Loading...
HomeMy WebLinkAboutAQ_F_1900030_20220323_CMPL_InspRpt (4) NORTH CAROLINA DIVISION OF Raleigh Regional Office W77V AIR QUALITY Arclin USA,LLC NC Facility ID 1900030 Inspection Report County/FIPS:Chatham/037 Date: 04/04/2022 Facility Data Permit Data Arclin USA,LLC Permit 04162/R23 790 Corinth Road Issued 12/11/2020 Moncure,NC 27559 Expires 6/30/2022 Lat: 35d 36.2420m Long: 79d 2.8780m Class/Status Synthetic Minor SIC: 2821 /Plastics Materials And Resins Permit Status Active NAICS: 325211 /Plastics Material and Resin Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP/112r Bowman Harvey James Gard Bowman Harvey NSPS: Subpart III, Subpart Kb,Subpart VV HSE Coordinator Plant Manager HSE Coordinator (919)545-5753 (919)545-7053 (919)545-5753 Compliance Data Comments: In compliance Inspection Date 03/23/2022 Inspector's Name Abdul Kadir Inspector's Signature: Operating Status Operating Compliance Status Compliance-inspection Action Code FCE Date of Signature: Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2010 0.0300 --- 0.4500 1.43 18.38 0.0100 2358.90 2005 0.1400 0.0100 1.80 2.65 26.42 0.0300 3607.79 *Highest HAP Emitted inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested (I) DIRECTIONS TO FACILITY: Arclin USA, Inc. is located on 790 Corinth Road in Moncure, NC, in Chatham County. From RRO,take 1-440 W(US-1 S)towards Sanford. Take the Old US-1 exit via Exit 84. Turn right onto Old US-1. After approximately 5 miles,turn left onto Corinth Rd. Facility is approx.0.5 mi.on the right.Pull up to the intercom and someone will open the gate. (II) FACILITY DESCRIPTION:Arclin manufactures three different groups of resins:urea formaldehyde resin for particle board, phenol formaldehyde resin for water resistant wood products, and melamine formaldehyde resin for auto paints. The facility has two plants that manufacture formaldehyde: MF-1 and MF-2. In MF-1, methanol is combined with water and a silver catalyst to create formaldehyde. MF-2 is a dry process in which methanol reacts with a molybdenum oxide catalyst to create formaldehyde. The facility operates six separate batch kettles, in which formaldehyde is combined with other ingredients to make batch-specific resins.The process operates 365 days/year and 24 hrs/day.The facility employs approximately 50 people. Safety notes:This is a large outdoor facility.Inspectors are required to wear a hard hat,safety glasses,gloves,and safety shoes. A high visibility safety vest is not required but is also a good idea as facility vehicle and truck traffic can be heavy at times. Inspectors may experience exposure to high pressure steam and hazardous chemicals/substances used to produce resins. (III) INSPECTION SUMMARY: On March 23, 2022, I (Abdul Kadir) visited Arclin for an air quality compliance inspection. There I met with Mr. Bowman Harvey,HSE Coordinator and Facility Contact. Mr.Harvey and I reviewed the current permit and required records. After the permit and records review,Mr.Harvey and I toured the facility. Emission sources were verified onsite and appeared to be in working order.MF-1 and MF-2 were in operation. At the time of inspection,the facility was not unloading urea.Overall,the facility appeared well run and maintained from an air quality standpoint. (IV) PERMITTED EMISSION SOURCES: Arclin has several permitted sources onsite;the following is a summary of sources by type and inspection observations. See permit for the full list. • Methanol-Formaldehyde Conversion Plant No.1 (MF-1) Source includes: formaldehyde absorption system (ES-A-1) controlled by a regenerative thermal oxidizer (CD-1) (hereafter"RTO"). Observed running. • Methanol-Formaldehyde Conversion Plant No.2(MF-2) Sources include two absorber columns (ES-A-2 and-3), controlled by a thermal oxidizer(CD-2) (hereafter"TO"). Observed running. • Resin Kettles Six resin kettles(ES-K series),controlled by the RTO.All were verified onsite. • Loading and Unloading Operations Sources include both truck and railcar loading/unloading areas and two railcar cleaning operations; all but the urea unloading pit are controlled by the