right of Other Persons Aggrieved to File a Contested Case; Pursuant to NOGS 143-
215.108(el), a person other than an applicant or permittee who is a person aggneved by the
Division's decision on a permit application may commence a contested case by filing a petition
under NCOS 150B-23 within 30 days after the Division provides notice of its decision on a
permit application, as provided m NCOS 150B-23(f), or by posting the decision on a publicly
available Web site. The filing of a petition under this subsection does not stay the Division's
decision except as ordered by the administrative law judge under NCGS 150B-33(b).
General Filing Instructions: A petition for contested case hearing must be in the form of a
wntten petition, conforming to NCGS 150B-23, and filed with the Office of Administrative
Hearings, 1711 New Hope Church Road, Raleigh NC, 27609, along with a fee in an amount
provided in NCGS 150B-23.2. A petition for contested case heanng form may be obtauied upon
request from the Office of Administrative Hearings or on its website at
https://www.oah.nc.gov/heanngs-division/filing/hearing-forms. Additional specific instmctions
for filing a petition are set forth at 26 NCAC Chapter 03.
Service Instructions: A party filing a contested case is required to serve a copy of the petition,
by any means authonzed under 26 NCAC 03 .0102, on the process agent for the Department of
Environmental Quality:
William F. Lane, General Counsel
North Carolina Department of Environmental Quality
1601 Mail Service Center
Raleigh, North Carolina 27699-1601
If the party filing the petition is a person aggrieved other than the permittee or permit applicant,
the party must also serve the permittee m accordance with NCGS 150B-23(a).
Additional information is available at https://www oah.nc gov/heanngs-division/hearing-
process/filing-contested-case. Please contact the OAH at 984-236-1850 or
oah.postmaster@oah.nc.gov with all questions regarding the filing fee and/or the details of the
filing process.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF AIR QUALITY
AIR PERMIT NO. 08834R18
Issue Date: March 10, 2023
Expiration Date: February 28, 2031
Effectve Date: March 10, 2023
Replaces Permit: 08834R17
To construct and operate air emission source(s) and/or air cleaning device(s), and for the
discharge of the associated air contaminants into the atmosphere m accordance with the provisions
of Article 21B of Chapter 143, General Statutes of North Carolina (NCGS) as amended, and other
applicable Laws, Rules and Regulations,
Fiber Composites, LLC dba Fiberon
181 Random Drive
New London, Stanly County, North Carolina
Permit Class: Synthetic Minor
Facility ID# 8400101
(the Permittee) is hereby authorized to construct and operate the air emissions sources and/or air
cleaning devices and appurtenances described below:
Emission
Source ID
Emission Source
Description
Control
System ID
Control System
Description
INL: Wood Flour Material Unloading/Storage
ES-111,ES-121, ES
DI
three (3) wood florir storage
silos (HDPE) (20 tons per
hour maximum process rate,
each)
BH-5 fabric filter (3,591 square
feet of filter area)
ES-BH-WALK2 trailer unloadmg-walkmg
bed-wood flour (HDPE) (4 0
tons per hour maximum
process rate)
CD-BH-WALK2 fabric filter (ICQ square feet
of filter area)
ES-PNEU-SILO-141 wood flour unloadmg/silo
filhng operation and storage
with process cyclone (9 tons
per hour maximum process
rate)
BH-5 fabric filter (3,591 square
feet of filter area)
ES-PNEU-SILO-161 wood flour unloading/silo
filhng operation and storage
with process cyclone (20
tons per hour maximum
process rate)
BH-SIL0161 fabric filter (676 square feet
of filter area)
Permit No. 08834R18
Page 2
Emission
Source ID
Emission Source
Description
Control
System ID
Control System
Description
ES-PNEU-SILO-181 wood flour unloadmg/silo
flllmg operation and storage
with process cyclone (20
tons per hour maximum
process rate)
BH-SIL0181 fabnc filter (676 square feet
of filter area)
