Loading...
HomeMy WebLinkAboutAQ_F_1900134_20220809_CEM_RptRvwLtr Etc STATE o o.'73 O ROY COOPER Governor ELIZABETH S.BISERf,z�M Secretary MICHAEL ABRACZINSKAS NORTH CAROLINA Director Environmental Quality August 9, 2022 Mr. Issa J. Zarzar General Manager- Central Carolina Projects Duke Energy Progress, LLC 500 C P and L Road Moncure,NC 27559-9517 SUBJECT: Review of 2022 Second Quarter STAR®Unit S02/CO2 CEMS Report Duke Energy Progress LLC - Cape Fear STAR® Facility Moncure, Chatham County,North Carolina Air Permit No. 10583ROI Facility ID No. 1900134 Dear Mr. Zarzar: Thank you for the timely submittal of the subject report, dated July 20, 2022, and received August 3, 2022. The report included an assessment of the continuous emissions monitoring systems (CEMS) operating on Duke Energy's Cape Fear STAR® (Staged Turbulent Air Reactor)Unit (ID No. ES-5) during the second quarter of 2022. The Division of Air Quality (DAQ) has completed its review of the CEMS-related information in the report and has the following comments: 1. A review of the sulfur dioxide (S02)/carbon dioxide (CO2) CEMS compliance report on the ash beneficiation STAR®process pursuant to NCAC 02D .0516 - Sulfur Dioxide Emissions from Combustion Sources and Air Permit No. 10583, Specific Condition 2.1.A.2 indicated that there were no exceedances of the S02 emission limit (2.3 pounds per million Btu; 3-hour rolling average). 2. Also, a review was conducted for compliance with good operation and maintenance (O&M) practices pursuant to NCAC 02D .0605 and General Condition 3.10. Unless otherwise specified in regulation, DAQ considers sources to have operated with proper O&M if percent excess emissions (%EE) and percent monitor downtime (%MD) are less than the target criteria of 6% for any single quarter and less than 3% for two consecutive quarters. Since the report indicated%EE was 0.00% and%MD was 0.05%, the STAR®Unit along with its associated air pollution control equipment appears to have been operated in a manner consistent with proper O&M practices for minimizing emissions. 3. The report also included monthly S02 emissions from CEMS data for the Unit's operation. The facility accumulated S02 emissions CEMS data for 17 months and calculated each 12- month period over the previous 17 months as required by Specific Condition 2.1.A.2.g. D Q2177 North Carolina Department of Environmental Quality I Division of Air QualityE West Jones Street 11641 Mail Service Center I Raleigh,North Carolina 27699-1641 NORTH CAROLINA oePanment of Environmental Uwi\ /� 919.707.8400 Mr. Issa J. Zarzar August 9, 2022 Page 2 4. Finally, consistent with the facility's Quality Assurance Plan, which was developed pursuant to NCAC 02D .0613 - Quality Assurance Program and Specific Condition 2.1.A.2.d, a quarterly cylinder gas audit (CGA)was submitted. The CGA was conducted by J. Punch on May 25, 2022, and reviewed for compliance with 40 CFR Part 60, Appendix F, Procedure 1 - Quality Assurance Requirements for Gas Continuous Emission Monitoring Systems Used for Compliance Determination. Results from the quarterly CGA appear to have met the requirements of Procedure 1 and are therefore acceptable. In addition to the mailing of this letter, an electronic copy(e-copy) is being provided for your records. If you should have any questions, please contact me at (919) 707-8410 or dennis.igboko@ncdenr.gov. Sincerely, Dennis U. Vboko, Environmen 1 Engineer Division of Air Quality,NCD c: Issa Zarzar, Duke Energy (e-copy) Erin Wallace, Duke Energy(e-copy) Cynthia Winston, Duke Energy(e-copy) Taylor Hartsfield, DAQ RRO (e-copy) Gary Saunders, DAQ SSCB (e-copy) IBEAM Documents, 1900134 (e-copy) Central File, Chatham County