RTO.Loading/unloading of urea was not observed. • Miscellaneous Sources Source includes fugitive emissions from MF-2 Plant(ES-FUG);none were observed. • Solid Raw Material Storage The permitted equipment list includes four urea weigh tanks(ES-WT series)that sit atop the Resin Kettles;a melamine storage silo (ES-MS-6); and one salt bin (ES-SB-1). According to Mr. Harvey, ES-SB-1 has never been installed and the associated bagfilter is not in service. • Storage Tanks Sources include 59 permitted tanks(ES-M series),of which 14 are controlled by the RTO and 37 are subject to NSPS. Some of the tanks (ES-M-77, 78 and 95) are listed as "future tank." and are not installed yet. ES-M-99 is removed from the facility. All the other tanks were observed onsite. (V) PERMIT SPECIFIC CONDITIONS: A.1 The Permittee shall comply with Title 15A NCAC, Subchapter 2D.0202,2D.0515,2D.0521,2D .0524(40 CFR 60, Subpart III, Subpart Kb, and Subpart VV), 2D .0535, 2D .0540, 2D .0611, 2D .0948, 2D .0949, 2D .1100, 2D .1806, 2D .2100, 2Q .0102,2Q.0315 and 2Q.0317(Avoidance). Appeared to be in compliance—see below for details. A.2 PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT - The Permittee, at least 90 days prior to the expiration date of this permit,shall request permit renewal and submit the air pollution emission inventory report for the 2021 calendar year. Appeared to be in compliance—I discussed with Mr.Harvey the renewal and emissions inventory due date of April 1, 2022.Mr.Harvey mentioned that they prepared the permit renewal application package and it will be submitted before the due date. A.3 PARTICULATE CONTROL REQUIREMENT—As required by 15A NCAC 213.0515 particulate matter emissions shall not exceed allowable emission rates. Appeared to be in compliance — this condition demonstrates that particulate emissions are a factor of the process throughput and were determined in permit review.There has been no change in the facility's process throughput. A.4 VISIBLE EMISSIONS (VE) CONTROL REQUIREMENT—As required by 15A NCAC 2D .0521 VE from the emission sources shall not be more than 20 percent opacity when averaged over a six-minute period. Appears to be in compliance—no VE was observed during the inspection. A.5 15A NCAC 2D .0524"NEW SOURCE PERFORMANCE STANDARDS (NSPS)" -For ID No. MF-2 consisting of ID Nos. ES-A-2 and ES-A-3 the Permittee shall comply with all applicable provisions in 15A NCAC 2D .0524, NSPS, Subpart III [Standards of Performance for Volatile Organic Compound (VOC) Emissions from the Synthetic Organic Chemical Manufacturing Industry(SOCMI)Air Oxidation Unit Processes],and including Subpart A"General Provisions". a. NSPS Emissions Limitations -As required by 15A NCAC 2D .0524 and 40 CFR Part 60.612,the following permit limits shall not be exceeded: i. The thermal oxidizer(ID No.CD-2)installed on the formaldehyde absorbers(ID nos.ES-A-2 and ES-A-3)shall reduce emissions of total organic compounds or TOC(minus methane and ethane)by 98 weight percent or to a TOC (minus methane and ethane) concentration of 20 ppmv on a dry basis corrected to 3 percent oxygen, whichever is less stringent. Appears to be in compliance—the TO was observed to appear to be running properly. b. NSPS Monitoring of Emissions and Operations-As required by 15A NCAC 2D .0524 and 40 CFR Part 60.613,the following requirements shall be met: i. The Permittee shall install,calibrate,maintain,and operate: A. A temperature monitoring device equipped with a continuous recorder and having an accuracy of± 1%of the temperature being monitored expressed in°C,or±0.5°C,whichever is greater. B. A flow indicator that provides a record of vent stream flow to the incinerator>—1/hr for each affected facility.The flow indicator shall be installed in the vent stream from each affected facility at a point closest to the inlet of the incinerator and before being joined with any other vent stream. Appeared to be in compliance—Mr.Harvey showed me run time temperature trends and vent stream flow trends were being monitored via the Parcview electronic monitoring program. c. NSPS Reporting and Record