ES-DRYSILO-1 dned wood flour silo with
process cyclone (20 tons per
hour maximum process rate)
BH-DRYSILOl fabnc filter (1,443 square
feet of filter area)
ES-DRYSILO-2 dried wood flour silo (20
tons per hour maximum
process rate)
BH-DRYSIL02 fabric filter (1,443 square
feet of filter area)
INL: Wood Flour Drying
ES-BH-DRY5 wood flour dryer #5
baghouse receiver (24 tons
per hour maximum process
rate)
N/A N/A
ES-BH-DRY6 dried wood flour silo with
process cyclone (24 tons per
hour maximum process rate)
N/A N/A
INL: Other Raw Material Storage
ES-POLY-UNLOAD
1
j
1
trailer polymer unloading-
walking bed (HDPE) (5.0
tons per hour maximum
process rate)
CD-BH-3 fabric filter (188 square feet
of filter area)
j ES-BH-SILO-311
i
i
1
tanker unloading & silo 311
filling - regrmd (HDPE)
(15.0 tons per hour
maximum process rate)
BH-1 fabnc filter (155 square feet
of filter area)
ES-BH-SILO-321
i
1
tanker imloading & silo #
321 flllmg - repro (HDPE)
(15 0 tons per hour
maximum process rate)
CD-BH-IA fabnc filter (155 square feet
of filter area)
ES-BH-SILO-341 silo 341 flllmg - trim recycle
from pellet mill (HDPE)
(15.0 tons per hour
maximum process rate)
CD-BH-2A fabric filter (155 square feet
of filter area)
ES-BH-SILO-511 tanker unloading & silo
flllmg - repro - various
colors (HDPE) (15 0 tons
per hour maximum process
rate)
CD-BH-SIL0511
A
bin vent (475 square feet of
filter area)
ES-BH-SILO-521 tanker unloadmg & silo
filling - repro - vanous
colors (HDPE) (15 0 tons
per hour maximum process
rate)
CD-BH-SIL0521 Dm vent (475 square feet of
filter area)
ES-BH-SILO-531
,
tanker unloadmg and silo
filling - repro - vanous
colors (HDPE) (15.0 tons
CD-BH-SIL0531 Din vent (475 square feet of
filter area)
Permit No. 08834R18
Page 3
; Emission
Source ID
Emission Source
Description
Control
System ID
Control System
Description
i per hour maximum process
rate)
ES-BH-SILO-541
!
tanker unloadmg and silo
filling - repro - vanous
colors (HDPE) (15 tons per
hour maximum process rate)
CD-BH-SIL0541 bin vent (475 square feet of
filter area)
ilNL: HDPE Board Line Material Handling
ES-BH-FR#11, ES-BH-
FR#12, ES-BH-FR#14, ES-
BH-FR#15, ES-BH-FR#16
1
five (5) wood flour filter SCD-HDPE-DC-MAIN
receivers which feed into j
extruders (0.97 tons per hour ;
maximum process rate, each) i
fabric filter (2,362 square
feet of filter area)
i ES-FR-17-8, ES-FR-18-
:8, ES-FR-19-8,ES-FR-20-8
i
four (4) wood flour filter
receivers which feed into
extruders (0 97 tons per hour
maximum process rate, each)
BH-DRYSILOl fabnc filter (1,443 square
feet of filter area)
BH-DRYSE.02 fabric filter (1,443 square
feet of filter area)
ES-FR-21-8, ES-FR-22-
;8, ES-FR-23-8, ES-FR-24-8
!
1
four (4) wood flour filter
receivers which feed into
extruders (1.2 tons per hour
maximum process rate, each)
BH-DRYSILOl fabric filter (1,443 square
feet of filter area)
BH-DRYSIL02 fabric filter (1,443 square
feet of filter area)
1 ES-BH-BDMDC
1
board Ime mixmg (HDPE) iCD-HDPE-DC-MAm
(4.85 tons per hour 1
maximum process rate) j
fabric filter (2,362 square
feet of filter area)
, ES-HDPE-BL-A
1
i
\
board Ime material handling jCD-HDPE-DC-MAEN
(HDPE) servmg five (5) j
extruders (16 0 tons per hour 1
combmed maximum process ]
rate) ;
fabric filter (2,362 square
feet of filter area)
IlNL: HDPE Board Line Finishing
i ES-BH-M0LDER#11,
1ES-BH-M0LDER#12, ES-
;BH-M0LDER#14, ES-BH-
M0LDER#15, ES-BH-
MOLDER#16, ES-BH-
iMOLDER#17, ES-BH-
MOLDER#18
seven (7) weinig ,CD-BH-TRIM-1 IB, CD-
molders/saws (HDPE) ;BH-TRIM-12B, CD-BH-
(0.163 tons per hour jTRIM-13B, CD-BH-TRIM-
maximum process rate, each)il4B, CD-BH-TRIM-16B,
iCD-BH-TRIM-17B, CD-
|bh-trim-18b
1
seven (7) cyclonic bagfilters
(578 square feet of filter
area, each) mstalled m
parallel
jlNL: HDPE Board Line Scrap Reuse
1 ES-HDPE-RegrmdMill
i
i
!1
i
three (3) mills to process m-
house regrind (HDPE) (1 25
tons per hour maximum
process rate, total)
CD-HDPE-RGD-CTC, CD-
HDPE-DC-REGR
cyclone (ID No. CD-HDPE-
RGD-CYC; 42 inches m
diameter) mstalled in series
with a fabric filter (ID No.
