HomeMy WebLinkAboutAQ_GEN_PLNG_20200903_SIP_SO2-NAAQS_Att4PermitAttachment 4
Blue Ridge Paper Products LLC
Canton, Haywood County, North Carolina
Air Quality Permit No. 08961T29
Facility ID: 4400159
(This page intentionally left blank)
June 2, 2020
Mr. Wallace McDonald
General Manager – Canton and Waynesville Operations
Blue Ridge Paper Products LLC
175 Main Street
Canton, North Carolina 28716
SUBJECT: Air Quality Permit No. 08961T29
Facility ID: 4400159
Blue Ridge Paper Products LLC
Canton, Haywood County, North Carolina
Fee Class: Title V
Dear Mr. McDonald:
In accordance with your Air Quality Permit Application for the Significant 02Q .0501(b)(2)
modification of your Title V permit received February 26, 2020, and amended May 1, 2020, we are
forwarding herewith Air Quality Permit No. 08961T29 to Blue Ridge Paper Products LLC, Canton, North
Carolina authorizing the construction and operation, of the emission source(s) and associated air pollution
control device(s) specified herein. Additionally, any emissions activities determined from your Air Quality
Permit Application as being insignificant per 15A North Carolina Administrative Code 02Q .0503(8) have
been listed for informational purposes as an "ATTACHMENT." Please note the requirements for the annual
compliance certification are contained in General Condition P in Section 3. The current owner is responsible
for submitting a compliance certification for the entire year regardless of who owned the facility during the
year.
As the designated responsible official, it is your responsibility to review, understand, and abide by all
of the terms and conditions of the attached permit. It is also your responsibility to ensure that any person who
operates any emission source and associated air pollution control device subject to any term or condition of
the attached permit reviews, understands, and abides by the condition(s) of the attached permit that are
applicable to that particular emission source.
If any parts, requirements, or limitations contained in this Air Quality Permit are unacceptable to you,
have the right to request a formal adjudicatory hearing within 30 days following receipt of this permit
identifying the specific issues to be contested. This hearing request must be in the form of a written petition,
conforming to NCGS (North Carolina General Statutes) 150B-23, and filed with both the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714 and the Division of
Air Quality, Permitting Section, 1641 Mail Service Center, Raleigh, North Carolina 27699-1641. The form
for requesting a formal adjudicatory hearing may be obtained upon request from the Office of Administrative
Hearings. Please note that this permit will be stayed in its entirety upon receipt of the request for a hearing.
Unless a request for a hearing is made pursuant to NCGS 150B-23, this Air Quality Permit shall be final and
binding 30 days after issuance.
Mr. Wallace McDonald
June 2, 2020
Page 2
You may request modification of your Air Quality Permit through informal means pursuant to NCGS
150B-22. This request must be submitted in writing to the Director and must identify the specific provisions
or issues for which the modification is sought. Please note that this Air Quality Permit will become final and
binding regardless of a request for informal modification unless a request for a hearing is also made under
NCGS 150B-23.
The construction of new air pollution emission source(s) and associated air pollution control
device(s), or modifications to the emission source(s) and air pollution control device(s) described in this
permit must be covered under an Air Quality Permit issued by the Division of Air Quality prior to construction
unless the Permittee has fulfilled the requirements of NCGS 143-215.108A(b) and received written approval
from the Director of the Division of Air Quality to commence construction. Failure to receive an Air Quality
Permit or written approval prior to commencing construction is a violation of NCGS 143-215.108A and may
be subject the Permittee to civil or criminal penalties as described in NCGS 143-215.114A and 143-215.114B.
Haywood County has triggered increment tracking under PSD for NOX. However, this permit
modification does not consume or expand increments for any pollutants.
This Air Quality Permit shall be effective from June 2, 2020, until October 31, 2021, is
nontransferable to future owners and operators, and shall be subject to the conditions and limitations as
specified therein. Should you have any questions concerning this matter, please contact Jenny Sheppard at
(919) 707-8725 or email heather.sands@ncdenr.gov.
Sincerely yours,
Booker T. Pullen
for
William D. Willets, P.E., Chief, Permitting Section
Division of Air Quality, NC DEQ
Enclosure
cc: Kelly Fortin, EPA Region 4
Asheville Regional Office
Connie Horne (cover letter only)
Central Files
Mr. Wallace McDonald
June 2, 2020
Page 3
ATTACHMENT to Permit No. 08961T29
Insignificant Activities per 15A NCAC 02Q .0503(8)
Emission Source ID No. Emission Source Description
I-G01001 Chip Unloading
I-G03008 Brownstock Washing B Other Units
I-G06015 Methanol Storage
I-G07017 Evaporator Other Units
I-G08020-1 Saltcake Mix Tank #10 RF
I-G08021-1 Saltcake Mix Tank #11 RF
I-G08074 Chloride Removal Process (CRP)
I-G09030 Lime Kiln Scrubber Sump Tanks
I-G09033 Lime Kiln Area Other Sources
I-G10036.10-TK-010 Causticizer (Center)
I-G10036.10-TK-009 Causticizer (East)
I-G10036.10-TK-025 Causticizer (South)
I-G10036.10-TK-011 Causticizer (West)
I-G10036.10-TK-026 Causticizer (North)
I-G10036.10-TK-015 White Liquor Clarifier (West)
I-G10036.10-TK-018 White Liquor Clarifier (EIMCO)
I-G10036.10-TK-012 White Liquor Clarifier (South)
I-G10036.10a White Liquor Pressure Disc Filter
I-G10091 Lime Mud Washers and Storage
I-G11043 Bark Storage and Handling
I-G11046 Cooling Towers
I-G11047 Power Boilers Other Units
I-G11079 No. 4 Power Boiler Flyash Storage Silo (180,000 gallons)
I-11-CU-006-01 Urea Solution Storage Tanks for SNCR System
I-G12052 No. 20 Paper Machine Trim System
I-G13053 Paper Machine Additives Area
I-G16057 Backup Lime Dewatering System
I-G16080 WTP Low Lift and Splitter Box
I-G16083 WTP Secondary Clarifiers
I-G16084 WTP Sludge Presses and Pile
I-G16085 WTP Other Sources
I-G20075 Main Turpentine Tank
I-G21062 Tall Oil Finishing Plant
I-G21063 Tall Oil Manufacturing Plant
I-G21076 MQB Storage Tank
I-G23064 Liquid Chemical Storage
Mr. Wallace McDonald
June 2, 2020
Page 4
Emission Source ID No. Emission Source Description
I-G23065 Bleached Stock Storage
I-G23066.a Sewer Lines
I-G23066.b Truck Traffic Fugitives
I-G23066.c Coal Handling Fugitives
I-G23066.d Water Treatment
I-G23066.f-ire
MACT ZZZZ Two 200 horsepower, diesel generators used in the fire control system
I-G23066.f-gen
MACT ZZZZ
One 64 horsepower and one 227 horsepower diesel engine used to turn the lime
kiln in the event of sudden power loss
I-G23066.f-rec
MACT ZZZZ
One 100-kW, diesel generator used for emergency breakdowns of the recovery
furnaces in the event of sudden power loss
I-G23066.g Propane Vaporizer
I-G23066.h Paint Shop Activities
I-G23066.i Maintenance Shop Activities
I-G23066.j Carpentry Shop Activities
I-G23067 Parts Washers
I-G24093 Pre-Bleach B Other Sources
I-G02307 Ultra-Low Sulfur No. 2 Fuel Oil Storage Tank (1,300 gallons capacity)
I-RB Bunker Riley Bark Coal Bunker
I-PG Bunker Peter G Coal Bunker
I-RC Bunker Riley Coal Bunker
I-G12077
MACT DDDDD
Two natural gas and/or propane hot oil heaters (maximum heat input of 3.9 million
Btu per hour each) installed on the calendar section of the No. 19 Paper Machine
1. Because an activity is insignificant does not mean that the activity is exempted from an applicable requirement
or that the owner or operator of the source is exempted from demonstrating compliance with any applicable
requirement.
2. When applicable, emissions from stationary source activities identified above shall be included in determining
compliance with the permit requirements for toxic air pollutants under 15A NCAC 02D .1100 “Control of
Toxic Air Pollutants” or 02Q .0711 “Emission Rates Requiring a Permit.”
3. For additional information regarding the applicability of MACT or GACT see the DAQ page titled “Specific
Permit Conditions Regulatory Guide.” The link to this site is as follows: http://deq.nc.gov/about/divisions/air-
quality/air-quality-permits/specific-permit-conditions-regulatory-guide.
Mr. Wallace McDonald
June 2, 2020
Page 5
Summary of Changes to Permit
The following changes were made to the Blue Ridge Paper Products LLC, Air Permit No. 08961T28.
Page No. Section Description of Change(s)
Cover Letter Cover Letter Updated permit revision and dates.
Cover Letter
Attachment
Insignificant
Activities List and
Summary of
changes to permit
• Added two insignificant activities: Causticizer (North) (ID No. I-
G10036.10-TK-026) and White Liquor Pressure Disc Filter (ID No. I-
G10036.10a)
• Updated Summary of changes to permit for current permit modifications.
Permit cover page Permit cover page Updated permit revision number and permit issuance date
1 – 153 All • Updated permit revision number in header
• Updated permit language to match permit shell
• Corrected typographical errors
3 – 11 1 • Updated footnotes to table and added specific equipment to the footnote
so that they are easier to read
• Moved Dregs Filter to the Lime Production Area (Area 09)
• Added lime pre-coat filter vacuum pumps to the equipment description
for Lime Production – Other Units
• Added footnotes indicating that the recausticizing area sources and the
lime kilns are modified under 15A NCAC 02D .0501(b)(2) as the first
step of a two-step significant modification as proposed in Permit
Application No. 4400159.20B
• Removed footnote from Nos. 1 and 2 Package Boilers – requirement for
second step of two-step modification was satisfied with issuance of
Permit No. 08961T28
• Added a footnote for the Black Liquor Oxidation System Condensate
Collection Tank. This footnote was inadvertently left off the table when
Permit No. 08961T27 was issued.
35 – 40 2.1 O • Added a requirement to condition O.1.b to conduct a performance test
within 180 days of normal operation after upgrades to lime kiln
scrubbers as proposed in Permit Application No. 4400159.20B
• Added language to condition O.1.e to specify that the No. 4 Lime Kiln
Scrubber should be operated as previously permitted prior to the
upgrades and that after upgrading the scrubber, the manufacturer-
suggested operating parameters be used prior to the performance test and
site-specific operating parameters be confirmed or reestablished during
the initial performance test.
• Added a language to condition O.2.c requiring that “normal” visible
emissions should be established within the first 30 days of the
resumption of normal operations following the upgrades to the lime kiln
scrubbers.
• Added a footnote to the table in condition O.5.d requiring that new
minimum indicator ranges be established following the initial
performance tests.
Mr. Wallace McDonald
June 2, 2020
Page 6
Page No. Section Description of Change(s)
44 2.1 R • Corrected No. 6 Lime Pre-Coat Filter ID No. (should be 09-PU-004, not
003)
• Added the Nos. 4, 5, and 6 Lime Pre-coat Filter Vacuum Pumps and
Dregs Filter to condition header
45 – 46 2.1 S • Added specific Green Liquor Clarification and Storage emission unit
descriptions to condition header
• Added unit ID to Green Liquor Stabilization in condition header
94 – 96 2.2 A • Added recordkeeping and reporting condition A.6 for the use of
projected actual emissions to avoid PSD applicability.
98 2.2 B • Added condition B.6 requiring a permit application to be submitted
within one year from the date the No. 4 or No. 5 Lime Kiln Scrubbers
resume normal operation or the completion of upgrades to the
recausticizing sources as proposed in Application No. 4400159.20B,
whichever is earlier.
112 – 117 2.2 D • Specified in condition D.1.d.i that performance tests previously
conducted on the No. 4 Lime Kiln scrubber cannot be used to satisfy the
October 13, 2020, testing requirement.
• Added condition D.1.d.iv to require a performance test on the No. 5
Lime Kiln Scrubber within 180 days of resumption of normal operation
after the scrubber upgrades.
• Updated Table 2.2 D.2 to specify the operating parameter requirements
before and after the scrubber upgrades to the Nos. 4 and 5 Lime Kiln
Scrubbers
133 – 140 2.2 H • To reflect the correct modeling configuration used to derive Table 2.2
H.1, the lime pre-coat filter vacuum pumps and the dregs filter in were
added to the emission limits associated with the lime pre-coat filters
• Added the White Liquor Pressure Disc Filter to the TAP limits for white
liquor clarifiers
• Added North Causticizer to the TAP limits for the causticizers
143 - 145 2.2 J • Modified condition J.1.c.iii to refer to the Subpart MM requirements in
Section 2.2 D.1 instead of the State regulation requirements in Section
2.1 O.1.
• Modified condition J.1.d.i to add a requirement to conduct a performance
test to demonstrate compliance with the SO2 emission limit following the
modifications to the lime kiln scrubbers.
State of North Carolina
Department of Environmental Quality
Division of Air Quality
AIR QUALITY PERMIT
Permit No. Replaces Permit No. Effective Date Expiration Date
08961T29 08961T28 June 2, 2020 October 31, 2021
Until such time as this permit expires or is modified or revoked, the below named Permittee is authorized to
construct and operate the emission source(s) and associated air pollution control device(s) specified herein, in
accordance with the terms, conditions, and limitations within this permit. This permit is issued under the
provisions of Article 21B of Chapter 143, General Statutes of North Carolina as amended, and Title 15A North
Carolina Administrative Codes (15A NCAC), Subchapters 02D and 02Q, and other applicable Laws.
Pursuant to Title 15A NCAC, Subchapter 02Q, the Permittee shall not construct, operate, or modify any
emission source(s) or air pollution control device(s) without having first submitted a complete Air Quality
Permit Application to the permitting authority and received an Air Quality Permit, except as provided in this
permit.
Permittee: Blue Ridge Paper Products LLC
Facility ID: 4400159
Facility Site Location: 175 Main Street
City, County, State, Zip: Canton, Haywood County, North Carolina, 28716
Mailing Address: P.O. Box 4000
City, State, Zip: Canton, North Carolina 28716
Application Number: 4400159.20B
Complete Application Date: February 26, 2020 (amended May 1, 2020)
Primary SIC Code: 2621
Division of Air Quality, Asheville Regional Office
Regional Office Address: 2090 US Highway 70
Swannanoa, North Carolina, 28778
Permit issued this the 2nd day of June, 2020
Booker T. Pullen
for
_________________________________________________
William D. Willets, P.E., Chief, Permitting Section
By Authority of the Environmental Management Commission
Table of Contents
SECTION 1: PERMITTED EMISSION SOURCE(S) AND ASSOCIATED
AIR POLLUTION CONTROL DEVICE(S) AND APPURTENANCES
SECTION 2: SPECIFIC LIMITATIONS AND CONDITIONS
2.1- Emission Source(s) Specific Limitations and Conditions
(Including specific requirements, testing, monitoring, recordkeeping, and reporting
requirements)
2.2- Multiple Emission Source(s) Specific Limitations and Condition
(Including specific requirements, testing, monitoring, recordkeeping, and reporting
requirements)
SECTION 3: GENERAL PERMIT CONDITIONS
ATTACHMENT
List of Acronyms
Permit 08961T29
Page 3
SECTION 1- PERMITTED EMISSION SOURCE(S) AND ASSOCIATED AIR
POLLUTION CONTROL DEVICE(S) AND APPURTENANCES
The following table contains a summary of all permitted emission sources and associated air pollution control devices and appurtenances:
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
CHIP HANDLING AND STORAGE (AREA 01)
NA* G01002* Chip Handling Operations NA NA
NA* G01003* Chip Storage Area NA NA
DIGESTER AREA (AREA 02)
12, 96 G02004
MACT S
Digester Area:
Eighteen (18) batch digesters (No. 02-PU-001)
No. 1 Hardwood Blow Heat System:
Blow Tank (No. 02-PU-005)
Fiberline Accumulator (No. 02-PU-006)
Secondary Condenser (No. 02-PU-008)
No. 2 Pine Blow Heat System, including:
Blow Tank (No. 02-PU-003)
Fiberline Accumulator (No. 02-PU-007)
Secondary Condenser (No. 02-PU-009)
NOTE: Foul condensates to condensate stripper
system via closed collection system (ID No.
G07018)
G09028
(primary)
G09029
(backup)
No. 4 Lime Kiln via NCG
closed collection system
No. 5 Lime Kiln via NCG
closed collection system
BROWNSTOCK WASHING (AREA 03)
14, 96 G03005
MACT S
No. 1 Hardwood Fiberline Brownstock
Washing System:
Nos. 1 through 4 Brownstock Washers
(No. 03-PU-001)
Foam Tank No. 1 (No. 03-TK-003)
Foam Tank No. 2 (No. 03-TK-004)
NA NA
14, 96 G03006
MACT S
No. 2 Pine Fiberline Brownstock Washing
System:
Washers and Filtrate Tanks (No. 03-PU-
032)Δ
Brownstock Washer Mix Tanks (Nos. 03-
TK-015, 03-TK-016, 03-TK-017)
NA NA
127 G03007 Reject Knots NA NA
OXYGEN DELIGNIFICATION (AREA 04)
14, 96 G04009
MACT S
No. 1 Hardwood Fiberline Oxygen
Delignification System:
O2 Reactor (No. 04-PU-001)Δ
O2 Blow Tank (No. 04-TK-005)
Post-O2 Washer (No. 04-PU-002)
Post-O2 Filtrate Chest (No. 04-TK-008)
NA NA
14, 96 G04010
MACT S
No. 2 Pine Fiberline Oxygen Delignification
System:
O2 Reactor (No. 04-PU-014)Δ
O2 Blow Tank (No. 04-TK-018)
Post-O2 washer (No. 04-PU-016)
NA NA
14,
127
G04011 White Liquor Oxidation System
(maximum production rate of 40,500 pounds of
white liquor per hour)
04-CD-021-01 Chevron demister
Permit 08961T29
Page 4
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
14, 96 G04025
MACT S
No. 1 Hardwood Fiberline Pulp Screening
System (No. 04-TK-009)
NA NA
14, 96 G04026
MACT S
No. 2 Pine Fiberline Pulp Screening System NA NA
73, 96 G24087
MACT S
No. 1 Hardwood Fiberline Deckers:
East Decker (No. 04-PU-003)
West Decker (No. 04-PU-004)
Decker Filtrate Tank (No. 04-TK-007)
NA NA
73, 96 G24088
MACT S
No. 2 Pine Fiberline Deckers:
Decker (No. 04-PU-015)
Decker Filtrate Tank (No. 04-TK-017)
NA NA
73,
127
G24092 Hardwood Brownstock High Density Storage NA NA
73,
127
G24094 Pine Brownstock High Density Storage NA NA
BLEACHING (AREA 05)
15,
96,
124
G05012
MACT S
No. 1 Hardwood Fiberline Bleaching System:
D1 Stage (ClO2):
Tower (No. 05-PU-002),
Washer (No. 05-PU-004),
Filtrate Tank (No. 05-TK-003)
Eo Stage (Extraction):
Tower (No. 05-PU-008),
Washer (No. 05-PU-007),
Filtrate Tank (No. 05-TK-009)
D2 Stage (ClO2):
Tower (No. 05-PU-010)
Washer (No. 05-PU-012)
Filtrate Tank (No. 05-TK-011)
NOTE: Extraction stage is not subject to MACT Subpart S
05-CD-002-01 No. 1 Fiberline Bleaching
countercurrent packed
tower-type wet scrubber
(190 gallons per minute
white liquor design flow
rate)
15,
96,
124
G05013
MACT S
No. 2 Pine Fiberline Bleaching System:
D1 Stage (ClO2):
Tower (No. 05-PU-017),
WasherΔ (No. 05-PU-022),
Filtrate Tank (No. 05-TK-018)
Eo Stage (Extraction):
Tower (No. 05-PU-019),
WasherΔ (No. 05-PU-023),
Filtrate Tank (No. 05-TK-020),
D2 Stage (ClO2):
Tower (No. 05-PU-021),
WasherΔ (No. 05-PU-024),
Filtrate Tank (No. 05-TK-027)
NOTE: Extraction stage is not subject to MACT Subpart S
05-CD-017-01 No. 2 Fiberline Bleaching
countercurrent packed
tower-type wet scrubber
(70 gallons per minute
white liquor design flow
rate)
15,
127
G05073 Minerals Removal Process (MRP) NA NA
Permit 08961T29
Page 5
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
CHLORINE DIOXIDE PREPAREATION (AREA 06)
16,
127
G06014
112(r)
Chlorine Dioxide Generation System:
R-8 Chlorine Dioxide Generator (No. 06-PU-
002), and
Three Chlorine Dioxide Solution Storage Tanks
(Nos. 06-TK-007, 06-TK-008, and 06-TK-009,
125,000 gallons capacity, each)
06-CD-002-01
05-CD-002-01
Primary Operating
Scenario: Two scrubbers in
series:
one two-section packed
tower wet scrubber (70
to 80 gallons of chilled
water per minute
minimum flow rate); and
No. 1 Fiberline
Bleaching
countercurrent packed
tower-type wet scrubber
(190 gallons per minute
white liquor design flow
rate)
Alternate Operating
Scenario:
One two-section packed
tower wet scrubber (ID No.
06-CD-002-01)
EVAPORATORS (AREA 07)
18, 96 G07016^
MACT S
Black Liquor Evaporation System:
Swenson Countercurrent Evaporator, consisting
of six effects and one concentrator -147,402
pounds per hour black liquor solids maximum
design capacity (No. 07-PU-002)
Swenson Evaporator Hotwell - collects
condensates from the 4th, 5th, and 6th
evaporator effects (No. 07-TK-006)
NOTE: Foul condensates to Foul Condensate
Stripper System (ID No. G07018) via closed
collection system
West GB Countercurrent Evaporator, consisting
of six bodies and five effects and steam liquor
heater - 131,614 pounds per hour black liquor
solids maximum design capacity (No. 07-PU-
003)
West GB Evaporator Hotwell – collects
condensates from the 2nd through 6th evaporator
effects (No. 07-TK-007
NOTE: Foul condensates to Foul Condensate
Stripper System (ID No. G07018) via closed
collection system
G09028
(primary)
or
G09029
(backup)
No. 4 Lime Kiln via NCG
closed collection system
No. 5 Lime Kiln via NCG
closed collection system
(Control system serves
both evaporators)
Permit 08961T29
Page 6
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
21, 96 G07018
NSPS BB
MACT S
Foul Condensate Stripper System:
Condensate Stripper (No. 07-PU-015),
Stripper Feed Tank (No. 07-TK-011), and
Reflux Tank (No. 07-TK-014)
NOTE: Foul condensates are collected from the
digester area (ID No. G02004), the evaporators (ID
No. G07016), the turpentine recovery systems (ID
Nos. G20060 and G20062), the LVHC collection
system, the HVLC collection system, and the black
liquor oxidation gas collection system (ID No.
G08022b)
G09029
(primary)
or
G09028
(backup)
No. 5 Lime Kiln via NCG
closed collection system
No. 4 Lime Kiln via closed
collection system
20,
127
G07019
Heavy Black Liquor Storage:
East Storage Tank (No. 07-TK-023)
West Storage Tank (No. 07-TK-024)
Red Liquor Tank (No. 07-TK-022)
Backup Tank (No. 07-TK-025)
NA NA
20,
127
G07086
Weak Black Liquor Storage:
Eight Storage Tanks (No. 07-TK-004, 07-TK-
013, 07-TK-016, 07-TK-017, 07-TK-018, 07-
TK-019, 07-TK-020, 07-TK-021)
NA NA
RECOVERY (AREA 08)
22,
90,
109,
124,
133
G08020£
MACT MM
No. 10 Recovery Furnace (No. 08-PU-001):
Black liquor solids, ultra-low sulfur No. 2 fuel
oil blended with black liquor solids, natural gas,
and No. 6 fuel oil and No.2 fuel oil-fired new
design recovery furnace (121,000 pounds per
hour maximum black liquor solids firing rate
and 382 million Btu per hour maximum heat
input rate from natural gas, No. 6 fuel oil and
No. 2 fuel oil)
08-CD-001-01 3-Chamber, 6-field wet
bottom electrostatic
precipitator (nominal
115,236 square feet of
collection plate area)
26,
90,
109,
124,
133
G08021£
MACT MM
No. 11 Recovery Furnace (No. 08-PU-002):
Black liquor solids, ultra-low sulfur No. 2 fuel
oil blended with black liquor solids, natural gas,
and No. 6 fuel oil and No. 2 fuel oil-fired new
design recovery furnace (121,000 pounds per
hour maximum black liquor solids firing rate,
382 million Btu per hour maximum heat input
rate from natural gas, No. 6 fuel oil, No. 2 fuel
oil and 0.25 million Btu per hour maximum
heat input rate from propane igniters)
08-CD-002-01 3-Chamber, 4-Field wet
bottom electrostatic
precipitator (nominal
115,236 square feet of
collection plate area)
30,
96,
133
G08022a
Black liquor oxidation system: Collection of
vent gases from black liquor oxidation - (No.
08-PU-005, 228,000 pounds per hour maximum
design black liquor solids feed rate based on
calendar day average)
CD-BLO
CD-
BLOXRTO
CD-RTOSCR
Three cyclones, one on
each oxidizer tank (60
inches in diameter, each);
One natural gas-fired
regenerative thermal
oxidizer (4.2 million Btu
per hour heat input);
One caustic scrubber (5 to
7-gallons per minute NaOH
injection design flow rate)
Permit 08961T29
Page 7
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
101,
103
G08022bµ Black Liquor Oxidation System:
Condensate Collection Tank (No. 08-TK-001)
G07018
Or
G16082
Foul condensate stripper
system
Or
Via hard pipe to and
discharged below the liquid
surface of the WTP
Aeration and Digestion
Basins
32,
109,
124,
133
G08023
MACT MM
NSPS BB
No. 10 Smelt Dissolving Tank (No. 08-PU-011,
121,000 pounds per hour black liquor solids
feed rate)
08-CD-011-01 chevron mist eliminator
(33.5 square feet of
collection surface area)
with a secondary shower
after the demister pad (86
gallons per minute
minimum 3-hour average
flow rate)
32,
109,
124,
133
G08024
MACT MM
NSPS BB
No. 11 Smelt Dissolving Tank (No. 08-PU-012,
121,000 pounds per hour black liquor solids
feed rate)
08-CD-012-01 chevron mist eliminator
(33.5 square feet of
collection surface area)
with a secondary shower
after the demister pad (86
gallons per minute
minimum 3-hour average
flow rate)
LIME PRODUCTION (AREA 09)
45,
127
G09027 π Lime Production – Other Units:
No. 4 Lime Pre-Coat Filter (No. 09-PU-001)
No. 4 Lime Pre-Coat Filter Vacuum Pump
(No. 09-PU-001a)
No. 5 Lime Pre-Coat Filter (No. 09-PU-002)
No. 5 Lime Pre-Coat Filter Vacuum Pump
(No. 09-PU-002a)
No. 6 Lime Pre-Coat Filter (No. 09-PU-004)
No. 6 Lime Pre-Coat Filter Vacuum Pump
(No. 09-PU-004a)
NA NA
NA G09027-3π Dregs Filter NA NA
36,
90,
96,
109,
124
G09028£
MACT MM
No. 4 Lime Kiln (No. 09-PU-009):
Natural gas/No. 6 fuel oil/No. 2 fuel oil-fired
lime kiln (9.0 tons per hour maximum calcium
oxide design capacity; 60.0 million Btu per
hour maximum permitted heat input rate, with
propane igniters)
NOTE: Provides primary control for collected NCG
foul gases and backup control for stripper off-gases
from the condensate stripper system.
09-CD-009-01 Cyclonic mist eliminator
(120 inches in diameter) in
series with a flooded disc-
type wet scrubber (360
gallons per minute liquid
design flow rate, with pH
control)
Permit 08961T29
Page 8
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
36,
90,
96,
109,
124
G09029£
MACT MM
No. 5 Lime Kiln (No. 09-PU-010):
Natural gas/No. 6 fuel oil/No. 2 fuel oil-fired
lime kiln (12.0 tons per hour maximum calcium
oxide design capacity; 100.0 million Btu per
hour maximum permitted heat input rate, with
propane igniters)
NOTE: Provides backup control for collected NCG
foul gases and primary control for stripper off-gases
from the condensate stripper system.
09-CD-010-01 One 4-stage MicroMistTM
venturi scrubber (quench,
venturi, impingement tray,
and chevron mist
eliminator, 156 inches in
diameter, 250 gallons per
minute venturi design rate,
with pH control)
44 G09031 No. 6 Lime Silo Dust Collection System:
Lime Storage Silo (No. 09-TK-018, 150 tons
maximum capacity)
Fresh Lime Storage Silo (No. 09-TK-019,
150 tons maximum capacity)
No. 6 Hot Lime Conveyor (No. 09-PU-011)
Lime Crusher (No. 09-PU-012)
Bucket Elevator (No. 09-PU-013)
09-CD-018-01 Cartridge-type bagfilter
(1,728 square feet of filter
area)
42 G09032 No. 5 Lime Silo Dust Collection System:
No. 5 Lime Storage Silo (No. 09-TK-013,
400 tons maximum capacity)
Hot Lime Conveyor (No. 09-PU-014),
Lime Crusher (No. 09-PU-015),
Bucket Elevator (No. 09-PU-016)
09-CD-013-01 Cartridge-type bagfilter
(1,728 square feet of filter
area)
CAUSTICIZING (AREA 10)
46,
127
G10035 No. 5 Lime Slaker (No. 10-PU-027) – serves
No. 5 Lime Kiln
10-CD-027-01 one natural draft
condensing scrubber
(nominal 30 gallons per
minute mill water injection
rate)
46,
127
G10034 No. 6 Lime Slaker (No. 10-PU-036) – serves
No. 4 Lime Kiln
10-CD-036-01 one natural draft scrubber
(nominal 30 gallons per
minute mill water injection
rate)
46,
127
G10089 Green Liquor Clarification and Storage:
West Green Liquor Storage (No. 10-TK-002)π
North Green Liquor Storage (No. 10-TK-013)
South Green Liquor Clarifier (No. 10-TK-
005)π
North Green Liquor Clarifier (No. 10-TK-
006)π
NA NA
46,
127
G10090 Green Liquor Stabilization (No. 10-TK-008) NA NA
0BPOWER (AREA 11)
48, 90 G11039
PSD
MACT
DDDDD
Riley Coal (No. 11-CU-005):
Coal-fired utility boiler (399 million Btu per
hour maximum heat input rate) equipped with
low-NOX burners and natural gas/kerosene
igniters
11-CD-005-01
11-CD-005-02
2-Chamber, 3-Field
electrostatic precipitator
(40,500 square feet of plate
area)
Wet caustic scrubber
Permit 08961T29
Page 9
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
54,
90,
114
G11040
NSPS D
PSD
MACT
DDDDD
No. 4 Power Boiler (No. 11-CU-006):
Coal-fired (535 million Btu per hour maximum
heat input rate) pulverized dry bottom-type
design and natural gas-fired (12 burners, 20
million Btu per hour, each, maximum heat
input), equipped with low-NOX burner
components and a Separated Overfire Air
(SOFA) system.
11-CD-006-01
11-CD-006-02
11-CD-006-03
2-Chamber, 4-Field
electrostatic precipitator
(115,236 square feet of
plate area)
Urea-based Selective Non-
Catalytic Reduction
(SNCR)
NOX emission reduction
system
Wet caustic scrubber
62,
114
G11042
MACT
DDDDD
Riley Bark Boiler (No. 11-CU-016):
Biomass¥/coal-fired hybrid suspension grate
boiler (380 million Btu per hour maximum heat
input rate) with partial flyash reinjection and
grate fire ignition (kerosene and rags)
11-CD-016-01
11-CD-016-02
multicyclone
(approximately 160 tubes,
9 inches in diameter, each)
venturi-type wet scrubber
(water with pH adjustment)
69 G11044 Riley Bark Boiler Fuel Feed System and
associated transfer cyclone (No. 11-PU-042)
NA NA
69 G11045 Utility Boiler Flyash Handling System Main
Flyash Silo (25,300 cubic feet); and
Pneumatic flyash collection system
11-CD-021-01
11-CD-021-02
One bin vent bagfilter (95
square feet of filter area);
One cyclone separator with
bagfilter (479 square feet of
filter area)
69 G11025 No. 4 Power Boiler Flyash Transfer Silo (600
cubic feet)
11-CD-021-03 One bin vent bagfilter (26
square feet of filter area)
80
G11052
G11053
NSPS Y
Coal Processing and Conveying:
Crusher (No. 13A-CRUSHER)
Coal Conveying and Storage System
Equipment:
o Collecting Conveyor No. 1 (No. 13A-001)
o Receiving Conveyor No. 2 (No. 13A-002)
o Stockpile Conveyor No. 3 (No. 13A-003)
o Overland Conveyor No. 4 (No. 13A-004)
o Overland Conveyor No. 5 (No. 13A-005)
o Transfer Conveyor No. 6 (No. 13A-006)
o Transfer Conveyor No. 7 (No. 13A-007)
o Bunker Feed Conveyor No. 8 (No. 13A-
008)
NA NA
80 G11041
NSPS Y
No. 4 Boiler Bunker (No. N4-BUNKER) CD-013-011,
CD-013-012,
CD-013-015
Three fabric filters (65
square feet of filter area,
each)
83,
90,
G11050
NSPS Db
MACT
DDDDD
No. 1 Natural Gas Package Boiler:
Natural gas-fired package boiler (225 million
Btu per hour maximum heat input rate)
equipped with low NOX burners and an oxygen
trim system
NA NA
Permit 08961T29
Page 10
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
79, 90 G11051
NSPS Db
MACT
DDDDD
No. 2 Natural Gas Package Boiler:
Natural gas-fired package boiler (225 million
Btu per hour maximum heat input rate)
equipped with low NOX burners and an oxygen
trim system
NA NA
PAPER MACHINES (AREA 12)
73,
127
G12048
G12049
G12050
G12051
Four paper machines:
No. 20 Paper Machine;
No. 19 Paper Machine;
No. 12 Paper Machine;
No. 11 Paper Machine
NA NA
CHEMICAL PREPARATION (AREA 13)
73 G13054 East starch storage silo (30 tons per hour
maximum throughput)
13-CD-014-01 one bagfilter (255 square
feet of filter area)
73 G13055 West starch storage silo (30 tons per hour
maximum throughput)
13-CD-016-01 one bin vent filter (183
square feet of filter area)
73 G13056 Center starch storage silo (30 tons per hour
maximum throughput)
13-CD-020-01
one bagfilter (255 square
feet of filter area)
WASTEWATER TREATMENT PLANT (AREA 16)
75,
127
G16081 WTP Primary Clarifiers NA NA
75,
127
G16082 WTP Aeration and Digestion Basins NA NA
PAPER CONVERTING (AREA 19)
75 G19058 Rewinders on Trim System No. 1 NA NA
75 G19059 Rewinders on Trim System No. 2 NA NA
TURPENTINE RECOVERY (AREA 20)
77, 96 G20060
MACT S
No. 1 Hardwood Turpentine Recovery System:
Turpentine Entrainment System (No. 20-PU-
001)
Turpentine Condenser (No. 20-PU-002)
Turpentine Underflow Tank (No. 20-TK-004)
Turpentine Transfer Tank (No. 20-TK-005)
NOTE: Foul condensates to Foul Condensate
Stripper System (ID No. G07018) system via closed
collection system
G09028
(primary)
or
G09029
(backup)
No. 4 Lime Kiln via NCG
closed collection system
No. 5 Lime Kiln via NCG
closed collection system
77, 96 G20062
MACT S
No. 2 Pine Turpentine Recovery System:
Turpentine Entrainment System (No. 20-PU-
006)
Turpentine Condenser (No. 20-PU-007)
Turpentine Decanter (No. 20-TK-008)
Turpentine Underflow Tank (No. 20-TK-009)
Turpentine Transfer Tank (No. 20-TK-010)
NOTE: Foul condensates to Foul Condensate
Stripper System (ID No. G07018) via closed
collection system
G09028
(primary)
or
G09029
(backup)
No. 4 Lime Kiln via NCG
closed collection system
No. 5 Lime Kiln via NCG
closed collection system
Permit 08961T29
Page 11
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
TALL OIL PRODUCTION (AREA 21)
77,
127
G21072
Tall Oil Reactor
21-ST-008-01
Packed tower-type wet
scrubber (10 to 15 gallons
per minute minimum white
liquor design injection rate)
NCG COLLECTION (AREA 23)
NA* G23078* NCG Collection System Fugitives NA NA
77,
127
G23066.k No. 1 Fiberline Building Ventilation –
Fugitives (former ID No. G0308a)
NA NA
77,
127
G23066.l No. 2 Fiberline Building Ventilation –
Fugitives (former ID No. G0410a)
NA NA
Permit 08961T29
Page 12
Page
No.
Emission
Source ID
No. Emission Source Description
Control
Device ID No.
Control Device
Description
MISCELLANEOUS
78 16-CU-001
MACT
ZZZZ
One 1850 horsepower, diesel-fired emergency
generator
NA NA
* Sources with no applicable requirements that emit greater than de minimis for classification as Insignificant Activities per 15A NCAC 02Q .0503(8).
Δ Sources are fully enclosed and do not have emission points.
¥ Biomass fuel must meet the clean cellulosic biomass definition as provided in 40 CFR 241.2 or the specific non-hazardous secondary material (NHSM)
categories in 40 CFR 241.4. The Permittee must notify the Division of Air Quality in writing within 30 days of beginning use of any new biomass fuel. For
any fuel that is not clearly defined by 40 CFR 241.1 or 241.4, the Permittee must first submit a NHSM determination request to the Division of Air Quality
under 40 CFR 241.2 and 241.3. A biomass fuel may also be approved as a NHSM by EPA.
£ The Nos. 10 and 11 Recovery Furnaces (ID Nos. G08020 and G08021) and the Nos. 4 and 5 Lime Kilns (ID Nos. G09028 and G09029) are listed as a 15A
NCAC 02Q .0501(b)(2) modification. The Permittee shall file a Title V Air Quality Permit Application on or before 12 months after commencing operation
in accordance with General Condition NN.1. The permit shield described in General Condition R does not apply and compliance certification as described
in General Condition P is not required.
^ The Black Liquor Evaporator System: WB Counter Current Evaporator (ID No. G07016.07-PU-003) is listed as a 15A NCAC 02Q .0501(b)(2) modification.
The Permittee shall file a Title V Air Quality Permit Application on or before 12 months after commencing operation in accordance with General Condition
NN.1. The permit shield described in General Condition R does not apply and compliance certification as described in General Condition P is not required.
µ The Black Liquor Oxidation System: Condensate Collection Tank (ID No. G08022b.08-TK-001) is listed as a 15A NCAC 02Q .0501(b)(2) modification.
The Permittee shall file a Title V Air Quality Permit Application on or before 12 months after commencing operation in accordance with General Condition
NN.1. The permit shield described in General Condition R does not apply and compliance certification as described in General Condition P is not required.
π The Nos. 4, 5, and 6 Lime Pre-Coat Filters (No. G09027.09-PU-001, 002, and 004), Nos. 4, 5, and 6 Lime Pre-Coat Filter Vacuum Pumps (No. G09027.09-
PU-001a, 002a, and 004a), the Dregs Filter (ID No. G09027-3), North and South Green Liquor Clarifiers (ID No. G10089, Nos. 10-TK-005 and 10-TK-
006), West Green Liquor Storage Tank (ID No. G10089, No. 10-TK-003), and the Nos. 4 and 5 Lime Kilns (ID Nos. G09028 and G09029) and associated
wet scrubbers (ID Nos. 09-CD-009-01 and 09-CD-010-01) are listed as a 15A NCAC 02Q .0501(b)(2) modification. The Permittee shall file a Title V Air
Quality Permit Application on or before 12 months after commencing operation in accordance with General Condition NN.1. The permit shield described
in General Condition R does not apply and compliance certification as described in General Condition P is not required.
Permit 08961T29
Page 13
SECTION 2 – SPECIFIC LIMITATIONS AND CONDITIONS
2.1- Emission Source(s) and Control Devices(s) Specific Limitations and
Conditions
The emission source(s) and associated air pollution control device(s) and appurtenances listed below are subject to the
following specific terms, conditions, and limitations, including the testing, monitoring, recordkeeping, and reporting
requirements as specified herein:
DIGESTER AREA (AREA 02)
A. Digester Area (ID No. G02004), consisting of:
• Eighteen (18) batch digesters (No. 02-PU-001);
• No. 1 Hardwood Blow Heat System:
o Blow Tank (No. 02-PU-005),
o Fiberline Accumulator (No. 02-PU-006), and
o Secondary Condenser (No. 02-PU-008);
• No. 2 Pine Blow Heat System:
o Blow Tank (No. 02-PU-003),
o Fiberline Accumulator (No. 02-PU-007), and
o Secondary Condenser (ID No. 02-PU-009).
Gases are collected via the NCG closed collection system and burned in the No. 4 Lime Kiln (ID No.
G09028, primary) or No. 5 Lime Kiln (ID No. G09029, backup). Foul condensates are collected in a
closed collection system and treated in the Foul Condensate System (ID No. G07018).
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant
Limits/Standards
Applicable Regulation
Total reduced sulfur 5 ppm (as H2S) by volume on a dry basis 15A NCAC 02D .0528
Hazardous air pollutants See Section 2.2 C.1 15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
1. 15A NCAC 02D .0528: TOTAL REDUCED SULFUR FROM KRAFT PULP MILLS
a. The emissions of total reduced sulfur shall not exceed five parts per million from the digester (ID No. G02004),
measured as hydrogen sulfide on a dry gas basis and averaged per discrete contiguous 12-hour time period.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 A.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Except as allowed under Section 2.2 C.1.c, the Digester Area emission sources (ID No. G02004), shall comply
with the limitation above by ensuring the gases are combusted in the No. 4 Lime Kiln (ID No. G09028) or the No.
5 Lime Kiln (ID No. G09029). The Permittee shall be considered in noncompliance with 15A NCAC 02D 0528 if
the gases are not combusted in the No. 4 or No. 5 Lime Kiln.
d. The Permittee shall follow the closed-vent inspection procedures per Section 2.2 C.1 to ensure that the emissions
are routed to either the No. 4 Lime Kiln (ID No. G09028) or No. 5 Lime Kiln (ID No. G09029) as specified
above. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0528 if these procedures are not
followed or if the records are not maintained.
Permit 08961T29
Page 14
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
Permit 08961T29
Page 15
BROWNSTOCK WASHING (AREA 03)
B. Brownstock Washing Area, consisting of:
• No. 1 Hardwood Fiberline Brownstock Washing System (ID No. G03005):
o Nos. 1 through 4 Brownstock Washers (No. 03-PU-001)
o Foam Tank No. 1 (No. 03-TK-003)
o Foam Tank No. 2 (No. 03-TK-004)
• No. 2 Pine Fiberline Brownstock Washing System (ID No. G03006)
o Washers and Filtrate Tanks (Nos. 03-PU-032)
o Brownstock Washer Mix Tanks (Nos. 03-TK-015, 03-TK-016, and 03-TK-017)
NOTE: No. 2 Pine fiberline brownstock washing system washers and filtrate tanks are fully enclosed and
are not sources of emissions.
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Hazardous air pollutants See Section 2.2 C.1 15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
OXYGEN DELIGNIFICATION (AREA 04)
C. Oxygen Delignification Area, consisting of:
• No. 1 Hardwood Fiberline Oxygen Delignification System (ID No. G04009), including:
o one O2 reactor,
o one oxygen blow tank, and
o post-O2 washers
• No. 2 Pine Fiberline Oxygen Delignification System (ID No. G04010), including:
o one O2 reactor,
o one oxygen blow tank, and
o post-O2 washers
• No. 1 Hardwood Fiberline Pulp Screening System (ID No. G04025)
• No. 2 Pine Fiberline Pulp Screening System (ID No. G04025)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Hazardous air pollutants See Section 2.2 C.1 15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
D. White Liquor Oxidation System (ID No. G04011), equipped with a chevron demister (ID No. 04-CD-
021-01)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Toxic air pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
Permit 08961T29
Page 16
BLEACHING (AREA 05)
E. No. 1 Hardwood Fiberline Bleaching System (ID No. G05012):
• D1-Stage (ClO2):
o Tower (No. 05-PU-002),
o Washer (No. 05-PU-004),
o Filtrate Tank (No. 05-PU-003)
• Eo-Stage (Extraction):
o Tower (No. 05-PU-008),
o Washer (No. 05-PU-007),
o Filtrate Tank (No. 05-TK-009)
• D2-Stage (ClO2)
o Tower (No. 05-PU-010),
o Washer (No. 05-PU-012),
o Filtrate Tank (No. 05-TK-011)
Exhausts to the No. 1 Fiberline Bleaching countercurrent packed tower-type wet scrubber (ID No. 05-
CD-002-01).
No. 2 Pine Fiberline Bleaching System (ID No. G05013):
• D1-Stage (ClO2):
o Tower (No. 05-PU-017),
o Washer (No. 05-PU-022),
o Filtrate Tank (No. 05-TK-018)
• Eo-Stage (Extraction):
o Tower (No. 05-PU-019),
o Washer (No. 05-PU-023),
o Filtrate Tank (No. 05-TK-020)
• D2-Stage (ClO2):
o Tower (No. 05-PU-021),
o Washer (No. 05-PU-024),
o Filtrate Tank (No. 05-TK-027)
Exhausts to the No. 2 Fiberline Bleaching countercurrent packed tower-type wet scrubber (ID No. 05-
CD-017-01).
Minerals Removal Process (MRP, ID No. G05073)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Hazardous air pollutants Affected Sources: G05012 and G05013
See Section 2.2 C.1a
15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
Toxic air pollutants Affected Sources: G05073
State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
aThe Eo stages are not required to be controlled for MACT compliance.
Permit 08961T29
Page 17
CHLORINE DIOXIDE PREPARATION (AREA 06)
F. Chlorine dioxide generation system (ID No. G06014):
• R-8 Chlorine Dioxide Generator (ID No. 06-PU-002)
• Three Chlorine Dioxide Solution Storage Tanks (Nos. 06-TK-007, 06-TK-008, and 06-TK-009) –
125,000 gallons capacity, each
Primary Operating Scenario
Two scrubbers in series:
• One two-section packed tower wet scrubber (ID No. 06-CD-002-01)
• No. 1 Hardwood Fiberline Bleaching System countercurrent packed tower-type wet scrubber (ID
No. 05-CD-002-01)
Alternate Operating Scenario
• One two-section packed tower wet scrubber (ID No. 06-CD-002-01)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulations
Hazardous air pollutants 112–I - Prevention of accidental releases. 15A NCAC 02Q .0508(h)
Toxic air pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
1. 15A NCAC 02D .2100: RISK MANAGEMENT PROGRAM – SECTION 112(r) OF THE CLEAN AIR ACT
a. The Permittee is subject to Section 112(r) of the Clean Air Act and shall comply with all applicable requirements
in accordance with 40 CFR Part 68 [15A NCAC 02D .2103].
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
b. Chlorine dioxide emissions from the Chlorine Dioxide System (ID No. G06014) shall be controlled by the wet
scrubber (ID No. 06-CD-002-01) either in series with the No. 1 Hardwood Fiberline Bleaching System wet
scrubber (ID No. 05-CD-002-01) or alone. To ensure compliance, the Permittee shall perform inspections and
maintenance. As a minimum, the inspection and maintenance requirement must include the following:
i. a monthly external visual inspection (for each calendar month, not to exceed 6 weeks from the previous
inspection) of the system ductwork and material collection unit for leaks; and
ii. an annual internal inspection (for each calendar year, not to exceed 14 months from the previous inspection)
of the wet scrubber's structural integrity.
iii. inspection of the wet scrubber spray nozzles to detect clogging or corrosion damage of nozzles and perform
maintenance and repair when necessary to ensure proper operation of the scrubber;
iv. inspection of packing material to ensure proper packing depth and to check for clogging; and
v. inspection, cleaning, and calibration of all instrumentation associated with the wet scrubber.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .2100 if the wet scrubber (ID No. 06-CD-
002-01) is not inspected and maintained.
c. The results of inspection and maintenance shall be maintained in a logbook (written or electronic format) on-site
and made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the wet scrubber; and
iv. any corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .2100 if the results of inspections and
maintenance records are not maintained.
d. The Permittee submitted a Risk Management Plan (RMP) to EPA pursuant to 40 CFR Part 68.150 on June 13,
2014.