keeping Requirements-As required by 15A NCAC 2D .0524 and 40 CFR Part 60.615, the following requirements shall be met: i. The Permittee shall keep records of during each performance test,and include the following data in the report of the initial performance test required under 40 CFR Part 60.8. A. The average temperature of the firebox measured at least every 15 min.and averaged over the same time period of the performance testing. B. The percent reduction of total organic compounds minus methane and ethane(TOC)determined as specified in 40 CFR Part 60.614(b)achieved by the incinerator,or the concentration of TOC(ppmv, by compound)determined as specified in 40 CFR Part 60.614(b)at the outlet of the control device on a dry basis corrected to 3%oxygen. Appeared to be in compliance - the most recent performance test was conducted on November 22, 2004. Test results were incorporated into the facility's permit application and were deemed in compliance by DAQ Stationary Source Compliance Branch in a memo dated May 5,2005.Results include TOC reduction of 98.87%with the following emission rates: Pollutant Pounds/hour Tons/year Formaldehyde 0.07 0.29 Methane,other VOCs 0.35 1.53 Methyl Formate 0.33 1.44 Total VOCs 0.74 3.26 ii. The Permittee shall keep continuous records of the equipment operating parameters specified to be monitored under 40 CFR Part 60.613(a) [i.e., temperature and vent stream flow] as well as records of periods of operation during which the parameter boundaries established during the most recent performance test are exceeded. For the incinerator, the periods of operation during which the parameter boundaries established during the most recent performance test are exceeded are defined as follows: A. All 3-hour periods of operation during which the average combustion temperature is more than 28°C (50°F)below the average combustion temperature during the most recent performance test at which compliance with 40 CFR Part 60.612(a)was determined. Appeared to be in compliance—Mr.Harvey stated that there are interlocks that prevent the system from operating if the average combustion temperature is 28°C (50°F) below the 1290°F (693°F) from the 2004 performance test. The facility keeps continuous records of temperature and vent stream flow. iii. The Permittee shall keep up-to-date,readily accessible records of all periods when the vent stream is diverted from the control device or has no flow rate. Appeared to be in compliance —I reviewed the facility's Thermal Oxidizer Outage Log sheets, which document the periods when vent stream flow is diverted from the TO,which actually means that TO was not operating but the flow was still passing through the TO. iv. The Permittee shall submit to the Regional Supervisor, DAQ, semiannual reports of the following information as specified in 40 CFR Part 60.6150): A. Exceedances of monitoring parameters recorded above in paragraph c.ii above,and in 40 CFR Part 60.615(c). B. All periods recorded above in paragraph c.iii above,and in 40 CFR Part 60. 615(d),when the vent stream is diverted from the control device or has no flow rate. Appeared to be in compliance-the most recent semi-annual report,received on January 28,2022,states: "There were no 3-hour periods of operation when average combustion temperature was more than 28°C below the average combustion temperature recorded during the last performance test [i.e., 12901171." The semi-annual reports also include completed Thermal Oxidizer Outage Log forms. A.6 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" - For ID No. MF-2, the Permittee shall comply with all applicable provisions in 15A NCAC 2D .0524,NSPS, Subpart VV, "Standards of Performance for Equipment Leaks in the Synthetic Organic Chemicals Manufacturing Industry,"and including Subpart A"General Provisions". a. STANDARDS-The Permittee shall comply with the requirements of the leak standards in 60.482-1 through 60.482- 10 as applicable for all equipment in the affected facility. b. RECORDKEEPING REQUIREMENTS - The Permittee shall comply with the recordkeeping requirements in 60.486(a)through(h). i. Affected