CD-HDPE-DC-REGR,
1,219 square feet of filter
area)
; ES-TRIM SCRAP
i
i
i
trim scrap pneumatic
transport (HDPE) (1 049
tons per hour maximum
process rate)
CD-BH-ENTEK, CD-
CYCllA, CD-CYC12A,
CD-CYC14A, CD-
CYC15A, CD-CYC16A,
CD-CYC17A, CD-CYC18A
seven (7) cyclones'mstalled
in parallel (ID Nos. CD-
CYCllA, CD-CYC12A,
CD-CYC14A, CD-
CYC15A, CD-CYC16A,
Permit No. 08834R18
Page 4
Emission
Source ID
Emission Source
Description
Control
System ID
Control System
Description
I
'
CD-CYC17A, and CD-
CYC18A, 14 5 inches
diameter, each) installed m
series with fabric filter (ID
No. CD-BH-ENTEK; 1,200
square feet of filter area)
; ES-TRIMSCRAP
iSURPLUS
1
1
i
1
i
trim scrap surplus (HDPE)
(0 222 tons per hour
maximum process rate)
CD-CYCllB, CD-CYC12B,
CD-CYC14B, CD-CYC15B,
CD-CYC16B, CD-CYC17B,
CD-CYC18B, CD-HDPE-
DC-REGR
seven (7) cyclones mstalled
m parallel (ID Nos. CD-
CYCllB, CD-CYC12B,
CD-CYC14B, CD-CYC15B,
CD-CYC16B, CD-CYC17B,
and CD-CYC18B, 14 5
inches diameter, each)
installed m senes with fabric
filter (ID No CD-HDPE-
DC-REGR; 1,219 square
feet of filter area)
i ES-HDPE-Box Dump box dump (1.25 tons per !CD-HDPE-DC-REGR
hour maximum process rate) i
fabric filter (1,219 square
feet of filter area)
!1NL: Support Operations
1 ES-PVC-RegrindMill
1
i
i
i
!
I
i
multi-stage regrmd operation iCD-PVC-DC-REGRI
with process cyclone '
separators (PVC) (1.625 tons |
per hour maximum process j
rate) j
fabric filter (933 square feet
of filter area)
2NL:Material Unloading/Storage
' ES-BH-7 wet wood flour track ;CD-BH-7
unloadmg (3 tons per hour j
maximum process rate) i
fabric filter (163 square feet
of filter area)
i2NL: PVC Miscellaneous
, ES-BH-SIL0231
1
i
tanker track unloading & ICD-BH-SIL0231
silo #231 flllmg - recycle ;
"CW" (PVC) (11.0 tons per |
hour maximum process rate) ,
bm vent (560 square feet of
filter area)
ES-BH-SIL0411
1
tanker track unloadmg & |CD-BH-SIL0411
silo #411 filling - recycle j
(PVC) (11.0 tons per hour |
maximum process rate) 1 ^
fabric filter (560 square feet
of filter area)
' ES-BH-SIL0421
1
1
tanker track unloading & |CD-BH-SIL0421
silo #421 filling - dry blend '
(PVC) (110 tons per hour |
maximum process rate) |
fabnc filter (560 square feet
of filter area)
; ES-BH-SIL0431
i
i
i
tanker track unloading & iCD-BH-SlL0431
silo #431 flllmg - PVC blend j
#2 (PVC) (11.0 tons per hour i
maximum process rate) '
bm vent (560 square feet of
filter area)
Permit No. 08834R18
Page 5
in accordance with the application 8400101.22A received September 2,2022 including any plans,
specifications, previous applications, and other supporting data, all of which are filed with the
Department of Environmental Quality, Division of Air Quality (DAQ) and are incorporated as part
of this permit.
This permit is subject to the following specified conditions and limitations mcluding any
TESTING. REPORTING. OR MONITORING REQUIREMENTS:
A. SPECIFIC CONDITIONS AND LIMITATIONS
1. Any air emission sources or control devices authorized to construct and operate above must
be operated and maintained in accordance with the provisions contained herein. The
Permittee shall comply with applicable Environmental Management Commission
Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter
2D .0202, 2D .0515, 2D .0521, 2D .0535, 2D .0540, 2D .1806, 2Q .0102 and2Q .0315.
