Loading...
HomeMy WebLinkAboutAQ_F_1900104_20220208_CEM_RptRvwLtr Etc STATE o o.'73 O ROY COOPER Governor ELIZABETH S.BISERf,z�M Secretary MICHAEL ABRACZINSKAS NORTH CAROLINA Director Environmental Quality February 8, 2022 Mr. Blake Arnett Plant Director 3M Company—Pittsboro 4191 Highway 87 South Moncure,North Carolina 27559 Subject: Review of 2021 Semiannual COMS Report, Second Half 3M Pittsboro—Industrial Mineral Products Moncure, Chatham County,North Carolina Air Quality Permit No. 09006T08 Facility ID: 1900104 Dear Mr. Arnett: Thank you for the timely submittal of the subject report, dated January 28, 2022, and received February 2, 2022. The excess emissions report(EER)provided information about the continuous opacity monitoring systems (COMS) operating at 3M's Pittsboro facility during the second half of 2021. Specifically, COMS data for the following natural gas-fired dryers were reviewed: C&S Dryer(ID No. ES1415), Line 1 Coloring Dryer(ESCPPH1), and Line 2 Coloring Dryer(ESCPPH2). The Division of Air Quality(DAQ) has completed its review of the submittal and has the following comments: 1. The natural gas-fired dryers were reviewed for compliance with the underlying opacity standard set forth at NCAC 2D .0524 (40 CFR Part 60, Subpart UUU -Standards of Performance for Calciners and Dryers in Mineral Industries) and Air Permit No. 09006, Specific Conditions 2.1.B.2 and 2.1.D.2. The EER indicated there were no excess emissions and consequently no violations of the applicable standard. 2. A review was also conducted for compliance with good operation and maintenance (O&M) practices pursuant to NCAC 2D .0524 (NSPS UUU, including Subpart A - General Provisions), 40 CFR 60.11(d), and 40 CFR 60.13. Unless otherwise specified in regulation, DAQ considers sources to have operated with good O&M if the percent excess emissions (%EE) and percent monitor downtime (%MD) are less than the target criteria of 6% for any single quarter and less than 3% for two consecutive quarters. When compared to the total operating time of the dryers, %EE and%MD were reported as shown in the table below and appear to indicate the use of good O&M practices for minimizing emissions. D Q2177 North Carolina Department of Environmental Quality I Division of Air QualityE West Jones Street 11641 Mail Service Center I Raleigh,North Carolina 27699-1641 NORTH CAROLINA oePanment of Environmental Uwi\ /� 919.707.8400 Mr. Blake Arnett February 8, 2022 Page 2 Unit Quarter %EE %MD C&S Dryer 3rd 0.0 1.01 4th 0.0 0.84 Line 1 Coloring Dryer 3rd 0.0 4.14 4th 0.0 0.98 Line 2 Coloring Dryer 3rd 0.0 4.04 4th 0.0 1.59 3. The 2021 third and fourth quarter audits of the COMS units were reviewed in accordance with 40 CFR Part 60, Appendix F, Procedure 3 - Quality Assurance Requirements for Continuous Opacity Monitoring Systems at Stationary Sources. The quality assurance (QA) test results for the COMS appear to have met the quarterly specifications and are acceptable. In addition to the mailing of this letter, an electronic copy(e-copy) is being provided for your records. If you should have any questions regarding this review, please contact me at (919) 707-8410 or dennis.igboko@ncdenr.gov. Sincerely, ennis U. Igb6ko, Environmental ngineer Division of Air Quality,NCDEQ c: Blake Arnett, 3M (e-copy) Della Hardy, 3M (e-copy) Taylor Hartsfield, DAQ RRO (e-copy) Gary Saunders, DAQ SSCB (e-copy) IBEAM Documents, 1900104 (e-copy) Central File, Chatham County