facilities applying for exemptions from this subpart per 60.480(d) must comply with the recordkeeping requirements in 60.486(i). ii. All records shall be kept in a log in a readily accessible location. c. REPORTING REQUIREMENTS - The Permittee shall submit semiannual reports to the Air Quality Regional Supervisor,Division of Air Quality. i. All semiannual reports shall include a summary of the recordkeeping requirements detailed in 60.486. ii. If electing to comply with the provisions in 60.483-1 and 60.483-2 the Permittee shall notify the Regional Supervisor,Division of Air Quality of the alternative standard selected 90 days before implementing either of the provisions. Appeared to be in compliance-the facility conducts Leak Detection and Repair(LDAR)inspections on pumps monthly and on valves quarterly, following their preventative maintenance program which uses electronically scheduled and recorded work orders. I reviewed LDAR log reports and work orders. For VOC detection,they employ the MultiRAE 3000 Portable Handheld VOC monitor. According to the standards in 60.482-1 through 60.482—10,a reading on the monitor of 10,000 ppm or higher indicates a leak. Mr.Harvey indicated that if he obtains a reading>0 on the MultiRAE or if there is a visible leak, maintenance is called to inspect and repair as needed. We discussed the timing in the standard that states that once a leak is detected, repairs should be initiated within 5 days and completed within 15 calendar days.The most recent semi-annual report was received on January 28,2022 and found to be in compliance. A.7 15A NCAC 2D.0524"NEW SOURCE PERFORMANCE STANDARDS"-For storage tanks listed in the table(see the Permit under this condition),the Permittee shall comply with all applicable provisions in 15A NCAC 2D .0524,NSPS, Subpart Kb, "Standards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for which Construction, Reconstruction, or Modification Commenced After July 23, 1984," and including Subpart A "General Provisions." Recordkeeping Requirements-Per 40 CFR 60.116b(a)and(b),the Permittee shall keep records showing the dimension of each storage vessel and an analysis showing the capacity of each storage vessel readily accessible for the life of the source. Appeared to be in compliance — Mr. Harvey showed me a spreadsheet listing all relevant tanks, their ID numbers, dimensions,and capacities in gallons. ID No.ES-M-99 has been removed from the site. A.8 NOTIFICATION REQUIREMENT—As required by 15A NCAC 2D.0535 the Permittee of a source of excess emissions that last>4 hr and results from a malfunction,a breakdown of process or control equipment or any other abnormal condition shall be required to give notification to the Director or his designee. Appeared to be in compliance — On February 17, 2022 facility had an excess emission situation resulting due to a malfunction of CD-2 (TO) and it lasted 4 hours and 21 minutes. The facility sent a notification email to RRO on February 17,2022 and a written notification with detailed information on February 28,2022. A.9 FUGITIVE DUST CONTROL REQUIREMENT—As required by 15A NCAC 213.0540 the Permittee shall not cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. Appeared to be in compliance—no dust was observed during the inspection; no dust complaints are on file at RRO against Arclin. A.10 FABRIC FILTER REQUIREMENTS-As required by 15A NCAC 2D.0611,particulate matter emissions shall be controlled as described in the permitted equipment list. a. Inspection and Maintenance (I&M) Requirements - To comply with the provisions of this permit and ensure that emissions do not exceed the regulatory limits,the Permittee shall perform,at a minimum,an annual internal inspection of each bagfilter system and periodic I&M as recommended by the equipment manufacturer. b. Recordkeeping Requirements-The results of all inspections and any variance from manufacturer's recommendations shall be investigated with corrections made and dates of actions recorded in a logbook. Records of all maintenance activities shall be recorded in the logbook. The logbook