2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT - The Permittee,
at least 90 days prior to the expiration date of this permit, shall request permit renewal by
letter in accordance with 15A NCAC 2Q .0304(d) and (f). Pursuant to 15A NCAC 2Q
.0203(i), no permit application fee is required for renewal of an existing air permit (without
a modification request). The renewal request (with application Form A) should be submitted
to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration date of this
permit, the Permittee shall submit the air pollution emission inventory report (with
Certification Sheet) in accordance with 15A NCAC 2D 0202, pursuant to N.C General
Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ and shall
document air pollutants emitted for the 2029 calendar year.
3. PARTICULATE CONTROL REQUIREMENT - As required by 15A NCAC 2D .0515
"Particulates from Miscellaneous Industrial Processes," particulate matter emissions from
the emission sources shall not exceed allowable emission rates. The allowable emission rates
are, as defined in 15A NCAC 2D .0515, a function of the process weight rate and shall be
determined by the following equation(s), where P is the process throughput rate in tons per
hour (tons/hr) and E is the allowable emission rate in pounds per hour (Ibs/hr).
E = 4.10 * (P) ° for P <= 30 tons/hr, or
E = 55 * (P) ° - 40 for P >30 tons/hr
4. VISIBLE EMISSIONS CONTROL REQUIREMENT - As required by 15A NCAC 2D
.0521 "Control of Visible Emissions," visible emissions from the emission sources,
manufactured after July 1, 1971, shall not be more than 20 percent opacity when averaged
over a six-mmute period, except that six-minute periods averagmg not more than 87 percent
opacity may occur not more than once in any hour nor more than four times in any 24-hour
period. However, sources which must comply with a visible emissions standard in 15A
NCAC 2D .0524 "New Source Performance Standards" or .1110 "National Emission
Standards for Hazardous Air Pollutants" shall meet that standard instead of the 2D .0521
visible emissions standard.
Permit No. 08834R18
Page 6
5. NOTIFICATION REQUIREMENT - As required by 15A NCAC 2D .0535, the Permittee of
a source of excess emissions that last for more than four hours and that results from a
malfunction, a breakdown of process or control equipment or any other abnormal
conditions, shall:
a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastem time
of the Division's next business day of becoming aware of the occurrence and
describe:
i. the name and location of the facility,
ii. the nature and cause of the malfunction or breakdown,
lii. the time when the malfunction or breakdown is first observed,
/
iv. the expected duration, and
V. an estimated rate of emissions.
b. Notify the Director or his designee immediately when the corrective measures have
been accomplished.
, This reporting requirement does not allow the operation of the facility in excess of
Environmental Management Commission Regulations.
6. FUGITIVE DUST CONTROL REQUIREMENT - As required by 15 A NCAC 2D .0540
"Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow
fugitive dust emissions to cause or contribute to substantive complaints or excess visible
emissions beyond the property boundary. If substantive complaints are received or excessive
fugitive dust emissions from the facility are observed beyond the property boundaries for six
minutes in any one hour (using Reference Method 22 in 40 CFR, Appendix A), the owner or
operator may be required to submit a fugitive dust plan as described in 2D .0540(f).
"Fugitive dust emissions" means particulate matter that does not pass through a process
stack or vent and that is generated withm plant property boundaries from activities such as:
unloading and loadmg areas, process areas stockpiles, stockpile working, plant parkmg lots,
and plant roads (including access roads and haul roads).
i
7. CONTROL AND PROHIBITION OF ODOROUS EMISSIONS - As required by 15A i
NCAC 2D . 1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not {
operate the facility without implementing management practices..or installing and operating i
odor control equipment sufficient to prevent odorous emissions from the facility from ;
causing or contributing to objectionable odors beyond the facility's boundary. |
8. Federal and State Rules Applicable to Sources Exempted from Air Permitting Requirements \
- Your facility is subject to the following federal and state niles: i
Permit No. 08834RI8
Page 7
40 CFR 60 - NSPS -- Subpart JJJJ ~ Standards of Performance for Stationary
Spark Ignition Internal Combustion Engines
40 CFR 63 - NESHAP/MACT ~ Subpart ZZZZ ~ Reciprocating Internal
Combustion Engines
which are applicable to some of the emission sources at your facility listed on the
"Insignificant/Exempt Activities" list attached to this permit. The purpose of this permit
condition is to inform you of your compliance obligations to these applicable rules as they
are enforceable.