Permit 08961T29
Page 18
e. The Permittee shall revise and update the RMP submitted on June 13, 2014, under 40 CFR 68.150 at least once
every five years after that date or most recent update required by 40 CFR 68.190(b)(2) through (b)(7), whichever
is later. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked
on or before January 30 of each calendar year for the preceding six-month period between July and December and
July 30 of each calendar year for the preceding six-month period between January and June. All instances of
deviations from the requirements of this permit must be clearly identified.
Permit 08961T29
Page 19
EVAPORATORS (AREA 07)
G. Black Liquor Evaporator System (ID No. G07016):
• Swenson Countercurrent Evaporator, consisting of six effects and one concentrator (No. 07-PU-
002);
• Swenson Evaporator Hotwell – collects condensates from the 4th, 5th, and 6th evaporator effects
(No. 07-TK-006)
• West GB Countercurrent Evaporator, consisting of six bodies and five effects and steam liquor
heater (No. 07-PU-003)
• West GB Evaporator Hotwell – collects condensates from the 2nd through 6th evaporator effects
(No. 07-TK-007)
Gases are collected via the NCG closed collection system and burned in the No. 4 Lime Kiln (ID No.
G09028, primary) or No. 5 Lime Kiln (ID No. G09029, backup). Foul condensates are collected in a
closed collection system and treated in the Foul Condensate System (ID No. G07018).
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Total reduced sulfur 5 ppm (as H2S) by volume on a dry basis 15A NCAC 02D .0528
Hazardous air pollutants See Section 2.2 C.1 15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
Particulate matter
(PM/PM10/PM2.5), sulfur dioxide,
nitrogen oxides, carbon monoxide,
H2SO4, fluorides, TRS, lead, and
volatile organic compounds
See Section 2.2 A.5 15A NCAC 02D .0530(u)
1. 15A NCAC 02D .0528: TOTAL REDUCED SULFUR FROM KRAFT PULP MILLS
a. The emissions of total reduced sulfur shall not exceed five parts per million from the two black liquor evaporator
systems (ID No. G07016), measured as hydrogen sulfide on a dry gas basis and averaged per discrete contiguous
12-hour time period.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 G.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Except as allowed under Section 2.2 C.1.c, the black liquor evaporator systems (ID No. G07016), shall comply
with the limitation above by ensuring the gases are combusted in the No. 4 Lime Kiln (ID No. G09028) or the
No. 5 Lime Kiln (ID No. G09029). The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0528
if the gases are not combusted in the Nos. 4 or 5 Lime Kilns.
d. The Permittee shall follow the closed-vent inspection procedures per Section 2.2 C.1 to ensure that the emissions
are routed to either the No. 4 Lime Kiln (ID No. G09028) or No. 5 Lime Kiln (ID No. G09029) as specified
above. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0528 if these procedures are not
followed or if the records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
Permit 08961T29
Page 20
H. Weak Black Liquor Storage (ID No. G07086)
• Eight Storage Tanks (Nos. 07-TK-004, 07-TK-013, 07-TK-016, 07-TK-017, 07-TK-018, 07-TK-019,
07-TK-020, 07-TK-021)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulations
Toxic air pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
I. Heavy Black Liquor Storage (ID No. G07019)
• East Storage Tank (No. 07-TK-023)
• West Storage Tank (No. 07-TK-024)
• Red Liquor Tank (No. 07-TK-022)
• Backup Tank (No. 07-TK-025)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulations
Toxic Air Pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
Permit 08961T29
Page 21
J. Foul Condensate System (ID No. G07018):
• Condensate Stripper (ID No. 07-PU-015),
• Stripper Feed Tank (ID No. 07-TK-011),
• Reflux Tank (ID No. 07-TK-014).
Gases are collected via the NCG closed collection system and burned in the No. 5 Lime Kiln (ID No.
G09029, primary) or No. 4 Lime Kiln (ID No. G09028, backup). Foul condensates are collected from the
Digester Area (ID No. G02004), the Evaporator System (ID No. G07016), and the Turpentine Recovery
Systems (ID Nos. G20060 and G20062).
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulations Total reduced sulfur
5 ppm by volume on a dry basis, corrected to
10 percent oxygen
15A NCAC 02D .0524
(40 CFR Part 60, Subpart BB)
Hazardous air pollutants See Section 2.2 C.1 15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
1. 15A NCAC 02D .0524: NEW SOURCE PERFORMANCE STANDARDS (40 CFR 60 SUBPART BB)
a. The Permittee shall comply with all applicable provisions, including the notification, testing, reporting,
recordkeeping, and monitoring requirements contained in Environmental Management Commission Standard 15A
NCAC 02D .0524 “New Source Performance Standards” (NSPS) as promulgated in 40 CFR Part 60, Subpart BB,
including Subpart A “General Provisions.”
Emissions Limitations [15A NCAC 02D .0524]
b. The Permittee shall not cause to be discharged into the atmosphere any gases from the foul condensate system (ID
No. G07018) which contain TRS in excess of 5 ppm by volume on a dry basis, corrected to 10 percent oxygen,
unless the gases are burned with other waste gases in the No. 5 Lime Kiln (ID No. G09029, primary) or No. 4
Lime Kiln (ID No. 09028, backup), and are subjected to a minimum temperature of 650OC (1200OF) for at least
0.5 second [40 CFR 60.283(a)(1)].
Monitoring [15A NCAC 02Q .0508(f) and 02D .0524]
c. The Permittee shall follow the closed-vent inspection procedures per Section 2.2 C.1 to ensure that the emissions
from the Foul Condensate System (ID No. G07018) are routed to the No. 5 Lime Kiln (ID No. G09029, primary)
or the No. 4 Lime Kiln (ID No. G09028, backup), as specified in Section 2.1 J.1.b, above. The Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0524 if these procedures are not followed or if the records are
not maintained.
d. The Permittee shall calibrate, maintain, and operate a monitoring device for measuring the combustion
temperature at the point of incineration of effluent gases in the No. 5 Lime Kiln (ID No. G09029) and the No. 4
Lime Kiln (ID No. G09028) to ensure the minimum temperature as specified in Section 2.1 J.1.b, above, is
maintained [40 CFR 60.284(b)(1)]. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524
if these monitoring procedures are not followed.
Reporting/ Recordkeeping [15A NCAC 02Q .0508(f) and 02D .0524]
e. The Permittee shall follow 40 CFR 60.284(d) for reporting of excess emissions.
f. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
Permit 08961T29
Page 22
RECOVERY (AREA 08)
K. No. 10 Recovery Furnace (ID No. G08020-08-PU-001) – equipped with one 3-chamber, 6-field wet-
bottom electrostatic precipitator (ID No. 08-CD-001-01).
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter 3.0 lb per ton of air dried pulp 15A NCAC 02D .0508
Sulfur dioxide
2.3 lb per million Btu heat input
Monitoring Requirements
15A NCAC 02D .0516
15A NCAC 02D .0608
see Section 2.2 J.1 15A NCAC 02D .0501
Total reduced sulfur 5 ppm (as H2S) by volume on a dry basis,
corrected to 8 percent oxygen 15A NCAC 02D .0528
Particulate matter Compliance assurance monitoring 15A NCAC 02D .0614
Carbon monoxide and
Volatile organic
compounds
Annual recordkeeping and reporting of actual
emissions (See Section 2.2 A.3) 15A NCAC 02D .0530(u)
Visible emissions
Hazardous air pollutants See Section 2.2 D 15A NCAC 02D .1111
40 CFR Part 63, Subpart MM
1. 15A NCAC 02D .0508: PARTICULATES FROM PULP AND PAPER MILLS
a. Emissions from the production of pulp and paper that are discharged from the No. 10 Recovery Furnace (ID
No. G08020) into the atmosphere shall not exceed 3.0 pounds of particulate matter per equivalent tons of air dried
pulp.
Testing [15A NCAC 02Q .0508(f)]
b. Under the provisions of NCGS 143-215.108, the Permittee shall demonstrate compliance with the emission
limit(s) above by testing the No. 10 Recovery Furnace (ID No. G08020) annually for particulate matter in
accordance with a testing protocol approved by the DAQ. Details of the emissions testing and reporting
requirements can be found in General Condition JJ. If the results of the testing demonstrate that emissions are less
than 80 percent of the limit in Section 2.1 K.1.a, above, the testing frequency may be reduced to every two years.
If the results of this or any test are above the limit given in Section 2.1 K.1.a, above, the Permittee shall be deemed
in noncompliance with 15A NCAC 02D .0508 and the Permittee shall resume performance testing on an annual
basis, beginning no more than 12 months after the previous test.
Monitoring/ Recordkeeping/ Reporting [15A NCAC 02Q .0508(f), 40 CFR 70.6(a)(3)(A)]
c. Particulate matter emissions from the No. 10 Recovery Furnace (ID No. G08020) shall be controlled by an
electrostatic precipitator (ESP) (ID No. 08-CD-001-01). To ensure compliance with the particulate emission limit
in Section 2.1 K.1.a, above, the Permittee shall follow the 40 CFR Part 63, Subpart MM monitoring,
recordkeeping, and reporting requirements as specified in Section 2.2 D. Excess emissions shall be in reported in
accordance with 15A NCAC 02D .0535 as outlined in General Condition I. The Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0508 if either (1) the applicable MACT Subpart MM requirements above
are not monitored and recorded; or (2) the MACT Subpart MM monitoring determines a violation of the applicable
PM emission standard per 40 CFR 63.864(k)(2) as detailed above.
2. 15A NCAC 02D .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
15A NCAC 02D .0608: OTHER LARGE COAL OR RESIDUAL OIL BURNERS
a. Emissions of sulfur dioxide from this source shall not exceed 2.3 pounds per million Btu heat input. Sulfur
dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other substances shall be included when
determining compliance with this standard.
Permit 08961T29
Page 23
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 K.2.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0516.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f), and 02D .0608]
c. No monitoring/recordkeeping is required for sulfur dioxide emissions from the firing of natural gas/No. 2 fuel oil
in this Recovery Furnace (ID No. G08020).
d. To ensure compliance with Section 2.1 K.2.a, the Permittee shall monitor the sulfur content and heat content of the
No. 6 fuel oil by using fuel oil supplier certification per month. The results of the fuel oil supplier certifications
shall be recorded in a logbook (written or electronic format) and include the following information:
i. the name of the fuel oil supplier; and
ii. a statement verifying that the methods used to determine the maximum sulfur content of the fuel oil was in
accordance with the following:
(A) sample collection – ASTM D4177 or D4057;
(B) heat of combustion (Btu) – ASTM D240 or D4868; and
(C) sulfur content – ASTM D129, D-4294, or D1552.
iii. the maximum sulfur content of the fuel oil received during the month;
iv. the average heat content of the fuel oil received during the month; and
v. a certified statement signed by the responsible official that the records of fuel oil supplier certification
submitted represent all of the fuel oil fired during the period.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0516 and 02D .0608 if the results of the
fuel oil supplier certifications are not monitored and recorded.
e. The Permittee shall calculate and record in a logbook (written or electronic format) the pounds of sulfur dioxide
per million Btu heat content of the fuel oil per month using the above information. The Permittee shall be deemed
in noncompliance with 15A NCAC 02D .0516 and 02D .0608 if the requirements above are not monitored and
recorded or if the results show an exceedance of the limit given in Section 2.1 K.2.a, above.
Reporting [15A NCAC 02Q .0508(f) and 02D .0608]
f. No reporting is required for sulfur dioxide emissions from the firing of natural gas/No. 2 fuel oil in this Recovery
Furnace (ID No. G08020).
g. The Permittee shall submit a summary report of the fuel oil supplier certifications and calculated emission rates
postmarked on or before January 30 of each calendar year for the preceding six-month period between July and
December and July 30 of each calendar year for the preceding six-month period between January and June. All
instances of deviations from the requirements of this permit must be clearly identified.
3. 15A NCAC 02D .0528: TOTAL REDUCED SULFUR FROM KRAFT PULP MILLS
a. The emissions of total reduced sulfur from the No. 10 Recovery Furnace (ID No. G08020) shall not exceed 5 parts
per million corrected to 8 percent oxygen, measured as hydrogen sulfide on a dry gas basis and averaged per
discrete contiguous 12-hour time period. [15A 02D .0528(c)(1)]
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 K.3.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, the Permittee shall calibrate, maintain, and operate a continuous monitoring system for
determining the total reduced sulfur (as hydrogen sulfide, dry basis, corrected to 8 percent oxygen) emissions
discharged to the atmosphere and record the output of the system. The continuous monitoring system shall be
operated in accordance with the applicable performance specifications in 40 CFR Part 60, Appendix B and quality
assurance procedures in 40 CFR Part 60, Appendix F, Section 3, unless an alternative monitoring and quality
assurance program is approved by the DAQ. The monitoring system downtime shall not exceed 5 percent. If any
12-hour block average exceeds the limit above or the records are not maintained, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528, except that one percent of all 12-hour total reduced sulfur averages
Permit 08961T29
Page 24
per quarter year in excess of the limitation given above, in the absence of start-ups, shutdowns, and malfunctions,
shall not be considered in violation.
Reporting [15A NCAC 02Q .0508(f)]
d. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
4. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. For the electrostatic precipitator (ID No. 08-CD-001-01) associated with the No. 10 Recovery Furnace (ID No.
G08020), the Permittee shall comply with 40 CFR part 64 pursuant to 15A NCAC 02D .0614 to ensure that the
recovery furnace complies with the emission limits of 15A NCAC 02D .0508.
Background
b. Emission Units: No. 10 Recovery Furnace (ID No. G08020)
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements
i. Regulation: 15A NCAC 02D .0508: Particulates from Pulp and Paper Mills
ii. Emission Limits:
PM: 3.0 pounds of particulate matter per equivalent tons of air dried pulp.
iii. Control Technology: Electrostatic precipitator (ESP)
Monitoring Approach
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Measure Indicator
I. Indicator
Opacity of ESP exhaust
Measuring approach Continuous opacity monitoring system (COMS) in ESP exhaust
II. Indicator Range The opacity indicator range is a 1-hour average opacity of 20 percent.
An excursion occurs when any 1-hour average opacity is greater than 20
percent. The excursion triggers corrective action and reporting requirement.
The QIP threshold is when the total duration of excursions is greater than
5 percent of the source operating time during any 6-month period. The QIP shall
be prepared as required under 40 CFR 64.8.
III. Performance Criteria
Data Representativeness The COMS was installed at a representative location in the recovery furnace
ESP exhaust stack per 40 CFR 60, Appendix B, Performance Specification (PS-
1)
QA/QC Practices and Criteria The COMS was initially installed and evaluated per PS-1. Zero
and span drift are checked daily and a quarterly filter audit is performed.
Monitoring Frequency The opacity of the ESP exhaust is monitored continuously (every 10 seconds)
Data Collection Procedures The data acquisition system shall retain all 6-minute data and 3-hour block
averages pursuant to PS-1.
Averaging Period The 10-second opacity data are used to calculate the 6-minute averages. The 6-
minute averages are used to calculate the 3-hour block average.
Permit 08961T29
Page 25
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. In addition, the summary report shall contain the following
information, as applicable:
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 26
L. No. 11 Recovery Furnace (ID No. G08021-08-PU-002) – equipped with one 3-chamber, 4-field wet
bottom design electrostatic precipitator (ID No. 08-CD-002-01)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter 3.0 lb per ton of air dried pulp 15A NCAC 02D .0508
Visible emissions 35 percent opacity 15A NCAC 02D .0508
Sulfur dioxide
2.3 lb per million Btu heat input
Monitoring Requirements
15A NCAC 02D .0516
15A NCAC 02D .0608
see Section 2.2 J.1 15A NCAC 02D .0501
Total reduced sulfur 5 ppm (as H2S) by volume on a dry basis,
corrected to 8 percent oxygen 15A NCAC 02D .0528
Particulate matter Compliance assurance monitoring 15A NCAC 02D .0614
Carbon monoxide and
Volatile organic compounds
Annual recordkeeping and reporting of actual
emissions (See Section 2.2 A.3)
15A NCAC 02D .0530(u)
Visible emissions
Hazardous air pollutants See Section 2.2 D 15A NCAC 02D .1111
40 CFR Part 63, Subpart MM
1. 15A NCAC 02D .0508: PARTICULATES FROM PULP AND PAPER MILLS
a. Emissions from the production of pulp and paper that are discharged from the No. 11 Recovery Furnace (ID No.
G08021) into the atmosphere shall not exceed:
i. 3.0 pounds of particulate matter per equivalent tons of air dried pulp, and
ii. Visible emissions shall not be more than 35 percent opacity when averaged over a six-minute period.
However, six-minute averaging periods may exceed 35 percent not more than once in any hour and not more
than four times in any 24-hour period. In no event shall the six-minute average exceed 89 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. Under the provisions of NCGS 143-215.108, the Permittee shall demonstrate compliance with the emission
limit(s) above by testing the No. 11 Recovery Furnace (ID No. G08021) annually for particulate matter in
accordance with a testing protocol approved by the DAQ. Details of the emissions testing and reporting
requirements can be found in General Condition JJ. If the results of the testing demonstrate that emissions are less
than 80 percent of the limit in Section 2.1 L.1.a, above, the testing frequency may be reduced to every two years.
If the results of this or any test are above the limit given in Section 2.1 L.1.a, above, the Permittee shall be deemed
in noncompliance with 15A NCAC 02D .0508 and the Permittee shall resume performance testing on an annual
basis, beginning no more than 12 months after the previous test.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f), 40 CFR 70.6(a)(3)(A)]
c. Particulate matter emissions from the No. 11 Recovery Furnace (ID No. G08021) shall be controlled by an
electrostatic precipitator (ESP) (ID No. 08-CD-001-01). To ensure compliance with the particulate matter
emission limit in Section 2.1 L.1.a.i, above, the Permittee shall follow the 40 CFR Part 63, Subpart MM
monitoring, recordkeeping, and reporting requirements as specified in Section 2.2 D. Excess emissions shall be in
reported in accordance with 15A NCAC 02D .0535 as outlined in General Condition I. The Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0508 if either (1) the applicable MACT Subpart MM
requirements above are not monitored and recorded or (2) the MACT Subpart MM monitoring determines a
violation of the applicable PM emission standard per 63.864(k)(2) as detailed above.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f), 40 CFR 70.6(a)(3)(A)]
d. To determine compliance with the opacity limits in condition 2.1 L.1.a.ii, the Permittee shall follow the 40 CFR
63, Subpart MM continuous opacity monitoring system (COMS) monitoring requirements as specified in Section
2.2 D to monitor and record opacity. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0508
if the monitoring is not performed, if the monitored values exceed the limitations given above, or if the records are
not maintained.
Permit 08961T29
Page 27
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the monitoring data postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified.
2. 15A NCAC 02D .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
15A NCAC 02D .0608: OTHER LARGE COAL OR RESIDUAL OIL BURNERS
a. Emissions of sulfur dioxide from the No. 11 Recovery Furnace (ID No. G08021) shall not exceed 2.3 pounds per
million Btu heat input. Sulfur dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other
substances shall be included when determining compliance with this standard.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ found in
Section 3. If the results of this test are above the limit given in Section 2.1 L.2.a, above, the Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0516 and 02D .0608.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f), and 02D .0608]
c. No monitoring/recordkeeping is required for sulfur dioxide emissions from the firing of natural gas/No. 2 fuel oil
in this Recovery Furnace (ID No. G08021).
d. To ensure compliance with Section 2.1 L.2.a, the Permittee shall monitor the sulfur content and heat content of the
No. 6 fuel oil by using fuel oil supplier certification per month. The results of the fuel oil supplier certifications
shall be recorded in a logbook (written or electronic format) and include the following information:
i. the name of the fuel oil supplier; and
ii. a statement verifying that the methods used to determine the maximum sulfur content of the fuel oil was in
accordance with the following:
(A) sample collection – ASTM D4177 or D4057;
(B) heat of combustion (Btu) – ASTM D240 or D4868; and
(C) sulfur content – ASTM D129, D-4294, or D1552.
iii. the maximum sulfur content of the fuel oil received during the month;
iv. the average heat content of the fuel oil received during the month; and
v. a certified statement signed by the responsible official that the records of fuel oil supplier certification
submitted represent all of the fuel oil fired during the period.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0516 and 02D .0608 if the results of the
fuel oil supplier certifications are not monitored and recorded.
e. The Permittee shall calculate and record in a logbook (written or electronic format) the pounds of sulfur dioxide
per million Btu heat content of the fuel oil per month using the above information. The Permittee shall be deemed
in noncompliance with 15A NCAC 02D .0516 and 02D .0608 if the requirements above are not monitored and
recorded or if the results show an exceedance of the limit given in Section 2.1 L.2.a, above.
Reporting [15A NCAC 02Q .0508(f) and 02D .0608]
f. No reporting is required for sulfur dioxide emissions from the firing of natural gas/No. 2 fuel oil in this Recovery
Furnace (ID No. G08021).
g. The Permittee shall submit a summary report of the fuel oil supplier certifications and calculated emission rates
postmarked on or before January 30 of each calendar year for the preceding six-month period between July and
December and July 30 of each calendar year for the preceding six-month period between January and June. All
instances of deviations from the requirements of this permit must be clearly identified.
3. 15A NCAC 02D .0528: TOTAL REDUCED SULFUR FROM KRAFT PULP MILLS
a. The emissions of total reduced sulfur from the No. 11 Recovery Furnace (ID No. G08021) shall not exceed 5 parts
per million corrected to 8 percent oxygen, measured as hydrogen sulfide on a dry gas basis and averaged per
discrete contiguous 12-hour time period.
Permit 08961T29
Page 28
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 L.3.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, the Permittee shall calibrate, maintain, and operate a continuous monitoring system for
determining the total reduced sulfur (as hydrogen sulfide, dry basis, corrected to 8 percent oxygen) emissions
discharged to the atmosphere and record the output of the system. The continuous monitoring system shall be
operated in accordance with the applicable performance specifications in 40 CFR Part 60 Appendix B and quality
assurance procedures in 40 CFR Part 60, Appendix F, Section 3, unless an alternative monitoring and quality
assurance program is approved by the DAQ. The monitoring system downtime shall not exceed 5 percent. If any
12-hour block average exceeds the limit above or the records are not maintained, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528, except that one percent of all 12-hour total reduced sulfur averages
per quarter year in excess of the limitation given above, in the absence of start-ups, shutdowns, and malfunctions,
shall not be considered in violation.
Reporting [15A NCAC 02Q .0508(f)]
d. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
4. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. For the electrostatic precipitator (ID No. 08-CD-002-01) associated with the No. 11 Recovery Furnace (ID No.
G08021), the Permittee shall comply with 40 CFR part 64 pursuant to 15A NCAC 02D .0614 to ensure that the
recovery furnace complies with the emission limits of 15A NCAC 02D .0508.
Background
b. Emission Units: No. 11 Recovery Furnace (ID No. G08021)
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements
i. Regulation: 15A NCAC 02D .0508: Particulates from Pulp and Paper Mills
ii. Emission Limits:
PM: 3.0 pounds of particulate matter per equivalent tons of air dried pulp.
iii. Control Technology: Electrostatic precipitator (ESP)
Monitoring Approach
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Measure Indicator
I. Indicator
Opacity of ESP exhaust
Measuring approach Continuous opacity monitoring system (COMS) in ESP exhaust
II. Indicator Range The opacity indicator range is a 1-hour average opacity of 20 percent.
An excursion occurs when any 1-hour average opacity is greater than
20 percent. The excursion triggers corrective action and reporting
requirement.
The QIP threshold is when the total duration of excursions is greater
than 5 percent of the source operating time during any 6-month period.
The QIP shall be prepared as required under 40 CFR 64.8.
Permit 08961T29
Page 29
Measure Indicator
III. Performance Criteria
Data Representativeness The COMS was installed at a representative location in the recovery
furnace ESP exhaust stack per 40 CFR 60, Appendix B, Performance
Specification (PS-1)
QA/QC Practices and Criteria The COMS was initially installed and evaluated per PS-1. Zero and
span drift are checked daily and a quarterly filter audit is
performed.
Monitoring Frequency The opacity of the ESP exhaust is monitored continuously (every
10 seconds)
Data Collection Procedures The data acquisition system shall retain all 6-minute data and 3-hour
block averages pursuant to PS-1.
Averaging Period The 10-second opacity data are used to calculate the 6-minute averages.
The 6-minute averages are used to calculate the 3-hour block average.
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. In addition, the summary report shall contain the following
information, as applicable:
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 30
M. Black liquor oxidation system (ID No. G08022a):
• Collection of vent gases from black liquor oxidation (No. 08-PU-005) – equipped with three
cyclones, one on each oxidizer tank (ID No. CD-BLO) followed by one natural gas-fired
regenerative thermal oxidizer (4.2 million Btu per hour heat input, ID No. CD-BLOXRTO) and
one caustic scrubber (ID No. CD-RTOSCR)
NOTE: Only two of the three oxidizer tanks are required to operate if one of the recovery furnaces is
down
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Sulfur dioxide
Less than 40 tons per consecutive twelve-
month period
15A NCAC 02Q .0317
(15A NCAC 02D .0530 Avoidance)
see Section 2.2 J.1 15A NCAC 02D .0501
Sulfuric acid Less than 7 tons per consecutive twelve-
month period
15A NCAC 02Q .0317
(15A NCAC 02D .0530 Avoidance)
1BHazardous air pollutants See Section 2.2 C.2
15A NCAC 02D .1111
(40 CFR Part 63, Subpart S) via
Equivalency by Permit (EBP)
[40 CFR 63.94]
1. 15A NCAC 02Q. 0317: AVOIDANCE CONDITIONS for
15A NCAC 02D. 0530: PREVENTION OF SIGNIFICANT DETERIORATION
a. In order to avoid applicability of 15A NCAC 02D .0530(g) for major sources and major modifications, the BLOX
System (ID No. G08022a) shall discharge into the atmosphere:
i. less than 40 tons per consecutive twelve-month period of sulfur dioxide; and
ii. less than 7 tons per consecutive twelve-month period of sulfuric acid.
b. To ensure that emissions are less than the above-specified limits, the Black Liquor Oxidation System thermal
oxidizer (ID No. CD-BLOXRTO) is permitted to burn only BLOX gases and natural gas as an auxiliary fuel.
Testing [15A NCAC 02Q .0508(f)]
c. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limits given in Section 2.1 M.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0530.
Monitoring/ Recordkeeping [15A NCAC 02Q .0508(f)]
d. Sulfur dioxide and sulfuric acid emissions from the BLOX system (ID No. G08022a) shall be controlled by the
RTO scrubber (ID No. CD-RTOSCR). To ensure compliance, the Permittee shall install, calibrate, operate, and
maintain a continuous pH indicator and a scrubbing liquid flow meter on the RTO scrubber. These parameters
shall be recorded pursuant to General Condition O. observationThe Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0530 if these parameters are not monitored or the records are not maintained.
e. The Permittee shall monitor the following parameters daily for values outside the normal operating range, as
specified:
i. The pH shall be greater than or equal to 8.0 standard units; and
ii. The scrubbing liquid flow rate shall be greater than or equal to 400 gallons per minute.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530 if these parameters are not
monitored.
f. The Permittee shall calculate the sulfur dioxide emissions from the BLOX System (ID No. G08022a) on a
monthly basis to ensure compliance with the limits given in Section 2.1 M.1.a, above. The RTO scrubber is
required to be operated only as necessary to achieve compliance with the limitations above. Sulfur dioxide
emissions shall be determined by the following:
Permit 08961T29
Page 31
i. When the RTO Scrubber is operating within the monitoring parameter values established above, the sulfur
dioxide emissions shall be calculated by multiplying the total amount of operating time by the maximum
controlled emission factor of 0.5 pounds per hour;
ii. When the RTO Scrubber is not in operation or is not operating within the monitoring parameter values
established above, the sulfur dioxide emissions shall be calculated by multiplying the total amount of
operating time by the maximum uncontrolled emission factor of 25 pounds per hour; and
iii. When the thermal oxidizer (ID No. CD-BLOXRTO) is not in operation, the RTO scrubber is not required,
and the sulfur dioxide emissions are zero.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530 if the amounts of sulfur dioxide
emissions are not calculated and recorded.
g. Calculations and the total amount of sulfur dioxide emissions from the BLOX System (ID No. G08022a) shall be
recorded monthly in a logbook (written or electronic format), maintained on-site and made available to officials of
the Division of Air Quality, upon request. The Permittee must keep each entry in the log and all required records
on file for a minimum of five years. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530
if the sulfur dioxide emissions exceed the limit in Section 2.1 M.1.a, above, or if the records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
h. The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June. All instances of deviations from
the requirements of this permit must be clearly identified. The report shall contain the monthly sulfur dioxide
emissions totaled for the previous seventeen months. The emissions shall be calculated for each of the twelve
month periods over the previous seventeen months.
Permit 08961T29
Page 32
N. Two Smelt Dissolving Tanks:
• No. 10 Smelt Dissolving Tank (ID No. G08023, No. 08-PU-011) – equipped with a chevron mist
eliminator (ID No. 08-CD-011-01) in series with a spray tower scrubber (ID No. 08-CD-011-02);
and
• No. 11 Smelt Dissolving Tank (ID No. G08024, No. 08-PU-012) – equipped with a chevron mist
eliminator (ID No. 08-CD-012-01) in series with a spray tower scrubber (ID No. 08-CD-012-02)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter 0.6 lb per ton of air dried pulp 15A NCAC 02D .0508
Visible emissions 20 percent opacity 15A NCAC 02D .0521
Total reduced sulfur 0.016 g/kg black liquor solids as H2S
(0.033 lb/ton black liquor solids as H2S)
15A NCAC 02D .0524
NSPS Subpart BB
Particulate matter 0.1 g/kg black liquor solids (dry weight)
[(0.2 lb/ton black liquor solids (dry weight)]
15A NCAC 02D .0524
NSPS Subpart BB
Particulate matter Compliance assurance monitoring 15A NCAC 02D .0614
Hazardous air pollutants See Section 2.2 D 15A NCAC 02D .1111
40 CFR Part 63, Subpart MM
Sulfur Dioxide see Section 2.2 J.1 15A NCAC 02D .0501
1. 15A NCAC 02D .0508: PARTICULATES FROM PULP AND PAPER MILLS
a. Emissions from the production of pulp and paper that are discharged from the Nos. 10 and 11 Smelt Dissolving
Tanks (ID Nos. G08023 and G08024) into the atmosphere shall not exceed 0.6 pounds of particulate matter per
equivalent tons of air dried pulp.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 N.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0508.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f), 40 CFR 70.6(a)(3)(A)]
c. Particulate matter emissions from the No.10 Smelt Dissolving Tank (ID No. G08023) shall be controlled by a
chevron mist eliminator in series with a spray tower scrubber (ID No. 08-CD-011-01). Particulate matter
emissions from the No.11 Smelt Dissolving Tank (ID No. G08024) shall be controlled by a chevron mist
eliminator in series with a spray tower scrubber (ID No. 08-CD-012-01). To ensure compliance with the
particulate emission limit in Section 2.1 N.1.a, above, the Permittee shall follow the 40 CFR Part 63, Subpart MM
monitoring, recordkeeping and reporting requirements as specified in Section 2.2 D. Excess emissions shall be in
reported in accordance with 15A NCAC 02D .0535 as outlined in General Condition I. The Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0508 if either (1) the applicable MACT Subpart MM
requirements above are not monitored and recorded or (2) the MACT Subpart MM monitoring determines a
violation of the applicable PM emission standard per 63.864(k)(2) as detailed above.
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the No. 10 Smelt Dissolving Tank (ID No. G08023) and the No. 11 Smelt Dissolving
Tank (ID No. G08024) shall not be more than 20 percent opacity when averaged over a six-minute period.
However, six-minute averaging periods may exceed 20 percent not more than once in any hour and not more than
four times in any 24-hour period. In no event shall the six-minute average exceed 87 percent opacity.
Permit 08961T29
Page 33
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the results
of this test are above the limits given in Section 2.1 N.2.a, above, the Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a week the Permittee shall observe the emission points of the No. 10 Smelt Dissolving
Tank and No. 11 Smelt Dissolving Tank (ID Nos. G08023 and G08024) for any visible emissions above normal.
The weekly observation must be made for each week of the calendar year period to ensure compliance with the
requirement. If visible emissions from these sources are observed to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 N.2.a, above.
If the above-normal emissions are not corrected per (i) above or if the demonstration in (ii) above cannot be made,
the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be in
noncompliance along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified.
3. 15A NCAC 02D .0524: NSPS 40 CFR SUBPART BB
a. For the Nos. 10 and 11 Smelt Dissolving Tanks (ID Nos. G08023 and G08024), the Permittee shall comply with
all applicable provisions, including the notification, testing, reporting, recordkeeping, and monitoring requirements
contained in Environmental Management Commission Standard 15A NCAC 02D .0524 "New Source
Performance Standards (NSPS) as promulgated in 40 CFR Part 60, Subpart BB, including Subpart A "General
Provisions."
Emissions Limitations [15A NCAC 02D .0524]
b. The Permittee shall not discharge into the atmosphere from the Nos. 10 and 11 Smelt Dissolving Tanks (ID Nos.
G08023 and G08024) any gases which contain:
i. particulate matter in excess of 0.1 g/kg black liquor solids (dry weight) [(0.2 lb/ton black liquor solids (dry
weight)][40 CFR Part 60, Subpart 60.282(a)(2)]; or
ii. TRS in excess of 0.016 g/kg black liquor solids TRS as H2S (0.033 lb/ton black liquor solids TRS as H2S) [40
CFR Part 60, Subpart 60.283(a)(4)].
Testing [15A NCAC 02Q .0508(f)]
c. The Permittee shall demonstrate compliance with the emission limit(s) above by testing the Nos. 10 and 11 Smelt
Dissolving Tanks (ID Nos. G08023 and G08024) in accordance with a testing protocol approved by the DAQ.
Details of the emissions testing and reporting requirements can be found in General Condition JJ. Testing shall be
completed once per calendar year and the results submitted to the DAQ. If the results of the testing demonstrate
results at less than 80 percent of the limit above, the testing frequency may be reduced to every five years. If the
results of this or any test is above the limit given in Section 2.1 N.3.b, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0524.
Permit 08961T29
Page 34
Monitoring/Recordkeeping [15A NCAC 02D .0524]
d. Particulate matter emissions from the reconstructed Nos. 10 and 11 Smelt Dissolving Tanks (ID Nos. G08023 and
G08024) shall be controlled by the spray tower/chevron mist eliminator control system installed on each smelt
dissolving tank (ID Nos. 08-CD-011-01 and CD-012-01) as described above. To ensure compliance, the
Permittee shall install, calibrate, maintain, and operate the following continuous monitoring systems: [40 CFR
60.284(b)(2)]
i. A monitoring device for the continuous measurement of the pressure loss of the gas stream through the
control equipment. The monitoring device shall be certified by the manufacturer to be accurate to within a
gauge pressure of ±500 Pascals (ca. ±2 inches water gauge pressure), and
ii. A monitoring device for the continuous measurement of the scrubbing liquid supply pressure to the control
equipment. The monitoring device shall be certified by the manufacturer to be accurate within ±15 percent of
design scrubbing liquid supply pressure. The pressure sensor or tap is to be located close to the scrubber liquid
discharge point. The Administrator may be consulted for approval of alternative locations.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if the particulate matter emissions
are not controlled as required above.
e. The Permittee shall record the results of these measurements at least once per shift. The Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0524 if these parameters are not monitored or these records are
not maintained.
f. The Permittee shall establish operating ranges and otherwise operate and control the emissions from the Nos. 10
and 11 Smelt Dissolving Tanks (ID Nos. G08023 and G08024) in accordance with the procedures in Section 2.2
D.1.g through D.1.h. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if any of these
operating parameters are outside the parameter values in Table 2.2 D-2 of Section 2.2 D.1.
Reporting [15A NCAC 02D .0524]
g. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
4. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. For the chevron mist eliminators (ID Nos. 08-CD-011-01 and 08-CD-012-01) and spray tower scrubbers (ID Nos.
08-CD-011-02 and 08-CD-012-02) associated with the Nos. 10 and 11 Smelt Dissolving Tanks (ID No. G08023
and G08024), respectively, the Permittee shall comply with 40 CFR part 64 pursuant to 15A NCAC 02D .0614 to
ensure that the smelt dissolving tanks comply with the emission limits of 15A NCAC 02D .0508.
Background
b. Emission Units: No. 10 Smelt Dissolving Tank (ID No. G08023)
No. 11 Smelt Dissolving Tank (ID No. G08024)
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements:
i. Regulation: 15A NCAC 02D .0508: Particulates from Pulp and Paper Mills
ii. Emission Limits:
PM: 0.6 pounds of particulate matter per equivalent tons of air dried pulp.
iii. Control Technology: chevron mist eliminator
spray tower scrubber
Monitoring Approach
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Measure
Indicator
No. 10 Smelt Dissolving Tank No. 11 Smelt Dissolving Tank
I. Indicator
Scrubber pressure drop and total liquid
injection rate (firing floor plus demister)
Scrubber pressure drop and total liquid
injection rate (firing floor plus demister)
Permit 08961T29
Page 35
Measure
Indicator
No. 10 Smelt Dissolving Tank No. 11 Smelt Dissolving Tank
Measuring approach Install pressure drop and flow rate
continuous monitors
Install pressure drop and flow rate
continuous monitors
II. Indicator Rangea Pressure drop indicator range: minimum 3-
hour average of 0.12 inches of H2O
Liquid injection rate indicator range:
minimum 3-hour average 30 gallons per
minute
An excursion occurs when the 3-hour
average measurement is less than the
indicator range. The excursion triggers
corrective action and reporting
requirement. No more than one excursion
will be attributed in any given 24-hour
period.
The QIP threshold is a total of 6 excursions
during any 6-month period. The QIP shall
be prepared as required under 40 CFR
64.8.
Pressure drop indicator range: minimum 3-
hour average of 1.50 inches of H2O
Liquid injection rate indicator range:
minimum 3-hour average 74 gallons per
minute
An excursion occurs when the 3-hour
average measurement is less than the
indicator range. The excursion triggers
corrective action and reporting
requirement. No more than one excursion
will be attributed in any given 24-hour
period.
The QIP threshold is a total of 6 excursions
during any 6-month period. The QIP shall
be prepared as required under 40 CFR
64.8.
III. Performance Criteria
Data Representativeness Pressure drop tabs installed before and
after the scrubber.
Flow measurement devices located prior to
liquid injection point.
Pressure drop tabs installed before and
after the scrubber.
Flow measurement devices located prior to
liquid injection point.
QA/QC Practices and
Criteria
Annual calibration of pressure drop and
flow monitoring devices.
Annual calibration of pressure drop and
flow monitoring devices.
Monitoring Frequency Continuous pressure drop and flow
measurements; minimum of one value
every 15 minutes of operating time,
excluding periods of monitoring downtime
and required QA/QC.
Continuous pressure drop and flow
measurements; minimum of one value
every 15 minutes of operating time,
excluding periods of monitoring downtime
and required QA/QC.
Data Collection
Procedures
The data acquisition system shall retain all
15-minute data and 3-hour block averages.
The data acquisition system shall retain all
15-minute data and 3-hour block averages.
Averaging Period The 15-minute pressure drop and liquid
injection rate data are used to calculate the
3-hour block average.
The 15-minute pressure drop and liquid
injection rate data are used to calculate the
3-hour block average.
aDuring performance testing, the established continuous compliance monitoring parameters shall not apply.
Performance tests will serve to provide the monitoring during these periods.
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. In addition, the summary report shall contain the following
information, as applicable:
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 36
LIME PRODUCTION (AREA 09)
O. Two Lime Kilns:
• No. 4 Lime Kiln (ID No. G09028, No. 09-PU-009) – equipped with propane igniters equipped with
a cyclonic mist eliminator in series with a flooded-disc type wet scrubber (ID No. 09-CD-009-01).
• No. 5 Lime Kiln (ID No. G09029, No. 09-PU-010) – equipped with propane igniters equipped with
one 4-stage MicroMistTM venturi scrubber (ID No. 09-CD-010-01).
No. 4 Lime Kiln is the primary burner and No. 5 Lime Kiln is backup burner for collected NCG gases
from the Digester Area (ID No. G02004), Black Liquor Evaporation System (ID No. G07016), No. 1
Hardwood Turpentine Recovery System (ID No. G20060), and No. 2 Pine Turpentine Recovery System
(ID No. G20062); No. 5 Lime Kiln is the primary burner and No. 4 Lime Kiln is backup burner for
Stripper Off Gases (SOG) from the Condensate Stripper System (ID No. G07018).
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits / Standards Applicable Regulation
Particulate matter 0.5 lb per ton of air dried pulp 15A NCAC 02D .0508
Sulfur dioxide
2.3 lb per million Btu heat input 15A NCAC 02D .0516
see Section 2.2 J.1 15A NCAC 02D .0501
Visible emissions 40 percent opacity 15A NCAC 02D .0521
Total reduced sulfur 20 ppm by volume on a dry basis, corrected
to 10 percent oxygen 15A NCAC 02D .0528
Particulate matter Compliance assurance monitoring 15A NCAC 02D .0614
Carbon monoxide and
Volatile organic compounds
Annual recordkeeping and reporting of
actual emission (See Section 2.2 A.3) 15A NCAC 02D .0530(u)
Hazardous air pollutants See Section 2.2 D 15A NCAC 02D .1111
40 CFR Part 63, Subpart MM
1. 15A NCAC 02D .0508: PARTICULATES FROM PULP AND PAPER MILLS
a. Emissions from the production of pulp and paper that are discharged from the Nos. 4 and No. 5 Lime Kilns (ID
Nos. G09028 and G09029) into the atmosphere shall not exceed 0.5 pounds of particulate matter per equivalent
tons of air dried pulp.
Testing [15A NCAC 02Q .0508(f)]
b. The Permittee shall demonstrate compliance with the particulate matter emission limit specified in Section 2.1
O.1.a, above, by testing the Nos. 4 and No. 5 Lime Kilns (ID Nos. G09028 and G09029) in accordance with a
testing protocol approved by the DAQ and the following schedule. Testing shall be performed in accordance with
General Condition JJ.
i. The Permittee shall conduct performance tests on the Nos. 4 and 5 Lime Kilns no later than 180 days after the
scrubbers become operational following the upgrades specified in Permit Application No. 4400159.20B.
ii. The Permittee shall conduct periodic performance tests on an annual basis. If the results of the testing
demonstrate that emissions are less than 80 percent of the limit in Section 2.1 O.1.a, above, the testing
frequency may be reduced to once every two years.
iii. If the results of any test are 80 percent or greater than the limit specified in Section 2.1 O.1.a, above, the
Permittee shall resume performance testing on an annual basis, beginning no more than 12 months after the
previous test.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0508 if the results of any test are above
the limit specified in Section 2.1 O.1.a, above, or if testing is not performed as specified.
Permit 08961T29
Page 37
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f), 40 CFR 70.6(a)(3)(A)]
c. Particulate matter emissions from the No. 5 Lime Kiln (ID No. G09029) shall be controlled by the 4-stage
MicroMistTM venturi scrubber (ID No. 09-CD-010-01). To ensure compliance with the particulate emission limit
in Section 2.1 O.1.a, above, the Permittee shall follow the 40 CFR Part 63, Subpart MM monitoring,
recordkeeping, and reporting requirements as specified in Section 2.2 D.1. Excess emissions shall be reported in
accordance with 15A NCAC 02D .0535 as outlined in General Condition I. The Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0508 if either (1) the applicable MACT Subpart MM requirements above
are not monitored and recorded or (2) the MACT Subpart MM monitoring determines a violation of the applicable
PM emission standard per 63.864(k)(2) as detailed above.
d. Particulate matter emissions from the No. 4 Lime Kiln (ID No. G09028) shall be controlled by the flooded disc-
type wet scrubber (ID No. 09-CD-009-01). To ensure compliance with the particulate emission limit in Section 2.1
O.1.a, above, the Permittee shall meet the following:
i. When the combustion of No. 6 fuel oil provides greater than 50 percent of the heat input to the No. 4 Lime
Kiln (ID No. G09028), the Permittee shall follow the 40 CFR Part 63, Subpart MM monitoring,
recordkeeping, and reporting requirements as specified in Section 2.2 D.1. Excess emissions shall be reported
in accordance with 15A NCAC 02D .0535 as outlined in General Condition I.
ii. When the combustion of No. 6 fuel oil provides 50 percent or less of the heat input to the No. 4 Lime Kiln (ID
No. G09028), the Permittee shall perform inspections and maintenance as recommended by the manufacturer.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0508 if the scrubber is not inspected and
maintained.
e. To demonstrate compliance with the particulate matter emission limit in Section 2.1 O.1.a, above, the Permittee
shall install, operate, and maintain a pressure drop indicator and a liquid flowmeter on each scrubber.
i. The Permittee shall operate the No. 5 Lime Kiln scrubber (ID No. 09-CD-010-01) pursuant to the
Subpart MM requirements in Section 2.2 D.1, below.
ii. The Permittee shall operate the No. 4 Lime Kiln scrubber (ID No. 09-CD-009-01) pursuant to the
Subpart MM requirements in Section 2.2 D.1, below, when No. 6 fuel oil combustion provides greater than
50 percent of the heat input to the kiln.
iii. When No. 6 fuel oil combustion provides 50 percent or less of the heat input to the kiln, the Permittee shall
operate the No. 4 Lime Kiln scrubber (ID No. 09-CD-009-01) as follows.
(A) The Permittee shall continuously monitor and record scrubbing liquid flow rate and pressure drop on a 3-
hour average. The scrubber parameter monitoring system downtime shall not exceed two (2) percent of
the monitoring time in any semi-annual reporting period. If the emission source is not operating, a record
of this fact along with the corresponding date and time shall substitute for the observation. The
monitoring systems shall be calibrated annually.
(B) Prior to the upgrades to the No. 4 Lime Kiln scrubber (ID No. 09-CD-009-01), as specified in Permit
Application No. 4400159.20B, the Permittee shall maintain the pressure drop across the scrubber above a
minimum of 28.6 inches of H2O and the Permittee shall maintain the scrubber liquid injection rate above
a minimum of 302 gallons per minute.
(C) After normal operation begins following the upgrades to No. 4 Lime Kiln scrubber (ID No. 09-CD-009-
01) specified in Permit Application No. 4400159.20B, the Permittee shall maintain the pressure drop
across the scrubber in inches of H2O and the scrubber liquid injection rate in gallons per minute above
minimum operating parameters recommended by the manufacturer. The Permittee shall establish the site-
specific operating parameters during the initial performance test specified in Section 2.1 O.1.b.i, above.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0508 if the pressure drop and liquid flow
rate are not established and maintained as required above.
f. The results of inspection and maintenance shall be maintained in a logbook (written or electronic format) on site
and made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of actions recorded;
ii. the results of each respective monthly inspection;
iii. the results of any maintenance performed on the control devices; and
iv. any variance from manufacturer’s recommendations, if any, and corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0508 if these records are not maintained.
Permit 08961T29
Page 38
2. 15A NCAC 02D .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
a. Emissions of sulfur dioxide from this source shall not exceed 2.3 pounds per million Btu heat input. Sulfur
dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other substances shall be included when
determining compliance with this standard.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 O. 2. a. above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0508.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping is required for sulfur dioxide emissions from the firing of natural gas in the lime
kilns (ID Nos. G09028 and G09029).
d. To ensure compliance with 2.1 O.2.a, the Permittee shall monitor the sulfur content and heat content of the No. 6
fuel oil by using fuel oil supplier certification per month. The results of the fuel oil supplier certifications shall be
recorded in a logbook (written or electronic format) on a quarterly basis and include the following information:
i. the name of the fuel oil supplier;
ii. the maximum sulfur content of the fuel oil received during the month;
iii. the average heat content of the fuel received during the month;
iv. the method used to determine the maximum sulfur and heat content of the fuel oil;
v. the calculation of lb SO2 per million Btu; and
vi a certified statement signed by the responsible official that the records of fuel oil supplier certification
submitted represent all of the fuel oil fired during the period.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0516 if the sulfur and heat content of the
oil are not monitored and recorded.