shall be kept on-site and made available to DAQ personnel upon request. Appeared to be in compliance—The facility's bagfilter maintenance logs,which record monthly internal inspections and maintenance performed. The most recent annual internal inspection was conducted on February 2,2022. A.I I VOC EMISSIONS FROM TRANSFER OPERATIONS—As required by 15A NCAC 2D .0948,the Permittee shall not load in any one day>20,000 gallons of VOC with a vapor pressure of>1.5 lb/in2 under actual conditions into any tank-truck,trailer or railroad tank car from any loading operation unless the loading operation uses submerged loading through boom loaders that extend down into the compartment being loaded or by other methods that are at least as efficient based on source testing or engineering calculations Appeared to be in compliance — Mr. Harvey informed me that because of the equipment restrictions, they are not capable of exceeding the limit of 20,000 gallons. Additionally,no open loading is conducted; all loading is closed,with vapors trapped to prevent emissions. A.12 STORAGE OF MISCELLANEOUS VOLATILE ORGANIC COMPOUNDS — As required by 15A NCAC 2D .0949 the Permittee shall not place, store, or hold in any stationary tank,reservoir, or other container with a capacity>50,000 gallons, any liquid VOC that has a vapor pressure of> 1.5 lb/in2 under storage conditions unless certain conditions are met. Appeared to be in compliance-the facility's 500,000-gallon methanol storage tank(ES-M-34) has a floating pontoon type roof and was inspected in mid-December 2009.The facility has four(4)75,000-gallon formaldehyde storage tanks and two (2) 125,000-gallon formaldehyde storage tanks with the vapors being controlled by the regenerative thermal oxidizer(CD-1). A.13 TOXIC AIR POLLUTANT EMISSIONS LIMITATION AND REPORTING REQUIREMENT-Pursuant to 15A NCAC 2D .1100,and in accordance with the approved application for an air toxic compliance demonstration,the following permit limits shall not be exceeded(see permit for list). a. Operations Restrictions - the following operating restrictions (scenarios) shall apply during control device(s) maintenance downtime(see permit for table). b. Recordkeeping Requirements-During periods of control device(s)maintenance downtime,the Permittee shall record: i. the flow rates to the RTO and TO hourly; ii. the number of process kettles producing urea-formaldehyde resin operating in the vacuum strip step; Records shall be recorded in a log book, which shall be kept on-site and made available to DAQ personnel upon request. Appeared to be in compliance-the facility operates under Scenario C or Scenario D.Kettle K-4 was in operation during the inspection.The recordkeeping requirement,Stipulation 14.b.,is tied to the operating scenarios A,B,and E during which the process is not operated while a control device(s) is down. Mr. Harvey explained that when the process is shutdown,control devices are not in operation. The facility doesn't operate in Scenario A,B,or E,therefore,the facility does not maintain recordkeeping of flow rates and the number of process kettles. A.14 CONTROL AND PROHIBITION OF ODOROUS EMISSIONS -As required by 15A NCAC 2D .1806, the Permittee shall prevent odorous emissions from the facility from causing or contributing to objectionable odors beyond the facility's boundary. Appears to be in compliance- no odors were detected beyond the facility's boundary; no odor complaints are on file against the facility. A.15 40 CFR Part 68 "ACCIDENTAL RELEASE PREVENTION REQUIREMENTS: RISK MANAGEMENT PROGRAMS UNDER THE CLEAN AIR ACT, SECTION 112(r)" - The Permittee shall comply with all applicable requirements in accordance with 40 CFR Part 68 including submitting a Risk Management Plan to EPA pursuant to 40 CFR 68.150 or as specified in 40 CFR 68.10. Arclin USA, LLC maintains formaldehyde onsite above the threshold quantity and is required to maintain a risk management plan(RMP)under the 112(r)program. Arclin does have an active RMP for formaldehyde in eight covered processes: the two plants (MF-1 and MF-2) and six resin kettles (ES-K series). Matthew