9. LIMITATION TO AVOID ISA NCAC 20;.0501 - Pursuant to 15A NCAC 2Q .0315
"Sjmthetic Minor Facilities," to avoid the applicability of ISA NCAC 2Q .0501 "Purpose of
Section and Requirement for a Permit," as requested by the Permittee, facility-wide
emissions shall be less than the following:
Pollutant
PMIO
Emission Limit
(Tons per consecutive 12-month period)
100
a. Inspection and Maintenance Requirements -
i. Bagfilter Requirements - Particulate matter emissions shall be controlled as
described in the permitted equipment list. To comply with the provisions of this
permit and ensure that emissions do not exceed the regulated limits, the
Permittee shall perform periodic inspections and maintenance (I&M) as
recommended by the manufacturer. In addition, the Permittee shall perform an
annual (for each 12 month period following the initial inspection) internal
inspection of each bagfilter system.
ii Cvclone Requirements - Particulate matter emissions shall be controlled as
described in the permitted equipment list. To comply with the provisions of this
permit and ensure that emissions do not exceed the regulatory limits, the
Permittee shall perform an annual (for each 12 month period following the
initial inspection) inspection of the cyclone system. In addition, the Permittee
shall perform periodic inspections and maintenance (I&M) as recommended by
the manufacturer.
b Recordkeening Requirements
i. A logbook shall be kept on site for each control device and made available to
Division of Air Quality personnel upon request. The Permittee shall record all
inspection, maintenance and monitoring requirements listed above in the
logbook. Any variance from the manufacturer's recommendations shall be
investigated with corrections made and date of actions recorded in the logbook.
Permit No. 08834R18
Page 8
b;. general conditions and limitations
1. In accordance with G.S. 143-215.i08(c)(l), TWO COPIES OP ALL DOCUMENTS.
REPORTS. TEST DATA. MONITORING DATA. NOTIFICATIONS. REOUESTS FOR
RENEWAL. AND ANY OTHER INFORMATION REQUIRED BY TfflS PERMIT shall
be submitted to the:
Regional Supervisor
North Carolina Division of Air Quality
Mooresville Regional Office
610 East Center Avenue, Suite 301
Mooresville, NC 28115
704-663-1699
For identification purposes, each submittal should include the facility name as listed on the
permit, the facility identification number, and the permit number.
2. RECORDS RETENTION REOUIREMENT - In accordance with ISA NCAC 2D .0605,
any records required by the conditions of this permit shall be kept on site and made available
to DAQ persoimel for inspection upon request. These records shall be maintained in a form
suitable and readily available for expeditious inspection and review. These records must be
kept on site for a minimum of 2 years, unless another time period is otherwise specified.
3. ANNUAL FEE PAYMENT - Pursuant to ISA NCAC 2Q .0203(a), the Permittee shall pay
the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a
timely manner will cause the DAQ to initiate action to revoke the permit.
4. EQUIPMENT RELOCATION - In accordance with ISA NCAC 2Q .0301, a new air permit
shall be obtained by the Permittee prior to establishing, building, erecting, using, or
operating the emission sources or air cleaning equipment at a site or location not specified in
this permit.
5. REPORTING REOUIREMENT - In accordance with ISA NCAC 2Q .0309, any of the
followmg that would result in previously unperrmtted, new, or increased emissions must be
reported to the Regional Supervisor, DAQ:
a. changes in the information submitted in the application regarding facility emissions';
b. changes that modify equipment or processes of existing permitted facilities; or
c. changes in the quantity or quality of materials processed.
If appropriate, modifications to the permit may then be made by the DAQ to reflect any
necessary changes in the permit conditions. In no case are any new or increased emissions
allowed that will cause a violation of the emission limitations specified herein.
Permit No. 08834R18
Page 9
6. In accordance with I5A NCAC 2Q .0309, this permit is subject-to revocation or
modification by the DAQ upon a determination that information contained in the application
or presented in the support thereof is mcorrect, conditions under which this permit was
granted have changed, or violations of conditions contained m this permit have occurred. In
accordance with G.S. 143-215.108(c)(1), the facility shall be properly operated and
maintained at all times in a manner that will effectuate an overall reduction in air pollution
Unless otherwise specified by this permit, no emission source may be operated without the
concurrent operation of its associated air cleaning device(s) and appurtenances.