Reporting [15A NCAC 02Q .0508(f)]
e. No reporting is required for sulfur dioxide emissions from the firing of natural gas in the lime kilns
(ID Nos. G09028 and G09029).
f. The Permittee shall submit a summary report of the fuel oil supplier certifications and calculated emission rates
postmarked on or before January 30 of each calendar year for the preceding six-month period between July and
December and July 30 of each calendar year for the preceding six-month period between January and June. All
instances of deviations from the requirements of this permit must be clearly identified.
3. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the No. 4 Lime Kiln (ID No. G09028) and the No. 5 Lime Kiln (ID No. G09029) shall not
be more than 40 percent opacity when averaged over a six-minute period. However, six-minute averaging periods
may exceed 40 percent of more than once in any hour and not more than four times in any 24-hour period. In no
event shall the six-minute average exceed 90 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limits given in Section 2.1 O.3.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a day while in operation the Permittee shall observe the emission points of the Nos. 4
and 5 Lime Kilns (ID Nos. G09028 and G09029) for any visible emissions above normal. The daily observation
must be made for each day of the calendar year period to ensure compliance with this requirement. The Permittee
shall be allowed three (3) days of absent observations per semi-annual period. If the weather conditions (i.e. fog)
are such that the source emission points of this source cannot be observed, the Permittee shall make a minimum of
two (2) attempts to make the required observation, a record of this fact along with the corresponding date and
time(s) shall substitute for the daily observation. The Permittee shall establish “normal” for the Nos. 4 and 5 Lime
Kilns in the first 30 days of the resumption of normal operations following the scrubber upgrades specified in
Permit 08961T29
Page 39
Permit Application No. 4400159.20B. If visible emissions from these sources are observed to be above normal,
the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 O.3.a, above.
The Permittee shall be deemed to be in noncompliance with 15A NCAC 02D .0521 if the required daily
observations are not conducted as required; if the above-normal emissions are not corrected within the monitoring
period or the percent opacity demonstration cannot be made; or if “normal” is not established for this/these
source(s) in the first 30 days of the resumption of normal operations following the scrubber upgrades specified in
Permit Application No. 4400159.20B.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be in
noncompliance along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified.
4. 15A NCAC 02D .0528: TOTAL REDUCED SULFUR FROM KRAFT PULP MILLS
a. The emissions of total reduced sulfur shall not exceed 20 ppm by volume on a dry basis, corrected to 10 percent
oxygen, measured as hydrogen sulfide and averaged per discrete contiguous 12-hour time period, from the No. 4
Lime Kiln (ID No. G09028) or the No. 5 Lime Kiln (ID No. G09029).
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 O.4.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. To ensure compliance, the Permittee shall calibrate, maintain, and operate a continuous monitoring system for
determining the total reduced sulfur (as hydrogen sulfide, dry basis, corrected to 10 percent oxygen) emissions
discharged to the atmosphere and record the output of the system. The continuous monitoring system shall be
operated in accordance with the applicable performance specifications in 40 CFR Part 60 Appendix B and quality
assurance procedures in 40 CFR Part 60, Appendix F, Section 3, unless an alternative monitoring and quality
assurance program is approved by the DAQ. The monitoring system downtime shall not exceed 5 percent. If any
12-hour block average exceeds the limit above or the records are not maintained, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0528, except that two percent of all 12-hour total reduced sulfur averages
per quarter year in excess of the limitation in Section 2.1 O.4.a, above, in the absence of start-ups, shutdowns, and
malfunctions, shall not be considered in violation.
Reporting [15A NCAC 02Q .0508(f)]
d. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
5. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. For the cyclone mist eliminators in series with wet scrubbers (ID Nos. 09-CD-009-01 and 09-CD-010-01)
associated with the No. 4 Lime Kiln (ID Nos. G09028 and G09029), the Permittee shall comply with 40 CFR part
Permit 08961T29
Page 40
64 pursuant to 15A NCAC 02D .0614 to ensure that the lime kilns comply with the emission limits of 15A NCAC
02D .0508.
Background
b. Emission Units: No. 4 Lime Kiln (ID No. G09028)
No. 5 Lime Kiln (ID No. G09029)
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements
i. Regulation: 15A NCAC 02D .0508: Particulates from Pulp and Paper Mills
ii. Emission Limits:
PM: 0.5 pounds of particulate matter per equivalent tons of air dried pulp.
iii. Control Technology: cyclone mist eliminator in series with a flooded disc-type wet scrubber
Monitoring Approach
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Measure
Indicator
No. 4 Lime Kiln
(< 50 percent of heat input
from No. 6 fuel oil)
No. 4 Lime Kiln
(> 50 percent of heat input
from No. 6 fuel oil) No. 5 Lime Kiln
I. Indicator
Scrubber differential pressure
and scrubber recirculation
liquid flow rate
Scrubber differential pressure
and total liquid injection rate
Scrubber differential pressure and
total liquid injection rate (venturi
liquid flow plus quench liquid flow)
Measuring approach Install pressure drop and flow
rate continuous monitors
Install pressure drop and flow
rate continuous monitors
Install pressure drop and flow rate
continuous monitors
II. Indicator Rangea,b Scrubber differential pressure
indicator range: minimum 3-
hour average of 28.6 inches of
H2O.
Scrubber recirculation liquid
flow rate indicator range:
minimum 3-hour average of
302 gallons per minute.
An excursion occurs when the
3-hour average measurement is
less than the indicator range.
The excursion triggers
corrective action and reporting
requirement. No more than one
excursion will be attributed in
any given 24-hour period.
The QIP threshold is a total of
6 excursions during any 6-
month period. The QIP shall be
prepared as required under 40
CFR 64.8.
Scrubber differential pressure
indicator range: minimum 3-hour
average of 20 inches of H2O
Scrubber recirculation liquid
flow rate indicator range:
minimum 3-hour average of 289
gallons per minute.
An excursion occurs when the 3-
hour average measurement is
less than the indicator range. The
excursion triggers corrective
action and reporting requirement.
No more than one excursion will
be attributed in any given 24-
hour period.
The QIP threshold is a total of
6 excursions during any 6-month
period. The QIP shall be
prepared as required under 40
CFR 64.8.
Pressure drop indicator range:
minimum 3-hour average of 19.2
inches of H2O
Scrubber liquid injection rate
indicator range: minimum 3-hour
average 376 gallons per minute
(venturi plus quench liquid flow
rate)
An excursion occurs when the 3-
hour average measurement is less
than the indicator range. The
excursion triggers corrective action
and reporting requirement. No more
than one excursion will be attributed
in any given 24-hour period.
The QIP threshold is a total of
6 excursions during any 6-month
period. The QIP shall be prepared as
required under 40 CFR 64.8.
III. Performance Criteria
Data
Representativeness
Pressure drop tabs installed
before and after the scrubber.
Flow measurement devices
located prior to liquid injection
point.
Pressure drop tabs installed
before and after the scrubber.
Flow measurement devices
located prior to liquid injection
point.
Pressure drop tabs installed before
and after the scrubber.
Flow measurement devices located
prior to liquid injection point.
Permit 08961T29
Page 41
Measure
Indicator
No. 4 Lime Kiln
(< 50 percent of heat input
from No. 6 fuel oil)
No. 4 Lime Kiln
(> 50 percent of heat input
from No. 6 fuel oil) No. 5 Lime Kiln
QA/QC Practices and
Criteria
Annual calibration of pressure
drop and flow monitoring
devices.
Annual calibration of pressure
drop and flow monitoring
devices.
Annual calibration of pressure drop
and flow monitoring devices.
Monitoring Frequency Continuous pressure drop and
flow measurements; minimum
of one value every 15 minutes
of operating time, excluding
periods of monitoring
downtime and required QA/QC.
Continuous pressure drop and
flow measurements; minimum of
one value every 15 minutes of
operating time, excluding
periods of monitoring downtime
and required QA/QC.
Continuous pressure drop and flow
measurements; minimum of one
value every 15 minutes of operating
time, excluding periods of
monitoring downtime and required
QA/QC.
Data Collection
Procedures
The data acquisition system
shall retain all 15-minute data
and 3-hour block averages.
The data acquisition system shall
retain all 15-minute data and 3-
hour block averages.
The data acquisition system shall
retain all 15-minute data and 3-hour
block averages.
Averaging Period The 15-minute pressure drop
and liquid injection rate data
are used to calculate the 3-hour
block average.
The 15-minute pressure drop and
liquid injection rate data are used
to calculate the 3-hour block
average.
The 15-minute pressure drop and
liquid injection rate data are used to
calculate the 3-hour block average.
aDuring performance testing, the established continuous compliance monitoring parameters shall not apply. Performance tests will serve to provide the
monitoring during these periods.
bFollowing the upgrades to the scrubbers the Permittee shall establish the new minimum scrubbing liquid injection rate and pressure drop during the initial
performance test required in Section 2.1 O.1.b, above.
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. In addition, the summary report shall contain the following
information, as applicable:
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 42
P. No. 5 Lime Silo Dust Collection System (ID No. G09032):
• No. 5 lime storage silo (No. 09-TK-013)
• Hot Lime Conveyor (No. 09-PU-014)
• Lime Crusher (No. 09-PU-015)
• Bucket Elevator (No. 09-PU-016)
Equipped with a cartridge-type bagfilter (ID No. 09-CD-013-01)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter E = 4.10 P 0.67
where:
E = allowable particulate emission rate in
pounds per hour
P = process weight rate in tons per hour
15A NCAC 02D .0515
Visible emissions 20 percent opacity 15A NCAC 02D .0521
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from the No. 5 lime silo dust collection system (ID No. G09032) shall not exceed
an allowable emission rate as calculated by the following equation:
E = 4.10 x P 0.67 Where E = allowable emission rate in pounds per hour
P = process weight in tons per hour
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 P.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Particulate matter emissions from the No. 5 lime silo dust collection system (ID No. G09032) shall be controlled
by the cartridge bagfilter (ID No. 09-CD-013-01). To ensure compliance, the Permittee shall perform inspections
and maintenance. As a minimum, the inspection and maintenance requirement shall include the following:
i. a monthly visual inspection (for each calendar month, not to exceed 6 weeks from the previous inspection) of
the system ductwork and material collection unit for leaks; and
ii. an annual internal inspection (for each calendar year, not to exceed 14 months from the previous inspection)
of the cartridge filter structural integrity.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the ductwork and cartridge filter
are not inspected and maintained.
d. The results of inspection and maintenance shall be maintained in a logbook (written or electronic format) on-site
and made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the cartridge filter; and
iv. any corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit the results of any maintenance performed on any control device within 30 days of a
written request by the DAQ.
f. The Permittee shall submit a summary report of the monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
Permit 08961T29
Page 43
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified.
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the No. 5 lime silo dust collection system (ID No. G09032) shall not be more than
20 percent opacity when averaged over a six-minute period. However, six-minute averaging periods may exceed
20 percent not more than once in any hour and not more than four times in any 24-hour period. In no event shall
the six-minute average exceed 87 percent opacity. [15A NCAC 02D .0521 (d)]
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 P.2.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a month the Permittee shall observe the emission points of the No. 5 lime silo dust
collection system (ID No. G09032) for any visible emissions above normal. The monthly observation must be
made for each month of the calendar year period to ensure compliance with this requirement. If visible emissions
from this source are observed to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 P. 2.a. above.
If the above-normal emissions are not corrected per (i) above or if the demonstration per (ii) above cannot be
made, the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be above
normal along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified.
Permit 08961T29
Page 44
Q. No. 6 lime silo dust collection system (ID No. G09031):
• Lime Storage Silo (No. 09-TK-018),
• Fresh lime Storage Silo (No. 09-TK-019)
• No. 6 Hot Lime Conveyor (No. 09-PU-011)
• Lime Crusher (No. 09-PU-012)
• Bucket Elevator (No. 09-PU-013)
Equipped with a cartridge-type bagfilter (ID No. 09-CD-018-01)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter E = 4.10 P 0.67
where:
E = allowable particulate emission rate in
pounds per hour
P = process weight rate in tons per hour
15A NCAC 02D .0515
Visible emissions 20 percent opacity 15A NCAC 02D .0521
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from the No. 6 lime silo dust collection system (ID No. G09031) shall not exceed
an allowable emission rate as calculated by the following equation:
E = 4.10 x P 0.67 Where E = allowable emission rate in pounds per hour
P = process weight in tons per hour
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 Q.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Particulate matter emissions from the No. 6 lime silo dust collection system (ID No. G09031) shall be controlled
by the cartridge bagfilter (ID No. 09-CD-018-01). To ensure compliance, the Permittee shall perform inspections
and maintenance. As a minimum, the inspection and maintenance requirement shall include the following:
i. a monthly visual inspection (for each calendar month, not to exceed 6 weeks from the previous inspection) of
the system ductwork and material collection unit for leaks; and
ii. an annual internal inspection (for each calendar year, not to exceed 14 months from the previous inspection)
of the cartridge filter structural integrity.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the ductwork and cartridge filter
are not inspected and maintained.
d. The results of inspection and maintenance shall be maintained in a logbook (written or electronic format) on-site
and made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the cartridge filter; and
iv. any corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit the results of any maintenance performed on any control device within 30 days of a
written request by the DAQ.
f. The Permittee shall submit a summary report of the monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
Permit 08961T29
Page 45
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified.
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the No. 6 lime silo dust collection system (ID No. G09031) shall not be more than
20 percent opacity when averaged over a six-minute period. However, six-minute averaging periods may exceed
20 percent not more than once in any hour and not more than four times in any 24-hour period. In no event shall
the six-minute average exceed 87 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in 2.1 Q.2.a, above, the Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a month the Permittee shall observe the emission points of the sources for any visible
emissions above normal. The monthly observation must be made for each month of the calendar year period to
ensure compliance with this requirement. If visible emissions from this source are observed to be above normal,
the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 Q.2.a, above.
If the above-normal emissions are not corrected per (i) above or if the demonstration per (ii) above cannot be
made, the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be above
normal along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified.
R. Lime Production - Other Units (ID No. G09027):
• No. 4 Lime Pre-Coat Filter (No. 09-PU-001)
• No. 4 Lime Pre-Coat Filter Vacuum Pump (No. 09-PU-001a)
• No. 5 Lime Pre-Coat Filter (No. 09-PU-002)
• No. 5 Lime Pre-Coat Filter Vacuum Pump (No. 09-PU-002a)
• No. 6 Lime Pre-Coat Filter (No.09-PU-004)
• No. 6 Lime Pre-Coat Filter Vacuum Pump (No. 09-PU-004a),
Dregs Filter (ID No. G09027-3)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Toxic Air Pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
Permit 08961T29
Page 46
CAUSTICIZING (AREA 10)
S. Slakers:
• No. 5 Lime Slaker (ID No. G10035, No. 10-PU-027) – serves No. 5 Lime Kiln and controlled by a
natural draft condensing scrubber (ID No. 10-CD-027-01)
• No. 6 Lime Slaker (ID No. G10034, No. 10-PU-036) – serves No. 4 Lime Kiln and controlled by a
natural draft condensing scrubber (ID No. 10-CD-036-01)
Green Liquor Clarification and Storage (ID No. G10089)
• West Green Liquor Storage (No. 10-TK-002);
• North Green Liquor Storage (No. 10-TK-013);
• South Green Liquor Clarifier (No. 10-TK-005);
• North Green Liquor Clarifier (No. 10-TK-006)
Green Liquor Stabilization (ID No. G10090, No. 10-TK-008)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter Affected Sources: G10035 and G10034
E = 4.10 P 0.67
where:
E = allowable particulate emission rate in
pounds per hour
P = process weight rate in tons per hour
15A NCAC 02D .0515
Visible emissions Affected Sources: G10035 and G10034
20 percent opacity 15A NCAC 02D .0521
Toxic Air Pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from the Nos. 5 and 6 Lime Slakers (ID Nos. G10035 and G10034) shall not
exceed an allowable emission rate as calculated by the following equation:
E = 4.10 x P 0.67 Where E = allowable emission rate in pounds per hour
P = process weight in tons per hour
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 S.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Particulate matter emissions from the No. 5 Lime Slaker (ID No. G10035) shall be controlled by the natural draft
scrubber (ID No. 10-CD-027-01). Particulate matter emissions from the No. 6 Lime Slaker (ID No. G10034) shall
be controlled by the natural draft wet scrubber (ID No. 10-CD-036-01). The Permittee shall install, operate, and
maintain a wet scrubbing liquid flowmeter on each scrubber. To ensure compliance and the effective operation of
the scrubbers, the Permittee shall monitor and record, once per day, scrubbing liquid flow rate. The Permittee
shall be allowed three (3) days of absent observations per semi-annual period. If the emission source(s) is not
operating, a record of this fact along with the corresponding date and time shall substitute for the daily
observation. To ensure quality, the flow rate gauges shall be calibrated annually. The scrubber shall be operated to
ensure the scrubbing liquid flow rate is greater than 30 gallons per minute. The Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515 if the scrubber liquid flow rate is not maintained above the above
prescribed limit or if these records are not maintained.
d. If the scrubber liquid flow rate readings recorded as required in Section 2.1 S.1.c, above, are observed to be
outside the prescribed range, the Permittee shall inspect the scrubber(s) for malfunctions and clean or repair, as
Permit 08961T29
Page 47
necessary. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the inspections,
cleaning, and repairs are not performed.
e. The results of scrubber inspection and maintenance activities in Section 2.1 S.1.c and S.1.d, above, shall be
maintained in a logbook (written or electronic format) on-site and made available to an authorized representative
of DAQ upon request. The logbook shall record the following:
i. the date and time of each recorded action
ii. the results of each inspection;
iii. the causes for any variance from the prescribed operating range for the scrubber(s); and
iv. corrective actions taken.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
f. The Permittee shall submit the results of any maintenance performed on any control device within 30 days of a
written request by the DAQ.
g. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the Nos. 5 and 6 Lime Slakers (ID Nos. G10035 and G10034) shall not be more than
20 percent opacity when averaged over a six-minute period. However, six-minute averaging periods may exceed
20 percent not more than once in any hour and not more than four times in any 24-hour period. In no event shall
the six-minute average exceed 87 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in 2.1 S.2.a, above, the Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a month the Permittee shall observe the emission points of the Nos. 5 and 6 Lime
Slakers (ID Nos. G10035 and G10034) for any visible emissions above normal. The monthly observation must
be made for each month of the calendar year period to ensure compliance with this requirement. If visible
emissions from this source are observed to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 S.2.a, above.
If the above-normal emissions are not corrected per (i) above or if the demonstration in (ii) above cannot be made,
the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be above
normal along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified.
Permit 08961T29
Page 48
POWER (AREA 11)
T. Utility Boilers:
• Riley Coal (ID No. G11039, No. 11-CU-005) – equipped with low-NOX burners and natural gas/kerosene
igniters; a 2-chamber, 3-field electrostatic precipitator (ID No. 11-CD-005-01); and a wet scrubber (ID
No. 11-CD-005-02)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter 0.16 lb/million Btu heat input 15A NCAC 02D .0503
Sulfur dioxide
2.3 lb/million Btu heat input
Monitoring Requirements
15A NCAC 02D .0516
15A NCAC 02D .0608
see Section 2.2 J.1 15A NCAC 02D .0501
Nitrogen oxides 1.8 lb/million Btu heat input 15A NCAC 02D .0519
Visible emissions 40 percent opacity 15A NCAC 02D .0521
Visible emissions Excess Emissions Monitoring Requirements
(40 CFR 51, Appendix P) 15A NCAC 02D .0606
Particulate matter Compliance assurance monitoring 15A NCAC 02D .0614
Particulate matter 0.15 lb/million Btu heat input
(See Section 2.2 A.1) 15A NCAC 02D .0530
Nitrogen oxides
Nitrogen oxides emissions from the Riley
Coal and No. 4 Power Boilers shall be limited
to 4,368 tons per rolling consecutive 12
months
(See Section 2.2 A.1)
15A NCAC 02D .0530
Carbon monoxide Carbon monoxide emissions from the Riley
Coal and No. 4 Power Boilers shall be limited
to 898.2 tons per consecutive 12 months (See
Section 2.2 A.1)
15A NCAC 02D.0530
Sulfur dioxide
Sulfur dioxide emissions from the Riley Coal
and No. 4 Power Boilers shall be limited to
8,277 tons per rolling consecutive 12 months
(See Section 2.2 A.2)
15A NCAC 02Q .0317
Avoidance of
15A NCAC 02D .0530
Particulate matter
(PM/PM10/PM2.5), sulfur
dioxide, nitrogen oxides,
carbon monoxide, H2SO4,
fluorides, TRS, lead, and
volatile organic
compounds
See Section 2.2 A.4 15A NCAC 02D .0530(u)
Hazardous air pollutants See Section 2.2 E 15A NCAC 02D .1111
40 CFR Part 63, Subpart DDDDD
1. 15A NCAC 02Q .0508(j): ALTERNATIVE OPERATING SCENARIOS [15A NCAC 02Q .0508(j)]
The Permittee, contemporaneously with making a change from one alternate operating scenario to another, shall record
in a logbook (written or electronic format) the scenario under which it is operating. [15A NCAC 02Q .0508(p)]
a. The Primary Operating Scenario (POS) is defined as the Riley Coal Boiler (ID No. G11039) equipped with an
ESP and monitoring opacity using a COMS.
b. The Alternate Operating Scenario (AOS) and is defined as the Riley Coal Boiler (ID No. G11039) equipped with
an ESP, wet scrubber, and monitoring PM emissions using a PM CEMS.
Permit 08961T29
Page 49
2. 15A NCAC 02D .0503: PARTICULATES FROM FUEL BURNING INDIRECT HEAT EXCHANGERS
a. Emissions of particulate matter from the combustion of coal that are discharged from each of this boiler
(ID No. G11039) into the atmosphere shall not exceed 0.16 pounds per million Btu heat input.
Testing [15A NCAC 02Q .0508(f)]
b. Under the provisions of NCGS 143-215.108, the Permittee shall demonstrate compliance with the emission
limit(s) above by testing each of this boiler (ID No. G11039) as follows:
i. POS: The Permittee shall test annually for particulate matter in accordance with a testing protocol approved
by the DAQ. Details of the emissions testing and reporting requirements can be found in General Condition
JJ. If the results of the testing demonstrate that emissions are less than 80 percent of the limit in Section 2.1
T.2.a, above, the testing frequency may be reduced to once every five years (and not longer than 61 months
between compliance tests). If the results of this or any test are above the limit given in Section 2.1 T.2.a,
above, the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0503 and the Permittee shall
resume performance testing on an annual basis, beginning no more than 12 months after the previous test.
ii. AOS: If emissions testing is required, the Riley Coal Boiler (ID No. G11039) testing shall be performed in
accordance with General Condition JJ. If the results of this test are above the limit given in Section 2.1 T.2.a,
above, the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0503.
c. POS: The Permittee shall conduct a performance test on the Riley Coal Boiler (ID No. G11039) within 180 days
of startup of the rebuilt ESP (ID No. 11-CD-005-01). The performance test shall be conducted in accordance with
the requirements in General Condition JJ. The Permittee shall be deemed in noncompliance with 15A NCAC 02D
.0503 if this performance test is not conducted.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
d. Particulate matter emissions from this boiler (ID No. G11039) shall be controlled by the electrostatic precipitator
(ESP) (ID No. 11-CD-005-001).
i. POS: To ensure compliance with the emission limits in Section 2.1 T.2.a, the Permittee shall install, operate,
and maintain an opacity monitor at the exhaust of this boiler (ID No. G11039). The Permittee shall maintain
the opacity at or below the opacity limit specified in Section 2.1 T.5.a, below, following the procedure in
Section 2.1 T.5.b, below.
ii. POS: The Permittee shall determine compliance with the emission limit in Section 2.1 T.2.a, above, pursuant
to the ongoing compliance determinations in the monitoring, recordkeeping, and reporting requirements of
Section 2.1 T.5 and T.6, below. However, excess emissions shall be reported in accordance with 15A NCAC
02D .0535 as outlined in General Condition I.
iii. AOS: To ensure compliance with the emission limits in Section 2.1 T.2.a, the Permittee shall install, operate,
and maintain a PM CEMS on the Riley Coal Boiler (ID No. G11039) pursuant to the Section 2.2 E.2.e,
below.
The Permittee shall be deemed in noncompliance with 15A NCAC .0503 if the emissions are not monitored and
recorded as required above.
3. 15A NCAC 02D .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
15A NCAC 02D .0608: OTHER LARGE COAL OR RESIDUAL OIL BURNERS
a. Emissions of sulfur dioxide from this boiler (ID No. G11039) shall not exceed 2.3 pounds per million Btu heat
input. Sulfur dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other substances shall be
included when determining compliance with this standard.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 T.3.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0516 and 02D .0608.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. To ensure compliance with Section 2.1 T.3.a, the Permittee shall monitor the sulfur content and heat content of all
the coal burned during the period by using coal supplier certification per total shipment received. The coal
supplier certifications shall be recorded in a logbook (written or electronic format) per total shipment and include
the following information:
i. the name of the coal supplier;
Permit 08961T29
Page 50
ii. a statement verifying that the methods used to determine the maximum sulfur content and heat content of the
coal were in accordance with the following:
(A) sampling - ASTM Method D 2234;
(B) preparation - ASTM Method D 2013;
(C) gross calorific value (Btu) - ASTM Method D-2015, D-3286, D-1989, or D-5865;
(D) moisture content - ASTM Method D 3173 or D-2961; and
(E) sulfur content - ASTM Method D 3177 or ASTM Method D 4239.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0516 and 02D .0608 if the sulfur and heat
content of the coal are not monitored and recorded.
d. The Permittee is required to calculate and record in a logbook (written or electronic format) the equivalent
emission rate in pounds of sulfur dioxide per million Btu heat content of the coal per total shipment. The
equivalent sulfur dioxide emission rate (pounds per million Btu heat input) shall be calculated in accordance with
Method 19 of 40 CFR 60, Appendix A, Section 12.6 – Sulfur Retention Credit for Compliance Fuel. The
Permittee shall be deemed in noncompliance with 15A NCAC 02D .0516 and 02D .0608 if these records are not
kept or if the results show an exceedance of the limit given in Section 2.1 T.3.a, above.
Reporting [15A NCAC 02Q .0508(f)]
e The Permittee shall submit a summary report of the coal supplier certifications and calculated emission rates
postmarked on or before January 30 of each calendar year for the preceding six-month period between July and
December and July 30 of each calendar year for the preceding six-month period between January and June. All
instances of deviations from the requirements of this permit must be clearly identified.
4. 15A NCAC 02D .0519: CONTROL OF NITROGEN DIOXIDE AND NITROGEN OXIDES
a. Emissions of nitrogen oxides shall not exceed 1.8 pounds per million Btu of heat input from any coal-fired boiler
with a capacity of 250 million Btu per hour or more.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 T.4.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0519.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping/reporting is required from the firing of coal in these sources for this regulation.
5. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from this boiler (ID No. G11039) shall not be more than 40 percent opacity (except during
startups) when averaged over a six-minute period. However, six-minute periods averaging periods may exceed 40
percent not more than once in any hour and not more than four times in any 24-hour period. In no event shall the
six-minute average exceed 90 percent opacity.
b. POS: The Permittee shall install, operate, and maintain continuous opacity monitoring systems (COMS).
Compliance with the 40 percent opacity limit shall be determined as follows:
i. No more than four six-minute periods shall exceed the opacity standard in any one day; and
ii. The percent of excess emissions (defined as the percentage of monitored operating time in a calendar quarter
above the opacity limit) shall not exceed 0.8 percent of the total operating hours. If a boiler operates less than
500 hours during a calendar quarter, the percent of excess emissions shall be calculated by including hours
operated immediately previous to this quarter until 500 operational hours are obtained.
Excess emissions shall be reported in accordance with 15A NCAC 02D .0535 as outlined in General Conditions
I.A and I.B. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if the Permittee does
not monitor visible emissions as required above.
Testing [15A NCAC 02Q .0508(f)]
c. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 T.5.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Permit 08961T29
Page 51
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
d. POS: The Permittee shall use a continuous opacity monitoring system (COMS) to monitor and record opacity.
Continuous emissions monitoring and recordkeeping of opacity shall be performed as described in Paragraphs 2
and 3.1.1 through 3.1.5 of Appendix P of 40 CFR Part 51. The monitoring systems shall meet the minimum
specifications described in Paragraphs 3.3 through 3.8 of Appendix P of 40 CFR Part 51. The Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0521 if the monitoring is not performed, if the monitored values
exceed the limitations given above, or if the records are not maintained.
e. AOS: To ensure compliance, once a month the Permittee shall observe the emission points of the Riley Coal
Boiler (ID No. G11039) for any visible emissions above normal. The monthly observation must be made for each
month of the calendar year period to ensure compliance with this requirement. The Permittee shall establish
“normal” for this boiler in the first 30 days following the beginning of operation of the wet scrubber. If visible
emissions from this boiler are observed to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 T.5.a, above.
The Permittee shall be deemed to be in noncompliance with 15A NCAC 02D .0521 if the above-normal emissions
are not corrected per (i) above or the demonstration in (ii) above cannot be made.
Recordkeeping [15A NCAC 02Q .0508(f)]
f. AOS: The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and
made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be in
noncompliance along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 2D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
g. The Permittee shall submit a summary report of the monitoring data postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified.
6. 15A NCAC 02D .0606: SOURCES COVERED BY APPENDIX P OF 40 CFR PART 51 (CONTINUOUS
OPACITY MONITORING AND EXCESS EMISSIONS)
POS: Riley Coal Boiler (ID No. G11039), the provisions of 15A NCAC 02D .0606 apply as follows:
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f) and 02D .0606]
a. POS: The Permittee shall use a continuous opacity monitoring system (COMS) installed on the exhaust of the
boiler (ID No. G11039) to monitor and record opacity. Continuous emissions monitoring and recordkeeping of
opacity shall be performed as described in Paragraphs 2 and 3.1.1 through 3.1.5 of Appendix P of 40 CFR Part 51.
The monitoring systems shall meet the minimum specifications described in Paragraphs 3.3 through 3.8 of
Appendix P of 40 CFR Part 51.
b. POS: The quarterly excess emissions (EE) reports required under Appendix P of 40 CFR Part 51 shall be used as
an indication of good operation and maintenance of the electrostatic precipitators. These sources shall be deemed
to be properly operated and maintained if the percentage of time the opacity emissions, calculated on a 6-minute
average, in excess of 40 percent (including startups, shutdowns, and malfunctions) does not exceed 3.0 percent of
the total operating time for any given calendar quarter, adjusted for monitor downtime (MD) as calculated below.
In addition, these sources shall be deemed to be properly operated and maintained if the percent monitor downtime
does not exceed 2.0 percent.
Permit 08961T29
Page 52
Calculations for %EE and %MD
Percent Excess Opacity Emission (%EE) Calculation:
%EE=� Total Excess Emission Time*[(Total Source Operating Time***)- (Monitor Downtime)] �x 100
Percent Monitor Downtime (%MD) Calculation for COMS:
%MD= �Total Monitor Downtime**
Total Source Operating Time***� x 100
* Total Excess Emission Time contains any 6-minute period greater than 40% opacity including startup, shutdown, and malfunction.
** Total Monitor Downtime includes Quality Assurance (QA) activities unless exempted by regulation or defined in an agency approved QA
Manual. The amount of exempt QA Time will be reported in the quarterly report as such.
*** If a source operates less than 2200 hours during any quarter, the source may calculate the %EE and/or %MD using all operating data for
the current quarter and the preceding quarters until 2200 hours of data are obtained. [N.C.G.S. 143-215.110]
Reporting [15A NCAC 02Q .0508(f) and 02D .0606]
c. POS: The Permittee shall submit the excess emissions and monitor downtime reports as required under Appendix
P of 40 CFR Part 51 no later than January 30 of each calendar year for the preceding three-month period between
October and December, April 30 of each calendar year for the preceding three-month period between January and
March, July 30 of each calendar year for the preceding three-month period between April and June, and October
30 of each calendar year for the preceding three-month period between July and September. For periods of excess
emissions, defined as each six-minute period average greater than 40 percent opacity, the opacity measurements
recorded by the COMS shall be reported as described in Paragraphs 4 and 5.1 of Appendix P of 40 CFR Part 51
except that a six-minute time period shall be deemed as an appropriate alternative opacity averaging period as
described in Paragraph 4.2 of Appendix P of 40 CFR Part 51. A minimum of 36 data points, equally spaced, is
required to determine a valid six-minute value. All periods of noncompliance from the requirements of this permit
must be clearly identified.
7. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. POS: For the electrostatic precipitator (ID No. 11-CD-005-01) associated with the Utility Boiler (ID No.
G11039), the Permittee shall comply with 40 CFR part 64 pursuant to 15A NCAC 02D .0614 to ensure that the
boilers comply with the emission limits of 15A NCAC 02D .0503. As required under 40 CFR 64.7(e), if the
performance testing conducted under Section 2.1 T.2.c, above, documents a need to modify the existing indicator
ranges or designated conditions, the Permittee shall promptly notify DAQ and, if necessary, submit a permit
application to address the necessary monitoring changes. Such a modification may include, but is not limited to,
reestablishing indicator ranges or designated conditions, modifying the frequency of conducting monitoring and
collecting data, or the monitoring of additional parameters.
Background
b. Emission Units:
Riley Coal Utility Boiler (ID No. G11039)
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements
i. Regulation: 15A NCAC 02D .0503: Particulates from Fuel Burning Indirect Heat Exchangers
ii. Emission Limits:
PM: 0.15 lb/million Btu
iii. Control Technology: electrostatic precipitator
Monitoring Approach
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Permit 08961T29
Page 53
Measure
Indicator
Riley Coal Boiler (POS Only)
I. Indicator
Opacity of ESP exhaust
Measuring approach COMS in ESP exhaust
II. Indicator Range The opacity indicator range is a 3-hour block average opacity of 7.0 percent.
An excursion occurs when the 3-hour block average measurement is greater than the
indicator range. The excursion triggers corrective action and reporting requirement.
The QIP threshold is when the total duration of excursions is greater than 5 percent of the
source operating time during any 6-month period. The QIP shall be prepared as required
under 40 CFR 64.8.
III. Performance Criteria
Data
Representativeness
The COMS was installed at a representative location in the utility boiler stack per PS-1.
QA/QC Practices and
Criteria
The COMS was initially installed and evaluated per PS-1. Zero and span drift are checked
daily and a quarterly filter audit is
performed.
Monitoring Frequency The opacity of the ESP exhaust is monitored continuously (every 10 seconds)
Data Collection
Procedures
The data acquisition system shall retain all 6-minute data and 3-hour block averages
pursuant to PS-1.
Averaging Period The 10-second opacity data are used to calculate the 6-minute averages. The 6-minute
averages are used to calculate the 3-hour block average.
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. In addition, the summary report shall contain the following
information, as applicable:
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 54
U. No. 4 Power Boiler (ID No. G11040) – equipped with low-NOX burner components and a Separated Overfire
Air (SOFA) system, and a 2-Chamber, 4-Field electrostatic precipitator (ID No. 11-CD-006-01); a urea-based
Selective Non-Catalytic Reduction (SNCR) NOX emission reduction system (ID No. 11-CD-006-02); and a wet
scrubber (ID No. 11-CD-006-03)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter 0.151 pounds per million Btu heat input 15A NCAC 02D .0503
Sulfur dioxide Natural gas combustion only:
2.3 pounds per million Btu heat input
15A NCAC 02D .0516
Visible emissions Natural gas combustion only:
20 percent opacity
15A NCAC 02D .0521
Particulate matter 0.10 lb/million Btu heat input (coal) 15A NCAC 02D .0524
40 CFR 60, Subpart D
Visible emissions 20 percent opacity (coal) 15A NCAC 02D .0524
40 CFR 60, Subpart D
Sulfur dioxide 1.2 lb/million Btu heat input (coal)
See table in Section 2.1 U.1.b, below
15A NCAC 02D .0524
40 CFR 60, Subpart D
see Section 2.2 J.1 15A NCAC 02D .0501
Nitrogen oxides 0.2 lb/million Btu heat input (natural gas)
0.7 lb/million Btu heat input (coal)
See table in Section 2.1 U.1.b, below
15A NCAC 02D .0524
40 CFR 60, Subpart D
Particulate matter Compliance assurance monitoring (POS
only)
15A NCAC 02D .0614
Nitrogen oxides Nitrogen oxides emissions from the Riley
Coal and No. 4 Power Boilers shall be
limited to 4,368 tons per rolling consecutive
12 months
(See Section 2.2 A.1)
15A NCAC 02D .0530
Carbon monoxide Carbon monoxide emissions from the Riley
Coal and No. 4 Power Boilers shall be
limited to 898.2 tons per rolling consecutive
12 months
(See Section 2.2 A.1)
15A NCAC 02D .0530
Particulate matter 0.085 lb/million Btu heat input
(See Section 2.2 A.1)
15A NCAC 02D .0530
Sulfur dioxide Sulfur dioxide emissions from the Riley Coal
and No. 4 Power Boilers shall be limited to
8,277 tons per rolling consecutive 12 months
(See Section 2.2 A.2)
15A NCAC 02Q .0317
Avoidance of
15A NCAC 02D .0530
Particulate matter
(PM/PM10/PM2.5), sulfur
dioxide, nitrogen oxides,
carbon monoxide,
H2SO4, fluorides, TRS,
lead, and volatile organic
compounds
See Section 2.2 A.4 15A NCAC 02D .0530(u)
Hazardous air pollutants See Section 2.2 E.2 15A NCAC 02D .1111
40 CFR Part 63, Subpart DDDDD
1. 15A NCAC 02Q .0508(j): ALTERNATIVE OPERATING SCENARIOS [15A NCAC 02Q .0508(j)]
The Permittee, contemporaneously with making a change from one alternate operating scenario to another, shall record
in a logbook (written or electronic format) the scenario under which it is operating. [15A NCAC 02Q .0508(j)]
Permit 08961T29
Page 55
a. The Primary Operating Scenario (POS) is defined as the No. 4 Power Boiler (ID No. G11040) equipped with an
ESP and monitoring opacity using a COMS.
b. The Alternate Operating Scenario (AOS) is defined as the No. 4 Power Boiler (ID No. G11040) equipped with an
ESP, wet scrubber, and monitoring PM emissions using a PM CEMS.
2. 15A NCAC 02D .0503: PARTICULATES FROM FUEL BURNING INDIRECT HEAT EXCHANGERS
a. Emissions of particulate matter from the combustion of coal and/or natural gas that are discharged from the No. 4
Power Boiler (ID Nos. G11040) into the atmosphere shall not exceed 0.151 pounds per million Btu heat input.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the No. 4 Power Boiler (ID No. G11040) testing shall be performed in accordance
with General Condition JJ. If the results of this test are above the limit given in Section 2.1 U.2.a, above, the
Permittee shall be deemed in noncompliance with 15A NCAC 02D .0503.
c. The Permittee shall conduct a performance test on the No. 4 Boiler (ID No. G11040) within 180 days of startup of
the rebuilt ESP (ID No. 11-CD-006-01). The performance test shall be conducted in accordance with the
requirements in General Condition JJ. The permittee shall be deemed in noncompliance with 15A NCAC 02D
.0503 if this performance test is not conducted.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
d. Particulate matter emissions from the combustion of coal in the No. 4 Power Boiler (ID No. G11040) shall be
controlled by an electrostatic precipitator (ESP) (ID No. 11-CD-006-02).
i. POS: To ensure compliance with the emission limits in Section 2.1 U.2.a, the Permittee shall install, operate,
and maintain an opacity monitor at the exhaust of this boiler (ID No. G11040). The Permittee shall maintain
the opacity at or below the opacity limit specified in Section 2.1 U.5.b, below, following the procedure in
Section 2.1 U.5.h through U.5.j, below.
ii. POS: The Permittee shall determine compliance with the emission limit in Section 2.1 U.2.a, above, pursuant
to the ongoing compliance determinations in the monitoring, recordkeeping, and reporting requirements of
Section 2.1 U.5 and U.6, below. However, excess emissions shall be reported in accordance with 15A NCAC
02D .0535 as outlined in General Condition I.
iii. AOS: To ensure compliance with the emission limits in Section 2.1 U.2.a, the Permittee shall install, operate,
and maintain a PM CEMS on the No. 4 Power Boiler (ID No. G11040) and comply with the PM
monitoring/recordkeeping/reporting requirements of Section 2.1 U.5.g, below.
The Permittee shall be deemed in noncompliance with 15A NCAC .0503 if the emissions are not monitored and
recorded as required in this paragraph.
e. No monitoring/recordkeeping/reporting is required for particulate emissions from the combustion of natural gas in
the No. 4 Power Boiler.
3. 15A NCAC 02D .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
a. Emissions of sulfur dioxide from this boiler (ID No. G11040) shall not exceed 2.3 pounds per million Btu heat
input while firing natural gas. Sulfur dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other
substances shall be included when determining compliance with this standard.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 U.3.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0516 and 02D .0608.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping/reporting is required for sulfur dioxide emissions from natural gas combustion in the
No. 4 Power Boiler (ID No. G11040).
4. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. When firing natural gas in the No. 4 Power Boiler (ID No. G11040), visible emissions shall not be more than 20
percent opacity (except during startups) when averaged over a six-minute period. However, six-minute periods
averaging periods may exceed 20 percent not more than once in any hour and not more than four times in any 24-
hour period. In no event shall the six-minute average exceed 87 percent opacity.
Permit 08961T29
Page 56
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 U.4.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping/reporting is required for visible emissions from the combustion of natural gas in the
No. 4 Power Boiler (ID No. G11040).
5. 15A NCAC 02D .0524: NEW SOURCE PERFORMANCE STANDARDS (40 CFR PART 60, SUBPART D)
a. The Permittee shall comply with all applicable provisions, including the notification, testing, reporting,
recordkeeping, and monitoring requirements in accordance with 15A NCAC 02D .0524, “New Source
Performance Standards” (NSPS) as promulgated in 40 CFR Part 60, Subpart D, including Subpart A “General
Provisions.”
b. For the No. 4 Power Boiler (ID No. G1140) the following emission limits shall not be exceeded [40 CFR 60.42,
60.43, and 60.44]:
Regulated Pollutant Limits/Standards Fuel
Particulate matter 0.10 lb/million Btu heat input Coal combustion only
Visible emissions 20 percent opacity (except during periods of
startup, shutdown and malfunction) except for one
six-minute period per hour of not more than 27
percent opacity
Coal combustion only
Sulfur dioxide 1.2 lb (coal only) / million Btu heat input Coal combustion only
Nitrogen oxides 0.2 lb (natural gas only) / million Btu heat input
0.7 lb (coal only) / million Btu heat input
or
S = [y (0.2) + z (0.7)] / (y + z)
Where:
y = % total heat input from natural gas
z = % total heat input from coal
Natural Gas
Coal
Testing [15A NCAC 02Q .0508(f)]
c. POS: The Permittee shall demonstrate compliance with the emission limit(s) in Section 2.1 U.5.b, above, by
testing the No. 4 Power Boiler (ID No. G1140) annually for particulate matter in accordance with a testing
protocol approved by the DAQ. Details of the emissions testing and reporting requirements can be found in
General Condition JJ. If the results of the testing demonstrate that emissions are less than 80 percent of the limit
in Section 2.1 U.5.b, above, the testing frequency may be reduced to once every five years (and not longer than 61
months between compliance tests). If the results of this or any test are above the limit given in Section 2.1 U.5.b,
above, the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 and the Permittee shall
resume performance testing on an annual basis, beginning no more than 12 months after the previous test.
d. AOS: If emissions testing is required, the No. 4 Power Boiler (ID No. G11040) testing shall be performed in
accordance with General Condition JJ. If the results of this test are above the limit given in Section 2.1 U.5.b,
above, the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524.
e. POS: The Permittee shall conduct a performance test on the No. 4 Power Boiler (ID No. G11040) for particulate
matter within 180 days of startup of the rebuilt ESP (ID No. 11-CD-006-01). The performance test shall be
conducted in accordance a testing protocol approved by the DAQ and the requirements in General Condition JJ.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0503 if this performance test is not
conducted.
Permit 08961T29
Page 57
Monitoring/Recordkeeping (PM) [15A NCAC 02Q .0508(f)]
f. POS: Particulate matter emissions from this boiler (ID No. G11040) shall be controlled by the ESP (ID No. 11-
CD-006-01). To ensure compliance with the particulate emission limits in Section 2.1 U.2.b, the Permittee shall
follow the visible emissions requirements as specified in Section 2.1 U.5.i through U.5.j, below. The Permittee
shall be deemed in noncompliance with 15A NCAC .0524 if the monitoring and recordkeeping requirements
above are not met.
g. AOS: The Permittee shall install, certify, operate, and maintain a PM CEMS on the No. 4 Power Boiler (ID
No. G11040) as follows [40 CFR 60.48Da(p) and 60.49Da(v)]:
i. The Permittee shall conduct performance evaluations of the PM CEMS pursuant to the applicable
requirements of 40 CFR 60.13, Performance Specification 11 in Appendix B of this 40 CFR Part 60, and
Procedure 2 in Appendix F of 40 CFR Part 60. The initial performance evaluation shall be completed no later
than 180 days after the date of initial startup of the wet scrubber (ID No. 11CD-006-03), as specified under 40
CFR 60.8 or within 180 days of the date of notification required under Section 2.1 U.5.s, below, whichever is
later.
ii. During each PM correlation testing run of the CEMS required by Performance Specification 11 in Appendix
B of this part, PM and O2 (or CO2) data shall be collected concurrently (or within a 30- to 60-minute period)
by both the CEMS and performance tests conducted using the following test methods:
(A) For PM, Method 5 or 5B of appendix A-3 of this part or Method 17 of appendix A-6 of this part shall be
used; and
(B) For O2 (or CO2), Method 3A or 3B of appendix A-2 of this part, as applicable shall be used.
iii. Quarterly accuracy determinations and daily calibration drift tests shall be performed in accordance with
Procedure 2 in Appendix F of this 40 CFR Part 60. Relative Response Audit's must be performed annually
and Response Correlation Audits must be performed every 3 years.
iv. The Permittee shall determine compliance with the emissions limit in Section 2.1 U.5.b, above, based on the
24-hour daily (block) average of the hourly arithmetic average emissions concentrations using the continuous
monitoring system outlet data. The 24-hour block arithmetic average emission concentration shall be
calculated using EPA Reference Method 19 of Appendix A of 40 CFR Part 60, Section 4.1.
v. The Permittee shall obtain non-out-of-control CEMS hourly averages, at a minimum, for 75 percent of all
operating hours on a 30-boiler operating day rolling average basis. Non-out-of-control CEMS hourly averages
shall be obtained for 90 percent of all operating hours on a 30-boiler operating day rolling average basis. At
least two data points per hour shall be used to calculate each 1-hour arithmetic average.
vi. The Permittee shall calculate the boiler operating day daily arithmetic average emission concentrations using
the 1-hour arithmetic averages required expressed in nanograms per joule, pounds per million Btu, or pounds
per megawatt-hour. The 1-hour arithmetic averages shall be calculated using the data points required under 40
CFR 60.13(e)(2).
vii. The Permittee shall use all non-out-of-control CEMS data in calculating average emission concentrations even
if the minimum CEMS data requirements of paragraph U.5.g.v, above, are not met.
viii. When PM emissions data are not obtained because of CEMS breakdowns, repairs, calibration checks, and
zero and span adjustments, emissions data shall be obtained by using other monitoring systems as approved
by DAQ or EPA Reference Method 19 of Appendix A of 40 CFR Part 60, to provide, as necessary, non-out-
of-control emissions data for a minimum of 90 percent of all operating hours per 30-boiler operating day
rolling average.
Monitoring/Recordkeeping (opacity) [15A NCAC 02D .0524]
h. POS: The Permittee shall install, maintain, and operate a continuous opacity monitoring system (COMS) for
measuring the opacity of emissions meeting the requirements of 40 CFR Part 60. [40 CFR 60.45] The Permittee
shall be deemed in noncompliance with 15A NCAC 02D .0524 if the monitoring is not conducted as required
above.
i. POS: Compliance with visible emissions limit of Section 2.1 U.2.b, above, shall be determined using six-minute
averages of the COMS values. If any six-minute period average exceeds 20 percent opacity (except during periods
of startup, shutdown and malfunction) except for one six-minute period per hour of not more than 27 percent
opacity, the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524. [40 CFR 60.45(g)(1)]
j. POS: The COMS and the facility shall be assessed for good operation and maintenance (O&M) practices in
accordance with 40 CFR Part 60, Subpart A, Section 60.11(d); Subpart D, Section 60.45; and the EPA Region IV
Continuous Emission Monitor Enforcement Plan (CEP).