Mahler, former RRO personnel,performed a full 112(r)inspection on March 12,2020 and found the facility to appear in compliance. The current RMP was briefly reviewed on site,is dated 12/30/2019, and is due to be reviewed and updated by 12/30/2024. The facility was reminded of the need to update their RMP by the due date and Mr.Harvey indicated that the facility has plans to do so.Mr.Harvey also mentioned that facility is currently conduction RMP compliance audit at the facility. A.16 Federal and State Rules Applicable to Sources Exempted from Air Permitting Requirements -Your facility is subject to the following federal and state rules: 40 CFR 63 -NESHAP/MACT--Subpart ZZZZ--Stationary Reciprocating Internal Combustion Engines Diesel-fired fire pump IES-FP-1 hours-meter reading was noted as 616.5 hours. From the February 2021 inspection report,the reading was 613 hours.Records indicated that the most recent annual engine maintenance was in November 2021. A.17 LIMITATION TO AVOID 15A NCAC 2Q .0501 -Pursuant to 15A NCAC 2Q .0315 "Synthetic Minor Facilities," to avoid the applicability of 15A NCAC 2Q .0501 "Purpose of Section and Requirement for a Permit," as requested by the Permittee, facility-wide air pollutant emissions shall be less than the amounts tabulated below per consecutive 12-month period. Volatile Organic Compounds(VOCs) 100 tons Carbon Monoxide 100 tons Formaldehyde and Methanol 10 tons each Sum of all Hazardous Air Pollutants(HAPs) 25 tons total a. Operations Restrictions-the following restrictions shall apply: i. Carbon monoxide, formaldehyde, methanol,total VOC and total HAP emissions shall be controlled by the RTO and TO as described in the equipment list with downtime allowances as described below. Appeared to be in compliance—both the RTO and TO were observed running properly. b. Recordkeeping Requirements-The Permittee shall record monthly and total annually the following: i. the facility-wide carbon monoxide,formaldehyde,methanol,total VOC and total HAP emissions. The Permittee shall keep each record on file for a minimum of three years. Appeared to be in compliance—I reviewed the facility's monthly and total annual emission records,which appeared complete and up to date. c. Reporting Requirements-Within 30 days after each calendar year,the Permittee shall submit the following to DAQ: i. monthly carbon monoxide,formaldehyde,methanol,total VOC and total HAP emissions for the previous 12 months;and ii. total carbon monoxide, formaldehyde, methanol, total VOC and total HAP emissions for the previous 12 months. Appeared to be in compliance—copies of submitted reports are kept onsite. The most recent report submitted was received on January 28,2022 and includes monthly and 12-month rolling total emissions for 2021. Total emissions for 2021 are as follows: Pollutant CY 2021 VOC 3.58 tons CO 60.65 tons Formaldehyde 0.76 tons Methanol 3.06 tons Total HAPs 4.77 tons d. RTO and TO Requirements-Carbon monoxide, formaldehyde,methanol,total VOC and total HAP emissions shall be controlled by the RTO (ID No. CD-I) and TO (ID No. CD-2) as described in the equipment list with downtime allowances as described in paragraph(d)(v)below. i. I&M Requirements - the Permittee shall perform periodic I&M as recommended by the manufacturer and perform an annual internal inspection of the primary heat exchanger and associated inlet/outlet valves to ensure structural integrity. Appeared to be in compliance—Mr.Harvey confirmed to me the information from the previous inspection record that they do I&M checks on the RTO and TO every Monday, Wednesday and Friday. Arclin maintenance also does an internal inspection every 6 months, which is in a greater frequency than the required annual. Additionally, Durr contractors conducts extensive internal maintenance every other year. Durr's last RTO and TO maintenance were completed on December 1-2,2021. ii. Recordkeeping Requirements - The results of all inspections and any variance from manufacturer's recommendations shall be investigated with corrections made and dates of actions recorded in a logbook. Records