7. CHANGES NOT REQUIRING PERMIT REVISIONS - Pursuant to 15 A NCAC 02Q
.0318, changes to the facility that are not exempt pursuant to ISA NCAC 02Q .0102 may he
allowed without first modifying an applicable air permit if the change(s) meet(s) the
requirements of 15A NCAC 02Q .0318(b)(1) through (b)(5) and the owner or operator
notifies the Director in writing, using forms provided by the Division, seven calendar days
before the change is made. Within 10 business days of receipt of the notice, the Division
shall notify the owner or operator of its determination of whether the change(s) meet(s) the
requirements of ISA NCAC 02Q .0318(b)(1) through (b)(5).
8. In accordance with G.S. 143-21S 108(c)(1), this permit is nontransferahle by the Permittee.
Future owners and operators must obtain a new air permit from the DAQ.
9. In accordance with G.S. 143-21S. 108(c)(1), this issuance of this permit in no way absolves
the Permittee of liability for any potential civil penalties which may be assessed for
violations of State law which have occurred prior to the effective date of this permit.
10. In accordance with G.S. 143-21S. 108(c)(1), this permit does not relieve the Permittee of the
responsibility of complying with all applicable requirements of any Federal, State, or Local
water quality or land quality control authority.
11. In accordance with ISA NCAC 2D .0605, reports on the operation and maintenance of the
facility shall be submitted by the Permittee to the Regional Supervisor, DAQ at such
mtervals and in such form and detail as may be required by the DAQ. Information required
m such reports may include, hut is not limited to, process weight rates, firing rates, hours of
operation, and preventive maintenance schedules.
12. A violation of any term or condition of this permit shall subject the Permittee to enforcement
pursuant to G.S. 143-215.114A, 143-215.114B, and 143-215.114C, including assessment of
civil and/or criminal penalties.
13. Pursuant to North Carolina General Statute 143-215.3(a)(2), no person shall refuse entry or
access to any authorized representative of the DAQ who requests entry or access for
purposes of inspection, and who presents appropriate credentials, nor shall any person
obstruct, hamper, or interfere with any such representative while in the process of carrying
out his official duties. Refusal of entry or access may constitute grounds for permit
revocation and assessment of civil penalties.
Permit No. 08834R18
Page 10
14. In accordance with G.S. 143-215.108(c)(1), this permit does not relieve the Perrnittee of the
responsibility of complying with any applicable Federal, State, or Local requirements
governing the handling, disposal, or incineration of hazardous, solid, or medical wastes,
including the Resource Conservation and Recovery Act (RCRA) administered by the
Division of Waste Management.
15. PERMIT RETENTION REQUIREMENT - In accordance with 15A NCAC 2Q .0110, the
Permittee shall retain a current copy of the air permit at the site. The Permittee must make
available to personnel of the DAQ, upon request, the current copy of the air permit for the
site.
16. CLEAN AIR ACT SECTION 112^^ REQUIREMENTS - Pursuant to ISA NCAC 2D .2100
"Risk Management Program," if the Permittee is required to develop and register a risk
management plan pursuant to Section 112(r) of the Federal Clean Air Act, then the
Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part
68.
17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS - If emissions
testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing
to the DAQ in support of a permit application or to demonstrate compliance, the Permittee
shall perform such testing in accordance with ISA NCAC 2D .2600 and follow all DAQ
procedures including protocol approval, regional notification, report submittal, and test
results approval. Additionally, in accordance with ISA NCAC 2D .0605, the Permittee shall
follow the "procedures for obtaining any required audit sample and reporting those results.
Permit issued this the 10'^ of March, 2023.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Melinda Wolanin
Regional Supervisor
By Authority of the Environmental Management Commission
Air Permit No. 08834R18
ATTACHMENT to Permit No. 08834R18, March 10, 2023
Insignificant / Exempt Activities
Source
Exemption
Regulation
Source
of
TAPS?
Source of
Title V
Pollutants?
IES-DRY#1 - natural gas-fired wood flour dryer (2.8
million Btu per hour maximum heat input)2Q .0102 (h)(5)Yes Yes
IES-DRY#2 - natural gas-fired wood flour dryer (2.8
million Btu per-hour maximum heat input)2Q .0102(h)(5)Yes Yes
IES-DRY#3 - natural gas-fired wood flour dryer (2.8
million Btu per hour maximum heat input)2Q .0102(h)(5)Yes Yes
IES-DRY#5 - natural gas-fired wood flour dryer (9.0
million Btu per hour maximum heat input)2Q .0102(h)(5)Yes Yes
IES-DRY#6 - natural gas-fired wood flour dryer (9.0
million Btu per hour maximum heat input)2Q .0102 (h)(5)Yes Yes
IES-BH-SILO-331 - bagfilter (ID No. BH-2; 155
square feet filter of filter area) installed on railcar car
unloading & silo 331 filling - virgin polyethylene
pellets (HDPE) (11 tons per hour maximum process
rate)
2Q .0102(h)(5)No Yes
BES-BH-RAIL - simple cyclone (ID No. CD-CYC-
RAIL; 30 inch diameter) and cartridge filter (ID No.