Permit 08961T29
Page 58
k. AOS: The Permittee shall conduct a performance test using Method 9 of Appendix A-4 of 40 CFR Part 60 and the
procedures in 40 CFR 60.11 to demonstrate compliance with the opacity limit in Section 2.1 U.5.b, above, within
45 days after stopping use of the existing COMS, and shall comply with either paragraph U.5.k.i, U.5.k.ii, or
U.5.k.iii. The observation period for Method 9 performance tests may be reduced from 3 hours to 60 minutes if all
6-minute averages are less than 10 percent and all individual 15-second observations are less than or equal to 20
percent during the initial 60 minutes of observation. [40 CFR 60.45(b)(7)]
i. Except as provided in paragraph U.5.k.ii or U.5.k.iii, the Permittee shall conduct subsequent Method 9
performance tests pursuant to the applicable schedule in the paragraphs below, as determined by the most
recent Method 9 performance test results.
(A) If no visible emissions are observed, a subsequent Method 9 performance test must be completed within
12 calendar months from the date that the most recent performance test was conducted or within 45 days
of the next day that fuel with an opacity standard is combusted, whichever is later;
(B) If visible emissions are observed but the maximum 6-minute average opacity is less than or equal to 5
percent, a subsequent Method 9 performance test must be completed within 6 calendar months from the
date that the most recent performance test was conducted or within 45 days of the next day that fuel with
an opacity standard is combusted, whichever is later;
(C) If the maximum 6-minute average opacity is greater than 5 percent but less than or equal to 10 percent, a
subsequent Method 9 performance test must be completed within 3 calendar months from the date that
the most recent performance test was conducted or within 45 days of the next day that fuel with an
opacity standard is combusted, whichever is later; or
(D) If the maximum 6-minute average opacity is greater than 10 percent, a subsequent Method 9 performance
test must be completed within 45 calendar days from the date that the most recent performance test was
conducted.
ii. If the maximum 6-minute opacity is less than 10 percent during the most recent Method 9 performance test,
Permittee may, as an alternative to performing subsequent Method 9 performance test, elect to perform
subsequent monitoring using Method 22 of Appendix A-7 of 40 CFR Part 60 pursuant to the procedures
specified in the following paragraphs.
(A) The Permittee shall conduct 10 minute observations (during normal operation) each operating day the
No. 4 Power Boiler (ID No. G11040) fires coal for which an opacity standard is applicable using
Method 22 and demonstrate that the sum of the occurrences of any visible emissions is not in excess of
5 percent of the observation period (i.e., 30 seconds per 10-minute period). If the sum of the occurrence
of any visible emissions is greater than 30 seconds during the initial 10-minute observation, immediately
conduct a 30-minute observation. If the sum of the occurrence of visible emissions is greater than
5 percent of the observation period (i.e., 90 seconds per 30-minute period), the Permittee shall either
document and adjust the operation of the boiler and demonstrate within 24 hours that the sum of the
occurrence of visible emissions is equal to or less than 5 percent during a 30-minute observation (i.e.,
90 seconds) or conduct a new Method 9 performance test using the procedures in this paragraph within
45 calendar days.
(B) If no visible emissions are observed for 10 operating days during which an opacity standard is applicable,
observations can be reduced to once every 7 operating days during which an opacity standard is
applicable. If any visible emissions are observed, daily observations shall be resumed.
iii. If the maximum 6-minute opacity is less than 10 percent during the most recent Method 9 performance test,
the Permittee may, as an alternative to performing subsequent Method 9 performance tests, elect to perform
subsequent monitoring using a digital opacity compliance system pursuant to a site-specific monitoring plan
approved by DAQ. The observations shall be similar, but not necessarily identical, to the requirements in
paragraph U.5.k.ii, above. For reference purposes in preparing the monitoring plan, see OAQPS
“Determination of Visible Emission Opacity from Stationary Sources Using Computer-Based Photographic
Analysis Systems.” This document is available from the U.S. Environmental Protection Agency (U.S. EPA);
Office of Air Quality and Planning Standards; Sector Policies and Programs Division; Measurement Policy
Group (D243-02), Research Triangle Park, NC 27711. This document is also available on the Technology
Transfer Network (TTN) under Emission Measurement Center Preliminary Methods.
l. AOS: The Permittee shall maintain records pursuant to the requirements specified in the following paragraphs, as
applicable to the visible emissions monitoring method used. [40 CFR 60.45(h)]
i. For each performance test conducted using Method 9 of appendix A-4 of this part, the Permittee shall keep the
records including the following information:
(A) Dates and time intervals of all opacity observation periods;
Permit 08961T29
Page 59
(B) Name, affiliation, and copy of current visible emission reading certification for each visible emission
observer participating in the performance test; and
(C) Copies of all visible emission observer opacity field data sheets;
ii. For each performance test conducted using Method 22 of appendix A-4 of this part, the Permittee shall keep
the following records.
(A) Dates and time intervals of all visible emissions observation periods;
(B) Name and affiliation for each visible emission observer participating in the performance test;
(C) Copies of all visible emission observer opacity field data sheets; and
(D) Documentation of any adjustments made and the time the adjustments were completed to the affected
facility operation by the owner or operator to demonstrate compliance with the applicable monitoring
requirements.
iii. For each digital opacity compliance system, the Permittee shall maintain records and submit reports pursuant
to the requirements specified in the site-specific monitoring plan approved by DAQ.
Monitoring / Recordkeeping (SO2) [15A NCAC 02D .0524, 02Q .0508(f)]
m. The Permittee shall monitor sulfur dioxide emissions by fuel sampling and analysis. [40 CFR 60.45(b)(2)]
n. The Permittee shall monitor the sulfur and heat content of all the coal burned during the period by using coal
supplier certification per total shipment received. The coal supplier certification shall be recorded in a logbook
(written or electronic format) per total shipment and include the following information:
i. the name of the coal supplier;
ii. a statement verifying that the methods used to determine the maximum sulfur content of the coal was
determined in accordance with the following:
(A) sampling - ASTM Method D 2234;
(B) preparation - ASTM Method D 2013;
(C) gross calorific value (Btu) - ASTM Method D-2015, D-3286, D-1989, or D-5865;
(D) moisture content - ASTM Method D 3173 or D-2961; and
(E) sulfur content - ASTM Method D 3177 or ASTM Method D 4239.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if the sulfur and heat content of the
coal is not monitored and recorded.
o. The maximum equivalent sulfur dioxide emission rate (as SO2) of any coal received and burned in the boiler shall
not exceed 1.2 pounds per million Btu.
i. The Permittee is required to calculate and record in a logbook (written or electronic format) the pounds of
sulfur dioxide per million Btu heat content of the coal per total shipment.
ii. The equivalent sulfur dioxide emission rate (pounds per million Btu heat input) shall be calculated in
accordance with Method 19 of 40 CFR 60, Appendix A, Section 12.6 – Sulfur Retention Credit for
Compliance Fuel.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if the results show an exceedance of
the limit given above if the requirements above are not monitored and recorded.
Monitoring / Recordkeeping (NOX) [15A NCAC 02D .0524, 02Q .0508(f)]
p. As allowed per 40 CFR 60.45(b)(3) the Permittee has demonstrated that emissions of nitrogen oxides are less than
70 percent of the applicable standards in 40 CFR 60.44, and a continuous monitoring system for measuring
nitrogen oxides emissions is not required pursuant to NSPS Subpart D.
Reporting [15A NCAC 02D .0524, 02Q .0508(f)]
q. The Permittee shall submit a summary report of the information listed below postmarked on or before January 30
of each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. Periods of excess emissions and monitoring system
downtime that shall be reported are defined as follows:
i. POS: Particulate matter. The monitoring and recordkeeping in Section 2.1 U.5.i through U.5.j, above;
ii. AOS: Particulate matter. Excess emissions for the No. 4 Power Boiler (ID No. G11040) are defined as any
boiler operating day period during which the average emissions (arithmetic average of all operating one-hour
periods) exceed the PM emission limit in Section 2.1 U.5.b, above. [40 CFR 60.45(g)(4)]
iii. POS: Opacity. The excess emissions and monitoring systems performance reports for the COMS in Section
2.1 U.5.h through U.5.j, above.
Permit 08961T29
Page 60
iv. AOS: Opacity. Any six-minute period during which the average opacity of emissions exceeds 20 percent
opacity, except that one six-minute average per hour of up to 27 percent opacity need not be reported. [40
CFR 60.45(g)(1)]
v. The fuel suppliers’ certifications and calculations of the pounds of sulfur dioxide per million Btu heat content
of each fuel per month in Section 2.1 U.2.i through U.2.l, above.
r. Within 90 days after the date of completing each performance test, as defined in 40 CFR 60.8, conducted to
demonstrate compliance with this subpart, the Permittee shall submit relative accuracy test audit (i.e., reference
method) data and performance test (i.e., compliance test) data, except opacity data, electronically to EPA's Central
Data Exchange (CDX) by using the Electronic Reporting Tool (ERT) (see http://www.epa.gov/ttn/chief/ert/ert
tool.html/) or other compatible electronic spreadsheet. Only data collected using test methods compatible with
ERT are subject to this requirement to be submitted electronically into EPA's WebFire database.
s. The Permittee shall submit a written notification to DAQ of intent to demonstrate compliance with Section 2.1 U.5
by using a CEMS measuring PM. This notification shall be sent at least 30 calendar days before the initial startup
of the monitor for compliance determination purposes. [40 CFR 60.48Da(p)]
6. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. POS: For the electrostatic precipitator (ID No. 11-CD-006-01) associated with the No. 4 Power Boiler (ID No.
G11040), the Permittee shall comply with 40 CFR part 64 pursuant to 15A NCAC 02D .0614 to ensure that the
power boiler complies with the emission limits of 15A NCAC 02D .0530. As required under 40 CFR 64.7(e), if
the performance testing conducted under Section 2.1 U.2.d, above, documents a need to modify the existing
indicator ranges or designated conditions, the Permittee shall promptly notify DAQ and, if necessary, submit a
permit application to address the necessary monitoring changes. Such a modification may include, but is not
limited to, reestablishing indicator ranges or designated conditions, modifying the frequency of conducting
monitoring and collecting data, or the monitoring of additional parameters.
Background
b. Emission Units: No. 4 Power Boiler (ID No. G11040) – POS Only
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements
i. Regulation: 15A NCAC 02D .0530: Prevention of Significant Deterioration
ii. Emission Limits:
PM: 0.085 lb/million Btu
iii. Control Technology: Electrostatic precipitator (ESP)
Monitoring Approach (POS Only)
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Measure Indicator
I. Indicator
Opacity of ESP exhaust
Measuring approach Continuous opacity monitoring system (COMS) in ESP exhaust
Indicator Range The opacity indicator range is a 3-hour block average opacity of 9.6 percent.
An excursion occurs when the 3-hour block average measurement is greater
than the indicator range. The excursion triggers corrective action and
reporting requirement.
The QIP threshold is when the total duration of excursions is greater than
5 percent of the source operating time during any 6-month period. The QIP
shall be prepared as required under 40 CFR 64.8.
Permit 08961T29
Page 61
Measure Indicator
III. Performance Criteria
Data Representativeness The COMS was installed at a representative location in the boiler ESP
exhaust stack per 40 CFR 60, Appendix B, Performance Specification (PS-1)
QA/QC Practices and Criteria The COMS was initially installed and evaluated per PS-1. Zero and span
drift are checked daily and a quarterly filter audit is
performed.
Monitoring Frequency The opacity of the ESP exhaust is monitored continuously (every
10 seconds)
Data Collection Procedures The data acquisition system shall retain all 6-minute data and 3-hour block
averages pursuant to PS-1.
Averaging Period The 10-second opacity data are used to calculate the 6-minute averages. The
6-minute averages are used to calculate the 3-hour block average.
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. POS: The Permittee shall submit a summary report of all monitoring activities postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June. All instances of deviations from
the requirements of this permit must be clearly identified. In addition, the summary report shall contain the
following information, as applicable:
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 62
V. Riley Bark Boiler (ID No. G11042) – with partial flyash reinjection and grate fire ignition (kerosene and rags),
equipped with a multicyclone (ID No. 11-CD- 016-01) in series with a venturi-type wet scrubber (ID No. 11-CD-
016-02)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter 0.16 pounds per million Btu heat input (when
firing coal/ fuel oil only);
0.31 pounds per million Btu heat input (when
firing woodwaste only); or
Ec = [(0.31)(Qw) + (0.16)(Qo)]/Qt
Where;
Ec = emission limit for combined firing (pound
per mmBtu);
Qw=actual wood heat input including
woodwaste;
Qo=actual heat input other than wood heat
input; and
Qt = Qw + Qo
15A NCAC 02D .0503
15A NCAC 02D .0504
Sulfur dioxide
2.3 lb/million Btu heat input
Monitoring Requirements
15A NCAC 02D .0516
15A NCAC 02D .0608
see Section 2.2 J.1 15A NCAC 02D .0501
Nitrogen oxides
1.8 lb/million Btu heat input (when firing coal
only);
0.8 lb/million Btu heat input (when firing oil
only); or
E=[(Ec)(Qc) + (Eo)(Qo)]/Qt
Where:
E = emission limit for combined burning of coal
and oil in pounds per million Btu heat input
Ec = 1.8 pounds per million Btu heat input for
coal only
Eo = 0.8 pounds per million Btu heat input for
oil only
Qc = coal heat input in Btu per hour
Qo = oil heat input in Btu per hour; and
Qt = Qc + Qo
15A NCAC 02D .0519
Visible emissions 40 percent opacity 15A NCAC 02D .0521
Visible emissions Excess Emissions Monitoring Requirements
(40 CFR 51, Appendix P) 15A NCAC 02D .0606
Particulate matter Compliance assurance monitoring 15A NCAC 02D .0614
Hazardous air pollutants See Section 2.2 E 15A NCAC 02D .1111
40 CFR Part 63, Subpart DDDDD
1. 15A NCAC 02D .0503: PARTICULATES FROM FUEL BURNING INDIRECT HEAT EXCHANGERS
a. Emissions of particulate matter from the combustion of coal and fuel oil that are discharged from this boiler (ID
No. G11042) into the atmosphere shall not exceed 0.16 pound per million Btu heat input.
Permit 08961T29
Page 63
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 V.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0503.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. To ensure compliance, the Permittee shall follow the monitoring, recordkeeping, and reporting requirements per
Section 2.1 V.2.c through V.2.g, below. The Permittee shall be deemed in noncompliance with 15A NCAC 02D
.0503 if the monitoring and recordkeeping is not maintained.
2. 15A NCAC 02D .0504: PARTICULATES FROM WOOD BURNING INDIRECT HEAT EXCHANGERS
a. Emissions of particulate matter from this boiler (ID No. G11042) shall not exceed an allowable emission rate as
calculated by the following equation:
Ec = [(0.31)(Qw) + (0.16)(Qo)]/Qt
Where; Ec = emission limit for combined firing (pound per million Btu);
Qw = actual wood heat input including woodwaste;
Qo = actual heat input other than wood heat input; and
Qt = Qw + Qo
Testing [15A NCAC 02Q .0508(f)]
b. Under the provisions of NCGS 143-215.108, the Permittee shall demonstrate compliance with the emission
limit(s) above by testing the boiler (ID No. G11042) annually for particulate matter with a testing protocol
approved by the DAQ. Details of the emissions testing and reporting requirements can be found in General
Condition JJ. If the results of the testing demonstrate that emissions are less than 80 percent of the limit in Section
2.1 V.2.a, above, the testing frequency may be reduced to every five years. If the results of this or any test are
above the limit given in Section 2.1 V.2.a, above, the Permittee shall be deemed in noncompliance with 15A
NCAC 02D .0504 and the Permittee shall resume performance testing on an annual basis, beginning no more than
12 months after the previous test.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Particulate matter emissions from the boiler shall be controlled by the multicyclone and venturi-type wet scrubber.
The Permittee shall install, operate, and maintain a wet scrubbing liquid flowmeter and pressure drop indicator on
the scrubber. To ensure compliance and the effective operation of the scrubber, the Permittee shall continuously
monitor and record scrubbing liquid flow rate and pressure drop on a 3-hour block average. The Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0504 if the scrubber is not installed, operated and maintained as
required.
d. The scrubber parameter monitoring system downtime shall not exceed two (2) percent of the monitoring time in
any semi-annual reporting period. If the emission source(s) is not operating, a record of this fact along with the
corresponding date and time shall substitute for the observation. The readings shall be recorded in a logbook
(written or electronic format) on-site and made available to an authorized representative upon request. To ensure
quality, the flow rate gauges or devices shall be calibrated annually. The scrubber shall be operated to ensure the
following operational parameters are maintained:
i. The pressure drop across the scrubber shall be greater than 4 inches water column, and
ii. The scrubbing liquid flow rate shall be greater than 450 gallons per minute.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0504 if the scrubbing liquid flow rate or
pressure drop is not maintained above the above prescribed value(s) or if these records are not maintained.
e. If the scrubber liquid flow rate or pressure drop readings recorded as required in Section 2.1 V.2.d, above, are
observed to be outside the prescribed range, the Permittee shall inspect the scrubber(s) for malfunctions and clean
or repair, as necessary. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0504 if the
inspections, cleaning, and repairs are not performed.
Permit 08961T29
Page 64
f. The results of inspection and maintenance activities, discussed above for the scrubbers, shall be maintained in a
logbook (written or electronic format) on-site and made available to an authorized representative of DAQ upon
request. The logbook shall record the following:
i. the date and time of each recorded action
ii. the results of each inspection;
iii. the causes for any variance from the prescribed operating range for the scrubbers(s); and
iii. corrective actions taken.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0504 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
g. The Permittee shall submit a summary report of the monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of
noncompliance from the requirements of this permit must be clearly identified.
3. 15A NCAC .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
a. Emissions of sulfur dioxide from this boiler (ID No. G11042) shall not exceed 2.3 pounds per million Btu heat
input. Sulfur dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other substances shall be
included when determining compliance with this standard.
Testing [15A NCAC 02Q .0508(f) and 02D .0608]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 V.3.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0516.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f), and 02D .0608]
c. To ensure compliance with Section 2.1 V.3.a, the Permittee shall monitor the sulfur content and heat content of the
coal by using coal supplier certification per total shipment received. The results of the coal supplier certifications
shall be recorded in a logbook (written or electronic format) and include the following information:
i. the name of the coal supplier;
ii. a statement verifying that the methods used to determine the maximum sulfur content of the coal was in
accordance with the following:
(A) sampling - ASTM Method D 2234;
(B) preparation - ASTM Method D 2013;
(C) gross calorific value (Btu) - ASTM Method D-2015, D-3286, D-1989, or D-5865;
(D) moisture content - ASTM Method D 3173 or D-2961; and
(E) sulfur content - ASTM Method D 3177 or ASTM Method D 4239.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0516 if the coal supplier certification is
not recorded.
d. Additionally, the Permittee is required to calculate and record in a logbook (written or electronic format) the
equivalent emission rate in pounds of sulfur dioxide per million Btu heat content of the coal per total shipment.
This equivalent sulfur dioxide emission rate (pounds per million Btu heat input) shall be calculated in accordance
with Method 19 of 40 CFR 60, Appendix A, Section 12.6 – Sulfur Retention Credit for Compliance Fuel. The
Permittee shall be deemed in noncompliance with 15A NCAC 02D .0516 and 02D .0608 if the requirements above
are not monitored and recorded or if the results show an exceedance of the limit given in Section 2.1 V.3.a, above.
Reporting [15A NCAC 02Q .0508(f) and 02D .0608]
e. The Permittee shall submit a summary report of the coal supplier certifications and calculated emission rates
postmarked on or before January 30 of each calendar year for the preceding six-month period between July and
December and July 30 of each calendar year for the preceding six-month period between January and June. All
instances of deviations from the requirements of this permit must be clearly identified.
Permit 08961T29
Page 65
4. 15A NCAC 02D .0519: CONTROL OF NITROGEN OXIDES EMISSIONS
a. Emissions of nitrogen oxides from this boiler (ID No. G11042) when burning coal and oil shall be calculated by
the following equation:
E = [(Ec)(Qc) + (Eo)(Qo)]/Qt
where: E = emission limit for combined burning of coal and oil in pounds per million Btu heat input
Ec = 1.8 pounds per million Btu heat input for coal only
Eo = 0.8 pounds per million Btu heat input for oil only
Qc = coal heat input in Btu per hour
Qo = oil heat input in Btu per hour; and
Qt = Qc + Qo
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 V.4.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0519.
c. Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
No monitoring recordkeeping or reporting is required for the burning of coal or oil in this source.
5. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from this boiler (ID No. G11042) shall not be more than 40 percent opacity (except during
startups) when averaged over a six-minute period except that six-minute periods averaging not more than 90
percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period.
Testing [15A NCAC 02Q .0508(f)]
b. Under the provisions of NCGS 143-215.108, in order to demonstrate continuous compliance with the opacity limit
above, the Permittee shall test the boiler (ID No. G11042) for particulate matter and opacity with a testing
protocol approved by the DAQ. Details of the emissions testing and reporting requirements can be found in
General Condition JJ. Testing shall be completed and the results submitted January 26, 2016, unless an alternate
date is approved by the DAQ. The testing shall be conducted as follows:
i. The Permittee shall conduct a minimum of three one-hour performance test runs on the boiler (ID No.
G11042) to demonstrate compliance with PM and opacity limits simultaneously using EPA Reference
Method 5/202 and EPA Reference Method 9, respectively.
ii. The Permittee shall collect pressure drop and liquid flow rate data every 15 minutes during the entire period of
the performance test.
iii. The Permittee shall determine the average pressure drop and liquid flow rate for each individual test run in the
3-run performance test by computing the average of all the 15-minute readings taken during each test run.
iv. The three-hour block average during any performance test that shows compliance with the emission limit in
Section 2.1 V.5.a, above, shall be used to establish minimum scrubber liquid flow rate (gallons per minute)
and minimum scrubber pressure drop (inches of water). These parametric values shall be reviewed and
approved by the DAQ.
v. In no case shall the minimum scrubber liquid flow rate or minimum pressure drop operating limits be less than
the scrubber parameters established under Section 2.1 V.2.c, above.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if the testing is not performed
pursuant to these requirements.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. The Permittee shall install, operate, and maintain a wet scrubbing liquid flow meter and pressure drop indicator on
the scrubber. To ensure compliance and the effective operation of the scrubber, the Permittee shall continuously
monitor and record scrubbing liquid flow rate and pressure drop on a 3-hour block average. The scrubber
parameter monitoring system downtime shall not exceed two (2) percent of the monitoring time in any semi-
annual reporting period. If the emission source(s) is not operating, a record of this fact along with the
corresponding date and time shall substitute for the observation. The readings shall be recorded in a logbook
(written or electronic format) on-site and made available to an authorized representative upon request. To ensure
quality, the flow rate gauges or devices shall be calibrated annually.
d. The Permittee shall operate the scrubber such that the following operating limits are met:
Permit 08961T29
Page 66
i. The pressure drop across the scrubber shall be greater than 12.4 inches of water column (3-hour average), and
ii. The scrubbing liquid flow rate shall be greater than 621 gallons per minute (3-hour average).
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if the scrubbing liquid flow rate or
pressure drop is not maintained above the above prescribed value(s) or if these records are not maintained. The
established continuous compliance monitoring parameters shall not apply during any required subsequent testing.
e. If the scrubber liquid flow rate or pressure drop readings recorded as required in Section 2.1 V.5.d, above, are
observed to be outside the prescribed range, the Permittee shall inspect the scrubber(s) for malfunctions and clean
or repair, as necessary. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if the
inspections, cleaning, and repairs are not performed.
f. The results of inspection and maintenance activities, discussed above for the scrubber, shall be maintained in a
logbook (written or electronic format) on-site and made available to an authorized representative of DAQ upon
request. The logbook shall record the following:
i. the date and time of each recorded action
ii. the results of each inspection;
iii. the causes for any variance from the prescribed operating range for the scrubbers(s); and
iv. corrective actions taken.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0504 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
g. The Permittee shall submit a summary report of the monitoring and recordkeeping activity postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
6. 15A NCAC 02D .0606: SOURCES COVERED BY APPENDIX P OF 40 CFR PART 51 (CONTINUOUS
OPACITY MONITORING AND EXCESS EMISSIONS)
For the Riley Bark boiler (ID No. G11042) the provisions of 15A NCAC 02D .0606 apply as follows:
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f) and 02D .0606]
a. The Permittee shall comply with the continuous opacity monitoring and excess emissions requirements by
monitoring scrubber liquid flow rate and scrubber pressure drop as specified in Section 2.1 V.5, above. The
Permittee shall be deemed in noncompliance with 15A NCAC 02D .0606 if the scrubber liquid flow rate and
pressure drop are not monitored as required.
b. The quarterly excess emissions (EE) reports required under Appendix P of 40 CFR Part 51 shall be used as an
indication of good operation and maintenance of the multicyclone and scrubber. Any periods of noncompliance
with the scrubber operating limits established in Section 2.1 V.5.d, above, shall be considered an exceedance of
the opacity standard.
Reporting [15A NCAC 02Q .0508(f) and 02D .0606]
c. The Permittee shall submit the excess emissions and monitor downtime reports as required under Appendix P of
40 CFR Part 51 no later than January 30 of each calendar year for the preceding three-month period between
October and December, April 30 of each calendar year for the preceding three-month period between January and
March, July 30 of each calendar year for the preceding three-month period between April and June, and October
30 of each calendar year for the preceding three-month period between July and September. For periods of excess
emissions, defined as periods of noncompliance with from the scrubber operating limits, shall be reported as
described in Paragraphs 4 and 5.1 of Appendix P of 40 CFR Part 51. All periods of noncompliance with the
requirements of this permit must be clearly identified.
Permit 08961T29
Page 67
7. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. For the venturi-type wet scrubber (ID No. 11-CD-016-02) associated with the Riley Bark Boiler (ID No. G11042),
respectively, the Permittee shall comply with 40 CFR part 64 pursuant to 15A NCAC 02D .0614 to ensure that
boiler complies with the emission limits of 15A NCAC 02D .0503 and 2D .0504.
Background
b. Emission Units: Riley Bark Boiler (ID No. G11042)
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements:
i. Regulation: 15A NCAC 02D .0503: Particulates from Fuel Burning Indirect Heat Exchangers
15A NCAC 02D .0504: Particulates from Wood Burning Indirect Heat Exchangers
ii. Emission Limits:
PM: 0.16 pounds per million Btu heat input (when firing coal/ fuel oil only);
0.31 pounds per million Btu heat input (when firing woodwaste only); or
Ec = [(0.31)(Qw) + (0.16)(Qo)]/Qt
Where;
Ec = emission limit for combined firing (pound per mmBtu);
Qw = actual wood heat input including woodwaste;
Qo = actual heat input other than wood heat input; and
Qt = Qw + Qo
iii. Control Technology: venturi-type wet scrubber
Monitoring Approach
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Measure Indicator
I. Indicator
Scrubber pressure drop and total liquid flow rate
Measuring approach Install pressure drop and liquid flow rate continuous monitors
II. Indicator Rangea Pressure drop indicator range: minimum 3-hour average of 12.4 inches of H2O
Scrubbing liquid flow rate indicator range: minimum 3-hour average
621 gallons per minute
An excursion occurs when the 3-hour average measurement is less than the
indicator range. The excursion triggers corrective action and reporting
requirement. No more than one excursion will be attributed in any given 24-
hour period.
The QIP threshold is when the total duration of excursions is greater than
5 percent of the source operating time during any 6-month period. The QIP
shall be prepared as required under 40 CFR 64.8.
Permit 08961T29
Page 68
Measure Indicator
III. Performance Criteria
Data Representativeness Pressure drop tabs installed before and after the scrubber.
Flow measurement devices located prior to liquid injection point.
QA/QC Practices and Criteria Conform to EPA PS-1
Monitoring Frequency Continuous pressure drop and flow measurements; minimum of one value
every 15 minutes of operating time, excluding periods of monitoring downtime
and required QA/QC.
Data Collection Procedures The data acquisition system shall retain all 15-minute data and 3-hour block
averages.
Averaging Period The 15-minute pressure drop and liquid injection rate data are used to calculate
the 3-hour block average.
a During performance testing, the established continuous compliance monitoring parameters shall not apply. Performance tests will serve to provide
the monitoring during these periods.
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. In addition, the summary report shall contain the following
information, as applicable:
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 69
W. Boiler Fuel Feed and Flyash Handling Systems:
• Riley Bark Boiler Fuel Feed System and Associated Transfer Cyclone (ID No. G11044);
• Utility Boiler Flyash Handling System Main Flyash Silo and Pneumatic Flyash Collection System
with associated cyclone separator (ID No. G11045), equipped with one bin vent bagfilter (ID No.
11-CD-021-01) and one bagfilter (ID No. 11-CD-021-02):
• No. 4 Power Boiler Flyash Transfer Silo (ID No. G11025), equipped with one bin vent bagfilter
(ID No. 11-CD-021-03)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter E = 4.10 P 0.67
where:
E = allowable particulate emission rate in
pounds per hour
P = process weight rate in tons per hour
15A NCAC 02D .0515
Visible emissions 20 percent opacity 15A NCAC 02D .0521
Particulate matter Compliance assurance monitoring 15A NCAC 02D .0614
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from each of these systems (ID Nos. G11044, G11045, and G11025) shall not
exceed an allowable emission rate as calculated by the following equation:
E = 4.10 x P 0.67 Where E = allowable emission rate in pounds per hour
P = process weight in tons per hour
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1.W.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Particulate matter emissions from the Utility boiler flyash handling system and No. 4 power boiler flyash handling
system (ID Nos. G11045 and G11025) shall be controlled by their respective bin vent bagfilters and the
pneumatic system dust separator cyclone with bagfilters (ID Nos. 11-CD-021-01, 11-CD-021-02, and 11-CD-
021-03) as described above. To ensure compliance, the Permittee shall perform inspections and maintenance. As a
minimum, the inspection and maintenance requirement shall include the following:
i. a monthly visual inspection (for each calendar month, not to exceed 6 weeks from the previous inspection) of
the system ductwork and material collection unit for leaks; and
ii. an annual internal inspection (for each calendar year, not to exceed 14 months from the previous inspection)
of the bagfilters’ and cyclones’ structural integrity.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the ductwork, bagfilters, and
cyclones are not inspected and maintained.
d. The results of inspection and maintenance shall be maintained in a logbook (written or electronic format) on-site
and made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the bagfilters or cyclones; and
iv. any corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit the results of any maintenance performed on the bagfilters or cyclones within 30 days
of a written request by the DAQ.
Permit 08961T29
Page 70
f. The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June. All instances of deviations from
the requirements of this permit must be clearly identified.
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from these systems (ID Nos. G11044, G11045 and G11025) shall not be more than 20 percent
opacity when averaged over a six-minute period. However, six-minute averaging periods may exceed 20 percent
not more than once in any hour and not more than four times in any 24-hour period. In no event shall the six-
minute average exceed 87 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in 2.1 W.2.a, above, the Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a month the Permittee shall observe the emission points of these systems (ID Nos.
G11044, G11045, and G11025) for any visible emissions above normal. The observation must be made each
month of the calendar year period to ensure compliance with this requirement. If visible emissions from any
source are observed to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 W.2.a, above.
If the above-normal emissions are not corrected per (i) above or if the demonstration per (ii) above cannot be
made, the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be above
normal along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified.
3. 15A NCAC 02D .0614: COMPLIANCE ASSURANCE MONITORING
a. For the fabric filters (ID Nos. 11-CD-021-01, 11-CD-021-02, and 22-CD-021-03) associated with the Utility
Boiler Flyash Handling System and No. 4 Power Boiler Flyash Handing Systems (ID Nos. G11045 and G11025),
the Permittee shall comply with 40 CFR part 64 pursuant to 15A NCAC 02D .0614 to ensure that the flyash
handling system complies with the emission limits of 15A NCAC 02D .0515.
Background
b. Emission Units:
i. Utility Boiler Flyash Handling System (ID No. G11045).
ii. No. 4 Power Boiler Flyash Handling Systems (ID Nos. G11025).
c. Applicable Regulation, Emission Limitation, and Monitoring Requirements
i. Regulations: 15A NCAC 02D .0515: Particulates from Miscellaneous Industrial Processes
Permit 08961T29
Page 71
ii. Emission Limits: Particulate matter emissions shall not exceed the limits calculated using the following
equations.
E = 4.10 x P 0.67
Where:
E = allowable emission rate in pounds per hour
P = process weight in tons per hour (P< 30 tons per hour)
E = 55(P)0.11 - 40
Where:
E = allowable emission rate in pounds per hour
P = process weight in tons per hour (P> 30 tons per hour)
iii. Control Technology: Bagfilters
Monitoring Approach
d. The key elements of the monitoring approach for particulate matter, including parameters to be monitored,
parameter ranges and performance criterial are presented in the following table.
Measure Indicator
I. Indicator
Visible emissions (VE)
Measuring approach Visible emissions from each baghouse will be observed daily using
EPA Reference Method 22-like procedures
II. Indicator Range An excursion is defined as the presence of visible emissions. Excursion
triggers a demonstration of compliance with the 20 percent opacity
standard in accordance with 15A NCAC 02D .2610 (Method 9) for 12
minutes; or an inspection, corrective action, and a reporting
requirement.
The QIP threshold is excursions occurring on three days (consecutive
or non-consecutive days) in a six-month reporting period for which the
Permittee did not perform a demonstration of compliance with the 20
percent opacity standard in accordance with 15A NCAC 02D .2610
(Method 9) for 12 minutes. The QIP shall be prepared within 30 days
of reaching the QIP threshold and shall contain procedures for
evaluating control performance problems.
III. Performance Criteria
Data Representativeness Visible emissions shall be observed at the emission point (baghouse
exhaust)
QA/QC Practices and Criteria The observer shall be familiar with EPA Reference Method 22 and
follow Method 22-like procedures when VE is observed. Method 9
observations shall be conducted by a certified Reference Method 9
observer.
Monitoring Frequency A VE observation shall be performed daily, when operating.
Data Collection Procedures The VE observation recorded by the observer.
Averaging Period N/A
Reporting [15A NCAC 02Q .0508(f) and 40 CFR 64.9(a)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each calendar
year for the preceding six-month period between January and June. All instances of deviations from the
requirements of this permit must be clearly identified. In addition, the summary report shall contain the following
information, as applicable:
Permit 08961T29
Page 72
i. Summary information on the number, duration, and cause (including unknown cause, if applicable) of
excursions or exceedances, as applicable, and the corrective actions taken;
ii. Summary information on the number, duration, and cause (including unknown cause, if applicable) for
monitor downtime incidents (other than downtime associated with zero and span or other daily calibration
checks, if applicable); and
iii. A description of the actions taken to implement a QIP during the reporting period as specified in 40 CFR 64.8.
Upon completion of a QIP, the Permittee shall include, in the next summary report, documentation that the
implementation of the plan has been completed and reduced the likelihood of similar levels of excursions or
exceedances.
Permit 08961T29
Page 73
PAPER MACHINES (AREA 12)
X. Four Paper Machines:
• No. 20 Paper Machine (ID No. G12048);
• No. 19 Paper Machine (ID No. G12049);
• No. 12 Paper Machine (ID No. G12050); and
• No. 11 Paper Machine (ID No. G12051)
The following table provides a summary of limits and standards for the emission source(s) described above: Regulated Pollutant Limits/Standards Applicable Regulations Toxic Air Pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
CHEMICAL PREPARATION (AREA 13)
Y. Three starch storage silos:
• East starch storage silo (ID No. G13054) – 30 tons per hour maximum throughput, controlled by a
bagfilter (ID No. 13-CD-014-01);
• West starch storage silo (ID No. G13055) – 30 tons per hour maximum throughput, controlled by
a bin vent filter (ID No. 13-CD-016-01); and
• Center starch storage silo (ID No. G13056) – 30 tons per hour maximum throughput, controlled
by a 255 square feet of filter area bagfilter (ID No. 13-CD-020-01).
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate E = 4.10 P 0.67
where:
E = allowable particulate emission rate in
pounds per hour
P = process weight rate in tons per hour
15A NCAC 02D .0515
Visible emissions 20 percent opacity 15A NCAC 02D .0521
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from each of the starch silos (ID Nos. G13054, G13055, and G13056) shall not
exceed an allowable emission rate as calculated by the following equation:
E = 4.10 x P 0.67 Where E = allowable emission rate in pounds per hour
P = process weight in tons per hour
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 Y.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Particulate matter emissions from the starch silos (ID Nos. G13054, G13055, and G13056) shall be controlled by
the bagfilters and bin vent filter as described above. To ensure compliance, the Permittee shall perform
inspections and maintenance. As a minimum, the inspection and maintenance requirement shall include the
following:
i. a monthly visual inspection of the system ductwork and material collection unit for leaks; and
ii. an annual (for each 12-month period following the initial inspection) internal inspection of the bagfilters' and
bin vent filter's structural integrity.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the ductwork, bagfilters, and bin
vent filter are not inspected and maintained.
Permit 08961T29
Page 74
d. The results of inspection and maintenance shall be maintained in a logbook (written or electronic format) on-site
and made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the bagfilters and bin vent filter; and
iv. any corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit the results of any maintenance performed on the bagfilters within 30 days of a written
request by DAQ.
f. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified.
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the starch silos (ID Nos. G13054, G13055, and G13056) shall not be more than
20 percent opacity when averaged over a six-minute period. However, six-minute averaging periods may exceed
20 percent not more than once in any hour and not more than four times in any 24-hour period. In no event shall
the six-minute average exceed 87 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in 2.1 Y.2.a, above, the Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a month the Permittee shall observe the emission points of the starch silos (ID Nos.
G13064, G13055, and G13056) for any visible emissions above normal. The monthly observation must be made
for each month of the calendar year period to ensure compliance with this requirement. If visible emissions from
any source are observed to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 Y.2.a, above.
If the above-normal emissions are not corrected per (i) above or if the demonstration per (ii) above cannot be
made, the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be above
normal along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year for
the preceding six-month period between January and June. All instances of deviations from the requirements of this
permit must be clearly identified.
Permit 08961T29
Page 75
WASTEWATER TREATMENT PLANT (AREA 16)
Z. WTP Primary Clarifiers (ID No. G16081) and WTP Aeration and Digestion Basins (ID No. G16082)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits / Standards Applicable Regulations
Toxic air pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
PAPER CONVERTING (AREA 19)
AA. Rewinders on Trim System No. 1 (ID No. G19058)
Rewinders on Trim System No. 2 (ID No. G19059)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter E = 4.10 P 0.67
where:
E = allowable particulate emission rate in
pounds per hour
P = process weight rate in tons per hour
15A NCAC 02D .0515
Visible emissions 40 percent opacity 15A NCAC 02D .0521
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from each of the rewinders (ID Nos. G19058 and G19059) shall not exceed an
allowable emission rate as calculated by the following equation:
E = 4.10 x P 0.67 Where E = allowable emission rate in pounds per hour
P = process weight in tons per hour
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 AA.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. The Permittee shall maintain production records such that the process rates “P” in tons per hour, as specified by
the formula contained above can be derived, and shall make these records available to a DAQ authorized
representative upon request. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the
production records are not maintained or the types of materials are not monitored.
d. No reporting is required for particulate matter emissions from the rewinders on trim systems Nos. 1 and 2 (ID Nos.
G19058 and G19059).
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the rewinders (ID Nos. G19058 and G19059) shall not be more than 40 percent opacity
when averaged over a six-minute period. However, six-minute averaging periods may exceed 40 percent not more
than once in any hour and not more than four times in any 24-hour period. In no event shall the six-minute
average exceed 90 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in 2.1 AA.2.a, above, the Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0521.
Permit 08961T29
Page 76
Monitoring [15A NCAC 02Q .0508(f)]
c. To ensure compliance, once a month the Permittee shall observe the emission points of the rewinders (ID Nos.
G19058 and G19059) for any visible emissions above normal. The monthly observations must be made for each
month of the calendar year period to ensure compliance with this requirement. If visible emissions from any
source are observed to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
ii. demonstrate that the percent opacity from the emission points of the emission source in accordance with 15A
NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section 2.1 AA.2.a, above.
If the above-normal emissions are not corrected per (i) above or if the demonstration per (ii) above cannot be
made, the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521.
Recordkeeping [15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook (written or electronic format) on-site and made
available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be above
normal along with any corrective actions taken to reduce visible emissions; and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified.
Permit 08961T29
Page 77
TURPENTINE RECOVERY (AREA 20)
BB. No. 1 Hardwood Turpentine Recovery System (ID No. G20060) and No. 2 Pine Turpentine Recovery System (ID
No. G20062)
Gases are collected via the NCG closed collection system and burned in the No. 4 Lime Kiln (ID No.
G09028, primary) or No. 5 Lime Kiln (ID No. G09029, backup).
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Hazardous air pollutants See Section 2.2 C.1 15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
TALL OIL PRODUCTION (AREA 21)
CC. Tall Oil Reactor (ID No. G21072) controlled by a packed tower-type wet scrubber (ID No. 21-ST-008-01)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Toxic air pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
NCG COLLECTION (AREA 23)
DD. No. 1 Fiberline Building Ventilation – Fugitives (ID No. G23066.k)
No. 2 Fiberline Building Ventilation – Fugitives (ID No. G23066.l)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Toxic air pollutants State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
MISCELLANEOUS FIBERLINE (AREA 24)
EE. No. 1 Hardwood Fiberline Deckers (ID No. G24087) and No. 2 Pine Fiberline Deckers (ID No. G24088)
Hardwood Brownstock High Density Storage (ID No. G24092)
Pine Brownstock High Density Storage (ID No. G24094)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Hazardous air pollutants Affected Sources: G24087 and G24088
See Section 2.2 C.1
15A NCAC 02D .1111
(40 CFR Part 63, Subpart S)
Toxic air pollutants Affected Sources: G24092 and G24094
State Enforceable Only (See Section 2.2 H) 15A NCAC 02D .1100
Permit 08961T29
Page 78
FF. One 1850 horsepower, diesel-fired emergency generator (ID No. 16-CU-001)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Sulfur dioxide
2.3 lb/million Btu heat input 15A NCAC 02D .0516
see Section 2.2 J.1 15A NCAC 02D .0501
Visible emissions 20 percent opacity 15A NCAC 02D .0521
Hazardous air pollutants Notification Requirements 15A NCAC 02D .1111
(40 CFR Part 63, Subpart ZZZZ)
1. 15A NCAC 02D .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
a. Emissions of sulfur dioxide from the emergency generator (ID No. 16-CU-001) shall not exceed 2.3 pounds per
million Btu heat input. Sulfur dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other
substances shall be included when determining compliance with this standard.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 FF.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0516.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping is required for sulfur dioxide emissions from diesel fuel firing in the emergency
generator (ID No. 16-CU-001).
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from the emergency generator (ID No. 16-CU-001) shall not be more than 20 percent opacity
when averaged over a six-minute period. However, six-minute averaging periods may exceed 20 percent not more
than once in any hour and not more than four times in any 24-hour period. In no event shall the six-minute
average exceed 87 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 FF.2.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping/reporting is required from the firing of diesel fuel oil in this source for this
regulation.
3. 15A NCAC 02D .1111: MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY
Applicability [40 CFR 63.6585 and 63.6590(a)(2)(i)]
a. For the emergency generator (ID No. 16-CU-001) (a new stationary RICE with a site rating of more than 500
brake HP located at a major source of HAP emissions), the Permittee shall comply with all applicable provisions,
including the monitoring, recordkeeping, and reporting contained in Environmental Management Commission
Standard 15A NCAC 02D .1111 "Maximum Achievable Control Technology" (MACT) as promulgated in 40 CFR
63, Subpart ZZZZ, “National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating
Internal Combustion Engines” and Subpart A “General Provisions.”
Stationary RICE subject to limited requirements
b. The emergency generator (ID No. 16-CU-001) does not have to meet the requirements of 40 CFR 63 Subpart
ZZZZ and Subpart A except for the initial notification requirements of Section 2.1 FF.4.c, below. [40 CFR
63.6590(b)(1)(i)]
Permit 08961T29
Page 79
Notification Requirements [15A NCAC 02Q. 0508(f)]
c. The Permittee shall submit an initial notification for the emergency generator (ID No. 16-CU-001) later than 120
calendar days after construction and include the information in 40 CFR 63.9(b)(2)(i) through (iv) and a statement
that the stationary RICE has no additional requirements and explain the basis of the exclusion. [40 CFR
63.6590(b) and 63.6645(c) and (f)]
d. The notification requirements in Section 2.1 FF.3.c, above, were met with the submittal of Permit Application
No. 4400159.06B.
Permit 08961T29
Page 80
GG. Coal Processing and Conveying consisting of the following:
• Crusher (No. G11052)
• Coal Conveying and Storage System Equipment:
o Conveyor System (ID No. G11053) consisting of the following:
Collecting Conveyor No. 1 (No. 13A-001)
Receiving Conveyor No. 2 (No. 13A-002)
Stockpile Conveyor No. 3 (No. 13A-003)
Overland Conveyor No. 4 (No. 13A-004)
Overland Conveyor No. 5 (No. 13A-005)
Transfer Conveyor No. 6 (No. 13A-006)
Transfer Conveyor No. 7 (No. 13A-007)
Transfer Conveyor No. 8 (No. 13A-008)
o No. 4 Boiler Bunker (ID No. G11041) equipped with three fabric filters (ID Nos. CD-013-011,
CD-013-012 and CD-013-015)
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter E = 4.10 P0.67
where:
E = allowable particulate emission rate in
pounds per hour
P = process weight rate in tons per hour
15A NCAC 02D .0515
Visible emissions Coal Processing (ID No. G11052):
10 percent opacity
Coal Conveying and Storage (ID Nos.
G11053 and G11041):
20 percent opacity
15A NCAC 02D .0524 (40 CFR Part 60,
Subpart Y)
Particulate matter See Section 2.2 A.1 15A NCAC 02D .0530
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from the coal processing and conveying equipment (ID Nos. G11052, G11053,
and G11041) shall not exceed an allowable emission rate as calculated by the following equation:
E = 4.10 x P 0.67 Where: E = allowable emission rate in pounds per hour
P = process weight in tons per hour
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 GG.1.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping [15A NCAC 02Q .0508(f)]
c. Particulate matter emissions from the No. 4 Boiler Coal Bunker (ID No. G11041) shall be controlled by the
bagfilters (ID Nos. CD-013-011, CD-013-013, and CD-013-015). To ensure compliance, the Permittee shall
perform inspections and maintenance as recommended by the manufacturer. In addition to the manufacturer’s
inspection and maintenance recommendations, or if there are no manufacturer’s inspection and maintenance
recommendations, as a minimum, the inspection and maintenance requirement shall include the following:
i. a monthly visual inspection of the system ductwork and material collection unit for leaks; and
ii. an annual (for each 12-month period following the initial inspection) internal inspection of the bagfilter's
structural integrity.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the ductwork and bagfilters are
not inspected and maintained.
Permit 08961T29
Page 81
d. The results of inspection and maintenance in Section 2.1 GG.1.c, above, for the No. 4 Boiler Coal Bunker (ID No.
G11041) shall be maintained in a logbook (written or electronic format) on-site and made available to an
authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the bagfilters; and
iv. any variance from manufacturer’s recommendations, if any, and corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if these records are not maintained.
e. For the uncontrolled coal processing, conveying, and storage equipment (ID Nos. G11052 and G11053), the
Permittee shall maintain production records such that the process rates “P” in tons per hour, as specified by the
formulas above can be derived, and shall make these records available to a DAQ authorized representative upon
request. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if the production records
are not maintained or the types of materials are not monitored.
Reporting [15A NCAC 02Q .0508(f)]
f. The Permittee shall submit the results of any maintenance performed on the bagfilters within 30 days of a written
request by the DAQ.
g. The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June. All instances of deviations from
the requirements of this permit must be clearly identified.