of all maintenance and monitoring activities shall be recorded in the logbook.The logbook shall be kept on-site and made available to DAQ personnel upon request. Appeared to be in compliance—I reviewed the RTO and TO I&M electronic logs,which appeared complete and up-to- date. iii. RTO Monitoring Requirements - The Permittee shall ensure the proper performance of the RTO by monitoring the following operational parameters: A. The Permittee shall record the maximum temperature measured inside the unit but in the second half of the oxidizer(away from the flame zone)monthly.The allowable range is between 1,400 and 1,700-F. B. The Permittee shall record the gas flowrate to the RTO daily. The maximum allowable flowrate is 11,800 standard cubic feet per minute(scfm),except during periods of thermal oxidizer maintenance downtime. Appears to be in compliance—I reviewed daily data for the RTO from January 2022—February 2022. All recorded temperatures were within the allowable range. All recorded flowrates reviewed were below the maximum 11,800 scfm. iv. TO Monitoring Requirements-The Permittee shall ensure the proper performance of the TO by monitoring the following operational parameters: A. The Permittee shall record the maximum temperature measured inside the unit but in the second half of the oxidizer(away from the flame zone)monthly.The minimum temperature is 1,280°F. B. The Permittee shall record the gas flowrate to the TO daily. The maximum allowable flowrate is 11,414 scfin,except during periods of maintenance downtime. Appeared to be in compliance—I reviewed daily data for the TO from January 2022—February 2022. All recorded temperatures were within the allowable range. All recorded flowrates reviewed were below the maximum 11,414 scfm. v. RTO and TO Downtime Allowance - emission sources controlled by the RTO or TO may operate uncontrolled according to the conditions listed below. This provision is limited only to satisfying maintenance requirements of the RTO and/or TO. A. Control Device Downtime Recordkeeping Requirements-The Permittee shall keep records of the dates and number of hours for each maintenance downtime of the RTO and/or the TO. Included with these records shall be calculations for emissions resulting from each RTO and/or TO downtime and 12-month facility-wide totals for the Synthetic Minor pollutants (carbon monoxide, formaldehyde,methanol,total VOCs and total HAN). B. Control Device Downtime Reporting Requirements - The Permittee shall provide a written report to DAQ within 7 days of conclusion of each control device maintenance downtime. This report shall contain a summary of all RTO and/or TO maintenance downtime over the previous twelve- month period and calculations showing facility-wide emissions of all Synthetic Minor pollutants over the previous 12-month period. Appeared to be in compliance— [Tayl arond I still reviewing THis part to see if they violated this condition due o recent TO downtime situation] I reviewed the facility's Thermal Oxidizer Outage Log forms,which appear complete and up-to-date. Copies of these logs are submitted to DAQ semi-annually. Every entry on the data log does not require a notice `within seven days of conclusion of each control device maintenance downtime' - according to the facility contacts,there are electrical `blips' with the TO and RTO that are recorded on the outage log, but do not constitute control device maintenance downtime. The system goes offline unexpectedly, and it is then put back online as soon as possible. However, the recordkeeping requirement, Stipulation 17.d.v., is tied to the assumption that the facility, at times,can operate their emission sources uncontrolled. DAQ staff discussed this Stipulation with Mr.Harvey during the 2017 inspection and in follow-up phone calls in May and June 2017. Mr.Harvey explained that when the process is shutdown,control devices are not in operation. Thus,the facility has submitted the outage logs to DAQ,semi-annually. DAQ determined that this method satisfies the permit condition. In the event that the facility takes maintenance downtime in