CD-CART-RAIL; 19 square feet of filter area)
operating in series on the rail car unload - pneumatic
- virgin poly pellets (HDPE line) (10 tons per hour
maximum process rate)
2Q .0102 (h)(5)No Yes
EES-PR-17-3 - regrind trim extruder feeder with filter
receiver (0.97 tons per hour maximum process rate)
which vents to fabric filter (CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
EES-PR-18-3 - regrmd trim extruder feeder with filter
receiver (0.97 tons per hour maximum process rate)
which vents to fabric filter (CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
DBS-CYC-19-5 - dedicated ground trim extruder
feeder with process cyclone (0.5 tons per hour
maximum process rate) which vents to fabric filter
(CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
EES-CYC-19-9 - regrind trim (from trim system)
extruder feeder with process cyclone (0.15 tons per
hour maximum process rate) which vents to fabric
filter (CD-BH-ENTEK)
2Q 0102 (h)(5)No Yes
EES-CYC-20-5 - dedicated ground trim extruder
feeder with process cyclone (0.5 tons per hour
maximum process rate) which vents to fabric filter
(CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
Source
Exemption
Regulation
Source
of
TAPS?
Source of
Title V
Pollutants?
IES-CYC-20-9 - regrind trim (from trim system)
extmder feeder with process cyclone (0.15 tons per
hour maximum process rate) which vents to fabric
filter (CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
IES-CYC-21-5 - dedicated ground trim extmder
feeder with process cyclone (0.5 tons per hour
maximum process rate) which vents to fabric filter
(CD-BH-ENTEK)
2Q.0102(li)(5)No Yes
IES-CYC-21-9 - regrind trim (from trim system)
extmder feeder with process cyclone (0.15 tons per
hour maximum process rate) which vents to fabric
filter (CD-BH-6)
2Q .0102(h)(5)No Yes
IES-CYC-22-5 - dedicated ground trim extmder
feeder with process cyclone (0.5 tons per hour
maximum process rate) which vents to fabric filter
(CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
IES-CYC-22-9 - regrind trim (from trim system)
extmder feeder with process cyclone (0.15 tons per
hour maximum process rate) which vents to fabric
filter (CD-BH-6)
2Q .0102(h)(5)No Yes
IES-CYC-23-5 - dedicated ground trim extmder
feeder with process cyclone (0.5 tons per hour
maximum process rate) which vents to fabric filter
(CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
IES-CYC-23-9 - regrind trim (from trim system)
extmder feeder with process cyclone (0.15 tons per
hour maximum process rate) which vents to fabric
filter (CD-BH-6)
2Q .0102 (h)(5)No Yes
IES-CYC-24-5 - dedicated ground trim extmder
feeder with process cyclone (0.5 tons per hour
maximum process rate) which vents to fabric filter
(CD-BH-ENTEK)
2Q .0102 (h)(5)No Yes
IES-CYC-24-9 - regrind trim (from trim system)
extmder feeder with process cyclone (0.15 tons per
hour maximum process rate) which vents to fabric
filter (CD-BH-6)
2Q .0102 (h)(5)No Yes
IES-BoardExtmder#l 1 - board line extmder #11
(HDPE) (2 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
IES-BoardExtmder#12 - board line extmder #12
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
IES-BoardExtmder#14 - board line extmder #14
(HDPE) (2 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
Source
Exemption
Regulation
Source
of
TAPS?
Source of
Title V
Pollutants?