2. 15A NCAC 02D .0524: NEW SOURCE PERFORMANCE STANDARDS (40 CFR PART 60, SUBPART Y)
a. The Permittee shall comply with all applicable provisions, including the notification, testing, reporting,
recordkeeping, and monitoring requirements in accordance with 15A NCAC 02D .0524, "New Source
Performance Standards (NSPS)” as promulgated in 40 CFR Part 60, Subpart Y, including Subpart A "General
Provisions." [15A NCAC 02D .0524]
b. Visible emissions from Coal Processing and Conveying shall be less than the following:
i. 10 percent opacity from the Crusher (ID No. G11052); and
ii. 20 percent opacity from the Coal Conveying and Storage System Equipment (ID Nos. G11053 and G11041)
shall be less than. [40 CFR 60.254(b)(1) and 60.254(a)]
Testing/Monitoring [15A NCAC 02Q .0508(f)]
c. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ and 40
CFR 60.257. The Permittee shall conduct performance tests on the Crusher (ID No. G11052) for opacity as
follows [40 CFR 60.255(b)(2)]:
i. If all 6-minute average opacity readings in the most recent performance test are equal to or less than half the
applicable opacity limit, a new performance test must be conducted within 12 calendar months of the date that
the previous performance test was required to be completed.
ii. If any 6-minute average opacity reading in the most recent performance test exceeds half the applicable
opacity limit, a new performance test must be conducted within 90 operating days of the date that the previous
performance test was required to be completed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if the results of this test are above
the limit given in Section 2.1 GG.2.b, above, or if the performance tests are not conducted as required.
d. To ensure compliance, once a month, the Permittee shall observe the emission points of the Coal Conveying and
Storage System Equipment (ID Nos. G11052 and G11041) for any visible emissions above normal. The monthly
observations must be made each month of the calendar year period to ensure compliance with this requirement.
The Permittee shall establish normal for the first 30 days following the effective date of the permit. If visible
emissions from the Coal Conveying and Storage System Equipment (ID Nos. G11052 and G11041) are observed
to be above normal, the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below, or
Permit 08961T29
Page 82
ii. demonstrate that the percent opacity from the Coal Conveying and Storage System Equipment (ID Nos.
G11052 and G11041) in accordance with 15A NCAC 02D .2610 (Method 9) for 12 minutes is below the
limit given in Section 2.1 GG.2.b, above.
If the above normal emissions are not corrected per (i), above, or if the demonstration in (ii), above, cannot be
made, the Permittee shall be deemed to be in noncompliance with 15A NCAC .0524.
Recordkeeping [15A NCAC 02Q .0508(f)]
e. The Permittee shall maintain a logbook (written or electronic) on-site and make it available upon request. The
logbook shall record the following [40 CFR 60.258(a)(1) through (a)(3)]:
i. The manufacturer's recommended maintenance procedures and the date and time of any maintenance and
inspection activities and the results of those activities. Any variance from manufacturer recommendation, if
any, shall be noted.
ii. The date and time of any periodic coal preparation and processing plant visual observations, noting those
sources with visible emissions along with corrective actions taken to reduce visible emissions. Results from
the actions shall be noted.
iii. The amount and type of coal processed each calendar month.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
f. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified. The Permittee shall include following information in each summary
report [40 CFR 60.258(b)(3) and (c)]:
i. All 6-minute average opacity readings that exceed the applicable standards in Section 2.1 GG.2.b, above; and
ii. The results of initial performance tests consistent with 40 CFR 60.8.
g. Within 60 days after the date of completing each performance evaluation conducted to demonstrate compliance
with Section 2.1 GG.2, the Permittee must submit the test data to EPA by successfully entering the data
electronically into EPA's WebFIRE data base available at
http://cfpub.epa.gov/oarweb/index.cfm?action=fire.main. For performance tests that cannot be entered into
WebFIRE ( i.e., Method 9 of appendix A-4 of this part opacity performance tests) the Permittee shall mail a
summary copy to United States Environmental Protection Agency; Energy Strategies Group; 109 TW Alexander
DR; mail code: D243-01; RTP, NC 27711. [40 CFR 60.258(d)]
Permit 08961T29
Page 83
HH. Nos. 1 and 2 Natural Gas Package Boilers (ID Nos. G11050 and G11051) – equipped with low NOX burners
and oxygen trim systems.
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant Limits/Standards Applicable Regulation
Particulate matter 0.156 pounds per million Btu heat input 15A NCAC 02D .0503
Sulfur dioxide
2.3 pounds per million Btu heat input 15A NCAC 02D .0516
see Section 2.2 J.1 15A NCAC 02D .0501
Visible emissions 20 percent opacity 15A NCAC 02D .0521
Nitrogen oxides 0.10 pounds per million Btu heat input 15A NCAC 02D .0524
40 CFR Part 60, Subpart Db
Hazardous air pollutants Work Practices 15A NCAC 02D .1111
40 CFR Part 63, Subpart DDDDD
Particulate matter
(PM/PM10/PM2.5), sulfur
dioxide, nitrogen oxides,
carbon monoxide, H2SO4,
fluorides, TRS, lead, and
volatile organic
compounds
See Section 2.2 A.4 15A NCAC 02D .0530(u)
1. 15A NCAC 02D .0503: PARTICULATES FROM FUEL BURNING INDIRECT HEAT EXCHANGERS
a. Emissions of particulate matter from the combustion of natural gas that are discharged from each of these boilers
(ID Nos. G11050 and G11051) into the atmosphere shall not exceed 0.156 pounds per million Btu heat input.
Testing [15A NCAC 02Q .0508(f)]
b. If emission testing is required, the testing shall be performed in accordance General Condition JJ. If the results of
the test are above the limit given in Section 2.1 HH.1.a, above, the Permittee shall be deemed in noncompliance
with 15A NCAC 02D .0503.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping/reporting is required for particulate emissions from the firing of natural gas in these
boilers (ID Nos. G11050 and G11051).
2. 15A NCAC .0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
a. Emissions of sulfur dioxide from these boilers (ID Nos. G11050 and G11051) shall not exceed 2.3 pounds per
million Btu heat input. Sulfur dioxide formed by the combustion of sulfur in fuels, wastes, ores, and other
substances shall be included when determining compliance with this standard.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 HH.2.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0516.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping/reporting is required for sulfur dioxide emissions from the firing of natural gas in
these boilers (ID Nos. G11050 and G11051).
3. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from these boilers (ID Nos. G11050 and G11051) shall not be more than 20 percent opacity
when averaged over a six-minute period. However, six-minute averaging periods may exceed 20 percent not more
Permit 08961T29
Page 84
than once in any hour and not more than four times in any 24-hour period. In no event shall the six-minute
average exceed 87 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 HH.3.a above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Monitoring/Recordkeeping/Reporting [15A NCAC 02Q .0508(f)]
c. No monitoring/recordkeeping/reporting is required for visible emissions from the firing of natural gas in these
boilers (ID Nos. G11050 and G11051).
4. 15A NCAC 02D .0524: NEW SOURCE PERFORMANCE STANDARDS (40 CFR Part 60, Subpart Db)
a. The Permittee shall comply with all applicable provisions, including the notification, testing, reporting,
recordkeeping, and monitoring requirements contained in Environmental Management Commission Standard 15A
NCAC 02D .0524 "New Source Performance Standards (NSPS) as promulgated in 40 CFR Part 60, Subpart Db,
including Subpart A "General Provisions."[15A NCAC 02D .0524]
Emission Limitations [15A NCAC 02D .0524]
b. Nitrogen oxide emissions shall not exceed 0.10 pounds per million Btu heat input pursuant to the following:
[40 CFR 60.44b(a)(1)(i)]
i. Compliance with the nitrogen oxide emission limits are determined on a 30-day rolling average basis [40 CFR
60.44b(i)].
ii. The nitrogen oxide emission standards apply at all times [40 CFR 60.46b(a)]
Notifications [40 CFR 60.7 and 60.49b(a)]
c. The Permittee shall submit a notification of the date of initial startup each boiler (ID Nos. G11050 and G11051),
postmarked no later than 15 days after initial startup. In the notification of initial startup, the Permittee shall
include the design heat capacity of the boiler and identification of the fuels to be combusted in the boiler.
Testing [15A NCAC 02Q .0508(f)]
d. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of this test are above the limit given in Section 2.1 HH.4.b, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0524.
e. The Permittee shall conduct an initial performance test for nitrogen oxides on each of the Nos. 1 and 2 Package
Boilers (ID Nos. G11050 and G11051) as follows:
i. The Permittee shall conduct the initial performance test within 60 days after achieving the maximum
production rate at which each affected boiler will be operated, but not later than 180 days after initial startup
of each boilers. [40 CFR 60.8(a) and 60.46b(e)]
ii. During the initial performance test, the Permittee shall monitor nitrogen oxides emissions for 30 successive
boiler operating days and the 30-day average emission rate shall be used to demonstrate compliance with the
nitrogen oxides emission standards in Section 2.1 HH.4.b, above. [40 CFR 60.46b(e)(1)]
iii. The Permittee shall calculate the 30-day average emission rate as the average of all hourly emissions data
recorded by the monitoring system during the 30-day test period. [40 CFR 60.46b(e)(1)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if the initial performance test is not
conducted as required above.
Monitoring [15A NCAC 02Q .0508(f)]
f. The Permittee shall install, calibrate, maintain, and operate a CEM system for measuring nitrogen oxides and
oxygen (or carbon dioxide) emissions discharged to the atmosphere from the Nos. 1 and 2 Natural Gas Package
Boilers (ID Nos. G11050 and G11051), and shall record the output of the system. [40 CFR 60.48b(b)]
i. The CEMS shall be operated and data recorded during all periods of operation of the boilers (ID Nos. G11050
and G11051) except for CEMS breakdowns and repairs. [40 CFR 60.48b(c)]
ii. Data shall be recorded during calibration checks, and zero and span adjustments. [40 CFR 60.48b(c)]
iii. The 1-hour nitrogen oxides emission rates measured by the CEM installed on the Nos. 1 and 2 Package
Boilers (ID Nos. G11050 and G11051) shall be expressed in pounds per million Btu heat input and shall be
Permit 08961T29
Page 85
used to calculate the average emission rates for compliance with Section 2.1 HH.4.b, above. The 1-hour
averages shall be calculated using the procedures in 40 CFR 60.13(h)(2). [40 CFR 60.48b(d)]
iv. The Permittee shall follow the procedures under 40 CFR 60.13 for installation, evaluation, and operating of
the CEM systems. [40 CFR 60.48b(e)]
v. When nitrogen oxides emissions data are not obtained because of CEMS breakdowns, repairs, calibration
checks, and zero and span adjustments, emissions data shall be obtained by using standby monitoring systems,
Method 7 and 3A of 40 CFR Part 60, or other approved reference method to provide emissions data for a
minimum of 75 percent of the operating hours in each boiler (ID Nos. G11050 and G11051) operating day, in
at least 22 out of 30 successive boiler operating days. [40 CFR 60.48b(f)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if the monitoring is not conducted
as required above.
Recordkeeping [15A NCAC 02Q .0508(f)]
g. The Permittee shall maintain records for a period of two years of the following information for each boiler (ID
Nos. G11050 and G11051) operating day: [40 CFR 60.49b(g) and (o)]
i. Calendar date;
ii. The average hourly nitrogen oxides emission rates (expressed as NO2), in pounds per million Btu heat input,
measured or predicted;
iii. The 30-day average nitrogen oxides emission rates, in pounds per million Btu heat input, calculated at the end
of each boiler operating day from the measured or predicted hourly nitrogen oxide emission rates for the
preceding 30 steam generating unit operating days;
iv. Identification of the boiler operating days when the calculated 30-day average nitrogen oxides emission rates
are in excess of the nitrogen oxides emissions standards under Section 2.1 HH.4.2, above, with the reasons for
such excess emissions as well as a description of corrective actions taken;
v. Identification of the boiler operating days for which pollutant data have not been obtained, including reasons
for not obtaining sufficient data and a description of corrective actions taken;
vi. Identification of the times when emission data have been excluded from the calculation of average emission
rates and the reasons for excluding data;
vii. Identification of “F” factor used for calculations, method of determination, and type of fuel combusted;
viii. Identification of the times when the pollutant concentration exceeded full span of the CEMS;
ix. Description of any modifications to the CEMS that could affect the ability of the CEMS to comply with 40
CFR Part 60, Appendix B, Performance Specification 2 or 3; and
x. Results of daily CEMS drift tests and quarterly accuracy assessments as required under 40 CFR Part 60,
Appendix F, Procedure 1.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if these records are not maintained
as required.
Reporting [15A NCAC 02Q .0508(f)]
h. The Permittee shall submit the performance test data from the initial performance test and the results of the
performance evaluation of the CEMS pursuant to the requirements of 40 CFR Part 60, Appendix B. [40 CFR
60.49b(b)]
i. The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June. All instances of deviations from
the requirements of this permit must be clearly identified.
i. The summary report shall include the information recorded under Section 2.1HH.4.g, above. [40 CFR 49b(i)]
ii. The Permittee shall include in the summary report any excess emissions that have occurred during the
reporting period. Excess emissions are defined as any calculated 30-day rolling average nitrogen oxides
emissions rate, calculated under Section 2.1 HH.4.e, above, that exceeds the emission limit in Section 2.1
HH.4.b, above. [40 CFR 49b(h)]
5. 15A NCAC 02D .1111: MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY
Applicability
a. For the Nos. 1 and 2 Package Boilers (ID Nos. G11050 and G11051), the Permittee shall comply with all
applicable provisions for the “unit designed to burn gas 1 subcategory,” including the monitoring, recordkeeping,
and reporting contained in Environmental Management Commission Standard 15A NCAC 02D .1111 "Maximum
Permit 08961T29
Page 86
Achievable Control Technology" (MACT) as promulgated in 40 CFR 63, Subpart DDDDD . “National Emission
Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and
Process Heaters” and Subpart A “General Provisions.”
[40 CFR 63.7485, 63.7490(d), 63.7499(l)]
b. In order for the boilers (ID Nos. G11050 and G11051) to be considered in the “unit designed to burn gas 1
subcategory,” the Permittee shall only burn liquid fuel for periodic testing of liquid fuel, maintenance, or operator
training, not to exceed a combined total of 48 hours during any calendar year, and during periods of gas
curtailment or gas supply interruptions of any duration. The Permittee shall be deemed in noncompliance with 15A
NCAC 02D .1111 if the No. 2 fuel oil is burned in the boilers (ID Nos. G11050 and G11051) for periodic testing
of liquid fuel, maintenance or operator training for more than 48 hours during any calendar year or if No. 2 fuel oil
is burned in the boilers (ID Nos. G11050 and G11051) during any periods other than gas curtailment or gas
supply interruption. [40 CFR 63.7575]
Definitions and Nomenclature [40 CFR 63.7575]
c. For the purpose of Section 2.1 HH.5, the definitions and nomenclature contained in 40 CFR 63.7575 shall apply.
40 CFR Part 63, Subpart A - General Provisions [40 CFR 63.7565]
d. The Permittee shall comply with the requirements of 40 CFR 63 Subpart A, General Provisions, pursuant to the
applicability of Subpart A to such sources as identified in Table 10 to 40 CFR Part 63, Subpart DDDDD.
Compliance Date [40 CFR 63.7495]
e. The Permittee shall comply with the requirements of this section for the boilers (ID Nos. G11050 and G11051)
upon startup. The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the compliance date
is not met.
Notifications [40 CFR 63.7545(c)]
f. As specified in 40 CFR 63.9(b)(4) and (5), the Permittee shall submit an Initial Notification not later than 15 days
after the actual date of startup of the boilers (ID Nos. G11050 and G11051).
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the Initial Notification is not
submitted.
g. The Permittee shall submit a Notification of Compliance Status for the boilers (ID Nos. G11050 and G11051).
The notification must be signed by a responsible official and postmarked before the close of business within 60
days of the compliance date specified in Section 2.1 HH.5.e, above. The notification shall contain the following:
i. A description of the boilers (ID Nos. G11050 and G11051), including a statement that the boilers are in “the
unit designed to burn gas 1 subcategory,” the design heat input capacity of the boilers, and description of the
fuel(s) burned.
ii. A signed certification that the facility completed the required initial tune-up for all of the boilers covered by
40 CFR Part 63, Subpart DDDDD and at this site pursuant to the procedures Section 2.1 HH.5.j, below. [40
CFR 63.7545(e)(8) and 63.7530(e), and (f)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the Notification of Compliance
Status is not submitted.
h. The Permittee shall submit a notification of intent to fire an alternative fuel within 48 hours of the declaration of
each period of natural gas curtailment or supply interruption. The notification must include the following
information:
i. Company name and address;
ii. Identification of the affected boiler;
iii. Reason the Permittee is unable to use natural gas or equivalent fuel, including the date when the natural gas
curtailment was declared or the natural gas supply interruption began;
iv. The type of alternative fuel the Permittee intends to use; and
v. Dates when the alternative fuel use is expected to begin and end.
[40 CFR 63.7545(f)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the notification of intent to fire an
alternative fuel is not submitted.
Permit 08961T29
Page 87
General Compliance Requirements
i. The Permittee shall comply with the work practice standards in Section 2.1 HH.5.j, below at all times the boilers
(ID Nos. G11050 and G11051) are operating. [40 CFR 63.7500(f) and 63.7505(a)]
Work Practice Standards [15A NCAC 02Q .0508(f)]
j. The Permittee shall conduct a tune-up of the boilers (ID Nos. G11050 and G11051) as specified below. The
Permittee shall conduct the tune-up while burning the type of fuel that provided the majority of the heat input to
the boiler of the 12 months prior to the tune-up.
i As applicable, the Permittee shall inspect the burner, and clean or replace any components of the burner as
necessary. The Permittee may perform the burner inspection at any time prior to the tune-up or delay the
burner inspection until the next scheduled or unscheduled shutdown, but each burner must be inspected at
least once every 72 months.
ii. Inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The
adjustment should be consistent with the manufacturer's specifications, if available;
iii. Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and
functioning properly. The Permittee may delay the inspection until the next scheduled unit shutdown.
iv. Optimize total emissions of carbon monoxide. This optimization should be consistent with the manufacturer's
specifications, if available, and with any NOX requirement to which the unit is subject.
v. Measure the concentrations in the effluent stream of carbon monoxide in parts per million, by volume, and
oxygen in volume percent, before and after the adjustments are made (measurements may be either on a dry or
wet basis, as long as it is the same basis before and after the adjustments are made). Measurements may be
taken using a portable CO analyzer.
vi. The oxygen level shall be set no lower than the oxygen concentration measured during the most recent tune-
up.
[40 CFR 63.7500(a) and 63.7540(a)(10)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these work practice standards are
not met.
k. The tune-ups for the Nos. 1 and 2 Package Boilers (ID Nos. G11050 and G11051) shall be conducted pursuant to
the following schedule. [Table 3 of Subpart DDDDD]
i. The initial tune-up for the boilers (ID Nos. G11050 and G11051) shall be no later than 61 months after initial
startup of the unit. [40 CFR 63.7510(g) and 63.7515(d)]
ii. Subsequent tune-ups for each boiler (ID Nos. G11050 and G11051) shall be conducted every five years and
no more than 61 months after the previous tune-up. [40 CFR 63.7540(a)(12), 63.7515(d)]
iii. The tune-up for each boiler (ID Nos. G11050 and G11051) may be delayed until the next scheduled or
unscheduled unit shutdown, but the Permittee shall inspect each burner at least once every 72 months. [40
CFR 63.7540(a)(12)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the initial and subsequent tune-
ups are not conducted as specified.
l. If the boilers (ID Nos. G11050 and G11051) are not operating on the required date for a tune-up, the tune-up must
be conducted within 30 calendar days of startup. [40 CFR 63.7515(g) and 63.7540(a)(13)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the delayed tune-up is not
conducted within 30 calendar days of startup.
m. At all times, the Permittee shall operate and maintain the boilers, including associated air pollution control
equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices
for minimizing emissions. Determination of whether such operation and maintenance procedures are being used
will be based on information available to DAQ that may include, but is not limited to, monitoring results, review
of operation and maintenance procedures, review of operation and maintenance records, and inspection of the
source. [40 CFR 63.7500(a)(3)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the boiler is not operated in a
manner consistent with safety and good air pollution control practices for minimizing emissions.
Permit 08961T29
Page 88
Recordkeeping Requirements [15A NCAC 02Q .0508(f)]
n. The Permittee shall keep the following records:
i. A copy of each notification and report submitted to comply with Section 2.1 HH.5, including all
documentation supporting any Initial Notification or Notification of Compliance Status, or compliance report
that has been submitted, pursuant to the requirements in 40 CFR 63.10(b)(2)(xiv). [40 CFR 63.7555(a)(1)]
ii. A report, maintained on-site and submitted to DAQ if requested, containing the information in paragraphs (A)
through (C) below [40 CFR 63.7540(a)(10)(vi)]:
(A) The concentrations of carbon monoxide in the effluent stream of each boiler (ID Nos. G11050 and
G11051) in parts per million by volume, and oxygen in volume percent, measured before and after the
tune-ups of the boilers (ID Nos. G11050 and G11051);
(B) A description of any corrective actions taken as a part of the tune-up; and
(C) The type and amount of fuel used over the 12 months prior to the tune-ups, but only if the boilers were
physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel
meter may estimate the fuel use by each unit.
iii. The associated records for compliance with the work practice standards in Section 2.1 HH.5.i through
GG.5.m, above, including the occurrence and duration of each malfunction of operation (i.e., process
equipment) or the required air pollution control and monitoring equipment. [40 CFR 63.10(b)(2)]
iv. Records of the total hours per calendar year that alternative fuel is burned in the boilers (ID Nos. G11050 and
G11051) and the total hours per calendar year that the boilers operated during periods of gas curtailment or
gas supply emergencies. [40 CFR 63.7555(h)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these records are not maintained.
p. The Permittee shall:
i. maintain records in a form suitable and readily available for expeditious review;
ii. keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective
action, report, or record; and
iii. keep each record on site for at least 2 years after the date of each occurrence, measurement, maintenance,
corrective action, report, or record. The Permittee can keep the records offsite for the remaining 3 years.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if records are not maintained as
specified above. [40 CFR 63.7560 and 63.10(b)(1)]
Reporting Requirements [15A NCAC 02Q .0508(f)]
q. The Permittee shall submit compliance reports to the DAQ every five years. The first report shall cover the period
beginning on the compliance date specified in Section 2.1 HH.5.e, above, and ending on December 31 within five
years after the compliance date in Section 2.1 HH.5.e, above. Subsequent reports shall cover the five-year periods
from January 1 to December 31. The compliance reports shall be postmarked on or before January 31.
[40 CFR 63.7550(a), (b) and 63.10(a)(4), (5)]
r. The Permittee shall submit the 5-year compliance report via the Compliance and Emissions Data Reporting
Interface (CEDRI). (CEDRI can be accessed through the EPA's Central Data Exchange, CDX.) The Permittee
shall use the appropriate electronic report in CEDRI 40 CFR Part 63, Subpart DDDDD. Instead of using the
electronic report in CEDRI for this 40 CFR Part 63, Subpart DDDDD, the Permittee may submit an alternate
electronic file consistent with the XML schema listed on the CEDRI Web site
(http://www.epa.gov/ttn/chief/cedri/index.html), once the XML schema is available. If the reporting form specific
to 40 CFR Part 63, Subpart DDDDD is not available in CEDRI at the time that the report is due, the Permittee
shall submit the report to DAQ. The Permittee shall begin submitting reports via CEDRI no later than 90 days
after the form becomes available in CEDRI. [40 CFR 63.7550(h)(3)]
s. The Permittee shall include the following information in the 5-year compliance report:
i. Company and facility name and address;
ii. Process unit information, emissions limitations, and operating parameter limitations;
iii. Date of report and beginning and ending dates of the reporting period;
iv. The date of the most recent tune-up for each boiler (ID Nos. G11050 and G11051) required pursuant to
Section 2.1 HH.5.j. Include the date of the most recent burner inspection if it was not done as scheduled and
was delayed until the next scheduled or unscheduled unit shutdown; and
Permit 08961T29
Page 89
v. If there are no periods of noncompliance from the requirements of the work practice requirements in
Section 2.1 HH.5.j, above, a statement that there were no deviations from the work practice standards during
the reporting period.
[40 CFR 63.7550(a) and (c)(1), (c)(5)(i) through (iii), (c)(5)(xiv), (c)(5)(xvii), and Table 9]
t. If the Permittee has a period of noncompliance with a work practice standard for periods of startup and shutdown
during the reporting period, the compliance report must also contain the following information:
i. A description of the period of noncompliance and which work practice standard from which the Permittee was
in noncompliance; and
ii. Information on the number, duration, and cause of periods of noncompliance (including unknown cause), as
applicable, and the corrective action taken.
[40 CFR 63.7540(b), 63.7550(a) and (d) and Table 9]
Permit 08961T29
Page 90
2.2- Multiple Emission Sources Specific Limitations and Conditions
A. Prevention of Significant Deterioration (PSD):
1. 15A NCAC 02D .0530: PREVENTION OF SIGNIFICANT DETERIORATION
a. The Permittee shall comply with all applicable provisions, including the notification, testing, reporting,
recordkeeping, and monitoring requirements in accordance with 15A NCAC 02D .0530, “Prevention of
Significant Deterioration of Air Quality” as promulgated in 40 CFR 51.166.
Operations Restrictions [15A NCAC 02D .0530]
b. The Permittee shall meet the following requirements on the No. 4 Power Boiler (ID No. G11040):
i. a dust suppression system and enclosed conveyor system for feeding coal to the No. 4 Power Boiler (ID No.
G11040) shall be installed and maintained;
ii. the No. 4 Power Boiler (ID No. G11040) design shall incorporate low excess air in the primary combustion
zone and staged combustion, and tangential firing to control NOX emissions;
iii. the coal fuel shall be low sulfur coal (as required in Section 2.1 U.2.k, above), and the NSPS limits in Section
2.1 U.2.b, above, for sulfur dioxide and nitrogen oxides shall apply;
iv. the particulate matter emissions from the No. 4 Power Boiler (ID No. G11040) shall be limited to 0.085
pounds per million Btu;
v. the steam production from the Riley Coal boiler (ID No. G11039) shall be limited to no more than 300,000 lb
steam/hr (399 million Btu per hour heat input).
vi. Riley Coal boiler (ID No. G11039) shall be limited to particulate matter emissions of no more than 0.15
pounds per million Btu, each;
vii. nitrogen oxide emissions from boilers Riley Coal and No. 4 Power Boiler (ID Nos. G11039 and G11040)
shall be limited to 4,368 tons per 12-month rolling total; and
viii. carbon monoxide emissions from boilers Riley Coal and No. 4 Power Boiler (ID Nos. G11039 and G11040)
shall be limited to 898.2 tons per 12-month rolling total.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530 if any of these operational
restrictions are exceeded.
Emissions Limitations [15A NCAC 02D .0530]
c. The Permittee shall meet the following emissions limitations:
i. particulate matter emissions from the No. 4 Power Boiler (ID No. G11040) shall be limited to no more than
0.085 pounds per million Btu;
ii. particulate matter emissions from the Riley Coal boiler (ID No. G11039) shall be limited to no more than 0.15
pounds per million Btu, each;
iii. nitrogen oxide emissions from boilers Riley Coal and No. 4 Power Boiler (ID Nos. G11039 and G11040)
shall be limited to 4,368 tons per 12-month rolling total; and
iv. carbon monoxide emissions from boilers Riley Coal, and No. 4 Power Boiler (ID Nos. G11039 and G11040)
shall be limited to 898.2 tons per 12-month rolling total.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530 if any of these emissions limitations
are exceeded.
Testing [15A NCAC 02D2Q .0508(f)]
d. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
results of the testing are above the limits given in Section 2.2 A.1.c, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0530.
e. Under the provisions of NCGS 143-215.108, the Permittee shall demonstrate compliance with the particulate
matter emission limits above by utilizing the test results of the particulate matter testing required per Section 2.1
T.2 and U.1. If the results of the testing are above the particulate matter limits given in Section 2.2 A.1.c, above,
the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530.
Monitoring, Recordkeeping, and Reporting [15A NCAC 02Q .0508(f)]
e. For compliance purposes, the following shall be monitored and recorded (in written or electronic format):
i. the monthly usage of all fuels burned at the facility, categorized by source, for the previous fourteen months.
The usage must be calculated for each of the three twelve month periods over the previous fourteen months;
Permit 08961T29
Page 91
ii. the total monthly nitrogen oxide, and carbon monoxide emissions from Riley Coal and No. 4 Power Boiler
(ID Nos. G11039 and G11040) for the previous fourteen months. The emissions shall be provided for each
of the three twelve month periods over the previous fourteen months; and
iii. The Permittee shall keep each monthly record on file for a minimum of three years.
iv. The Permittee shall follow the monitoring and recordkeeping per Section 2.1 T.2.d and Section 2.1 U.2.c
through U.2.h.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530 if these requirements are not
monitored or if the records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
f. The Permittee shall submit a summary report, acceptable to the Regional Air Quality Supervisor, of monitoring
and recordkeeping activities within 30 days after each calendar year quarter, postmarked on or before January 30
of each calendar year for the preceding three-month period between October and December, April 30 of each
calendar year for the preceding three-month period between January and March, July 30 of each calendar year for
the preceding three-month period between April and June, and October 30 of each calendar year for the preceding
three-month period between July and September.
2. 15A NCAC 02Q .0317: AVOIDANCE CONDITIONS for 15A NCAC 02D .0530: PREVENTION OF
SIGNIFICANT DETERIORATION
a. In order to avoid applicability of 15A NCAC 02D .0530 for major sources and major modifications, boilers Riley
Coal and No. 4 Power Boiler (ID Nos. G11039 and G11040) shall discharge into the atmosphere less than 8,277
tons of sulfur dioxide per consecutive 12-months.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If the
result of the testing is above the limit given in Section 2.2 A.2.a, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0530.
Monitoring, Recordkeeping, and Reporting [15A NCAC 02Q .0508(f)]
c. For compliance purposes, the following shall be monitored and recorded (in written or electronic format):
i. the monthly usage of all fuels burned at the facility, categorized by source, for the previous fourteen months.
The usage must be calculated for each of the three twelve month periods over the previous fourteen months;
ii. the total monthly sulfur dioxide emissions from Riley Coal and No. 4 Power Boiler (ID Nos. G11039 and
G11040) for the previous fourteen months. The sulfur dioxide data shall utilize fuel sulfur sampling results
for coal and fuel oil. The emissions shall be provided for each of the three twelve month periods over the
previous fourteen months; and
iii. The Permittee shall keep each monthly record on file for a minimum of three years.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530 if these requirements are not
monitored or if the records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
d. The Permittee shall submit a summary report, acceptable to the Regional Air Quality Supervisor, of monitoring
and recordkeeping activities within 30 days after each calendar year quarter, postmarked on or before January 30
of each calendar year for the preceding three-month period between October and December, April 30 of each
calendar year for the preceding three-month period between January and March, July 30 of each calendar year for
the preceding three-month period between April and June, and October 30 of each calendar year for the preceding
three-month period between July and September.
3. 15A NCAC 02D. 0530(u): USE OF PROJECTED ACTUAL EMISSIONS TO AVOID APPLICABILITY OF
PREVENTION OF SIGNIFICANT DETERIORATION REQUIREMENTS
Use of Projected Actual Emissions [15A NCAC 02D .0530(u)]
a. Pursuant to 15A NCAC 02D .0530(u), the applicant relied on the use of projected actual emissions to demonstrate
that the burning of natural gas in the Nos. 4 and 5 Lime Kilns and the Nos. 10 and 11 Recovery Furnaces (ID Nos.
G09028, G09029, G08020, and G08021) and the associated new burners, as requested in permit application
4400159.10A, would not result in a significant emissions increase. In order to verify the assumptions used in the
Permit 08961T29
Page 92
projected actual emissions calculations, the Permittee shall comply with the testing, recordkeeping and reporting
requirements in Section 2.2 A.3.b through A.3.d, below.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance General Condition JJ.
Recordkeeping [15A NCAC 02D .0530(u)]
c. The Permittee shall calculate and maintain records of actual emissions of carbon monoxide and volatile organic
compounds from the Nos. 4 and 5 Lime Kilns and the Nos. 10 and 11 Recovery Furnaces (ID Nos. G09028,
G09029, G08020, and G08021) in tons per year on a calendar year basis for each of the five years following the
resumption of regular operations upon commencement of the modifications described in application 4400159.10A.
Reporting [15A NCAC 02D .0530(u)]
d. The Permittee shall submit a report for carbon monoxide and volatile organic compound emissions to the Director
within 60 days after the end of each calendar year during which the records in Section 2.2 A.3.c, above, must be
generated. The report shall contain the following items [CFR 51.166(r)(6)(v)(a) through (c)]:
i. The name, address and telephone number of the major stationary source;
ii. The annual emissions as calculated pursuant to Section 2.2 A.3.c, above; and
iii. Any other information that the owner or operator wishes to include in the report (e.g., an explanation as to
why the emissions differ from the preconstruction projection).
4. 15A NCAC 02D .0530(u): USE OF PROJECTED ACTUAL EMISSIONS TO AVOID APPLICABILITY OF
REQUIREMENTS OF PSD
a. The Permittee has used projected actual emissions to avoid applicability of prevention of significant deterioration
requirements pursuant to application 4400159.16A for the Repowering Project Modification consisting of the
addition of the Nos. 1 and 2 Package Boilers (ID Nos. G11050 and G11051); the rebuild of the ESP (ID No. 11-
CD-005-01) and installation a wet scrubber (ID No. 11-CD-005-02) on the Riley Coal Boiler (ID No. G11039);
and replacement of the oil burners with natural gas burners, the rebuild of the ESP (ID No. 11-CD-006-01) and
installation of a wet scrubber (ID No. 11-CD-006-03) on the No. 4 Power Boiler (ID No. G11040). In order to
verify the assumptions used in the projected actual emissions calculations, the Permittee shall comply with the
requirements in Section 2.2 A.4.b, below.
Monitoring/Recordkeeping/Reporting [15A NCAC 02D .0530(u) and 2Q .0308]
b. The Permittee shall perform the following:
i. Upon commencement of regular operation of the Nos. 1 and 2 Package Boilers (ID Nos. G11050 and
G11051), the Permittee shall maintain records of annual SO2, PM, PM10, PM2.5, NOX, CO, H2SO4, Fluorides,
TRS, Lead, and VOC emissions from the Riley Coal Boiler (ID No. G11039), No. 4 Power Boiler (ID No.
G11040), and the Nos. 1 and 2 Package Boilers (ID Nos. G11050 and G11051) in tons per year, on a
calendar year basis related to the Repowering Project. The Permittee shall calculate these annual emissions for
five years following startup of regular operations of the Nos. 1 and 2 Package Boilers.
ii. The Permittee shall submit a report to the director within 60 days after the end of each calendar year during
which these records must be generated. The report shall contain the items listed in 40 CFR 51.166(r)(6)(v)(a)
through (c).
iii. The Permittee shall make the information documented and maintained under this condition available to the
Director or the general public pursuant to the requirements in 40 CFR 70.4(b)(3)(viii).
iv. The Permittee shall provide a comparison of the reported actual emissions (post-construction emissions) for
each of the five calendar years to the projected actual emissions (pre-construction projection) as included
below:
Permit 08961T29
Page 93
Pollutant
Projected Actual Emissions*
(tons per year)
SO2 6076
PM (filterable only) 270
PM10 314
PM2.5 203
NOX 2621
CO 751
H2SO4 71.8
F 27.1
TRS 9.9
Pb 0.64
VOC 42.6
* These projections are not enforceable limitations. If projected emissions are exceeded,
consistent with 15A NCAC 02D .0530, the Permittee shall include, in its annual report, an
explanation as to why the actual rates exceeded the projection.
5. 15A NCAC 02D. 0530(u): USE OF PROJECTED ACTUAL EMISSIONS TO AVOID APPLICABILITY OF
PREVENTION OF SIGNIFICANT DETERIORATION REQUIREMENTS
Use of Projected Actual Emissions [15A NCAC 02D .0530(u)]
a. The Permittee has used projected actual emissions to avoid applicability of prevention of significant deterioration
requirements for a project consisting of modifications to the West GB Evaporator (ID No. 07-PU-003) and
appurtenant equipment including but not limited to converting the evaporator to a six body, five effect
evaporator. This project will increase the evaporation capacity and allow processing of more liquor contaminated
water concurrently with the weak black liquor from the pulp mill. This project is fully described in Permit
Application No. 4400159.18H. In order to verify the assumptions used in the projected actual emissions
calculations, the Permittee shall comply with the testing, record keeping and reporting requirements in Sections
2.2 A.5.b through A.5.e, below.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance General Condition JJ.
Recordkeeping [15A NCAC 02D .0530(u)]
c. The Permittee shall maintain records of the actual emissions the pollutants listed in Table 2.2 A.5.1 below from the
sources indicated in Table 2.2 A.5.2 below. Records shall start following the resumption of regular operations
after the modifications described in Permit Application No. 4400159.18H and shall continue for ten years after the
resumption of regular operations after the modifications described in Permit Application no. 4400159.18H. The
first year shall start on the first day of the first full calendar month after commencing regular operations after the
modification described in Permit Application No. 4400159.18H. Each subsequent year shall include the same 12-
month period.
d. The reported actual emissions (post-construction emissions) of the sources in Table 2.2 A.5.2 for each of the years
will be compared to the projected actual emissions (pre-construction projection) for the same sources included
below:
Table 2.2 A.5.1
Pollutant
Projected Actual Emissions*
(tons per year)
SO2 3795
PM (filterable only) 518
PM10 624
PM2.5 526
NOX 4353
CO 1938
H2SO4 73
F 30
TRS (as H2S) 175
Pb 0.8
VOC 1380
* These projections are not enforceable limitations. If projected emissions are exceeded, consistent
with 15A NCAC 02D .0530, the permittee shall include in its annual report an explanation as to why
the actual rates exceeded the projection.
Permit 08961T29
Page 94
The Permittee shall make the information, documented and maintained in this condition available to the Director
or the general public pursuant to the requirements in 40 CFR 70.4(b)(3)(viii).
Table 2.2 A.5.2
ID No. Emission Source Description ID No. Emission Source Description
G02004 Digester Area (Batch Digesters and Blow Heat
Systems)
G03005 No. 1 Hardwood Fiberline Brownstock
Washing System (Brownstock Washers and
Foam Tanks)
G11039 Riley Coal Boiler
G03006 No. 2 Pine Fiberline Brownstock Washing
System (Washers, Filtrate tanks, and
Brownstock Washer Mix Tanks)
G11040 No. 4 Power Boiler
G03007 Reject Knots G11042 Riley Bark Boiler
G04009 No. 1 Hardwood Fiberline Oxygen
Delignification System (Reactor, Blow Tank,
Washer, and Filtrate Chest)
G11050 No. 1 Natural Gas Package Boiler
G04010 No. 2 Pine Fiberline Oxygen Delignification
System (Reactor, Blow Tank, and Washer)
G11051 No. 2 Natural Gas Package Boiler
G04011 White Liquor Oxidation System G12048 No. 20 Paper Machine
G04025 No. 1 Hardwood Fiberline Pulp Screening
System
G12049 No. 19 Paper Machine
G04026 No. 2 Pine Fiberline Pulp Screening System G12050 No. 12 Paper Machine
G05012 No. 1 Hardwood Fiberline Bleaching System
(D1, Eo, and D2 Towers, Washers, Filtrate
Tanks)
G12051 No. 11 Paper Machine
G05013 No. 2 Pine Fiberline Bleaching System (D1,
Eo, and D2 Towers, Washers, and Filtrate
Tanks)
I-G12077 Hot Oil Heaters on No. 19 Paper Machine
G05073 Minerals Removal Process (MRP) G16081 WTP Primary Clarifiers
G06014 Chlorine Dioxide Generation System (ClO2
Generator and ClO2 Solution Storage Tanks)
G21072 Tall Oil Reactor
I-G06015 Methanol Storage G16082 WTP Aeration and Digestion Basins
G07019 Heavy Black Liquor Storage I-G23066.c Coal Handling Fugitives
G07086 Weak Black Liquor Storage G23066.k No. 1 Fiberline Building Ventilation
G08020 No. 10 Recovery Furnace G23066.l No. 2 Fiberline Building Ventilation
G08021 No. 11 Recovery Furnace I-G23066.a Sewer Lines
I-G08020-1 Saltcake Mix Tank #10 RF I-G23066.d Water Treatment
I-G08021-1 Saltcake Mix Tank #11 RF I-G23066.b Truck Traffic Fugitives
G08022a Black Liquor Oxidation System G24087 No. 1 Hardwood Fiberline Deckers (Deckers
and Filtrate Tank)
G08023 No. 10 Smelt Dissolving Tank G24088 No. 2 Hardwood Fiberline Deckers (Deckers
and Filtrate Tank)
G08024 No. 11 Smelt Dissolving Tank G24092 Hardwood Brownstock High Density Storage
I-G08074 Chloride Removal Process (CRP) G24094 Pine Brownstock High Density Storage
G09027 Lime Production - Other Units (Pre-coat
Filters)
I-G10036.10-
TK-015 White Liquor Clarifier (West)
G09028 No. 4 Lime Kiln I-G10036.10-
TK-018 White Liquor Clarifier (EIMCO)
G09029 No. 5 Lime Kiln I-G10036.10-
TK-012 White Liquor Clarifier (South)
G10034 No. 6 Lime Slaker I-G23065 Bleached Stock Storage
G10035 No. 5 Lime Slaker G11045 Utility Boiler Flyash Handling System (Main
Flyash Silo and Pneumatic Collection System)
I-G10036.10-
TK-010 Causticizer (Center) G11025 No. 4 Power Boiler Flyash Transfer Silo
I-G10036.10-
TK-009 Causticizer (East) G11044 Riley Bark Boiler Fuel Feed System
Permit 08961T29
Page 95
Table 2.2 A.5.2
ID No. Emission Source Description ID No. Emission Source Description
I-G10036.10-
TK-025 Causticizer (South) G13054 East Starch Storage Silo
I-G10036.10-
TK-011 Causticizer (West) G13055 West Starch Storage Silo
G10089 Green Liquor Clarification and Storage G13056 Center Starch Storage Silo
G10090 Green Liquor Stabilization G09031 No. 6 Lime Silo Dust Collection System
(Storage Silos, Conveyor, Crusher, and
Elevator)
I-G10091 Lime Mud Washers and Storage G09032 No. 5 Lime Silo Dust Collection System
(Storage Silos, Conveyor, Crusher, and
Elevator)
Reporting [15A NCAC 02D .0530(u)]
e. The Permittee shall submit a report of the actual emissions of the pollutants identified in Table 2.2 A.5.1 from the
sources in Table 2.2 A.5.2 to the Director within 60 days after the end of each year (as defined in Section 2.2
A.5.c) during which the records in Section 2.2 A.5.c must be generated. The report shall contain the items listed in
40 CFR 51.166(r)(6)(v)(a) through (c).
6. 15A NCAC 02D. 0530(u): USE OF PROJECTED ACTUAL EMISSIONS TO AVOID APPLICABILITY OF
PREVENTION OF SIGNIFICANT DETERIORATION REQUIREMENTS
Use of Projected Actual Emissions [15A NCAC 02D .0530(u)]
a. The Permittee has used projected actual emissions to avoid applicability of Prevention of Significant Deterioration
requirements for the Recausticizing Optimization Project consisting of: (1) upgrades to the Green Liquor Clarifiers
(ID Nos. G10089.10-TK-005 and 10-TK-006), West Green Liquor Storage Tank (ID No. G10089.10-TK-002),
Dregs Filter (ID No. G09027-3), and Lime Pre-Coat Filters (ID Nos. G09027.09-PU-001, 09-PU, and 09-PU-
004); (2) new Causticizer (ID No. I-G10036-TK-026) and new White Liquor Pressure Disc Filter (ID No.
G10036.10a); (3) upgrades to Nos. 4 and 5 Lime Kiln Scrubbers (ID Nos. 09-CD-009-01 and 09-CD-010-01);
and (4) piping changes to the cyclone ring headers associated with the Nos. 10 and 11 Recovery Furnace (ID Nos.
G08020 and G08021). This project will reduce the amount of purchased make-up lime, reduce the amount of lime
mud currently disposed in the mill landfill, enhance compliance with PM emission limits applicable to the Nos. 4
and 5 Lime Kilns, and reduce plugging in the direct contact cyclone evaporators associated with the Nos. 10 and
11 Recovery Furnaces. This project is fully described in Permit Application No. 4400159.20B. In order to verify
the assumptions used in the projected actual emissions calculations, the Permittee shall comply with the testing,
record keeping and reporting requirements in Sections 2.2 A.6.b through A.6.e, below.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance General Condition JJ.
Recordkeeping [15A NCAC 02D .0530(u)]
c. The Permittee shall maintain records of the actual emissions the pollutants listed in Table 2.2 A.6.1, below, from
the sources indicated in Table 2.2 A.6.2, below. Records shall start following the resumption of regular operations
after the modifications described in Permit Application No. 4400159.20B and shall continue for five years after
the resumption of regular operations after the modifications described in Permit Application No. 4400159.20B.
The first year shall start on the first day of the first full calendar month after commencing regular operations after
the modification described in Permit Application No. 4400159.20B. Each subsequent year shall include the same
12-month period.
d. The Permittee shall make the information, documented and maintained in this condition available to the Director
or the general public pursuant to the requirements in 40 CFR 70.4(b)(3)(viii). The reported actual emissions (post-
construction emissions) of the sources in Table 2.2 A.6.2 for each of the years will be compared to the projected
actual emissions (pre-construction projection) for the same sources included below:
Permit 08961T29
Page 96
Table 2.2 A.6.1
Pollutant
Projected Actual Emissions*
(tons per year)
SO2 41
PM (filterable only) 330
PM10 282
PM2.5 225
NOX 1,480
CO 1,093
H2SO4 2.8
F 0.6
TRS (sum of compounds) 218
H2S 76
Pb 0.02
VOC 1,453
*These projections are not enforceable limitations. If projected emissions are exceeded, consistent
with 15A NCAC 02D .0530, the permittee shall include in its annual report an explanation as to why
the actual rates exceeded the projection.
Table 2.2 A.6.2
ID No. Emission Source Description ID No. Emission Source Description
G02004 Digester Area (Batch Digesters and
Blow Heat Systems)
G09027-3 Dregs Filter
G03005 No. 1 Hardwood Fiberline Brownstock
Washing System (Brownstock Washers
and Foam Tanks)
G09028 No. 4 Lime Kiln
G03006 No. 2 Pine Fiberline Brownstock
Washing System (Washers, Filtrate
tanks, and Brownstock Washer Mix
Tanks)
G09029 No. 5 Lime Kiln
G03007 Reject Knots G10034 No. 6 Lime Slaker
G04009 No. 1 Hardwood Fiberline Oxygen
Delignification System (Reactor, Blow
Tank, Washer, and Filtrate Chest)
G10035 No. 5 Lime Slaker
G04010 No. 2 Pine Fiberline Oxygen
Delignification System (Reactor, Blow
Tank, and Washer)
I-G10036 Causticizers
G04011 White Liquor Oxidation System G10089 Green Liquor Clarification and Storage
G04025 No. 1 Hardwood Fiberline Pulp
Screening System
G10090 Green Liquor Stabilization
G04026 No. 2 Pine Fiberline Pulp Screening
System
I-G10091 Lime Mud Washers and Storage
G05012 No. 1 Hardwood Fiberline Bleaching
System (D1, Eo, and D2 Towers,
Washers, Filtrate Tanks)
G16081 WTP Primary Clarifiers
G05013 No. 2 Pine Fiberline Bleaching System
(D1, Eo, and D2 Towers, Washers, and
Filtrate Tanks)
G21072 Tall Oil Reactor
G05073 Minerals Removal Process (MRP) G16082 WTP Aeration and Digestion Basins
G06014 Chlorine Dioxide Generation System
(ClO2 Generator and ClO2 Solution
Storage Tanks)
G23066.k No. 1 Fiberline Building Ventilation
I-G06015 Methanol Storage G23066.l No. 2 Fiberline Building Ventilation
G07019 Heavy Black Liquor Storage I-G23066.a Sewer Lines
G07086 Weak Black Liquor Storage I-G23066.d Water Treatment
G08020 No. 10 Recovery Furnace I-G23066.b Truck Traffic Fugitives
G08021 No. 11 Recovery Furnace G24087 No. 1 Hardwood Fiberline Deckers
(Deckers and Filtrate Tank)
I-G08020-1 Saltcake Mix Tank #10 RF G24088 No. 2 Hardwood Fiberline Deckers
(Deckers and Filtrate Tank)
Permit 08961T29
Page 97
Table 2.2 A.6.2
ID No. Emission Source Description ID No. Emission Source Description
I-G08021-1 Saltcake Mix Tank #11 RF G24092 Hardwood Brownstock High Density
Storage
G08022a Black Liquor Oxidation System G24094 Pine Brownstock High Density Storage
G08023 No. 10 Smelt Dissolving Tank I-G10036 White Liquor Clarifiers
G08024 No. 11 Smelt Dissolving Tank I-G23065 Bleached Stock Storage
I-G08074 Chloride Removal Process (CRP) G09031 No. 6 Lime Silo Dust Collection System
(Storage Silos, Conveyor, Crusher, and
Elevator)
G09027 Lime Production - Other Units G09032 No. 5 Lime Silo Dust Collection System
(Storage Silos, Conveyor, Crusher, and
Elevator)
Reporting [15A NCAC 02D .0530(u)]
e. The Permittee shall submit a report of the actual emissions of the pollutants identified in Table 2.2 A.6.1 from the
sources in Table 2.2 A.6.2 to the Director within 60 days after the end of each year (as defined in Section 2.2
A.6.c) during which the records in Section 2.2 A.6.c must be generated. The report shall contain the items listed in
40 CFR 51.166(r)(6)(v)(a) through (c).
i. The name, address and telephone number of the major stationary source;
ii. The annual emissions as calculated pursuant to Section 2.2 A.6.c, above; and
iii. Any other information that the owner or operator wishes to include in the report (e.g., an explanation as to
why the emissions differ from the preconstruction projection).