which the process stream is diverted from the control device, the facility will submit the written report within seven days to DAQ. A.18 LIMITATION TO AVOID 15A NCAC 213 .0530 "PREVENTION OF SIGNIFICANT DETERIORATION' -In accordance with 15A NCAC 2Q .0317,to comply with this permit and avoid the applicability of 15A NCAC 2D .0530, as requested by the Permittee,emissions shall be limited as follows: Affected Source(s) Pollutant Emission Limit (Tons Per Consecutive 12-month Period) Facility Wide F-c-61 100 Facility Wide VOC 100 Appeared to be in compliance-the Synthetic Minor conditions ensure compliance with this stipulation. (VI) GENERAL PERMIT CONDITIONS: 13.5 REPORTING REQUIREMENT-Any changes that would result in previously unpermitted,new,or increased emissions must be reported to DAQ. Appeared to be in compliance—no such changes were made nor are planned per facility personnel. B.14 PERMIT RETENTION REQUIREMENT-The Permittee shall retain a current copy of the air permit at the site. Appeared to be in compliance—a copy of Air Permit R23 was presented at my request during the inspection. (VII) INSIGNICANT/EXEMPT SOURCES: Source Exemption Regulation of Source of Title Operating Source Exemption Regulation TAPS? V Pollutants? IES-M-40-potassium hydroxide storage tank 2 .0102 c 1 D m No Yes Yes (10,000 gallon storage capacity) Q O( )( )( ) IES-QCL-Quality control laboratory 12Q .0102(c)(1)(C)(iv) FYes Yes Yes IES-M-96-diesel fuel storage tank(2,000 12Q .0102(c)(1)(D)(i) Yes Yes Yes gallon capacity) IS-B-1 -natural gas fired boiler(25 million Btu Yes per hour maximum heat input rate) 2Q .0102(c)(2)(B)(ii) Yes Yes IS-B-2-natural gas fired boiler(20.08 million 2Q.0102(c)(2)(B)(ii) Yes Yes F�o Btu per hour maximum heat input rate) I F There were no apparent issues with any of the exempt sources at this facility. All sources currently listed on the facility's insignificant activities attachment to the permit have been observed during this inspections. The quality control lab and fire pump engine were observed during this inspection.No additional exempt emission sources were noted that would need inclusion on the permit's insignificant activities list. (VIII) EMISSION INVENTORY REVIEW:Most pollutants are below the deminimus. The drop in emissions when comparing the 2010 and 2005 calendar years is due to a drop in business. (IX) COMPLIANCE HISTORY: Arclin has two reported violations in recent years: • On January 29,2016 a NOD was sent for deficiencies noted in the RMP resulting from a DAQ inspection on November 23,2015. • On November 15,2005 a NOV was sent for nonpayment of fees(2Q.0203). • On December 21,2004 a NOV was sent for failing emission tests of the RTO(Permit Condition A.8.). (X) PERFORMANCE TEST REVIEW: Stack testing has not been completed at this facility within the past five years. (XI) CLEAN AIR ACT SECTION 112(r)REQUIREMENTS-Pursuant to 15A NCAC 2D.2100"Risk Management Program," if the Permittee is required to develop and register a risk management plan pursuant to Section 112(r)of the Federal Clean Air Act,then the Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part 68. Arclin USA,LLC maintains formaldehyde onsite above the threshold quantity and is required to maintain a risk management plan(RMP)under the 112(r)program. Arclin does have an active RMP for formaldehyde in eight covered processes:the two plants(MF-1 and MF-2)and six resin kettles(ES-K series). Matthew Mahler,former RRO personnel,performed a full 112(r) inspection on March 12,2020 and found the facility to appear in compliance. The current RMP was briefly reviewed on site, is dated 12/30/2019, and is due to be reviewed and updated by 12/30/2024. The facility was reminded of the need to update their RMP by the due date and Mr.Harvey indicated that the facility has plans to do so.Mr.Harvey also mentioned that facility is currently conduction RMP compliance audit at the facility. (XII) CONCLUSIONS/RECOMMENDATIONS:Arclin USA,LLC appears to be in compliance with all conditions of its current Air Permit No.04162R23. I recommend that the facility be re-inspected in one year.