IES-BoardExtruder#15 - board line extruder #15
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
IES-BoardExtruder#16 - board line extruder #16
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102(h)(5)Yes Yes
IES-BoardExtruder#17 - board line extruder #17
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102(h)(5)Yes Yes
IES-BoardExtruder#18 - board line extruder #18
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102(h)(5)Yes Yes
IES-BoardExtruder#19 - board line extruder #19
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
IES-BoardExtruder#20 - board Ime extruder #20
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
IES-BoardExtruder#21 - board line extruder #21
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102(h)(5)Yes Yes
IES-BoardExtruder#22 - board line extruder #22
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
IES-BoardExtruder#23 - board line extruder #23
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
IES-BoardExtruder#24 - board line extruder #24
(HDPE) (2.0 tons per hour maximum process rate)2Q .0102 (h)(5)Yes Yes
ffiS-BH-M0LDERER#19 - HDPE molder/saw filter
receiver (0.163 tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-BH-MOLDERFR#20 - HDPE molder/saw filter
receiver (0.163 tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
IES-BH-M0LDERFR#21 - HDPE molder/saw filter
receiver (0.163 tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
IES-BH-MOLDERFR#22 - HDPE molder/saw filter
receiver (0.163 tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-BH-MOLDERFR#23 - HDPE molder/saw filter
receiver (0.163 tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-BH-MOLDERFR#24 - HDPE molder/saw filter
receiver (0.163 tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
lES-TRIMSCRAPRECYCLE - trim scrap recycle
filter receiver with inherent filtration (0.30 tons per
hour maximum process rate)
2Q .0102 (h)(5)No Yes
IES-2NL-1 - PVC storage silo with inherent bin vent
filter (456 square feet of filter area)2Q .0102 (h)(5)No Yes
IES-2NL-2 - PVC storage silo with inherent bin vent
filter (456 square feet of filter area)
2Q .0102 (h)(5)No Yes
ffiS-PVC EXTRUSION-01 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
Source
Exemption
Regulation
Source
of
TAPS?
Source of
Title V
Pollutants?
ffiS-PVC EXTRUSION-02 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102(h)(5)No Yes
ffiS-PVC EXTRUSION-03 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102(h)(5)No Yes
ffiS-PVC EXTRUSION-04 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102(h)(5)No Yes
ffiS-PVC EXTRUSION-05 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102(h)(5)
2Q .0102 (h)(5)
No Yes
EES-PVC EXTRUSION-06 - extruder (PVC) (0.24
tons per hour maximum process rate)No Yes
ffiS-PVC EXTRUSION-07 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102(h)(5)No Yes
ffiS-PVC EXTRUSION-08 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102(h)(5)No Yes
ffiS-PVC EXTRUSION-09 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-PVC EXTRUSION-10 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102(h)(5)No Yes
ffiS-PVC EXTRUSION-11 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-PVC EXTRUSION-12 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-PVC EXTRUSION-13 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-PVC EXTRUSION-14 - extmder (PVC) (0.24
tons per hour maximiun process rate)2Q .0102 (h)(5)No Yes
lES-PVC EXTRUSION-15 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-PVC EXTRUSION-16 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q 0102 (h)(5)No Yes
mS-PVC EXTRUSION-17 - extruder (PVC) (0.24
tons per hour maximum process rate)
2Q .0102 (h)(5)No
No
Yes
ffiS-PVC EXTRUSION-18 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)Yes
ffiS-PVC EXTRUSION-19 - extruder (PVC) (0.24
tons per hour maximum process rate)
2Q .0102 (h)(5)No Yes
lES-PVC EXTRUSION-20 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
ffiS-PVC EXTRUSION-21 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
Source
Exemption
Regulation
Source
of
TAPS?
Source of
Title V
Pollutants?
lES-PVC EXTRUSION-22 - extruder (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
lES-PVC EXTRUSION-23 - extrader (PVC) (0.24
tons per hour maximum process rate)2Q .0102 (h)(5)No Yes
IES-2NL-BH-TRIMSAW - reclaim fabric filter for
2NL trimsaw lines #1-34
2Q .0102 (h)(5)No Yes
IES-2NL-BH-R0UTER - reclaim fabric filter for
2NL router hoods # 1 -12
2Q .0102 (h)(5)No Yes
lES-CT - cooling tower for lines #21-24 2Q .0102 (h)(5)No Yes
IES-2NL-PARTS WASHER - parts washer for
tooling machine shop 2Q .0102 (h)(5)No Yes
I-EMERG-GEN - natural gas-fired emergency
generator (107 hp maximum capacity) subject to
NSPS subpart JJJJ and NESHAP subpart ZZZZ
2Q .0102 (h)(5)Yes Yes
1. Because an activity is exempted from being required to have a permit or permit modification
does not mean that the activity is exempted from an applicable requirement or that the owner
or operator of the source is exempted from demonstrating compliance with any applicable
requirement.
2. When applicable, emissions from stationary source activities identified above shall be
included in determining compliance with the permit requirements for toxic air pollutants
under ISA NCAC 2D .1100 "Control of Toxic Air Pollutants" or 2Q .0711 "Emission Rates
Requiring a Permit."
3. Sample permit conditions showing the regulatory requirements for exempt sources subject to
NESHAP, NSPS, and NCAC rules may be found here:
https ://d eg. nc. gov/aqpeimitconditions