Permit 08961T29
Page 98
B. Permit Application Submittal Requirement
1. 15A NCAC 02Q .0504: OPTION FOR OBTAINING CONSTRUCTION AND OPERATION PERMIT
Permitting [15A NCAC 02Q .0504(d)]
a. As required under 15A NCAC 02Q .0501(c)(2), the Permittee shall have one year from the date of beginning
operation of the Nos. 1 and 2 Package Boilers (ID Nos. G11050 and G11051) the scrubbers (ID Nos. 11-CD-005-
02 and 11-CD-006-03) installed on the Riley Coal Boiler and the No. 4 Power Boiler (ID Nos. G11039 and
G11040), whichever is earlier, to file an amended application following the procedures of Section 15A NCAC
02Q .0504.
Reporting [15A NCAC 02Q .0508(f)]
b. The Permittee shall notify the Regional Office, in writing, of the date of beginning operation of the Nos. 1 and 2
Package Boilers (ID Nos. G11050 and G11051) and the scrubbers (ID Nos. 11-CD-005-02 and 11-CD-006-03)
installed on the Riley Coal Boiler and the No. 4 Power Boiler (ID Nos. G11039 and G11040) postmarked no later
than 30 days after such date.
2. 15A NCAC 02Q .0504: OPTION FOR OBTAINING CONSTRUCTION AND OPERATION PERMIT
Permitting [15A NCAC 02Q .0504(d)]
a. As required under 15A NCAC 02Q .0501(c)(2), the Permittee shall have one year from the date of beginning
operation rebuilt ESPs (ID Nos. 11-CD-005-01 and 11-CD-006-01), installed on the Riley Coal Boiler and the
No. 4 Power Boiler (ID Nos. G11039 and G11040), to file an amended application following the procedures of
Section 15A NCAC 02Q .0504.
Reporting [15A NCAC 02Q .0508(f)]
b. The Permittee shall notify the Regional Office, in writing, of the date of beginning operation of the rebuilt ESPs
(ID Nos. 11-CD-005-01 and 11-CD-006-01) installed on the Riley Coal Boiler and the No. 4 Power Boiler (ID
Nos. G11039 and G11040) postmarked no later than 30 days after such date.
3. 15A NCAC 02Q .0504: OPTION FOR OBTAINING CONSTRUCTION AND OPERATION PERMIT
Permitting [15A NCAC 02Q .0504(d)]
a. For completion of the two-step significant modification process pursuant to 15A NCAC 02Q .0501(c)(2) or (d)(2),
the Permittee shall file an amended application following the procedures of Section 15A NCAC 02Q .0500 no
later than July 25, 2019 for modification of the No. 10 Recovery Furnace, No. 11 Recovery Furnace, No. 4 Lime
Kiln and No.5 Lime Kiln (ID Nos. G08020, G08021, G09028, and G09029).
4. 15A NCAC 02Q .0504: OPTION FOR OBTAINING CONSTRUCTION AND OPERATION PERMIT
Permitting [15A NCAC 02Q .0504(d)]
a. Pursuant to 15A NCAC 02Q .0501(b)(2), for completion of the two-step significant modification process initiated
by Application No. 4400159.18H, the Permittee shall file an amended application following the procedures of
Section 15A NCAC 02Q .0500 within one year from the date of beginning operation of the West GB
Countercurrent Evaporator (ID No. 07-PU-003) reconfigured as proposed in application no. 4400159.18H.
Reporting [15A NCAC 02Q .0508(f)]
b. The Permittee shall notify the Regional Office in writing of the date of beginning operation of the modified
evaporator (ID No. 07-PU-003) postmarked no later than 30 days after such date.
5. 15A NCAC 02Q .0504: OPTION FOR OBTAINING CONSTRUCTION AND OPERATION PERMIT
Permitting [15A NCAC 02Q .0504(d)]
a. Pursuant to 15A NCAC 02Q .0501(b)(2), for completion of the two-step significant modification process initiated
by Application No. 4400159.19A, the Permittee shall file an amended application following the procedures of
Section 15A NCAC 02Q .0500 within one year from the date the condensates from the black liquor oxidation
system condensate collection tank (ID No. 08-TK-001) are hard-piped to the WTP and aeration and digestion
basin are reconfigured as proposed in Application No. 4400159.19A.
Permit 08961T29
Page 99
Reporting [15A NCAC 02Q .0508(f)]
b. The Permittee shall notify the Regional Office in writing of the date that condensates from the black liquor
oxidation system condensate collection tank (ID No. 08-TK-001) are hard-piped from the to the WTP and aeration
and digestion basin postmarked no later than 30 days after such date.
6. 15A NCAC 02Q .0504: OPTION FOR OBTAINING CONSTRUCTION AND OPERATION PERMIT
Permitting [15A NCAC 02Q .0504(d)]
a. Pursuant to 15A NCAC 02Q .0501(b)(2), for completion of the two-step significant modification process initiated
by Application No. 4400159.20B, the Permittee shall file an amended application following the procedures of
Section 15A NCAC 02Q .0500 within one year from the date the No. 4 or the No. 5 Lime Kiln Scrubber (ID No.
09-CD-009-01 or 09-CD-010-01) resumes normal operation following upgrades or the completion of upgrades to
the Recausticizing Sources as proposed in Application No. 4400159.20B, whichever date is earlier.
Reporting [15A NCAC 02Q .0508(f)]
b. The Permittee shall notify the Regional Office in writing of the date the No. 4 or the No. 5 Lime Kiln Scrubber
(ID No. 09-CD-009-01 or 09-CD-010-01) resumes normal operation following upgrades or the completion of
upgrades to the Recausticizing Sources, whichever is earlier, postmarked no later than 30 days after such date.
Permit 08961T29
Page 100
C. 40 CFR 63, Subpart S Affected Sources:
Source
ID No.
Source Description Control ID No Control Description
Bleaching System Sources
G05012 No. 1 Hardwood Fiberline Bleaching
System:
05-CD-002-01 No.1 Fiberline Bleaching
countercurrent packed tower-type
wet scrubber (190 gallons per
minute white liquor design flow
rate)
D1 Stage (ClO2) Tower (No. 05-PU-003)
D1 Stage (ClO2) Washer (No. 05-PU-004)
D1 Stage (ClO2) Filtrate Tank (No. 05-
TK-003)
D2 Stage (ClO2) Tower (No. 05-PU-010)
D2 (ClO2) Stage Washer (No. 05-PU-012)
D2 Stage (ClO2) Filtrate Tank (No. 05-
TK-011)
G05013 No. 2 Pine Fiberline Bleaching System: 05-CD-017-01 No.2 Pine Fiberline Bleaching
countercurrent packed tower-type
wet scrubber (70 gallons per minute
white liquor design flow rate)
D1 Stage (ClO2) Tower (No. 05-PU-017)
D1 Stage (ClO2) Washer (No. 05-PU-
022)*
D1 Stage (ClO2) Filtrate Tank (No. 05-
TK-018)
D2 Stage (ClO2) Tower (No. 05-PU-021)
D2 Stage (ClO2) Washer (No. 05-PU-
024)*
D2 Stage (ClO2) Filtrate Tank (No. 05-
TK-027)
LVHC System Sources
G02004 Digester Area: G09028
or
G09029
No. 4 Lime Kiln (primary)
(via NCG closed collection system)
or
No. 5 Lime Kiln (backup)
(via NCG closed collection system)
Eighteen (18) batch digesters (No. 02-PU-
001)
No. 1 Hardwood Blow Heat System Blow
Tank (No. 02-PU-005)
No. 1 Hardwood Blow Heat System
Fiberline Accumulator (No. 02-PU-006)
No. 1 Hardwood Blow Heat System
Secondary Condenser (No. 02-PU-008)
No. 2 Pine Blow Heat System Blow Tank
(No. 02-PU-003)
No. 2 Pine Blow Heat System Fiberline
Accumulator (No. 02-PU-007)
No. 2 Pine Blow Heat System Secondary
Condenser (No. 02-PU-009)
G07016 Black Liquor Evaporator Systems: G09029
or
G09028
No. 4 Lime Kiln (primary)
(via NCG closed collection system)
or
No. 5 Lime Kiln (backup)
(via NCG closed collection system)
Swenson Countercurrent Evaporator (No.
07-PU-002)
Swenson Evaporator Hotwell (No. 07-TK-
006)
West GB Countercurrent Evaporator (No.
07-PU-003)
West GB Evaporator Hotwell (No. 07-
TK-007)
Permit 08961T29
Page 101
Source
ID No.
Source Description Control ID No Control Description
G07018 Foul Condensate System: G09029
or
G09028
No. 5 Lime Kiln (primary)
(via NCG closed collection system)
or
No. 4 Lime Kiln (backup)
(via NCG closed collection system)
Condensate Stripper (No. 07-PU-015)
Stripper Feed Tank (No. 07-TK-011)
Reflux Tank (No. 07-TK-014)
G20060 No. 1 Hardwood Turpentine Recovery
System:
G09029
or
G09028
No. 4 Lime Kiln (primary)
(via NCG closed collection system)
or
No. 5 Lime Kiln (backup)
(via NCG closed collection system)
Turpentine Entrainment System (No. 20-
PU-001)
Turpentine Condenser (No. 20-PU-002)
Turpentine Decanter (No. 20-TK-003)
Turpentine Underflow Tank (No. 20-TK-
004)
Turpentine Transfer Tank (No. 20-TK-
005)
G20061 No. 2 Pine Turpentine Recovery
System:
G09029
or
G09028
No. 4 Lime Kiln (primary)
(via NCG closed collection system)
or
No. 5 Lime Kiln (backup)
(via NCG closed collection system)
Turpentine Entrainment System (No. 20-
PU-006)
Turpentine Condenser (No. 20-PU-007)
Turpentine Decanter (No. 20-TK-008)
Turpentine Underflow Tank (No. 20-TK-
009)
Turpentine Transfer Tank (No. 20-TK-
010)
HVLC System Sources
G03005 No. 1 Hardwood Fiberline Brownstock
Washing System:
NA NA
Nos. 1 through 4 Brownstock Washers
(No. 03-PU-001)
Foam Tank No. 1 (No. 03-TK-003)
Foam Tank No. 2 (No. 03-TK-004)
G03006 No. 2 Pine Fiberline Brownstock
Washing System:
NA NA
Washers and Filtrate Tanks (No. 03-PU-
032)*
Brownstock Washer Mix Tanks (Nos. 03-
TK-015, 03-TK-016, 03-TK-017)
G04009 No. 1 Hardwood Fiberline Oxygen
Delignification System:
NA NA
O2 Reactor (No. 04-PU-001)*
O2 Blow Tank (No. 04-TK-005)
Post-O2 Washer (No. 04-PU-002)
Post-O2 Filtrate Chest (No. 04-TK-008)
G04010 No. 2 Pine Fiberline Oxygen
Delignification System:
NA NA
O2 Reactor (No. 04-PU-014)*
O2 Blow Tank (No. 04-TK-018)
Permit 08961T29
Page 102
Source
ID No.
Source Description Control ID No Control Description
Post-O2 Washer (No. 04-PU-016)
G24087 No. 1 Hardwood Fiberline Deckers: NA NA
East Decker (No. 04-PU-009)
West Decker (No. 04-PU-004)
Decker Filtrate Tank (No. 04-TK-007)
G24088 No. 2 Pine Fiberline Deckers: NA NA
Decker (No. 04-PU-015)
Decker Filtrate Tank (No. 04-TK-017)
G04025 No. 1 Hardwood Fiberline Pulp Screening
System (No. 04-TK-008)
NA NA
G04026 No. 2 Pine Fiberline Pulp Screening
System
NA NA
HVLC Foul Gas Collection System
Cooler
* Sources are fully enclosed and do not have emission points.
The following table provides a summary of limits and standards for the emission source(s) describe above:
Regulated Pollutant
Limits/Standards
Applicable Regulation Hazardous Air
Pollutants
Bleaching System
10 ppmv total chlorinated HAP
LVHC System
Route system vents to No. 4 Lime Kiln or No. 5 Lime Kiln
HVLC System
The following sources are not subject to HVLC control
requirements:
• Knotter and screen systems with emissions less than
0.3 pounds per ton of oven dried pulp (See Section 2.2 C.1.d,
below):
• Decker systems that use any process water with a total HAP
concentration less than or equal to 400 ppm by weight (see
Section 2.2 C.1.d, below):
No control is required for HAP emissions from brownstock
washing and oxygen delignification systems under an alternate
compliance approach using the equivalency by permit option
authorized under 40 CFR 63.94. (See Section 2.2 C.2, below)
Pulping Condensate Collection
Collect a minimum 11.1 pounds HAP per ODTP followed by
treatment in the Condensate Steam Stripper, meeting:
92 percent HAP removal, or 10.2 pounds HAP per ODTP
removal
15 A NCAC 02D .1111
(40 CFR 63 Subpart S)
1. 15A NCAC 02D .1111: MACT 40 CFR PART 63, SUBPART S
a. The Permittee shall comply with all applicable provisions, including the notification, testing, reporting,
recordkeeping, and monitoring requirements contained in Environmental Management Commission Standard 15A
NCAC 02D .1111 “Maximum Achievable Control Technology” (MACT) as promulgated in 40 CFR Part 63,
Subpart S, including Subpart A “General Provisions.”
Permit 08961T29
Page 103
Emission Limitations [15A NCAC 02D .1111]
Standards for the Bleaching Systems
b. The Permittee shall meet the following control requirements for bleaching systems using chlorinated compounds
[40 CFR 63.445]:
i. The equipment at each bleaching stage of the bleaching systems (ID Nos. G05012 and G05013), where
chlorinated compounds are introduced shall be enclosed and vented into a closed-vent system meeting the
requirements specified Section 2.2 C.1.g, below, and introduced into the respective bleach plant scrubbers (ID
Nos. 05-CD-002-01 and 05-CD-017-01);
ii. The bleach plant scrubbers (ID Nos. 05-CD-002-01 and 05-CD-017-01) shall achieve a treatment device
outlet concentration of 10 ppmv or less of total chlorinated HAP; and
iii. The Permittee shall not use hypochlorite or chlorine for bleaching in the bleaching systems (ID Nos. G05012
and G05013). [40 CFR 63.445(d)(2)]
iv. Until September 11, 2020, the Permittee shall comply with the work practice standards specified in Section
2.2 G.4, below, during startup, shutdown, and malfunction events.
Standards for the LVHC and HVLC pulping systems at Kraft processes
c. The Permittee shall meet the following control requirements for the total HAP emissions from the LVHC System
(ID Nos. G02004, G07016, G07018, G20060, and G20061) [40 CFR 63.443]:
i. Each LVHC system component shall be enclosed and vented into a closed-vent system meeting the
requirements of Section 2.2 C.1.g, below; and
ii. Emissions from each LVHC system (ID Nos. G02004, G07016, G07018, G20060, and G20061) shall be
routed to either the No. 4 (primary) or No. 5 (backup) Lime Kilns (ID Nos. G09028 or G09029) by
introducing the HAP emission stream with the primary fuel or into the flame zone. [40 CFR 63.442(d)(4)(i)]
iii. Periods of excess emissions for the LVHC System (ID Nos. G02004, G07016, G07018, G20060, and
G20061) reported under Section 2.2 C.1.v, below, shall not be a violation of these control requirements for
total HAP emissions from LVHC systems (including periods of startup, shutdown, and malfunction), provided
that the time of excess emissions divided by the total process operating time in a semi-annual reporting period
does not exceed one percent. [40 CFR 63.443(e)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if HAP emissions from the LVHC
system are not controlled as required above.
d. The Permittee shall meet the following control requirements for the HAP emissions from the HVLC system
sources (ID Nos. G03005, G03006, G04009, G04010, G04025, and G04026): [40 CFR 63.443]
i. The Permittee shall meet the HVLC control requirements for the No. 1 Hardwood Fiberline Brownstock
Washing System (ID No. G03005), the No. 2 Pine Fiberline Brownstock Washing System (ID No. G03006),
the No. 1 Hardwood Fiberline Oxygen Delignification System (ID No. G04009), and the No. 2 Pine Fiberline
Oxygen Delignification System (ID No. G04010) by demonstrating compliance with Section 2.2 C.2,
Equivalency by Permit. [40 CFR 63.94]
ii. The Permittee shall control emissions from each knotter and screen system with total emissions of greater than
or equal to 0.3 pounds of total HAP per ton of ODTP. Based on a June 2004 exemption analysis, the
Permittee has demonstrated that the following sources are exempt from these HVLC control requirements:
[40 CFR 63.443(a)(1)(ii)(C)]
(A) The No. 1 Hardwood Fiberline Pulp Screening System (ID No. G04025); and
(B) The No. 2 Pine Fiberline Pulp Screening System (ID No. G04026).
iii. The Permittee shall control emissions from each decker system that uses any process water with a total HAP
concentration greater than 400 parts per million by weight. Based on a June 2004 exemption analysis, the
Permittee has demonstrated that the following sources are exempt from these HVLC control requirements:
[40 CFR 63.443(a)(1)(iv)(B)]
(A) The No. 1 Hardwood Fiberline Decker Systems (ID No. G24087); and
(B) The No. 2 Pine Fiberline Decker System (ID No. G24088).
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if HAP emissions from the HVLC
systems are not controlled as required above.
Standards for Kraft pulping process condensates
e. The Permittee shall collect pulping process condensates from a combination of one or more of the systems
identified below that in total contain a total HAP mass of 11.1 pounds per ton of oven dried pulp: [40 CFR
63.446(b) and (c)(3)]
Permit 08961T29
Page 104
i. The Digester System (ID No. G02004);
ii. The Turpentine Recovery Systems (ID Nos. G20060 and G20061);
iii. The Evaporator Systems (ID Nos. G07016);
iv. The HVLC collection system;
v. The LVHC collection system; and
vi. The Black Liquor Oxidization System: Condensate Collection Tank (ID No. G08022b).
f. The pulping process condensates identified in Section 2.2 C.1.e, above, shall be conveyed in a closed collection
system that is designed and operated to meet the following requirements: [40 CFR 63.446(d), (e) and (g)]
i. Each closed collection system shall meet the individual drain system requirements specified in 40 CFR
63.960, 63.961, and 63.962, except for closed-vent systems and control devices;
ii. Closed-vent systems shall be designed and operated in accordance with Section 2.2 C.1.g, below;
iii. The Stripper Feed Tank (ID No. G07018.ES 07-TK-011) shall meet the following requirements: [40 CFR
63.446(d)(2)]
(A) The fixed roof and all openings (e.g., access hatches, sampling ports, gauge wells) shall be designed and
operated with no detectable leaks as indicated by an instrument reading of less than 500 parts per million,
measured as methanol, above background.
(B) The Stripper Feed Tank (ID No. G07018.ES 07-TK-011) shall be vented into a closed-vent system that
meets the requirements in Section 2.2 C.1.j, below, and routed to either the No. 5 (primary) or No. 4
(backup) Lime Kilns (ID Nos. G09029 or G09028) by introducing the HAP emission stream with the
primary fuel or into the flame zone [40 CFR 63.443(d)(4)(i)]; and
(C) Each opening shall be maintained in a closed, sealed position (e.g., covered by a lid that is gasketed and
latched) at all times that the tank contains pulping process condensates or any HAP removed from a
pulping process condensate stream except when it is necessary to use the opening for sampling, removal,
or for equipment inspection, maintenance, or repair.
iv. The collected pulping process condensates identified in Section 2.2 C.1.f, above, shall be treated by the
Condensate Stripper (ID No. G07018.ES 07-PU-015) which shall: [40 CFR 63.446(e)(2) or (e)(5)]
(A) Reduce or destroy the total HAPs by at least 92 percent or more by weight; or
(B) Remove a minimum of 10.2 pounds HAP per ton of oven dried pulp (ODTP).
(C) Each HAP removed shall be vented into a closed-vent system that meets the requirements in Section 2.2
C.1.g, below, and routed to either the No. 5 (primary) or No. 4 (backup) Lime Kiln (ID Nos. G09029 or
G09028) by introducing the HAP emission stream with the primary fuel or into the flame zone [40 CFR
63.446(f)]
v. For the Foul Condensate Stripper System (ID No. G07018) used to comply with these requirements specified
above, periods of excess emissions reported shall not be a violation of Section 2.2 C.1.e provided that the time
of excess emissions (including period of startup, shutdown, and malfunction) divided by the total process
operating time in a semi-annual reporting period does not exceed 10 percent.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the pulping process condensates
are not collected and controlled as required above.
Standards for Enclosures and Closed-Vent Systems
g. The Permittee shall meet the following standards for enclosures and closed-vent systems for capturing and
transporting vent streams that contain hazardous air pollutants. [40 CFR 63.450]
i. Each enclosure or hood opening closed during the initial performance test shall be maintained in the same
closed and sealed position as during the performance test at all times except when necessary to use the
opening for sampling, inspection, maintenance, or repairs.
ii. For each enclosure, the Permittee shall maintain negative pressure at each enclosure or hood opening as
demonstrated by the procedures specified below: [40 CFR 63.457(e)]
(A) An anemometer to demonstrate flow into the enclosure opening;
(B) Measure the static pressure across the opening;
(C) Smoke tubes to demonstrate flow into the enclosure opening; or
(D) Any other industrial ventilation test method demonstrated to the satisfaction of DAQ.
iii. Each component of the closed-vent system that is operated at positive pressure and located prior to a control
device shall be designed for and operated with no detectable leaks as measured by the procedures specified
below: [40 CFR 63.457(d)]
(A) A leak is indicated by an instrument reading of 500 parts per million by volume or greater, measured as
methanol, above background,
(B) The Permittee shall comply with Method 21, of 40 CFR Part 60, Appendix A-7;
Permit 08961T29
Page 105
(C) The instrument specified in Method 21 shall be calibrated before use pursuant to the procedures specified
in Method 21 on each day that leak checks are performed. The following calibration gases shall be used:
(1) Zero air (less than 10 parts per million by volume of hydrocarbon in air); and
(2) A mixture of methane or n-hexane and air at a concentration of approximately, but less than, 10,000
parts per million by volume methane or n-hexane.
iv. For each bypass line in the closed-vent system that could divert vent streams containing HAP to the
atmosphere without meeting the emission limitations Section 2.2 C.1.b through C.1.d, above, shall comply
with either of the following requirements [40 CFR 63.450(d)]:
(A) On each bypass line, the Permittee shall install, calibrate, maintain, and operate pursuant to the
manufacturer's specifications a flow indicator that is capable of taking periodic readings at least once
every 15 minutes. The flow indicator shall be installed in the bypass line in such a way as to indicate flow
in the bypass line; or
(B) For bypass line valves that are not computer controlled, the Permittee shall maintain the bypass line valve
in the closed position with a car seal or a seal placed on the valve or closure mechanism in such a way
that valve or closure mechanism cannot be opened without breaking the seal.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the enclosures and closed-vent
system standards are not met as specified above.
Testing [15A NCAC 02Q .0508(f)]
h. If emissions testing is required, the testing shall be performed in accordance General Condition JJ. If the results of
this test are above the limits given in Section 2.2 C.1.b through C.1.f, above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .1111.
i. The Permittee shall conduct repeat periodic performance tests at five-year intervals for emission sources specified
in Section 2.2 C.1.b and C.1.c, above, except for emission sources controlled by the Nos. 4 or 5 Lime Kilns (ID
Nos. G09028 or G09029). [40 CFR 63.457(a)]
i. The first of the five-year tests shall be conducted by September 7, 2015, and thereafter within 60 months from
the date of the previous performance test. Performance testing shall be conducted pursuant to 40 CFR 63.457.
ii. The Permittee may seek to establish or reestablish the monitoring parameter values specified in Section 2.2
C.1.j, C.1.k, C.1.m, and C.1.n, below. The Permittee shall establish or reestablish the value for each operating
parameter during initial or subsequent periodic performance tests, using the following procedures:
(A) During the initial or any subsequent performance test, the Permittee shall continuously record the
operating parameter;
(B) Determinations shall be based on the control performance and parameter data monitored during the
performance test, supplemented if necessary by engineering assessments and the manufacturer's
recommendations;
(C) The Permittee shall provide, for the DAQ approval, the rationale for the selected operating parameter
value, and monitoring frequency, and averaging time. Include all data and calculations used to develop
the value and a description of why the value, monitoring frequency, and averaging time demonstrate
continuous compliance with the applicable emission standard.
iii. The established continuous compliance monitoring parameters shall not apply during any required subsequent
testing.
Monitoring for the Bleaching System Scrubbers [15A NCAC 02Q .0508(f)]
j. The Permittee shall install, calibrate, certify, operate, and maintain pursuant to the manufacturer's specifications, a
continuous monitoring system (CMS), on the No. 1 Bleach Plant Wet Scrubber (ID No. 05-CD-002-01). The
CMS shall include a continuous recorder. The CMS shall be operated to ensure the following operational
parameters are maintained [40 CFR 63.453(c) and (o)]:
i. The minimum pH of the scrubber's effluent shall be 9.23 (averaged over three hours);
ii. The scrubber's inlet vent gas fan operating status of “on” (on or off based on motor load); and
iii. The minimum scrubber liquid recirculation rate for the respective scrubber shall be 85.8 gallons per minute
(3-hour average).
iv. Operation of the No. 1 Bleach Plant Wet Scrubber (ID No. 05-CD-002-01) below the minimum operating
parameters listed above shall constitute a violation of the emission standard of Section 2.2 C.1.b, above, and
shall be reported as a period of excess emissions in accordance with Section 2.2 C.1.v, below.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if any monitoring parameter values
are exceeded, except as provided in Section 2.2 C.1.i, above, or if the monitoring procedures are not followed.
Permit 08961T29
Page 106
k. The Permittee shall install, calibrate, certify, operate, and maintain pursuant to the manufacturer's specifications, a
continuous monitoring system (CMS), on the No. 2 Bleach Plant Wet Scrubber (ID No. 05-CD-017-01). The
CMS shall include a continuous recorder. The CMS shall be operated to ensure the following operational
parameters are maintained [40 CFR 63.453(c) and (o)]:
i. The minimum pH of each scrubber's effluent shall be 8.38 (averaged over three hours);
ii. The scrubber's inlet vent gas fan operating status of “on” (on or off based on motor load); and
iii. The minimum scrubber liquid recirculation rate for the respective scrubber shall be 27.57 gallons per minute
(3-hour average).
iv. Operation of the No. 2 Bleach Plant Wet Scrubber (ID No. 05-CD-017-01) below the minimum operating
parameters listed above shall constitute a violation of the emission standard of Section 2.2 C.1.b, above, and
shall be reported as a period of excess emissions in accordance with Section 2.2 C.1.v, below.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if any monitoring parameter values
are exceeded, except as provided in Section 2.2 C.1.i, above, or if the monitoring procedures are not followed.
Monitoring for the LVHC Pulping Systems Control Devices [15A NCAC 02D .1111]
l. No control device parameter monitoring is required for pulping vent systems routed to the No. 4 Lime Kiln (ID
No. G09028) or the No. 5 Lime Kiln (ID No. G09029). [40 CFR 60, Subpart 63.453]
Monitoring for the Pulping Process Condensate Collection: [15A NCAC 02D .1111]
m. The Permittee shall install, calibrate, certify, operate, and maintain pursuant to the manufacturer's specifications, a
continuous monitoring system (CMS) to monitor condensate collection. The CMS shall include a continuous
recorder. The CMS shall be operated to ensure the following operational parameters are maintained on a 15-day
rolling average of stripper operating days. [40 CFR 63.446 and 63.453(g) and (o)]:
i. Foul condensates collected in the Stripper Feed Tank shall be equal to or greater than 379 gallons per minute;
and
ii. Condensates from the Black Liquor Oxidizer System (ID No. G08022b) gas collection shall be collected and
sent to the Stripper Feed Tank (ID No. 07-TK-011) or collected and sent via hard pipe to, and discharged
below the liquid surface of, the Wastewater Treatment Plant Aeration and Digestion Basin (ID No. G16082).
iii. Condensates collected below the minimum operating parameters listed above shall constitute a violation of the
emission standard of Section 2.2 C.1.e, above, and shall be reported as a period of excess emissions in
accordance with Section 2.2 C.1.v, below.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if any monitoring parameter values
are exceeded, except as provided in Section 2.2 C.1.i, above, or if the monitoring procedures are not followed.
Monitoring for the Pulping Process Condensates Steam Stripper [15A NCAC 02D .1111]:
n. The Permittee shall install, calibrate, certify, operate, and maintain pursuant to the manufacturer's specifications, a
continuous monitoring system (CMS) on the Condensate Stripper (ID No. ES 07-PU-015). The CMS shall
include a continuous recorder. The CMS shall be operated to ensure the following operational parameters are
maintained on a 15-day rolling average of stripper operating days. [40 CFR 63.453(g) and (o)]:
i. Foul condensates feed from the Stripper Feed Tank shall be equal to or greater than 379 gallons per minute;
ii. The temperature of the foul condensates feed shall be equal to or greater than 161OF; and
iii. Steam feed to the Foul Condensate Stripper shall be equal to or greater than 38,021 lb/hour.
iv. Operation of the Condensate Stripper (ID No. ES 07-PU-015) below the minimum operating parameters
listed above shall constitute a violation of the emission standard of Section 2.2 C.1.e, above, and shall be
reported as a period of excess emissions in accordance with Section 2.2 C.1.v, below.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if any monitoring parameter values
are exceeded, except as provided in Section 2.2 C.1.i, above, or if the monitoring procedures are not followed.
Monitoring/Inspections for Enclosures, Closed-Vent, and Closed Collection Systems [15A NCAC 02D .1111]
o. Each enclosure and closed-vent system shall meet the following monitoring requirements: [40 CFR 63.453(k)].
i. The Permittee shall conduct a visual inspection of the closure mechanism of each enclosure specified in
Section 2.2 C.1.g, above, shall be performed at least once every 30 days to ensure the opening is maintained in
the closed position and sealed. The Permittee shall demonstrate initially and annually that each enclosure
opening is maintained at negative pressure as specified in Section 2.2 C.1.g, above.
ii. The Permittee shall visually inspect each closed-vent system every 30 days and at other times as requested by
the DAQ. The visual inspection shall include inspection of ductwork, piping, enclosures, and connections to
covers for visible evidence of defects.
Permit 08961T29
Page 107
iii. For positive pressure closed-vent systems or portions of closed-vent systems, the Permittee shall demonstrate
no detectable leaks as specified in Section 2.2 C.1.g, above, measured initially and annually by the procedures
in Section 2.2 C.1.g.
iv. The Permittee shall inspect the valve or closure mechanism specified in Section 2.2 C.1.g.iii.(B), above, at
least once every 30 days to ensure that the valve is maintained in the closed position and the emission point
gas stream is not diverted through the bypass line.
v. If a required inspection identifies visible defects in ductwork, piping, enclosures or connections to covers
required, or if an instrument reading of 500 parts per million by volume or greater above background is
measured (as methanol), or if enclosure openings are not maintained at negative pressure, then the Permittee
shall take following corrective actions as soon as practicable.
(A) A first effort to repair or correct the closed-vent system shall be made as soon as practicable but no later
than 5 calendar days after the problem is identified.
(B) The repair or corrective action shall be completed no later than 15 calendar days after the problem is
identified. Delay of repair or corrective action is allowed if the repair or corrective action is technically
infeasible without a process unit shutdown or if the Permittee determines that the emissions resulting
from immediate repair would be greater than the emissions likely to result from delay of repair. Repair of
such equipment shall be completed by the end of the next process unit shutdown.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the monitoring is not performed.
p. For each pulping process condensate closed collection system used to comply with Section 2.2 C.1.e and C.1.f
shall comply with the requirements specified below [40 CFR 63.453(l)]
i. The Permittee shall visually inspect each pulping process condensate closed collection system every 30 days
and shall comply with the inspection and monitoring requirements specified in 40 CFR Part 63, Subpart RR,
Section 63.964, except:
(A) The Permittee shall comply with the recordkeeping requirements Section 2.2 C.1 instead of the
requirements specified in 40 CFR 63.964(a)(1)(vi) and (b)(3) (Subpart RR).
(B) The Permittee shall comply with the inspection and monitoring requirements for closed-vent systems and
control devices specified in Section 2.2 C.1.o, above, instead of the requirements specified in 40 CFR
63.964(a)(2) (Subpart RR).
ii. Each condensate tank used in the closed collection system shall be operated with no detectable leaks as
specified in Section 2.2 C.1.f.iv.(C), above, measured initially and annually by the procedures specified in
Section 2.2 C.1.f.ii, above.
iii. If an inspection required by this section identifies visible defects in the closed collection system, or if an
instrument reading of 500 parts per million or greater above background is measured, then the Permittee shall
take the corrective actions specified in 40 CFR 63.964(b) (Subpart RR).
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the closed collection system is not
inspected as required above.
q. The Permittee shall prepare and maintain a site-specific inspection plan, including a drawing or schematic of the
components of affected equipment and shall record the following for each inspection for each enclosure opening,
closed-vent system, and closed collection system [40 CFR 63.454(b)]:
i. Date of inspection;
ii. The equipment type and identification;
iii. Results of negative pressure tests for enclosures;
iv. Results of leak detection tests;
v. The nature of the defect or leak and the method of detection (i.e., visual inspection or instrument detection);
vi. The date the defect or leak was detected and the date of each attempt to repair the defect or leak;
vii. Repair methods applied in each attempt to repair the defect or leak;
viii. The reason for the delay if the defect or leak is not repaired within 15 days after discovery;
ix. The expected date of successful repair of the defect or leak if the repair is not completed within 15 days;
x. The date of successful repair of the defect or leak;
xi. The position and duration of opening of bypass line valves and the condition of any valve seals; and
xii. The duration of the use of bypass valves on computer-controlled valves.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these inspection records are not
maintained.
Permit 08961T29
Page 108
Startup, Shutdown, and Malfunction [15A NCAC 02D .1111]
r. Except as specified in Section 2.2 C.1.b.iv, above, the Permittee shall operate and maintain the Subpart S affected
sources at all times, including associated air pollution control equipment and monitoring equipment, in a manner
consistent with safety and good air pollution control practices for minimizing emissions. Determination of whether
such operation and maintenance procedures are being used will be based on information available to the DAQ
which may include, but is not limited to, monitoring results, review of operation and maintenance procedures,
review of operation and maintenance records, and inspection of the source. [40 CFR 63.453(q)] The Permittee
shall be deemed in noncompliance with 15A NCAC 02D .1111 if these practices are not conducted.
s. In response to an action to enforce the standards set forth in Section 2.2 C.1.b, through C.1.g, above, the Permittee
may assert an affirmative defense to a claim for civil penalties for violations of such standards that are caused by
malfunction, as defined at 40 CFR 63.2. Appropriate penalties may be assessed, however, if the Permittee fails to
meet the burden of proving all of the requirements in the affirmative defense. The affirmative defense shall not be
available for claims for injunctive relief. To establish the affirmative defense in any action to enforce such a
standard, the Permittee must timely meet the reporting requirements in Section 2.2 C.1.w, below, and must prove
by a preponderance of evidence that: [40 CFR 63.456]
i. The violation:
(A) Was caused by a sudden, infrequent, and unavoidable failure of air pollution control equipment, process
equipment, or a process to operate in a normal or usual manner, and
(B) Could not have been prevented through careful planning, proper design or better operation and
maintenance practices; and
(C) Did not stem from any activity or event that could have been foreseen and avoided, or planned for; and
(D) Was not part of a recurring pattern indicative of inadequate design, operation, or maintenance; and
ii. Repairs were made as expeditiously as possible when a violation occurred. Off-shift and overtime labor were
used, to the extent practicable to make these repairs; and
iii. The frequency, amount and duration of the violation (including any bypass) were minimized to the maximum
extent practicable; and
iv. If the violation resulted from a bypass of control equipment or a process, then the bypass was unavoidable to
prevent loss of life, personal injury, or severe property damage; and
v. All possible steps were taken to minimize the impact of the violation on ambient air quality, the environment
and human health; and
vi. All emissions monitoring and control systems were kept in operation if at all possible, consistent with safety
and good air pollution control practices; and
vii. All of the actions in response to the violation were documented by properly signed, contemporaneous
operating logs; and
viii. At all times, the affected source was operated in a manner consistent with good practices for minimizing
emissions; and
ix. A written root cause analysis has been prepared, the purpose of which is to determine, correct, and eliminate
the primary causes of the malfunction and the violation resulting from the malfunction event at issue. The
analysis shall also specify, using best monitoring methods and engineering judgment, the amount of any
emissions that were the result of the malfunction.
Recordkeeping [15A NCAC 02D .1111]
t. The results of the CMS monitoring, enclosure system monitoring, and closed-vent system monitoring shall be
maintained (in written or electronic format) per the requirements of 40 CFR 63.454(a). The Permittee shall be
deemed in noncompliance with 15A NCAC 02D .1111 if these records are not maintained.
u. The Permittee shall maintain the following records of malfunctions [40 CFR 63.454(g)]:
i. Records of the occurrence and duration of each malfunction of operation (i.e., process equipment) or the air
pollution control and monitoring equipment.
ii. Records of actions taken during periods of malfunction to minimize emissions in accordance with Section 2.2
C.1.r, above, including corrective actions to restore malfunctioning process and air pollution control and
monitoring equipment to its normal or usual manner of operation.
Reporting [15A NCAC 02D .1111]
v. The Permittee shall submit a summary report of excess emissions postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
Permit 08961T29
Page 109
of this permit must be clearly identified. When no exceedances of an operating parameter have occurred, such
information shall be included in the report. [40 CFR 63.453(q)]
w. The Permittee shall comply with the reporting requirements of 40 CFR 63, Subpart A as specified in Table 1 of
Part 63, Subpart S.
x. If a malfunction occurred during the reporting period, the summary report must include the number, duration and a
brief description for each type of malfunction which occurred during the reporting period and which caused or
may have caused any applicable emission limitation to be exceeded. The report must also include a description of
actions taken by an owner or operator during a malfunction of an affected source to minimize emissions in
accordance with Section 2.2, C.1.r, above, including actions taken to correct a malfunction. [40 CFR 63.455(g)]
y. The Permittee shall submit performance test reports as specified in 40 CFR 63.455(h).
z. The Permittee seeking to assert an affirmative defense shall submit a written report to DAQ with all necessary
supporting documentation, that it has met the requirements set forth in Section 2.2 C.1.s, above. This affirmative
defense report shall be included in the summary report otherwise required after the initial occurrence of the
violation of the relevant standard (which may be the end of any applicable averaging period). If the summary
report is due less than 45 days after the initial occurrence of the violation, the affirmative defense report may be
included in the second summary report due after the initial occurrence of the violation of the relevant standard.
2. 15A NCAC 02D .1111: MACT 40 CFR 63 SUBPART S via 40 CFR 63.94 Equivalency by Permit – HVLC
System Sources
The Permittee shall comply with all applicable provisions, including the notification, testing, reporting, recordkeeping,
and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC 02D .1111
“Maximum Achievable Control Technology” (MACT) as promulgated in 40 CFR Part 63, Subpart S, including
Subpart A “General Provisions” as defined per 63.440(g) and indicated per Table 1 of Part 63, Subpart S. Terms used
throughout this section are defined in the Clean Air Act as amended in 1990 and in 40 CFR 63.2 and 63.441. Units
and abbreviations are defined in 40 CFR 63.3.
The authority for the alternate control requirements for Equivalency by Permit (EBP) is given in 40 CFR parts 63.91
63.94, and 63.99 as promulgated in “Approval of Section 112(l) Authority for Hazardous Air Pollutants; Equivalency
by Permit Provisions; National Emission Standards for Hazardous Air Pollutants from the Pulp and Paper Industry;
State of North Carolina”, Federal Register, Vol. 69, No. 70/Monday, April 12, 2004 pp 19106-19109. Section 63.99
“Delegated Federal Authorities” of Subpart E “Approval of State Programs and Delegation of Federal Authorities” was
also amended at FR Vol. 69, No. 70/Monday, April 12, 2004 p 19110 to add 63.99(a)(33)(ii) North Carolina.
Standards for the affected HVLC pulping system processes [15A NCAC 02Q .0508(f) and 02D .1111]
a. No later than April 16, 2007, the Permittee shall control HAP emissions from the Black Liquor Oxidation (BLOX)
System (ID No. G08022a) sources as required below, in lieu of controlling the 40 CFR 63, Subpart S-affected
HAP emissions from: [40 CFR Part 63.443 and 63.94]
The Brownstock Washing System (ID Nos. G03005 and G03006) Sources:
No. 1 Hardwood Fiberline Nos 1. Through 4 Brownstock Washers (No. 03-PU-001);
No. 1 Hardwood Fiberline Foam Tank No.1 (No. ES-03-TK-003);
No. 1 Hardwood Fiberline Foam Tank No. 2 (No. ES-03-TK-004);
No. 2 Pine Fiberline Washers and Filtrate Tanks (No. 03-PU-032)*
No. 2 Pine Fiberline Brownstock Washer Mix Tanks (Nos. 03-TK-015, 03-TK-016, and 03-TK-017)
The Oxygen Delignification Systems (ID Nos. G04009 and G04010) Sources:
No. 1 Hardwood Fiberline O2 Reactor (No. 04-PU-001)*
No. 1 Hardwood Fiberline O2 Blow Tank (No. 04-TK-005);
No. 1 Hardwood Fiberline Post O2 Washer (No. 04-PU-002);
No. 1 Hardwood Fiberline Post O2 Filtrate Chest (No. 04-TK-008);
No. 2 Pine Fiberline O2 Reactor (No. 04-PU-014)*
No. 2 Pine Fiberline O2 Blow Tank (No. 04-TK-018); and
No. 2 Pine Fiberline Post O2 Washer (No. 04-PU-016).
* These sources are fully enclosed and do not have a vent to the atmosphere.
Permit 08961T29
Page 110
Standards for the BLOX system [15A NCAC 02Q .0508(f) and 02D .1111]
b. No later than April 16, 2007, the Permittee shall meet the control requirements for the total HAP emissions from
the BLOX System (ID No. G08022a) sources. Each BLOX system component shall be enclosed and vented into a
closed-vent system meeting the requirements of Section 2.2 C.1.g, above, and controlled per the following
requirements: [40 CFR 63.94 and 63.443]:
i. Reduce total HAP emissions by 98 percent or more by weight; or
ii. Reduce total HAP emissions using a thermal oxidizer designed and operated at a minimum temperature of
871°C (1600°F) and a minimum residence time of 0.75 seconds.
c. Periods of excess emissions reported under Section 2.2 C.2.o, below, shall not be a violation of the above
requirements provided that the time of excess emissions (including periods of startup, shutdown, and malfunction)
divided by the total process operating time in a semi-annual reporting period does not exceed four percent for
control devices used to reduce the total HAP emissions from the BLOX system. The Permittee shall be deemed in
non-compliance with 15A NCAC 02D .1111 when excess emissions exceed four percent.
d. The Black Liquor Oxidation (BLOX) System thermal oxidizer is permitted to burn only BLOX gases and natural
gas as an auxiliary fuel.
Testing [15A NCAC 02Q .0508(f) and 02D .1111]
e. If emissions testing is required, the testing shall be performed in accordance General Condition JJ. If the results of
this or any testing are above the limits contained herein, the Permittee shall be deemed in noncompliance with 15A
NCAC 02D .1111 via 40 CFR 63.94. [40 CFR 63.94, 40 CFR 63.457]
i. An initial performance test is not required to show compliance with the HAP destruction efficiency if the
Permittee selects the compliance method per paragraph 2.2 C.2.b.ii, above. Otherwise, an initial performance
test shall be conducted no later than April 16, 2007 and subsequent performance tests shall be conducted
within 60 months after the previous test. The performance tests shall be conducted in accordance with General
Condition JJ and with the requirements of 40 CFR 63.457.
ii. If emission testing is required for parity demonstration, the testing shall be done in accordance with General
Condition JJ, and the test methods and procedures contained in 40 CFR 63.457. The testing will consist of:
(A) determining the emissions from the sources that were subject to 40 CFR 63 Subpart S as identified in
Section 2.2 C.2.a, above, but are not controlled under the EBP option; and
(B) the uncontrolled emissions from the BLOX system.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D .1111 via 40 CFR 63.94 if the emissions
from Section 2.2 C.2.e.ii.(A), above, exceed the emissions from Section 2.2 C.2.e.ii.(B), above.
Production Monitoring for Parity with 40 CFR 63, Subpart S [15A NCAC 02Q .0508(f) and 02D .1111]
f. To ensure continuing parity, the hardwood pulp production shall not exceed 83 percent of the total pulp production
on a 12-month rolling average basis. The Permittee shall keep records of the monthly hardwood pulp production
and the monthly total pulp production. The initial 12-month rolling average shall cover the period May 2007
through April 2008. [40 CFR 63.94] The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111
via 40 CFR 63.94 if the monitoring is not performed, or if the 12-month rolling average hardwood pulp production
exceeds 83 percent of the total pulp production.
Monitoring for BLOX System Control Device [15A NCAC 02Q .0508(f) and 02D .1111]
g. The Permittee shall install, calibrate, operate, and maintain pursuant to the manufacturer’s specifications, a
continuous monitoring system (CMS) to measure the temperature in the thermal oxidizer firebox or in the
ductwork immediately downstream of the firebox and before any substantial heat exchange occurs. The CMS shall
include a continuous recorder. The CMS shall be operated to ensure the following operational parameters are
maintained [40 CFR 63, Subpart 63.453(a), (b), (n), and (o) and 63.94]:
i. If the Permittee elects to comply with Section 2.2 C.2.b.i, above, a 3-hour rolling average minimum operating
temperature of 1450oF shall be recorded and maintained.
ii. An alternate minimum operating temperature may be established per additional approved testing performed
per Section 2.2 C.1.i.ii, above.
iii. If the Permittee elects to comply with Section 2.2 C.2.b.ii, above, then a minimum operating temperature of
871°C (1600°F) shall be recorded and maintained.
Operation of the black liquor oxidation system control device (ID. No. CD-BLOXRTO) below established
minimum operating temperatures, or failure to perform the required monitoring shall be reported as a period of
Permit 08961T29
Page 111
excess emissions. The established continuous compliance monitoring parameters shall not apply during any
required subsequent testing.
Standards for Enclosures and Closed-Vent Systems [15A NCAC 02Q .0508(f) and 02D .1111]
h. The Black Liquor Oxidation System enclosure and closed-vent system shall meet the requirements of Section 2.2
C.1.g, above. [40 CFR 63.450, 40 CFR 63.94] The Permittee shall be deemed in noncompliance with 15A NCAC
02D .1111 via 40 CFR 63.94 if the enclosure and closed-vent system requirements are not met.
Monitoring for Enclosures and Closed-Vent Systems [15A NCAC 02Q .0508(f) and 02D .1111]
i. The Black Liquor Oxidation System enclosure and closed-vent system shall meet the monitoring requirements of
Section 2.2 C.1.o, above. [40 CFR 63.453, 40 CFR 63.94] The Permittee shall be deemed in noncompliance with
15A NCAC 02D .1111 via 40 CFR 63.94 if the monitoring is not performed.
Startup, Shutdown, and Malfunction [15A NCAC 02Q .0508(f) and 02D .1111]
j. At all times, the Permittee shall operate and maintain the Black Liquor Oxidation System, including associated air
pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution
control practices for minimizing emissions. Determination of whether such operation and maintenance procedures
are being used will be based on information available to the DAQ which may include, but is not limited to,
monitoring results, review of operation and maintenance procedures, review of operation and maintenance records,
and inspection of the source. [40 CFR 63.94 and 63.453(q)] The Permittee shall be deemed in noncompliance with
15A NCAC 02D .1111 if these practices are not conducted.
k. In response to an action to enforce the standards set forth in Section 2.2 C.2.b, above, the Permittee may assert an
affirmative defense to a claim for civil penalties for violations of such standards that are caused by malfunction, as
defined at 40 CFR 63.2. Appropriate penalties may be assessed, however, if the Permittee fails to meet the burden
of proving all of the requirements in the affirmative defense. The affirmative defense shall not be available for
claims for injunctive relief. To establish the affirmative defense in any action to enforce such a standard, the
Permittee must timely meet the reporting requirements in Section 2.2 C.2.s, below, and must prove by a
preponderance of evidence that: [40 CFR 63.456]
i. The violation:
(A) Was caused by a sudden, infrequent, and unavoidable failure of air pollution control equipment, process
equipment, or a process to operate in a normal or usual manner, and
(B) Could not have been prevented through careful planning, proper design or better operation and
maintenance practices; and
(C) Did not stem from any activity or event that could have been foreseen and avoided, or planned for; and
(D) Was not part of a recurring pattern indicative of inadequate design, operation, or maintenance; and
ii. Repairs were made as expeditiously as possible when a violation occurred. Off-shift and overtime labor were
used, to the extent practicable to make these repairs; and
iii. The frequency, amount and duration of the violation (including any bypass) were minimized to the maximum
extent practicable; and
iv. If the violation resulted from a bypass of control equipment or a process, then the bypass was unavoidable to
prevent loss of life, personal injury, or severe property damage; and
v. All possible steps were taken to minimize the impact of the violation on ambient air quality, the environment
and human health; and
vi. All emissions monitoring and control systems were kept in operation if at all possible, consistent with safety
and good air pollution control practices; and
vii. All of the actions in response to the violation were documented by properly signed, contemporaneous
operating logs; and
viii. At all times, the affected source was operated in a manner consistent with good practices for minimizing
emissions; and
ix. A written root cause analysis has been prepared, the purpose of which is to determine, correct, and eliminate
the primary causes of the malfunction and the violation resulting from the malfunction event at issue. The
analysis shall also specify, using best monitoring methods and engineering judgment, the amount of any
emissions that were the result of the malfunction.
Recordkeeping/Reporting [15A NCAC 02Q .0508(f) and 02D .1111]
l. The results of the CMS monitoring, Enclosure System monitoring, and Closed-Vent System monitoring shall be
maintained (in written or electronic format) per the requirements of 40 CFR 63.454 and 63.455. [40 CFR 63.94,
Permit 08961T29
Page 112
63.454, and 63.455] The Permittee shall be deemed in noncompliance with 15A NCAC .02D .1111 if these
records are not maintained.
m. The results of the monthly hardwood and total pulp production monitoring required by Section 2.2 C.2.f shall be
maintained in written or electronic format. [40 CFR 63.94, 63.454, and 63.455]
n. The Permittee shall maintain the following records of malfunctions [40 CFR 63.94 and 63.454(g)]:
i. Records of the occurrence and duration of each malfunction of operation (i.e., process equipment) or the air
pollution control and monitoring equipment.
ii. Records of actions taken during periods of malfunction to minimize emissions in accordance with Section 2.2
C.2.j, above, including corrective actions to restore malfunctioning process and air pollution control and
monitoring equipment to its normal or usual manner of operation.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f) and 02D .1111]
o. The Permittee shall submit a summary report of excess emissions postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year
for the preceding six-month period between January and June. All instances of deviations from the requirements
of this permit must be clearly identified. When no exceedances of an operating parameter have occurred, such
information shall be included in the report. This report shall also include the 12-month rolling average percent
hardwood pulp production for each month in the reporting period, or the average percent hardwood pulp
production since April 16, 2007 if 12 months of data are not yet available. [40 CFR 63.454; 63.455, 40 CFR
63.94]
p. The Permittee shall comply with the reporting requirements of 40 CFR 63, Subpart A as specified in Table 1 of 40
CFR 63.440.
q. If a malfunction occurred during the reporting period, the summary report must include the number, duration and a
brief description for each type of malfunction which occurred during the reporting period and which caused or
may have caused any applicable emission limitation to be exceeded. The report must also include a description of
actions taken by an owner or operator during a malfunction of an affected source to minimize emissions in
accordance with Section 2.2 C.2.j, above, including actions taken to correct a malfunction. [40 CFR 63.455(g)]
r. The Permittee shall submit performance test reports as specified in 40 CFR 63.455(h).
s. The Permittee seeking to assert an affirmative defense shall submit a written report to DAQ with all necessary
supporting documentation, that it has met the requirements set forth in Section 2.2 C.2.k, above. This affirmative
defense report shall be included in the summary report otherwise required after the initial occurrence of the
violation of the relevant standard (which may be the end of any applicable averaging period). If the summary
report is due less than 45 days after the initial occurrence of the violation, the affirmative defense report may be
included in the second summary report due after the initial occurrence of the violation of the relevant standard. [40
CFR 63.456(b)]
Permit 08961T29
Page 113
D. 40 CFR 63, Subpart MM Affected Sources:
Source ID No. Source Description Control ID No Control Description G08020 No. 10 Recovery Furnace 08-CD-001-01 Wet Bottom electrostatic precipitator
G08023 No. 10 Smelt Dissolving Tank 08-CD-011-01 Chevron Mist Eliminator
G08021 No. 11 Recovery Furnace 08-CD-002-01 Wet Bottom electrostatic precipitator
G08024 No. 11 Smelt Dissolving Tank 08-CD-012-01 Chevron Mist Eliminator
G09028 No. 4 Lime Kiln 09-CD-009-01 Flooded Disk-type wet scrubber
G09029 No. 5 Lime Kiln 09-CD-010-01 MicroMist venturi scrubber
Table 2.2 D-1
The following table provides a summary of limits and standards for the emission source(s) described above:
Regulated Pollutant
Limits/Standards
Applicable Regulation
Hazardous Air
Pollutants
No. 4 Lime Kiln
PM emissions shall be no greater than 0.10 gr/dscf, corrected to
10% oxygen.
No. 5 Lime Kiln
PM emissions shall be no greater than 0.10 gr/dscf, corrected to
10% oxygen.
No. 10 Recovery Furnace
PM emissions shall be no greater than 0.032 gr/dscf, corrected
to 8% oxygen.
During times when spent pulping liquor is fed, opacity shall not
be greater than 35 percent for more than 2 percent of the
operating time within any semiannual period.
No. 11 Recovery Furnace
PM emissions shall be no greater than 0.032 gr/dscf, corrected
to 8% oxygen.
During times when spent pulping liquor is fed, opacity shall not
be greater than 35 percent for more than 2 percent of the
operating time within any semiannual period.
No. 10 Smelt Dissolving Tank
PM emissions shall be no greater than 0.268 gr/dscf.
No. 11 Smelt Dissolving Tank
PM emissions shall be no greater than 0.321 gr/dscf.
Overall Chemical Recovery System PM Limit
Total PM emissions from the Nos. 4 and 5 Lime Kilns, Nos. 10
and 11 Recovery Furnaces, and Nos. 10 and 11 Smelt
Dissolving Tanks shall be no greater than 1.49 lb/TBLS.
15A NCAC 02D .1111
(40 CFR 63, Subpart MM)
1. 15A NCAC 02D .1111: MACT 40 CFR 63 SUBPART MM
a. The Permittee shall comply with all applicable provisions, including the notification, testing, reporting,
recordkeeping, and monitoring requirements contained in Environmental Management Commission Standard 15A
NCAC 02D .1111 “Maximum Achievable Control Technology” (MACT) as promulgated in 40 CFR Part 63,
Permit 08961T29
Page 114
Subpart MM, including Subpart A “General Provisions” as defined per 63.440(g) and indicated per Table 1 of
Subpart MM. Terms used throughout this section are defined in the Clean Air Act as amended in 1990 and in 40
CFR 63.2 and 63.861. Units and abbreviations are defined in 40 CFR 63.3. [15A NCAC 02D .1111]
Emission Limitations [15A NCAC 02D .1111]
b. The following emission limits apply to the Nos. 10 and 11 Recovery Furnaces (ID Nos. G08020 and G08021), the
Nos. 10 and 11 Smelt Dissolving Tanks (ID No. G08023 and G08024) and the Nos. 4 and 5 Lime Kilns (ID Nos.
G09028 and G09029):
i. Particulate matter emissions from the recovery furnaces, smelt dissolving tanks, and lime kilns shall not
exceed the limits presented in Table 2.2 D-1, above. [40 CFR 63.862(a)(1)(ii) and 63.865(a)]
ii. The chemical recovery system emissions limits must be re-established if either [40 CFR 63.862(a)(1)(ii)(D):
(A) the wet ESPs installed on the Nos. 10 and 11 Recovery Furnaces (ID Nos. 08-CD-001-01 and 08-CD-
002-01), the scrubbers installed on the Nos. 10 and 11 Smelt Dissolving Tanks (ID Nos. 08-CD-011-01
and 08-CD-012-01), and the Nos. 4 and 5 Lime Kilns (ID Nos. 09-CD-009-01 and 09-CD-010-01) are
modified (as defined in 40 CFR 63.861) or replaced, or
(B) The recovery furnaces, smelt dissolving tanks, or lime kilns are shut down for more than 60 consecutive
days.
iii. At all times, the Permittee shall operate and maintain each recovery furnace, smelt dissolving tank, and lime
kiln, including associated air pollution control equipment and monitoring equipment, in a manner consistent
with safety and good air pollution control practices for minimizing emissions. The general duty to minimize
emissions does not require the Permittee to make any further efforts to reduce emissions if levels required by
the applicable standard have been achieved. Determination of whether a source is operating in compliance
with operation and maintenance requirements will be based on information available to DAQ which may
include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of
operation and maintenance records, and inspection of the source. [40 CFR 63.860(d)]
Testing [15A NCAC 02D .1111]
c. Emissions testing shall be performed according to the procedures in 40 CFR 63.7 and 63.865, and General
Condition JJ. If the results of the testing indicate that the chemical recovery system emission rate is greater than
the emission limits presented in Table 2.2 D-1, above, the Permittee shall be deemed in noncompliance with 15A
NCAC 02D .1111. [40 CFR 63.865]
d. The Permittee shall conduct a performance test using the methods and procedures specified in Section 2.2 D.1.c,
above, on the Nos. 10 and 11 Recovery Furnaces (ID Nos. G08020 and G08021), the Nos. 10 and 11 Smelt
Dissolving Tanks (ID No. G08023 and G08024), and the Nos. 4 and 5 Lime Kilns (ID Nos. G09028 and
G09029) no later than October 13, 2020 and thereafter every 5 years following the previous performance test. [40
CFR 63.865]
i. The Permittee may only use a previously conducted performance test to satisfy the October 13, 2020, testing
requirement for the No. 5 Lime Kiln, the recovery furnaces and the smelt dissolving tanks, provided DAQ has
approved the test.
ii. The Permittee shall conduct performance tests based on representative performance of the recovery furnaces,
smelt dissolving tank, and lime kilns for the period being tested. Representative conditions do not include
periods of startup and shutdown.
iii. The Permittee shall not conduct performance tests during periods of malfunction.
iv. The Permittee shall conduct a performance test on the No. 5 Lime Kiln Scrubber no later than 180 days of the
resumption of normal operation following the upgrades proposed in Permit Application No. 4400159.20B.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the periodic performance tests are
not conducted as required.
Monitoring [15A NCAC 02D .1111]
e. The Permittee must install, calibrate, maintain, and operate a continuous opacity monitoring system (COMS) at the
outlet of the No. 10 Recovery Furnace ESP (ID No. 08-CD-001-01) and No. 11 Recovery Furnace ESP (ID No.
08-CD-002-01) in accordance with Performance Specification 1 in Appendix B to 40 CFR Part 60 and the
provisions in 40 CFR 63.6(h) and 63.8, and as follows [40 CFR 63.864(d)]:
i. Each COMS shall complete a minimum of one cycle of sampling and analyzing for each successive 10-second
period and one cycle of data recording for each successive 6-minute period.
ii. Per 40 CFR 63.8(g)(2), each 6-minute COMS data average opacity shall be calculated as the average of 36 or
more data points equally spaced over each 6-minute period.
Permit 08961T29
Page 115
If these monitoring procedures are not followed, the Permittee shall be deemed in noncompliance with 15A NCAC
02D .1111
f. For each required continuous parameter monitoring system (CPMS), the Permittee shall meet the following
requirements [40 CFR 63.864(e)]:
i. The Permittee shall maintain proper operation of automatic voltage control of the ESPs installed on the Nos.
10 and 11 Recovery Furnaces. [40 CFR 63.864(e)(1)]
ii. The Permittee shall install, calibrate, maintain, and operate CPMS that can be used to determine and record
the pressure drop across the scrubber and the scrubbing liquid flow rate on the No. 4 Lime Kiln Scrubber (ID
No. 08-CD-009-01), No. 5 Lime Kiln Scrubber (ID No. 09-CD-010-01), No. 10 Smelt Dissolving Tank
Scrubber (ID No. 08-CD-011-01), and No. 11 Smelt Dissolving Tank Scrubber (ID No. 08-CD-012-01).
Pressure drop and scrubbing liquid flow rate must be recorded at least once every successive 15-minute period
using the procedures in 40 CFR 63.8(c), as well as the following procedures [40 CFR 63.864(e)(10)]:
(A) The monitoring device used for the continuous measurement of the pressure drop of the gas stream across
each scrubber shall be certified by the manufacturer to be accurate to within a gauge pressure of
±500 Pascals (±2 inches of water gauge pressure); and
(B) The monitoring device used for continuous measurement of the scrubbing liquid flow rate shall be
certified by the manufacturer to be accurate within ±5 percent of the design scrubbing liquid flow rate.
If these monitoring procedures are not followed, the Permittee shall be deemed in noncompliance with 15A NCAC
02D .1111.
g. Per 40 CFR 63.8(g)(5), monitoring data recorded during periods of unavoidable CMS breakdowns, out-of-control
periods, repairs, maintenance periods, calibration checks, and zero (low-level) and high level adjustments shall not
be included in any data averages computed for compliance with Section 2.2 D.1. The Permittee shall be deemed in
noncompliance with 15A NCAC 02D .1111 if data averages are not calculated as specified above. [40 CFR
63.864(h)]
Operating Limits [15A NCAC 02D .1111]
h. The Permittee shall confirm or reestablish operating limits for the monitoring parameters in Table 2.2 D-2, below,
during performance tests conducted per Section 2.2 D.1.c, above, as follows [40 CFR 63.864(j)]:
i. The Permittee shall establish operating limits on values recorded during the performance tests conducted
according to Section 2.2 D.1.c and D.1.d, above; or
ii. The Permittee may base operating limits on values recorded during previous performance tests or conduct
additional performance tests for the specific purpose of establishing operating limits, provided that test data
used to establish the operating limits are or have been obtained using the test methods required in 40 CFR Part
63, Subpart MM. The Permittee shall certify that all control devices and processes have not been modified
subsequent to the testing upon which the data used to establish the operating parameter limits were obtained.
iii. The Permittee may establish expanded or replacement operating limits for the monitoring parameters
specified in Table 2.2 D-2, below, during subsequent performance tests using the test methods in 40 CFR
63.865.
iv. The Permittee shall continuously monitor each parameter and determine the arithmetic average value of each
parameter during each performance test run. Multiple performance tests may be conducted to establish a
range of parameter values. Operating outside a previously established parameter limit during a performance
test to expand the operating limit range does not constitute a monitoring period of noncompliance.
v. The Permittee shall set the minimum scrubber pressure drop operating limit for the scrubbers installed on the
smelt dissolving tanks and the lime kilns as the lowest of the 1-hour average pressure drop values associated
with each test run demonstrating compliance with the applicable emission limits specified in Section 2.2
D.1.b, above.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the operating ranges for the
specified monitoring parameters are not established as required above.
Ongoing Compliance Requirements [15A NCAC 02D .1111]
i. The Permittee is required to implement corrective action if the following monitoring exceedances occur during
times when spent pulping liquor is fed to the Nos. 10 or 11 Recovery Boilers (ID Nos. G08020 and G08021) or
lime mud is fed to the Nos. 4 or 5 Lime Kilns (ID Nos. G09028 and G09029). Corrective action can include
completion of transient startup and shutdown conditions as expediently as possible.
i. For the Nos. 10 and 11 Recovery Furnaces, when the average of ten consecutive 6-minute averages results in
a measurement greater than 20 percent opacity [40 CFR 63.864(k)(1)(i)];
Permit 08961T29
Page 116
ii. For the Nos. 4 and 5 Lime Kilns and the Nos. 10 and 11 Smelt Dissolving Tanks (ID Nos. G08023 and
G08024), when any 3-hour average wet scrubber parameter value is below the minimum operating limit
established according to the methods specified in Section 2.2 D.1.h, above, and indicated in Table 2.2 D-2,
below, with the exception of pressure drop during periods of startup and shutdown. [40 CFR 63.864(k)(1)(ii)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if corrective action is not
implemented for the monitoring exceedances above.
j. The Permittee is in noncompliance with the emission limits in Section 2.2 D.1.b, above, if the following
monitoring exceedances occur during times when spent pulping liquor is being fed to the Nos. 10 or 11 Recovery
Boilers (ID Nos. G08020 and G08021) or lime mud is fed to the Nos. 4 or 5 Lime Kilns (ID Nos. G09028 and
G09029). [40 CFR 63.864(k)(2)]
i. For Nos. 10 and 11 Recovery Furnaces, when opacity is greater than 35 percent for 2 percent or more of the
operating time within any semiannual period. [40 CFR 63.864(k)(2)(i)]
ii. For Nos. 4 and 5 Lime Kilns and Nos. 10 and 11 Smelt Dissolving Tanks, when six or more 3-hour average
parameter values within any 6-month reporting period below the minimum operating limits above, established
according to the methods specified in Section 2.2 D.1.h and specified in Table 2.2 D.2, below, with the
exception of pressure drop during periods of startup or shutdown. [40 CFR 63.864(k)(2)(iv) and (viii)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 these monitoring exceedances
occur. The established continuous compliance monitoring parameters shall not apply during any required
subsequent performance testing.
Table 2.2 D-2
Source
Description
Parameter Values
No. 4 Lime Kiln Prior to upgrades to the scrubber (ID No. 09-CD-009-01):
1. Scrubber recirculation liquid flow shall be no less than 289 gpm (3-hour average), and
2. Scrubber differential pressure shall be no less than 20 in. H2O (3-hour average).
After upgrades to the scrubber (ID No. 09-CD-009-01):
1. Scrubber recirculation liquid flow rate shall be no less than the minimum value recommended
by the manufacturer. The Permittee shall establish site-specific minimum scrubber recirculation
liquid flow during the performance test required in Section 2.2 D.1.d, above.
2. Scrubber differential pressure shall be no less than the minimum value recommended by the
scrubber manufacturer. The Permittee shall establish site-specific minimum scrubber differential
pressure during the performance test require in Section 2.2 D.1.d, above.
No. 5 Lime Kiln Prior to upgrades to the scrubber (ID No. 09-CD-010-01):
1. Scrubber venturi liquid flow shall be no less than 224 gpm (3-hour average),
2. Scrubber quench liquid flow shall be no less than 152 gpm (3-hour average), and
3. Scrubber differential pressure shall be no less than 19.2 in. H2O (3-hour average).
After upgrades to the scrubber (ID No. 09-CD-010-01):
1. Scrubber venturi liquid flow rate shall be no less than the minimum value recommended by the
manufacturer. The Permittee shall establish a site-specific minimum venturi liquid flow rate
during the performance test required in Section 2.2 D.1.d, above.
2. Scrubber quench liquid flow rate shall be no less than the minimum value recommended by
the manufacturer. The Permittee shall establish a site-specific minimum quench liquid flow rated
during the performance test required in Section 2.2 D.1.d, above.
3. Scrubber differential pressure shall be no less than the minimum value recommended by the
manufacturer. The Permittee shall establish a site-specific minimum scrubber differential
pressure during the performance test require in Section 2.2 D.1.d, above.
No. 10 Smelt
Dissolving Tank
1. Scrubber liquid flow to firing floor shall be no less than 30 gpm (3-hour average), and
2. Scrubber pressure drop shall be no less than 0.12 in H2O (3-hr average).
No. 11 Smelt
Dissolving Tank
1. Scrubber liquid flow to demister system shall be no less than 74 gpm (3-hour average); and
2. Scrubber pressure drop shall be no less than 1.50 inches H2O (3-hr average).
k. For purposes of determining the number of non-opacity monitoring exceedances, no more than one exceedance
will be attributed in any given 24-hour period. [63.864(k)(3)]
Recordkeeping [15A NCAC 02D .1111]
l. In addition to the general records required by 40 CFR 63.10(b)(2)(iii) and (vi) through (xiv), the Permittee shall
maintain records of the following information [40 CFR 63.866(b) and (c)]:
Permit 08961T29
Page 117
i. Records of black liquor solids firing rates in units of tons per day for the Nos. 10 and 11 Recovery Furnaces
(ID Nos. G08020 and G08021);
ii. Records of lime (CaO) production rates in units of tons per day for the Nos. 4 and 5 Lime Kilns (ID Nos.
G09028 and G09029);
iii. Records of parameter monitoring data required under Section 2.2 D.1.e and D.1.f, above, including any period
when the operating parameter levels were inconsistent with the levels established during performance tests,
with a brief explanation of the cause of the monitoring exceedance, the time the exceedance occurred, the time
corrective action was initiated and completed, and the corrective action taken;
iv. Records and documentation of supporting calculations for the chemical recovery system emissions limit in
Section 2.2 D.1.b, above;
v. Records of parameter operating limits established under Section 2.2 D.1.h, and specified in Table 2.2 D-2;
vi. Records demonstrating compliance with the requirement specified in Section 2.2 D.1.f.i, above, to maintain
proper operation of the ESP AVC.
vii. Records of any occurrence when corrective action is required under Section 2.2 D.1.i, above, and when period
of noncompliance is noted under Section 2.2 D.1.j, above.
viii. Records of process information that is necessary to document operating conditions during performance tests
and an explanation to support that such conditions represent normal conditions. [40 CFR 63.865]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 these records are not maintained.
m. The Permittee shall maintain the following records [40 CFR 63.866(d)(1)]:
i. In the event that the Nos. 10 and 11 Recovery Furnaces (ID Nos. G08020 and G08021), Nos. 10 and 11
Smelt Dissolving Tanks (ID Nos. G08023 and G08024), or Nos. 4 and 5 Lime Kilns (ID No. G09028 and
G09029) fails to meet an applicable standard, including any emission limit or any opacity or CPMS operating
limit in Section 2.2 D.1.b, or Table 2.2 D-2, above, record the number of failures. For each failure record the
date, start time, and duration of each failure.
ii. For each failure to meet an applicable standard, record and retain a list of the affected sources or equipment,
and the following information:
A. For any failure to meet an emission limit in Section 2.2 D.1.b, above, record an estimate of the quantity of
each regulated pollutant emitted over the emission limit and a description of the method used to estimate
the emissions.
B. For each failure to meet an operating limit in Table 2.2 D-2, above, maintain sufficient information to
estimate the quantity of each regulated pollutant emitted over the emission limit. This information must
be sufficient to provide a reliable emissions estimate if requested by the DAQ.
iii. Record actions taken to minimize emissions in accordance with Section 2.2 B.1.b.iii, above, and any
corrective actions taken to return the affected unit to its normal or usual manner of operation.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the specified records are not
maintained.
n. The Permittee shall keep CPMS data quality assurance procedures consistent with the requirements in 40 CFR
63.8(d)(1) and (2) on record for the life of the Nos. 10 and 11 Recovery Furnaces (ID Nos. G08020 and G08021),
Nos. 10 and 11 Smelt Dissolving Tanks (ID Nos. G08023 and G08024), or Nos. 4 and 5 Lime Kilns (ID No.
G09028 and G09029). If the performance evaluation plan is revised, the Permittee shall keep previous versions on
record to be made available to DAQ upon request for a period of 5 years after each revision to the plan. The
program of corrective action should be included in the plan required under 40 CFR 63.8(d)(2). The Permittee shall
be deemed in noncompliance with 15A NCAC 02D .1111 if the required CPMS data quality assurance procedures
are not followed. [40 CFR 63.864(f)]
o. All records shall be maintained in a logbook (written or electronic format) on-site and made available to an
authorized representative upon request. The Permittee shall be deemed in noncompliance with 15A NCAC 02D
.1111 if the records are not maintained.
Reporting [15A NCAC 02D .1111]
p. After DAQ has approved the emissions limits Specified in Section 2.2 D.1.b, above, the Permittee shall notify
DAQ before any of the following actions are taken [40 CFR 63.867(b)(3)]:
i. The ESPs installed on the Nos. 10 or 11 Recovery Furnaces (ID Nos. 08-CD-001-01 or 08-CD-002-01), the
scrubbers installed on the Nos. 10 or 11 Smelt Dissolving Tanks (ID Nos. 08-CD-011-01 or 08-CD-012-01)
the scrubbers installed on the Nos. 4 or 5 Lime Kilns (ID Nos. 09-CD-009-01 or 09-CD-010-01), are
modified or replaced;
Permit 08961T29
Page 118
ii. The Nos. 10 or 11 Recovery Furnace (ID No. G08020 or G08021), Nos. 10 or 11 Smelt Dissolving Tank (ID
No. G08023 and G08024), or Nos. 4 or 5 Lime Kiln (ID No. G09028 or G09029), are shut down for more
than 60 consecutive days;
iii. A continuous monitoring parameter or the value or range of values of a continuous monitoring parameter for
the Nos. 10 or 11 Recovery Furnaces, the Nos. 10 or 11 Smelt Dissolving Tanks, or the Nos. 4 and 5 Lime
Kilns in Table 2.2 D-2, above, are changed; or
iv. The black liquor solids firing rate for Nos. 10 or No. 11 Recovery Furnaces (ID Nos. G08020 or G08021)
during any 24-hour averaging period is increased by more than 10 percent above the level measured during
the most recent performance test.
q. If the Permittee is required to recalculate the overall PM emissions limit for the Nos. 10 and 11 Recovery Furnaces
(ID Nos. G08020 and G08021), Nos. 10 or 11 Smelt Dissolving Tank (ID Nos. G08023 and G08024), or Nos. 4
and 5 Lime Kilns (ID Nos. G09028 and G09029) as required in Section 2.2 D.1.b.ii, above, the Permittee shall
resubmit the calculations and supporting documentation used in accordance with 40 CFR 63.865 to DAQ to
approval.
r. The Permittee shall submit semiannual excess emissions reports postmarked on or before January 30 of each
calendar year for the preceding six-month period between July and December and July 30 of each calendar year for
the preceding six-month period between January and June. Each report shall contain the following information and
shall be submitted following the reporting procedures specified in 40 CFR 63.867(d). [40 CFR 63.867(c)]
(i) If the total duration of excess emissions or process control system parameter exceedances for the reporting
period is less than 1 percent of the total reporting period operating time, and CMS downtime is less than 5
percent of the total reporting period operating time, only the summary report is required to be submitted. This
report will be titled “Summary Report—Gaseous and Opacity Excess Emissions and Continuous Monitoring
System Performance” and must contain the information specified in 40 CFR 63.867(c)(1)(i) through (x). [40
CFR 63.867(c)(1)]
(ii) If measured parameters meet any of the conditions specified in Section 2.2 D.1.i or D.1.j, above, the owner or
operator of the affected source must submit a semiannual report describing the excess emissions that occurred.
If the total duration of monitoring exceedances for the reporting period is 1 percent or greater of the total
reporting period operating time, or the total CMS downtime for the reporting period is 5 percent or greater of
the total reporting period operating time, or any violations according to Section 2.2 D.1.j, above, occurred,
information from both the summary report and the excess emissions and continuous monitoring system
performance report must be submitted. This report will be titled “Excess Emissions and Continuous
Monitoring System Performance Report” and must contain the information specified in 40 CFR
63.867(c)(1)(i) through (x), in addition to the information required in 40 CFR 63.10(c)(5) through (14), as
specified in 40 CFR 63.867(c)(3)(i) through (vi). Reporting monitoring exceedances does not constitute a
violation of the applicable standard unless the violation criteria in Section 2.2 D.1.j and D.1.k, above, are
reached. [40 CFR 63.867(c)(3)]
(iii) If a source fails to meet an applicable standard, including any emission limit or operating limit specified in
Table 2.2 D-2, above, the Permittee shall report such events in the semiannual excess emissions report. The
Permittee shall report the number of failures to meet an applicable standard and for each instance, the date,
time and duration of each failure. For each failure, the report shall include a list of the affected sources or
equipment, and for any failure to meet an emission limit specified in Table 2.2 D-2, above, the Permittee shall
provide an estimate of the quantity of each regulated pollutant emitted over the emission limit, and a
description of the method used to estimate the emissions. [40 CFR 63.867(c)(4)]
(iv) The Permittee may combine excess emissions and/or summary reports for the facility for 40 CFR Part 63,
Subpart MM and Subpart S. [40 CFR 63.867(c)(5)]
Permit 08961T29
Page 119
E. Riley Coal (ID No. G11039) – equipped with low NOX burners; a 2-chamber, 3-field electrostatic
precipitator (ID No. 11-CD-005-01); and a wet scrubber (ID No. 11-CD-005-02)
No. 4 Power Boiler (ID No. G11040) – equipped with low NOX burner components; a Separated Over
Fire Air (SOFA) system; a 2-chamber, 4-field electrostatic precipitator (ID No. 11-CD-006-01); a
urea-based Selective Non-Catalytic Reduction (SNCR) NOX emission reduction system (ID No. 11-
CD-006-02); and a wet scrubber (ID No. 11-CD-006-03).
Riley Bark Boiler (ID No. G11042) – with partial flyash reinjection and grate fire ignition (kerosene
and rags), equipped with a multicyclone (ID No. 11-CD- 016-01) in series with a venturi-type wet
scrubber (ID No. 11-CD-016-02).
1. 15A NCAC 02Q .0508(j): ALTERNATIVE OPERATING SCENARIOS [15A NCAC 02Q .0508(j)]
The Permittee, contemporaneously with making a change from one alternate operating scenario to another, shall record
in a logbook (written or electronic format) the scenario under which it is operating. [15A NCAC 02Q .0508(p)]
a. The Primary Operating Scenario (POS) is defined as the Riley Coal Boiler and No. 4 Power Boiler (ID Nos.
G11039 and G11040) equipped with an ESP and monitoring opacity using a COMS.
b. The Alternate Operating Scenario (AOS) is defined as the Riley Coal Boiler and No. 4 Power Boiler (ID Nos.
G11039 and G11040) equipped with an ESP, wet scrubber, and monitoring PM emissions using a PM CEMS.
2. 15A NCAC 02D .1111: MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY
Applicability
a. For the existing Riley Coal, No. 4 Power, and Riley Bark Boilers (ID Nos. G11039, G11040, and G11042), the
Permittee shall comply with all applicable provisions for the subcategories of boilers (as defined in 40 CFR
63.7575) identified below, including the monitoring, recordkeeping, and reporting contained in Environmental
Management Commission Standard 15A NCAC 02D .1111 "Maximum Achievable Control Technology" (MACT)
as promulgated in 40 CFR Part 63, Subpart DDDDD “National Emission Standards for Hazardous Air Pollutants
for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters” and Subpart A “General
Provisions.” [40 CFR 63.7485, 63.7490(d)]
i. Riley Coal Boiler and No. 4 Power Boiler (ID Nos. G11039 and G11040) are considered pulverized
coal/solid fossil fuel units. The boilers shall burn at least 10 percent coal or other solid fossil fuel on an annual
heat input basis. [40 CFR 63.7499(a),(p), and (r)]
ii. Riley Bark Boiler (ID No. G11042) is considered a unit designed to burn biomass/bio-based solid fuel and a
hybrid suspension grate boiler. [40 CFR 63.7499(h) and (p), and 63.7575]
(A) The boiler shall burn at least 10 percent biomass or bio-based solids on an annual heat input basis in
combination with solid fossil fuels, liquid fuels, or gaseous fuels.
(B) The moisture of the biomass fuel combusted in the Riley Bark Boiler shall exceed 40 percent on an as-
fired annual heat input basis as demonstrated by monthly fuel analysis.
Definitions and Nomenclature
b. For the purpose of this permit condition, the definitions and nomenclature contained in 40 CFR 63.7575 shall
apply. [40 CFR 63.7575]
40 CFR Part 63 Subpart A General Provisions
c. The Permittee shall comply with the requirements of 40 CFR 63 Subpart A General Provisions according to the
applicability of Subpart A to such sources as identified in Table 10 to 40 CFR Part 63 Subpart DDDDD. [40 CFR
63.7565]
Compliance Date
d. The Permittee shall be subject to the requirements of 40 CFR Part 63, Subpart DDDDD starting May 20, 2019.
Note that the requirements of this standard may require action on behalf of the Permittee prior to May 20, 2019.
[40 CFR 63.7510(e), 63.56(b)] The Permittee shall:
i. Complete the initial tune up and the one-time energy assessment as required in Section 2.2 E.2.s and A.10.t no
later than May 20, 2019.
Permit 08961T29
Page 120
ii. Complete the initial compliance requirements in Section 2.2 E.2.k no later than November 16, 2019 and
according to the applicable provisions in §63.7(a)(2).
General Compliance Requirements
e. The Permittee shall meet the following general compliance requirements.
i. At all times the Riley Coal, No. 4 Power, and Riley Bark Boilers (ID Nos. G11039, G11040, and G11042)
are operating, the Permittee shall be in compliance with the emission standards in Section 2.2 E.2.g, below,
except during periods of startup and shutdown. During startup and shutdown, the Permittee shall comply only
with Section 2.2 E.2.u through E.2.v, below. [40 CFR 63.7500(f) and 63.7505(a)]
ii. The Permittee shall develop a site-specific monitoring plan according to following requirements for the use of
each CMS (including CEMS or CPMS). [40 CFR 63.7505(d)]
(A) For each CEMS and CPMS, including oxygen analyzer systems and operating load or steam generation
monitors, the Permittee shall develop, and submit to DAQ for approval upon request, a site-specific
monitoring plan that addresses design, data collection, and the quality assurance and quality control
elements outlined in 40 CFR 63.8(d) and the following elements. The Permittee shall submit the site-
specific monitoring plan, if requested, at least 60 days before the initial performance evaluation of each
CEMS and oxygen analyzer system.
(1) Installation of the CMS sampling probe or other interface at a measurement location relative to each
boiler such that the measurement is representative of control of the exhaust emissions;
(2) Performance and equipment specifications for the sample interface, the pollutant concentration or
parametric signal analyzer, and the data collection and reduction systems; and
(3) Performance evaluation procedures and acceptance criteria (e.g., calibrations, accuracy audits,
analytical drift).
(B) In each site-specific monitoring plan, the Permittee shall also address ongoing operating and maintenance
procedures, ongoing data quality assurance procedures, and ongoing recordkeeping and reporting
procedures in accordance with 40 CFR 63.8 and 63.10. [40 CFR 63.8 (c)(1)(ii), (c)(3), and (c)(4)(ii),
63.8(d), 63.10(c) as applicable in Table 10 to 40 CFR Part 63, Subpart DDDDD), and 63.10(e)(1) and
(e)(2)(i)]
(C) The Permittee shall conduct a performance evaluation of each CMS in accordance with the site-specific
monitoring plan.
(D) The Permittee shall operate and maintain the CMS in continuous operation according to the site-specific
monitoring plan.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these general compliance
requirements are not met.
f. At all times, then Permittee shall operate and maintain the Riley Coal, No. 4 Power, and Riley Bark Boilers (ID
Nos. G11039, G11040, and G11042), including associated air pollution control equipment and monitoring
equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions.
Determination of whether such operation and maintenance procedures are being used will be based on information
available to the Administrator that may include, but is not limited to, monitoring results, review of operation and
maintenance procedures, review of operation and maintenance records, and inspection of the source. [40 CFR
63.7500(a)(3)]
Emission Limits [15A NCAC 02Q .0508(f)]
g. The Permittee shall comply with the emission limits in the table below for the Riley Coal, No. 4 Power, and Riley
Bark Boilers (ID Nos. G11039, G11040, and G11042). [40 CFR 63.7500(a)(1) and Table 2 to 40 CFR Part 63,
Subpart DDDDD]
Pollutant Emission Limit
Sample Volume or Test Run Duration for
Performance Tests
Hydrochloric
acid (HCl)
2.2E-02 lb per million Btu of heat
input
For EPA Method 26A, collect a minimum of 1
dry standard cubic meter per run; for Method 26,
collect a minimum of 120 liters per run.
Permit 08961T29
Page 121
Pollutant Emission Limit
Sample Volume or Test Run Duration for
Performance Tests
Mercury (Hg) 5.7E-06 lb per million Btu of heat
input
For EPA Method 29A, collect a minimum of 3
dry standard cubic meters per run; for Method
30A or Method 30B, collect a minimum sample
as specified in the method; for ASTM D6784
collect a minimum of 3 dry standard cubic
meters.
Carbon
monoxide (CO)
Riley Coal and No. 4 Power Boilers
130 ppm by volume on a dry basis
corrected to 3 percent oxygen, 3-run
average
Riley Bark Boiler
3,500 ppm by volume on a dry basis
corrected to 3 percent oxygen, 3-run
average
1-hour minimum sampling time.
Filterable
particulate
matter (PM)
Riley Coal and No. 4 Power Boilers
4.0E-02 lb PM per million Btu of heat
input
Riley Bark Boiler
4.4E-01 lb PM per million Btu of heat
input
Collect a minimum of 1 dry standard cubic meter
per run.
Testing [15A NCAC 02Q .0508(f)]
h. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. The
Permittee shall conduct performances stack tests according to the procedures specified in 40 CFR 63.7520,
including the following. [40 CFR 63.7520]
i. Develop a site-specific stack test plan according to the requirements of 40 CFR 63.7(c). [40 CFR 63.7520(a)]
ii. Conduct each performance test according to the requirements in Table 5 to 40 CFR Part 63, Subpart DDDDD.
[40 CFR 63.7520(b)]
iii. Conduct each performance test under the specific conditions listed in Tables 5 and 7 to 40 CFR Part 63,
Subpart DDDDD. The Permittee shall conduct performance stack tests at representative operating load
conditions while burning the type of fuel or mixture of fuels that has the highest content of HCl or mercury
and the Permittee shall demonstrate initial compliance and establish operating limits based on these
performance tests. These requirements could result in the need to conduct more than one performance test.
Following each performance test and until the next performance test, the Permittee shall comply with the
operating limit for operating load conditions specified in Table 4 to 40 CFR Part 63, Subpart DDDDD.
iv. Conduct a minimum of three separate test runs for each required performance stack test. Each test run must
comply with the minimum applicable sampling times or volumes specified in Section 2.2 E.2.g, above. [40
CFR 63.7520(b)]
v. Convert measured PM and mercury concentrations resulting from the performance stack test to pounds per
million Btu heat input emission rates as specified in 40 CFR 63.7520(e).
vi. Except for a 30-day rolling average based on CEMS (or sorbent trap monitoring system) data, if measurement
results for any pollutant are reported as below the method detection level (e.g., laboratory analytical results for
one or more sample components are below the method defined analytical detection level), the Permittee shall
use the method detection level as the measured emissions level for that pollutant in calculating compliance.
The measured result for a multiple component analysis (e.g., analytical values for multiple Method 29
fractions both for individual HAP metals and for total HAP metals) may include a combination of method
detection level data and analytical data reported above the method detection level. [40 CFR 63.7520(f)]
If the performance tests are not conducted as required above, the Permittee shall be deemed in noncompliance with
15A NCAC 02D .1111.
Fuel Analysis [15A NCAC 02Q .0508(f)]
i. The Permittee shall conduct fuel analyses for solid and liquid fuels for chloride and mercury according to the
following paragraphs. The Permittee is not required to conduct fuel analyses for fuels used for only startup, unit
Permit 08961T29
Page 122
shutdown, and transient flame stability purposes. Gaseous and liquid fuels are exempt from the sampling
requirements in Section 2.2 E.2.i.ii and E.2.i.iii, below. [40 CFR 63.7521(a) through (e)]
i. The Permittee shall develop a site-specific fuel monitoring plan according to the requirements and procedures
specified in 40 CFR 63.7521(b) and in Table 6 to 40 CFR Part 63, Subpart DDDDD.
ii. The Permittee shall obtain composite fuel samples for each fuel type according to the procedures in 40 CFR
63.7521(c)(1) or (2), or the methods listed in Table 6 to 40 CFR Part 63, Subpart DDDDD, or use an
automated sampling mechanism that provides representative composite fuel samples for each fuel type that
includes both coarse and fine material. At a minimum, for demonstrating initial compliance by fuel analysis,
the Permittee shall obtain three composite samples. For monthly fuel analyses, at a minimum, the Permittee
shall obtain a single composite sample. For fuel analyses as part of a performance stack test, as specified in 40
CFR 63.7510(a), the Permittee shall obtain a composite fuel sample during each performance test run.
iii. The Permittee shall prepare each composite sample according to the procedures in 40 CFR 63.7521(d)(1)
through (7).
iv. The Permittee shall determine the concentration of pollutants in the fuel (mercury and/or chlorine) in units of
pounds per million Btu of each composite sample for each fuel type according to the procedures in Table 6 to
40 CFR Part 63, Subpart DDDDD, for use in Equations 7, 8, and 9 of 40 CFR Part 63, Subpart DDDDD.
v. Fuel analyses are not required for the following: [40 CFR 63.7510(a)(2)]
(A) For boilers that fire a single type of fuel, a fuel analysis is not required for each type of fuel burned in the
boiler. Units that use supplemental fuel for only startup, shutdown, and transient flame stability purposes
qualify as unites that burn a single type of fuel. A fuel analysis is not required for the supplemental fuel.
(B) Natural gas, refinery gas, or “other gas 1 fuels” that are co-fired with other fuels.
(C) Non-Gas 1 gaseous fuels that are subject to another subpart of 40 CFR Part 60, Part 61, Part 63, or Part
65.
(D) Chlorine content of any gaseous fuel and mercury content of gaseous fuels exempted from (A) or (B)
above.
If the fuel analysis is not conducted as required above, the Permittee shall be deemed in noncompliance with 15A
NCAC 02D .1111.
Notifications [15A NCAC 02Q .0508(f)]
j. The Permittee shall submit the following notifications:
i. The Permittee shall submit a Notification of Intent to conduct a performance test at least 60 days before the
performance test is scheduled to begin. [40 CFR 63.7545(d)]
ii. For the initial compliance demonstration for each boiler, the Permittee shall submit the Notification of
Compliance Status, including all performance test results and fuel analyses, before the close of business on the
60th day following the completion of all performance test and/or other initial compliance demonstrations for
the Riley Coal, No. 4 Power, and Riley Bark Boilers (ID Nos. G11039, G11040, and G11042).
iii. The Notification of Compliance Status report must contain the information specified in 40 CFR 63.7545(e).
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these notification requirements
are not met.
Initial compliance requirements [15A NCAC 02Q .0508(f)]
k. The Permittee shall demonstrate initial compliance with the emission limits in Section 2.2 E.2.g, above, by [40
CFR 63.7510 and 63.7530]:
i. Conducting the initial performance test(s) as specified in Section 2.2 E.2.h, above for each pollutant, except as
specified below. [40 CFR 63.7510(a)(1) and 63.7530(a)]
(A) An initial performance stack test is not required to demonstrate initial compliance based on fuel analysis
alone for the HCl emission limit specified in Section 2.2 E.2.g, above, for the Riley Coal, No. 4 Power,
(ID Nos. G11039 and G11040) provided the fuel analysis is conducted as required in Section E.2.k.ii,
below. [40 CFR 63.7510(b)]
(B) The Permittee is not required to conduct an initial performance test on the Riley Coal, No. 4 Power, and
Riley Bark Boilers (ID Nos. G11039, G11040, and G11042) if a performance test has been previously
conducted, provided the test meets the following conditions:
(1) The test must have been conducted using the same methods specified in 40 CFR 63.7520, and these
methods must have been followed correctly.
(2) The performance test must not be older than 2 years.
(3) The performance test must be reviewed and accepted DAQ.
Permit 08961T29
Page 123
(4) Either no process or equipment changes shall have been made since the test was performed, or the
Permittee shall demonstrate that the results of the performance test, with or without adjustments,
reliably demonstrate compliance despite process or equipment changes.
(C) Each boiler equipped with CEMS or sorbent trap based integrated monitor for mercury are exempt from
the performance testing and operating parameter requirements. [40 CFR 63.7510(b)]
ii. Conducting the fuel analyses according to the procedures specified in Section 2.2 E.2.i, above, and as follows:
(A) When demonstrating compliance using performance testing, the Permittee shall establish maximum fuel
pollutant input levels using the procedures specified in 40 CFR 63.7530(b)(1) through (b)(3). [40 CFR
63.7510(a)(2) and 63.7530(b)]
(B) When demonstrating compliance using fuel analysis alone, the Permittee shall follow the procedures in
40 CFR 63.7530(c). If the emission rate calculated according to 40 CFR 63.7530(c) is not less than the
emission limit in Section 2.2 E.2.g, above, the Permittee must demonstrate compliance using performance
stack testing. [40 CFR 63.7510(b) and 63.7530(c)]
iii. Establishing operating limits as specified in Section 2.2 E.2.q and E.2.r, below [40 CFR 63.7510(a)(3) and
63.7530(b)(4)]. The Permittee shall submit a request to incorporate the established operating limits in the
permit at the same time the test report is submitted per General Condition JJ. The permit revision will be
processed pursuant to 15A NCAC 02Q .0514.
iv. Submitting the Notification of Compliance Status as specified in Section 2.2 E.2.j.iii, above [40 CFR
63.7530(e)].
v. Meeting the work practice standards in Section 2.2 E.2.s through E.2.v, below [40 CFR 63.7510(e) and
63.7530(h)].
vi. Installing monitoring systems and conducting CMS evaluation(s) as necessary as specified in Section 2.2
E.2.n and E.2.o, below [40 CFR 63.7510(a)(4) and 63.7530(a)].
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these initial compliance
requirements are not met.
Continuous compliance requirements [15A NCAC 02Q .0508(f)]
l. The Permittee shall conduct subsequent performance tests and fuel analyses as necessary according to 40 CFR
63.7515 and as follows:
i. Conduct all applicable performance tests according to the requirements in Section 2.2 E.2.h, above, on an
annual basis, except as specified below. Annual performance tests must be completed no more than 13 months
after the previous performance test. [40 CFR 63.7515(a)]
(A) If performance tests for a given pollutant for at least 2 consecutive years show that emissions are at or
below 75 percent of the applicable emission limit specified in Section 2.2 E.2.g, above, and if there are no
changes in the operation of the boiler or air pollution control equipment that could increase emissions, the
Permittee may choose to conduct performance tests for the pollutant every third year. Each such
performance test must be conducted no more than 37 months after the previous performance test. If
demonstrating compliance using emission averaging under 40 CFR 63.7522, the Permittee shall continue
to conduct performance tests annually. The requirement to test at maximum chloride input level is waived
unless the stack test is conducted for HCl. The requirement to test at maximum mercury input level is
waived unless the stack test is conducted for mercury. [40 CFR 63.7515(b)]
(B) If a performance test shows that emissions exceeded the emission limit or 75 percent of the applicable
emission limit specified in Section 2.2 E.20.g, above, the Permittee shall conduct annual performance
tests for that pollutant until all performance tests over a consecutive 2-year period meet the required level
(at or below 75 percent of the emission limit, specified in Section 2.2 E.2.g, above). [40 CFR 63.7515(c)]
ii. For the Riley Coal and No. 4 Power Boilers (ID Nos. G11039 and G11040), conduct a monthly fuel analysis
to demonstrate continuous compliance with the HCl emission limits according to Section 2.2 E.2.i, above, for
each type of fuel burned that is subject to the HCl emission limits in Section 2.2 E.2.g, above. The Permittee
may comply with this monthly requirement by completing the fuel analysis any time within the calendar
month as long as the analysis is separated from the previous analysis by at least 14 calendar days. [40 CFR
63.7515(e)]
(A) If a new type of fuel is burned in one of the boilers, the Permittee shall conduct a fuel analysis before
burning the new type of fuel in the boiler. The Permittee shall comply with the continuous compliance
requirements in 40 CFR 63.7540.
(B) If each of 12 consecutive monthly fuel analyses demonstrates 75 percent or less of the compliance level,
the Permittee may decrease the fuel analysis frequency to quarterly for that fuel. If any quarterly sample
exceeds 75 percent of the compliance level or beginning to burn a new type of fuel, the Permittee shall
return to monthly monitoring for that fuel, until 12 months of fuel analyses are again less than 75 percent
Permit 08961T29
Page 124
of the compliance level. If sampling is conducted on one day per month, samples should be no less than
14 days apart, but if multiple samples are taken per month, the 14-day restriction does not apply. [40 CFR
63.7515(e)]
iii. If one of the boilers have not operated since the previous compliance demonstration and more than one year
has passed since the previous compliance demonstration, the Permittee shall complete subsequent compliance
demonstrations no later than 180 days after the re-start of the affected source and according to 40 CFR
63.7(a)(2) as cited in Table 10 of 40 CFR Part 63, Subpart DDDDD. [40 CFR 63.7515(g)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if subsequent performance tests
and fuel analyses are not conducted as required above.
m. The Permittee shall demonstrate continuous compliance with each applicable emission limit, operating limit and
work practice standard according to 40 CFR 63.7540 and Table 8 of 40 CFR Part 63, Subpart DDDDD and as
follows:
i. Keep records as specified in Section 2.2 E.2.w, below [40 CFR 63.7540(a)(2)];
ii. When planning to burn a new type of fuel or a new mixture of fuels, the Permittee shall recalculate the Riley
Coal and No. 4 Power Boilers (ID Nos. G11039 and G11040) HCl emission rate using Equation 16 of 40
CFR 63.7530; the Riley Bark Boiler (ID No. G11042) HCl emission rate using Equation 7 of 40 CFR
63.7530; and the mercury emission rate from the Riley Coal, No. 4 Power, and Riley Bark Boilers (ID Nos.
G11039, G11040, and G11042) using Equation 8 of 40 CFR 63.7530 according to the following paragraphs.
A fuel analysis in not required for the fuels specified in Section 2.2 E.2.i.v, above and the Permittee may
exclude the fuels described in Section 2.2 E.2.i.v, above, when recalculating the emission rates.
(A) When demonstrating compliance using fuel analysis alone for the Riley Coal and No. 4 Power Boilers
(ID Nos. G11039 and G11040) HCl limits, the Permittee shall determine the chlorine concentration for
any new fuel type in units of pounds per million Btu, based on supplier data or the Permittee may conduct
a fuel analysis, according to the provisions in the site-specific fuel analysis plan developed according
Section 2.2 E.2.i, above.
(B) When demonstrating compliance using fuel analysis alone for the Riley Coal and No. 4 Power Boilers
(ID Nos. G11039 and G11040) HCl limits, the Permittee shall determine the new mixture of fuels that
will have the highest content of chlorine.
(C) When demonstrating compliance using fuel analysis alone for the Riley Coal and No. 4 Power Boilers
(ID Nos. G11039 and G11040) HCl limits, the Permittee shall recalculate the HCl emission rate from
each boiler under these new conditions using Equation 16 of 40 CFR 63.7530. The recalculated HCl
emission rates must be less than the applicable emission limits specified in Section 2.2 E.2.g, above. [40
CFR 63.7540(a)(3) and (a)(5)]
(D) When demonstrating compliance using performance testing for the HCl emission limit for the Riley Bark
Boiler (ID No. G11042) and for the mercury limits for the Riley Coal, No. 4 Power and Riley Bark
Boilers (ID Nos. G11039, G11040, and G11042), the Permittee shall recalculate the maximum chlorine
input using Equation 7 of 40 CFR 63.7530 or the maximum mercury input using Equation 8 of 40 CFR
63.7530, as applicable. If the maximum compound input is greater than the maximum compound input
level established during the previous performance test, the Permittee shall conduct a new performance
test within 60 days of burning the new fuel type or fuel mixture according to Section 2.2 E.1.h, above, to
demonstrate emissions do not exceed the emissions limits specified in Section 2.2 E.1.g, above. The
Permittee shall establish new operating limits according to Section 2.2 E.2.r, below.
iii. For the CEMS installed on the Riley Coal and No. 4 Boilers (ID Nos. G11039 and G11040) as specified in
Section 2.2 E.2.n through E.2.p, below, the Permittee shall do the following. [40 CFR 63.7540(a)(9), (14), and
(19)].
(A) Install, certify, operate, and maintain the PM CEMS in accordance with the site-specific monitoring plan
as required in Section 2.2 E.2.e.ii, above.
(B) Install, certify, operate, and maintain the mercury CEMS or sorbent trap based integrated monitor as
specified in 40 CFR 63.7540(a)(14).
(C) Install, certify, operate, and maintain the PM CEMS and record the output of the PM CEMS as specified
in 40 CFR 63.7540(a)(19). The compliance limit will be expressed as a 30-day rolling average of the
numerical emissions limit value applicable for the boiler in Section 2.2 E.2.g, above.
iv. The Permittee shall conduct tune-ups of the boilers as specified in Section 2.2 E.2.s, below. [40 CFR
63.7540(a)(10) and (a)(12)]
v. For startup and shutdown, the Permittee shall meet the work practice standards specified in Section 2.2 E.2.t
and A.10.u, below. [40 CFR 63.7540(d)]
Permit 08961T29
Page 125
vi. Operation above the established maximum or below the established minimum operating limits shall constitute
a period of noncompliance with the established operating limits listed in Table 4 of 40 CFR Part 63, Subpart
DDDDD except during performance tests conducted to determine compliance with the emission limits or to
establish new operating limits. Operating limits must be confirmed or reestablished during performance tests.
[40 CFR 63.7540(a)(1)]
vii. For demonstrating continuous compliance with the limits specified in Section 2.2 E.2.g, above, for the Riley
Bark Boiler (ID No. G11042), the Permittee shall:
(A) Meet the operating limits for wet scrubber pressure drop and liquid flow rate operating limits by:
(1) Collecting the pressure drop and liquid flow rate monitoring system data according to Section 2.2
E.2.o, below; and.
(2) Reducing the data to 30-day rolling averages; and
(3) Maintaining the 30-day rolling average pressure drop and liquid flow-rate at or above the operating
limits established during the performance test according to Section 2.2 E.2.r, below.
(B) Meet the operating limits for wet scrubber pH by:
(1) Collecting the pH monitoring system data according to Section 2.2 E.2.o, below; and
(2) Reducing the data to 30-day rolling averages; and
(3) Maintaining the 30-day rolling average pH at or above the operating limit established during the
performance test according to Section 2.2 E.2.r, below.
viii. For demonstrating continuous compliance with the HCl emission limits for the Riley Coal and No. 4 Power
Boilers (ID Nos. G11039 and G11040) specified in Section 2.2 E.2.g, above, using fuel analyses, the
Permittee shall:
(A) Conduct monthly fuel analysis for HCl according to Section 2.2 E.2.i, above.
(B) Reduce the data to 12-month rolling averages; and
(C) Maintain the 12-month rolling average at or below the applicable emission limit for HCl or mercury in
Section 2.2 E.2.g, above; and
(D) Calculate the HCl and mercury emission rate from the boilers in units of lb/MMBtu using Equation 15
and Equations 17, 18, and/or 19 in 40 CFR 63.7530.
ix. For demonstrating continuous compliance with the oxygen content operating parameter limits, the Permittee
shall:
(A) Continuously monitor oxygen content using an oxygen analyzer system according to Section 2.2 E.2.p,
below; and
(B) Reduce the data to 30-day rolling averages; and
(C) Maintain the 30-day rolling average oxygen content at or above the lowest hourly average oxygen level
measured during the CO performance test.
x. For demonstrating continuous compliance with the boiler operating load operating parameter limits, the
Permittee shall:
(A) Collect operating load data or steam generation data every 15 minutes.
(B) Reduce the data to 30-day rolling averages; and
(C) Maintain the 30-day rolling average operating load such that it does not exceed 110 percent of the highest
hourly average operating load recorded during the performance test in Section 2.2 E.2.h, above.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the continuous
compliance requirements are not met as specified in above.
Monitoring requirements [15A NCAC 02Q .0508(f)]
n. The Permittee shall install, operate, and maintain monitoring systems on the Riley Coal and No. 4 Power Boilers
(ID Nos. G11039 and G11040) as follows. [40 CFR 63.8(c) through (e) and (g), 63.7525, and 63.7540(a)(19)]
i. The Permittee shall install, certify, operate and maintain each PM CEMS according to the procedures in the
approved site-specific monitoring plan developed according to Section 2.2 E.2.e.ii, above, and the Permittee
shall do the following [40 CFR 63.7525(b)(5) through (8)]:
(A) conduct a performance evaluation of the PM CEMS according to the applicable requirements of 40 CFR
60.8(e), and Performance Specification 11 at 40 CFR part 60, appendix B. The reportable measurement
output from the PM CEMS shall be expressed in terms pounds per million Btu.
(B) during each PM correlation testing run of the CEMS required by Performance Specification 11 at 40 CFR
part 60, appendix B of this chapter, collect PM and oxygen (or carbon dioxide) data concurrently (or
within a 30-to 60-minute period) by both the CEMS and conducting performance tests using Method 5 at
40 CFR part 60, appendix A-3 or Method 17 at 40 CFR part 60, appendix A-6 of this chapter.
Permit 08961T29
Page 126
(C) perform quarterly accuracy determinations and daily calibration drift tests in accordance with Procedure 2
at 40 CFR part 60, appendix F of this chapter. You must perform Relative Response Audits annually and
perform Response Correlation Audits every 3 years.
(D) within 60 days after the date of completing each CEMS relative accuracy test audit or performance test
conducted to demonstrate compliance with this subpart, submit the relative accuracy test audit data and
performance test data to the EPA by successfully submitting the data electronically into the EPA's Central
Data Exchange by using the Electronic Reporting Tool (see
http://www.epa.gov/ttn/chief/ert/erttool.html/).
(E) complete the initial performance evaluation no later than November 16, 2019.
(F) collect PM CEMS hourly average output data for all boiler operating hours except as indicated in Section
2.2 E.2.p.ii, below.
(G) calculate the arithmetic 30-day rolling average of all the hourly average PM CEMS output data collected
during all boiler operating hours.
ii. The Permittee shall install, certify, maintain, and operate a CEMS measuring mercury emissions discharged to
the atmosphere and record the output of the system as specified in 40 CFR 63.7525(l).
iii. The Permittee shall install, operate, and maintain an oxygen analyzer system on each boiler, according to the
requirements of Section 2.2 E.2.p, below.
o. The Permittee shall install, operate, and maintain monitoring systems on the Riley Bark Boiler (ID No. G11042),
as follows:
i. A continuous monitoring system to monitor the liquid flow rate of the scrubber installed on the boiler as
follows [40 CFR 63.7525(e)]:
(A) install the flow sensor and other necessary equipment in a position that provides a representative flow.
(B) use a flow sensor with a measurement sensitivity of no greater than 2 percent of the design flow rate.
(C) minimize, consistent with good engineering practices, the effects of swirling flow or abnormal velocity
distributions due to upstream and downstream disturbances.
(D) conduct a flow monitoring system performance evaluation in accordance with the site-specific monitoring
plan required in Section 2.2 E.2.e.ii, above, at the time of each performance test but no less frequently
than annually.
ii. A continuous monitoring system to monitor the pressure drop of the scrubber installed on the boiler as follows
[40 CFR 63.7525(f)]:
(A) Install the pressure sensor(s) in a position that provides a representative measurement of the pressure
(e.g., PM scrubber pressure drop).
(B) Minimize or eliminate pulsating pressure, vibration, and internal and external corrosion consistent with
good engineering practices.
(C) Use a pressure sensor with a minimum tolerance of 1.27 centimeters of water or a minimum tolerance of
1 percent of the pressure monitoring system operating range, whichever is less.
(D) Perform checks at least once each process operating day to ensure pressure measurements are not
obstructed (e.g., check for pressure tap pluggage daily).
(E) Conduct a performance evaluation of the pressure monitoring system in accordance with the site-specific
monitoring plan required in Section 2.2 E.2.e.ii, above, at the time of each performance test but no less
frequently than annually.
(F) If at any time the measured pressure exceeds the manufacturer's specified maximum operating pressure
range, conduct a performance evaluation of the pressure monitoring system in accordance with the site-
specific monitoring plan required in Section 2.2 E.2.e.ii, above, and confirm that the pressure monitoring
system continues to meet the performance requirements in the monitoring plan. Alternatively, install and
verify the operation of a new pressure sensor.
iii. An oxygen analyzer system to monitor the oxygen content of the boiler according to the requirements of
Section 2.2 E.2.p, below. [40 CFR 63.7525(a)]
iv. A pH monitoring system to monitor the wet scrubber liquid pH installed as follows [40 CFR 63.7525(g)]
(A) The pH sensor shall be installed in a position that provides a representative measurement of scrubber
effluent pH.
(B) Ensure the sample is properly mixed and representative of the fluid to be measured.
(C) Calibrate the pH monitoring system in accordance with your monitoring plan and according to the
manufacturer's instructions. Clean the pH probe at least once each process operating day. Maintain on-site
documentation that your calibration frequency is sufficient to maintain the specified accuracy of your
device.
Permit 08961T29
Page 127
(D) Conduct a performance evaluation (including a two-point calibration with one of the two buffer solutions
having a pH within 1 of the pH of the operating limit) of the pH monitoring system in accordance with
your monitoring plan at the time of each performance test but no less frequently than annually.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the requirements for monitoring
systems installed on the Riley Bark Boiler are not met as specified above.
p. The Permittee shall install, operate, and maintain each CMS specified in Section 2.2 E.2.n through E.2.o, above,
including oxygen analyzer systems and operating load or steam generation monitors, as follows: [40 CFR
63.7525(d)]
i. The CMS must complete a minimum of one cycle of operation every 15-minutes. A minimum of four
successive cycles of operation, one representing each of the four 15-minute periods in an hour, is required to
have a valid hour of data. [40 CFR 63.7525(d)(1)]
ii. The CMS shall be operated according to and comply with the data calculation requirements specified below.
[40 CFR 63.7525(d)(2)]
(A) The Permittee shall operate the monitoring system and collect data at all required intervals at all times
that each boiler is operating and compliance is required, except for periods of monitoring system
malfunctions or out of control periods [see 40 CFR 63.8(c)(7)], and required monitoring system quality
assurance or control activities, including, as applicable, calibration checks, required zero and span
adjustments, and scheduled CMS maintenance as defined in the site-specific monitoring plan required
under Section 2.2 E.2.e.ii, above. A monitoring system malfunction is any sudden, infrequent, not
reasonably preventable failure of the monitoring system to provide valid data. Monitoring system failures
that are caused in part by poor maintenance or careless operation are not malfunctions. The Permittee is
required to complete monitoring system repairs in response to monitoring system malfunctions or out-of-
control periods and to return the monitoring system to operation as expeditiously as practicable. [40 CFR
63.7535(b)]
(B) The Permittee shall not use data recorded during periods of startup and shutdown, monitoring system
malfunctions or out-of-control periods, repairs associated with monitoring system malfunctions or out-of-
control periods, or required monitoring system quality assurance or control activities in data averages and
calculations used to report emissions or operating levels. The Permittee shall record, and make available
upon request, results of CMS performance audits and dates and duration of periods when the CMS is out
of control to completion of the corrective actions necessary to return the CMS to operation consistent
with the site-specific monitoring plan. The Permittee shall use all the data collected during all other
periods in assessing compliance and the operation of the control device and associated control system.
[40 CFR 63.7535(c)]
iii. Any 15-minute period for which the monitoring system is out-of-control and data are not available for a
required calculation constitutes a period of noncompliance from the monitoring requirements. Other situations
that constitute monitoring noncompliance are specified in 40 CFR 63.7535(d). [40 CFR 63.7525(d)(3)]
iv. The Permittee shall determine the 30-day rolling average of all recorded readings, except as provided in
paragraph ii(B), above. [40 CFR 63.7525(d)(4)]
v. The Permittee shall record the results of each inspection, calibration, and validation check. [40 CFR
63.7525(d)(5)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the requirements for CPMS
operation above are not met.
Operating Limits [15A NCAC 02Q .0508(f)],
q. The Permittee shall comply with the following operating limits established during performance testing conducted
according to Section 2.2 E.2.h, above, for the Riley Coal, No. 4 Power, and Riley Bark Boilers (ID Nos. G11039,
G11040, and G11042). [40 CFR 63.7500, Table 4 to 40 CFR Part 63, Subpart DDDDD]
i. When demonstrating compliance with the Riley Bark Boiler (ID No. G11042) emission limits specified in
Section 2.2 E.2.g, above, the Permittee shall operate the wet scrubber as follows:
(A) maintain the 30-day rolling average pressure drop at or above the lowest one-hour average pressure drop
measured during the PM performance test; and
(B) maintain the 30-day rolling average liquid flow rate at or above the lowest one-hour average liquid flow
rate measured during the PM and HCl performance test.
(C) Maintain the 30-day rolling average effluent pH at or above the lowest one-hour average pH and the 30-
day rolling average liquid flow rate at or above the lowest one-hour average liquid flow rate measured
during HCl the performance test.
Permit 08961T29
Page 128
ii. When demonstrating compliance with the Riley Coal, No. 4 Power, and Riley Bark Boilers (ID No. G11039,
G11040, and G11042) CO emission limit specified in Section 2.2 E.2.g, above, the Permittee shall maintain
the 30-day rolling average oxygen content at or above the lowest hourly average oxygen concentration
measured during the most recent CO performance test.
iii. When demonstrating compliance with the CO emission limits for all boilers or the mercury emission limit for
the Riley Bark Boiler (ID No. G11042), the Permittee shall maintain the 30-day rolling average operating
load of such that it does not exceed 110 percent of the highest hourly average operating load recorded during
the performance test.
iv. Operation above the established maximum or below the established minimum operating limits shall constitute
a period of noncompliance with the established operating limits listed in Table 4 to 40 CFR Part 63, Subpart
DDDDD except during performance tests conducted to determine compliance with the emission limits or to
establish new operating limits. The Permittee shall confirm or reestablish operating limits during performance
tests. [40 CFR 63.7540(a)(1)]
(A) If revisions to operating parameter values are necessary to demonstrate compliance with the emission
limits and are more stringent than the established minimum or maximum operating limits, the Permittee
shall submit a request to revise the values in the permit at the same time as the test report is submitted as
required per General Condition JJ. The permit revision will be processed pursuant to 15A NCAC 02Q
.0514.
(B) If performance testing indicates that compliance with emission limits is demonstrated with revisions to
operating parameter values that are less stringent than the established minimum or maximum operating
limits, the Permittee may request to revise the values in the permit pursuant to 15A NCAC 02Q .0515.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the operating limits above are not
met.
r. During the performance tests conducted according to Section 2.2 E.2.h, above, the Permittee shall establish each
site-specific operating limit in Section 2.2 EA.2.q, above, for the Riley Coal, No. 4 Power, and Riley Bark Boilers
(ID Nos. G11039, G11040 and G11042) as follows: [40 CFR 63.7530(b) and Table 7 of 40 CFR Part 63, Subpart
DDDDD]
i. For the CMS installed on Riley Bark Boiler (ID No. G11042) identified in Section 2.2 E.2.o, above, the
Permittee shall establish the minimum pressure drop, liquid flow rate, and liquid pH as the operating limits
during the three-run performance test conducted according to Section 2.2 E.2.h, above. If the Permittee
conducts multiple performance tests, the minimum liquid flow rate, pressure drop and pH operating limits
shall be set at the higher of the minimum values established during the performance tests. [40 CFR
63.7530(b)(4)(iii) and Table 7 of 40 CFR Part 63, Subpart DDDDD]
(A) The Permittee shall collect scrubber pressure drop, liquid flow rate, and pH data every 15 minutes during
the entire period of the performance tests.
(B) The Permittee shall determine the lowest hourly average scrubber pressure drop, liquid flow rate, and
liquid pH by computing the hourly averages using all of the 15-minute readings taken during each
performance test.
ii. Using data from the oxygen analyzer system installed to measure the oxygen content of all boilers and
operated according to Section 2.2 E.2.p, above, establish a unit-specific minimum oxygen level according to
the following requirements: [40 CFR 63.7530(b)(4)(viii) and Table 7 of 40 CFR Part 63, Subpart DDDDD]
(A) Collect oxygen data every 15 minutes during the entire period of the performance tests.
(B) Determine the hourly average oxygen concentration by computing the hourly averages using all of the 15-
minute readings taken during each performance test.
(C) Determine the lowest hourly average established during the performance test as the minimum operating
limit.
(D) If multiple performance tests are conducted, the minimum oxygen level shall be set at the lower of the
minimum values established during the performance tests.
iii. Using data from the operating load monitors or from steam generation monitors installed and operated as
specified in Section 2.2 E.2.p, above, establish a unit-specific limit for maximum operating load according to
Section 2.2 E.2.h.iii, above, as follows: [Table 7 to 40 CFR Part 63, Subpart DDDDD]
(A) Collect operating load or steam generation data every 15 minutes during the entire period of the
performance test.
(B) Determine the average operating load by computing the hourly averages using all of the 15-minute
readings taken during each performance test.
(C) Determine the highest hourly average of the three test run averages during the performance test and
multiply this by 1.1 (110 percent) as the operating limit.
Permit 08961T29
Page 129
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the operating limits are not
established according to the requirements above.
Work Practice Standards [15A NCAC 02Q .0508(f)]
s. Tune-up Requirements. The Permittee shall conduct a tune-up of the Riley Coal, No. 4, and Riley Bark Boilers
(ID Nos. G11039, G11040, and G11042) as specified below. The Permittee shall conduct the tune-up while
burning the type of fuel (or fuels in case of units that routinely burn a mixture) that provided the majority of the
heat input to each boiler over the 12 months prior to the tune-up. [40 CFR 63.7500(a) and 63.7540(a)(10)]
i. As applicable, inspect the burner, and clean or replace any components of the burner as necessary (the
Permittee may perform the burner inspection any time prior to the tune-up or delay the burner inspection until
the next scheduled unit shutdown);
ii. Inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The
adjustment should be consistent with the manufacturer's specifications, if available;
iii. Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and
functioning properly (the inspection may be delayed until the next scheduled unit shutdown);
iv. Optimize total emissions of carbon monoxide. This optimization should be consistent with the manufacturer's
specifications, if available, and with any NOX requirement to which the unit is subject; and
v. Measure the concentrations in the effluent stream of carbon monoxide in parts per million, by volume, and
oxygen in volume percent, before and after the adjustments are made (measurements may be either on a dry or
wet basis, as long as it is the same basis before and after the adjustments are made). Measurements may be
taken using a portable CO analyzer.
vi. After the initial tune-up conducted by the date specified in Section 2.2 E.2.d, above, each subsequent tune-up
shall be conducted once per year and no more than 13 months after the previous tune-up.
vii. If the boiler is not operating on the required date for a tune-up, the tune-up must be conducted within 30
calendar days of startup. [40 CFR 63.7540(a)(13) and 63.7515(g)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the tune-up requirements above
are not met.
t. Energy Assessment Requirements. The Permittee shall have a one-time energy assessment performed by a
qualified energy assessor. The energy assessment must address the requirements in 40 CFR 63 Subpart DDDDD,
Table 3, Item 4, with the extent of the evaluation for items (a) to (e) in Table 3, Item 4 appropriate for the on-site
technical hours listed in 40 CFR 63.7575. [40 CFR 63.7500(a)(1), Table 3 of 40 CFR Part 63, Subpart DDDDD]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if these requirements are not met.
u. Startup Requirements. The Permittee shall comply with all applicable emission standards at all times the unit is
operating except during startup, the Permittee shall meet the work practice requirements below. [Table 3 of 40
CFR Part 63, Subpart DDDDD]
i. All CMS shall be operated during startup.
ii. For startup of the each boiler, one or a combination of the following clean fuels shall be used: Natural gas,
synthetic natural gas, propane, other Gas 1 fuels, distillate oil, syngas, ultra-low sulfur diesel, fuel oil-soaked
rags, kerosene, hydrogen, paper, cardboard, refinery gas, liquefied petroleum gas, clean dry biomass, and any
fuels meeting the appropriate HCl, mercury and TSM emission standards by fuel analysis.
iii. The Permittee has the option of complying using either of the following work practice standards.
(A) If complying using definition (1) of “startup” in 40 CFR 63.7575, once the Permittee starts firing fuels
that are not clean fuels, the Permittee shall vent emissions to the main stack(s) and engage all of the
applicable control devices. Startup ends when steam or heat is supplied for any purpose, OR
(B) If complying using definition (2) of “startup” in 40 CFR 63.7575, once the Permittee starts to feed fuels
that are not clean fuels, the Permittee shall vent emissions to the main stack(s) and engage all of the
applicable control devices so as to comply with the emission limits within 4 hours of start of supplying
useful thermal energy. The Permittee shall engage and operate PM control within one hour of first
feeding fuels that are not clean fuels. The Permittee shall start all applicable control devices as
expeditiously as possible, but, in any case, when necessary to comply with other standards applicable to
the source by a permit limit or a rule other than this section that require operation of the control devices.
The Permittee shall develop and implement a written startup and shutdown plan, as specified in 40 CFR
63.7505(e).
iv. The Permittee shall collect monitoring data during periods of startup, as specified in Section 2.2 E.2.p.ii(B),
above.
Permit 08961T29
Page 130
v. The Permittee shall keep records during periods of startup and provide reports concerning activities and
periods of startup, as specified in 40 CFR 63.7555.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the startup procedures are not
followed.
v. Shutdown Requirements. The Permittee shall comply with all applicable standards at all times except during
shutdown periods shall meet the work practice requirements below. [Table 3 of 40 CFR Part 63, Subpart DDDDD]
i. The Permittee shall operate all CMS during shutdown.
ii. While firing fuels that are not clean fuels during shutdown, the Permittee shall vent emissions to the main
stack(s) and operate all applicable control devices when necessary to comply with other standards applicable
to the source that require operation of the control device.
iii. If, in addition to the fuel used prior to initiation of shutdown, another fuel must be used to support the
shutdown process, that additional fuel must be one or a combination of the following clean fuels: Natural gas,
synthetic natural gas, propane, other Gas 1 fuels, distillate oil, syngas, ultra-low sulfur diesel, refinery gas, and
liquefied petroleum gas.
iv. The Permittee shall collect monitoring data during periods of shutdown, as specified in Section 2.2
E.2.p.ii(B).
v. The Permittee shall keep records during periods of shutdown.
vi. The Permittee shall provide reports concerning activities and periods of shutdown, as specified in 40 CFR
63.7555.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the shutdown procedures are not
followed.
Recordkeeping Requirements [15A NCAC 02Q .0508(f)]
w. The Permittee shall keep the following records:
i. A copy of each notification and report submitted to comply with 40 CFR Part 63, Subpart DDDDD, including
all documentation supporting any Initial Notification or Notification of Compliance Status, or semiannual
compliance report that has been submitted. [40 CFR 63.10(b)(2)(xiv) and 63.7555(a)(1)]
ii. Records of performance tests, fuel analyses, or other compliance demonstrations and performance evaluations
pursuant to 40 CFR 63.10(b)(2)(viii). [40 CFR 63.7555(a)(2)]
iii. Maintain on-site and submit, if requested by the Administrator, an annual report containing the information in
paragraphs (A) through (C) below: [40 CFR 63.7540(a)(10)(vi)]
(A) The concentrations of carbon monoxide in the effluent stream in parts per million by volume, and oxygen
in volume percent, measured at high fire or typical operating load, before and after the tune-up of the
boiler or process heater;
(B) A description of any corrective actions taken as a part of the tune-up; and
(C) the type and amount of fuel used over the 12 months prior to the annual adjustment, but only if the unit
was physically and legally capable of using more than one type of fuel during that period. Units sharing a
fuel meter may estimate the fuel use by each unit.
iv. For each COMS and CMS, including oxygen analyzer systems and operating load or steam generating
monitors, the following records. [40 CFR 63.7555(b)]
(A) Records described in 40 CFR 63.10(b)(2)(vii) through (xi).
(B) Monitoring data for continuous opacity monitoring system during a performance evaluation as required in
§63.6(h)(7)(i) and (ii).
(C) Previous (i.e., superseded) versions of the performance evaluation plan as required in 40 CFR 63.8(d)(3).
(D) Records of the date and time that each period of noncompliance started and stopped.
v. Records required in Table 8 to 40 CFR Part 63, Subpart DDDDD including records of all monitoring data and
calculated averages for applicable operating limits, such as opacity, pressure drop, pH, and operating load, to
show continuous compliance with each emission limit and operating limit that applies. [40 CFR 63.7555(c)]
vi. The applicable records in paragraphs (d)(1) through (13) of 40 CFR 63.7555.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the records specified above are
not kept.
x. The Permittee shall maintain records as follows: [40 CFR 63.10(b)(1) and 63.7560]
i. Maintain records in a form suitable and readily available for expeditious review;
ii. Keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective
action, report, or record; and
Permit 08961T29
Page 131
iii. Keep each record on site for at least 2 years after the date of each occurrence, measurement, maintenance,
corrective action, report, or record. The Permittee can keep the records offsite for the remaining 3 years.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the records are not maintained as
required above.
Reporting Requirements [15A NCAC 02Q .0508(f)]
y. The Permittee shall submit a compliance report to the DAQ on a semi-annual basis, postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June.
i. The first compliance report shall be postmarked on or before January 30, 2020 and cover the period from May
20, 2019 through December 31, 2019.
ii. The compliance reports shall also be submitted electronically to the EPA via the procedures in 40 CFR
63.7550(h).
z. The compliance report shall contain [Table 9 to Subpart DDDDD of Part 63]:
i. The information in 40 CFR 63.7550(c) as applicable.
ii. If there are no periods of noncompliance with any applicable emission limitation (emission limit and
operating limit) and there are no periods of noncompliance from the applicable requirements for work practice
standards for periods of startup and shutdown in Table 3, a statement that there were no periods of
noncompliance from the emission limitations and work practice standards during the reporting period. If there
were no periods during which the CMSs, including CEMS and operating parameter monitoring systems, were
out-of-control as specified in 40 CFR 63.8(c)(7), a statement that there were no periods during which the
CMSs were out-of-control during the reporting period; and
iii. If there is a period of noncompliance with any applicable emission limitation (emission limit and operating
limit) where a CMS is not used to comply with that emission limit or operating limit, or a deviation from a
work practice standard for periods of startup and shutdown, during the reporting period, the report must
contain the information in 40 CFR 63.7550(d); and
iv. If there were periods during which the CMSs, including continuous emissions monitoring system, continuous
opacity monitoring system, and operating parameter monitoring systems, were out-of-control as specified in
§63.8(c)(7), or otherwise not operating, the report must contain the information in §63.7550(e). [40 CFR
63.7535(d)]
aa. Within 60 days after the date of completing each performance test including any associated fuel analyses and/or
CMS performance evaluation as required by 40 CFR Part 63, Subpart DDDDD. [40 CFR 63.7550(h)]
i. The Permittee shall submit the results to the DAQ pursuant to 40 CFR 63.10(d)(2) and to the EPA via the
procedures in 40 CFR 63.7550(h).
ii. This report must also verify that the operating limits for each boiler or process heater have not changed or
provide documentation of revised operating limits established according to 40 CFR 63.7530 and Table 7 to 40
CFR Part 63, Subpart DDDDD, as applicable. [40 CFR 63.7515(f)]
Permit 08961T29
Page 132
F. [RESERVED]
Permit 08961T29
Page 133
G. 15A NCAC 02D .1109: CAA 112(j); Case-by-case MACT for Start-up, Shutdown, or Malfunction (SSM)
Conditions from Subpart S affected sources
1. No. 1 Hardwood Fiberline Bleaching System and No. 2 Pine Fiberline Bleaching System.
a. The Permittee shall comply with this CAA §112(j) standard until September 11, 2020. The initial compliance date
for the applicable CAA §112(d) standard for ‘‘National Emission Standards for Hazardous Air Pollutants from the
Pulp and Paper Industry” is September 11, 2020.
Startup
b. For the No. 1 Hardwood Fiberline Bleaching System (ID No. G05012) and the No 2 Pine Fiberline Bleaching
System (ID No. G05013), startup begins when pulp stock enters either bleach plant tower for chlorine dioxide
application. Startup ends when all bleach plant towers are operating steady-state and normal operating conditions
have been attained as determined by pulp brightness and D2 tower residual chlorine dioxide. Operators will
operate the bleach plant scrubber with scrubber fan status, scrubber liquid recirculation rate, and scrubber effluent
pH meeting the specifications for normal operations as defined in 2.2.C.1.h PRIOR to the introduction of stock to
the bleach plant. The period of startup for the bleach plants managed in accordance with this work practice
standard shall not be an excess emission under 40 CFR Part 63, Subpart S or 15A NCAC 02D .1111. The
Permittee shall be deemed in noncompliance with 15A NCAC 02D .1109 if these work practices are not conducted
during startup.
Shutdown
c. For the No. 1 Hardwood Fiberline Bleaching System (ID No. G05012) and the No 2 Pine Fiberline Bleaching
System (ID No. G05013), shutdown begins when pulp stock is no longer fed to the pre-bleach washers. Shutdown
ends when chlorine dioxide flow to both towers is stopped and stock levels are brought to desired levels. During
shutdown, operators will operate the bleach plant scrubber with scrubber fan status, scrubber liquid recirculation
rate and scrubber effluent pH meeting the specifications for normal operations as defined in 2.2.C.1.h. The period
of shutdown for the bleach plants managed in accordance with this work practice standard shall not be an excess
emission under 40 CFR Part 63, Subpart S or 15A NCAC 02D .1111. The Permittee shall be deemed in
noncompliance with 15A NCAC 02D .1109 if these work practices are not conducted during shutdown.
Malfunction
d. In the event of malfunction of a bleach plant scrubber or scrubber fan installed on the No. 1 Hardwood Fiberline
Bleaching System control device (ID No. 05-CD-002-01) and the No 2 Pine Fiberline Bleaching System control
device (ID No. 05-CD-017-01), the following work practice will be followed:
i. Upon knowledge of the parameter excursion, operators will take immediate steps to identify the root cause of
the parameter excursion;
ii. If the root cause of the parameter excursion cannot be determined within 2 operating hours from initial
knowledge of the parameter excursion, operators will initiate an orderly shutdown of the process. If the
projected time to correct the parameter excursion exceeds 2 hours, operators will initiate an orderly shutdown
of the process. If required, the respective bleach plant will commence an orderly shutdown to a zero operating
state defined as pulp washers being flushed and cleared of stock and application of chlorine dioxide to the
bleach towers stopped. Stock may be held in the bleaching towers with no chlorine dioxide application after
washers are cleared. In the event the malfunction is resolved prior to reaching a zero operating state, the
orderly shutdown may be terminated, and the bleach plant equipment returned to normal operating condition.
iii. The parameter excursion shall be corrected as soon as practicable.
The period of malfunction for the bleach plants managed in accordance with this work practice standard shall not
be an excess emission under 40 CFR Part 63, Subpart S or 15A NCAC 02D .1111. The Permittee shall be deemed
in noncompliance with 15A NCAC 02D .1109 if these work practices are not conducted during malfunction.
Permit 08961T29
Page 134
H. North Carolina Air Toxics
State Enforceable Only Requirement
1. 15A NCAC 02D .1100: CONTROL OF TOXIC AIR POLLUTANTS
a. Pursuant to 15A NCAC 02D .1100 and in accordance with the approved air toxic compliance demonstration, the
Permittee shall be subject to the toxic air pollutant emission limits in Table 2.2 H-1 for known compounds emitted
from nonexempt sources at the pulp and paper mill. The limits are optimized, which means that the source would
have to generate emissions greater than the potential to emit in order to exceed the acceptable ambient levels
established in 15A NCAC 02D .1104.
Table 2.2 H.1 Toxic Air Pollutant Emission Limits
Permit ID No. Emission Source Description Toxic Air Pollutant (CAS No.)
Emission Limit
(lb/yr) (lb/day) (lb/hr)
G04011 White Liquor Oxidation System acetaldehyde (75-07-0) 6.29E-01
benzene (71-43-2) 2.13E+01
formaldehyde (50-00-0) 5.93E-02
n-hexane (110-54-3) 3.46E+01
methyl ethyl ketone (78-93-3) 3.21E+00 6.26E-01
G05073 Minerals Removal Process (MRP) chloroform (67-66-3) 1.72E+02
G06014.06-
PU-002
R-8 Chlorine Dioxide Generator acetaldehyde (75-07-0) 1.23E-01
benzene (71-43-2) 1.56E+00
carbon tetrachloride (56-23-5) 1.48E+03
chlorine (7782-50-5) 1.49E+02 1.68E+01
chloroform (67-66-3) 5.43E+02
formaldehyde (50-00-0) 3.50E-02
hydrogen chloride (7647-01-0) 1.67E-01
methylene chloride (75-09-2) 5.10E+02 1.42E-01
methyl ethyl ketone (78-93-3) 5.98E-01 1.16E-01
phenol (108-95-2) 4.51E-02
I-G08074 Chloride Removal Process (CRP) acetaldehyde (75-07-0) 1.25E-02
G09027
G09027-3
No. 4 Lime Pre-Coat Filter (No. 09-
PU-001)
No. 5 Lime Pre-Coat Filter (No. 09-
PU-002)
No. 6 Lime Pre-Coat Filter (No. 09-
PU-004)
No. 4 Lime Pre-Coat Filter Vacuum
Pump (No. 09-PU-001a)
No. 5 Lime Pre-Coat Filter Vacuum
Pump (No. 09-PU-002a)
No. 6 Lime Pre-Coat Filter Vacuum
Pump (No. 09-PU-004a)
Dregs Filter
acetaldehyde (75-07-0) 8.08E+00
acrolein (107-02-8) 3.55E-02
benzene (71-43-2) 6.86E+00
carbon disulfide (75-15-0) 6.57E+00
chloroform (67-66-3) 1.22E+02
formaldehyde (50-00-0) 5.54E-02
n-hexane (110-54-3) 6.11E+01
methylene chloride (75-09-2) 1.28E+03 3.57E-01
methyl ethyl ketone (78-93-3) 3.47E+01 6.74E+00
Permit 08961T29
Page 135
Table 2.2 H.1 Toxic Air Pollutant Emission Limits
Permit ID No. Emission Source Description Toxic Air Pollutant (CAS No.)
Emission Limit
(lb/yr) (lb/day) (lb/hr)
G10035 No. 5 Lime Slaker acetaldehyde (75-07-0) 7.80E+00
ammonia (7664-41-7) 1.45E+01
benzene (71-43-2) 1.02E+00
carbon disulfide (75-15-0) 8.43E-02
n-hexane (110-54-3) 1.55E+00
methylene chloride (75-09-2) 4.29E+04 2.13E+01
methyl ethyl ketone (78-93-3) 8.24E+00 2.87E+00
phenol (108-95-2) 1.02E-01
G10034 No. 6 Lime Slaker acetaldehyde (75-07-0) 7.59E+00
ammonia (7664-41-7) 1.41E+01
benzene (71-43-2) 1.53E+00
carbon disulfide (75-15-0) 1.26E-01
n-hexane (110-54-3) 2.33E+00
methylene chloride (75-09-2) 6.44E+04 2.08E+01
methyl ethyl ketone (78-93-3) 1.24E+01 2.79E+00
phenol (108-95-2) 9.91E-02
G10089.10-
TK-002
G10089.10-
TK-013
G10089.10-
TK-005
G10089.10-
TK-006
West Green Liquor Storage
North Green Liquor Storage
South Green Liquor Clarifier
North Green Liquor Clarifier
acetaldehyde (75-07-0) 8.92E-02
benzene (71-43-2) 9.79E+00
methyl ethyl ketone (78-93-3) 3.44E+00 8.63E-01
methyl mercaptan (74-93-1) 1.18E-02
phenol (108-95-2) 4.23E+00
G10090 Green Liquor Stabilization acetaldehyde (75-07-0) 3.34E-02
benzene (71-43-2) 1.37E+00
chloroform (67-66-3) 2.57E+00
n-hexane (110-54-3) 4.27E-01
methyl ethyl ketone (78-93-3) 2.86E-01 5.57E-02
methyl mercaptan (74-93-1) 3.82E-05
I-G10091 Lime Mud Washers and Storage methyl ethyl ketone (78-93-3) 7.30E-02 2.20E-02
G21072 Tall Oil Reactor acetaldehyde (75-07-0) 3.01E-01
acrolein (107-02-8) 3.50E-01
benzene (71-43-2) 1.74E+01
carbon disulfide (75-15-0) 1.23E+02
chloroform (67-66-3) 1.10E+03
n-hexane (110-54-3) 2.49E+03
hydrogen sulfide (7783-06-4) 8.45E+00
methylene chloride (75-09-2) 4.98E+02 1.39E-01
methyl ethyl ketone (78-93-3) 9.50E+00 1.85E+00
methyl mercaptan (74-93-1) 2.76E-01
phenol (108-95-2) 1.24E+00
Permit 08961T29
Page 136
Table 2.2 H.1 Toxic Air Pollutant Emission Limits
Permit ID No. Emission Source Description Toxic Air Pollutant (CAS No.)
Emission Limit
(lb/yr) (lb/day) (lb/hr)
G12049 No. 19 Paper Machine acetaldehyde (75-07-0) 6.52E+00
acrolein (107-02-8) 2.40E+00
ammonia (7664-41-7) 9.81E+00
benzene (71-43-2) 1.83E+02
carbon disulfide (75-15-0) 2.41E+02
chloroform (67-66-3) 5.71E+02
formaldehyde (50-00-0) 1.38E+00
n-hexane (110-54-3) 2.42E+02
methylene chloride (75-09-2) 5.42E+04 1.51E+01
methyl ethyl ketone (78-93-3) 7.20E+01 1.40E+01
methyl mercaptan (74-93-1) 5.03E-01
phenol (108-95-2) 2.80E+00
G12048 No. 20 Paper Machine acetaldehyde (75-07-0) 3.67E+00
acrolein (107-02-8) 1.35E+00
ammonia (7664-41-7) 5.52E+00
benzene (71-43-2) 1.03E+02
carbon disulfide (75-15-0) 1.36E+02
chloroform (67-66-3) 3.21E+02
formaldehyde (50-00-0) 7.75E-01
n-hexane (110-54-3) 1.36E+02
methylene chloride (75-09-2) 3.05E+04 8.49E+00
methyl ethyl ketone (78-93-3) 4.05E+01 7.88E+00
methyl mercaptan (74-93-1) 2.83E-01
phenol (108-95-2) 1.58E+00
G12050 No. 12 Paper Machine acetaldehyde (75-07-0) 1.83E+00
acrolein (107-02-8) 6.76E-01
ammonia (7664-41-7) 2.76E+00
benzene (71-43-2) 5.15E+01
carbon disulfide (75-15-0) 6.78E+01
chloroform (67-66-3) 1.60E+02
formaldehyde (50-00-0) 3.88E-01
n-hexane (110-54-3) 6.80E+01
methylene chloride (75-09-2) 1.52E+04 4.24E+00
methyl ethyl ketone (78-93-3) 2.02E+01 3.94E+00
methyl mercaptan (74-93-1) 1.41E-01
phenol (108-95-2) 7.89E-01
Permit 08961T29
Page 137
Table 2.2 H.1 Toxic Air Pollutant Emission Limits
Permit ID No. Emission Source Description Toxic Air Pollutant (CAS No.)
Emission Limit
(lb/yr) (lb/day) (lb/hr)
G12051 No. 11 Paper Machine acetaldehyde (75-07-0) 1.83E+00
acrolein (107-02-8) 6.76E-01
ammonia (7664-41-7) 2.76E+00
benzene (71-43-2) 5.15E+01
carbon disulfide (75-15-0) 6.78E+01
chloroform (67-66-3) 1.60E+02
formaldehyde (50-00-0) 3.88E-01
n-hexane (110-54-3) 6.80E+01
methylene chloride (75-09-2) 1.52E+04 4.24E+00
methyl ethyl ketone (78-93-3) 2.02E+01 3.94E+00
methyl mercaptan (74-93-1) 1.41E-01
phenol (108-95-2) 7.89E-01
I-G10036 White Liquor Clarifier (West) (No.
10-TK-015)
White Liquor Clarifier (EIMCO)
(No. 10-TK-018)
White Liquor Clarifier (South)
(No. 10-TK-012)
White Liquor Pressure Disc Filter
(No.10a)
acetaldehyde (75-07-0) 1.61E+00
acrolein (107-02-8) 4.12E-02
benzene (71-43-2) 2.13E+01
methyl ethyl ketone (78-93-3) 3.26E+00 8.20E-01
I-G23065 Bleached Stock Storage acetaldehyde (75-07-0) 1.71E-02
benzene (71-43-2) 2.91E-02
chloroform (67-66-3) 3.55E+02
n-hexane (110-54-3) 3.75E-01
hydrogen sulfide (7783-06-4) 2.99E-02
methyl ethyl ketone (78-93-3) 4.83E-01 9.39E-02
methyl mercaptan (74-93-1) 3.26E-04
phenol (108-95-2) 4.99E-02
G07019.07-
TK-023
G07019.07-
TK-024
G07019.07-
TK-022
G07019.07-
TK-025
Heavy Black Liquor Storage:
East Storage Tank
West Storage Tank
Red Liquor Tank
Backup Tank
acetaldehyde (75-07-0) 2.66E+00
acrolein (107-02-8) 1.84E-03
benzene (71-43-2) 5.99E-01
1,3-butadiene (106-99-0) 3.56E+01
carbon disulfide (75-15-0) 5.32E+01
chloroform (67-66-3) 1.60E+01
formaldehyde (50-00-0) 2.45E-02
n-hexane (110-54-3) 3.52E+00
hydrogen sulfide (7783-06-4) 2.49E+01
methylene chloride (75-09-2) 9.04E+01 2.52E-02
methyl ethyl ketone (78-93-3) 3.60E+01 7.00E+00
methyl mercaptan (74-93-1) 2.71E-01
phenol (108-95-2) 3.15E-02
Permit 08961T29
Page 138
Table 2.2 H.1 Toxic Air Pollutant Emission Limits
Permit ID No. Emission Source Description Toxic Air Pollutant (CAS No.)
Emission Limit
(lb/yr) (lb/day) (lb/hr)
G07086.07-TK-
004,
G07086.07-TK-
013,
G07086.07-TK-
016,
G07086.07-TK-
017,
G07086.07-TK-
018,
G07086.07-TK-
019,
G07086.07-TK-
020,
G07086.07-TK-
021
Weak Black Liquor Storage:
Eight Tanks
acetaldehyde (75-07-0) 1.25E-01
acrolein (107-02-8) 2.80E-02
benzene (71-43-2) 5.31E+00
1,3-butadiene (106-99-0) 9.92E+01
carbon disulfide (75-15-0) 5.30E+02
carbon tetrachloride (56-23-5) 1.44E+01
chloroform (67-66-3) 4.90E-01
formaldehyde (50-00-0) 1.96E-02
n-hexane (110-54-3) 6.74E-01
hydrogen sulfide (7783-06-4) 3.94E+00
methylene chloride (75-09-2) 9.51E+02 2.65E-01
methyl ethyl ketone (78-93-3) 1.39E+01 2.71E+00
methyl mercaptan (74-93-1) 3.41E-02
I-G23066a Sewer Lines chlorine (7782-50-5) 5.65E-01 6.38E-02
G03007 Reject Knots acetaldehyde (75-07-0) 1.67E+00
acrolein (107-02-8) 3.46E-01
benzene (71-43-2) 1.29E+00
1,3-butadiene (106-99-0) 1.42E+02
carbon disulfide (75-15-0) 1.55E+01
carbon tetrachloride (56-23-5) 2.94E+03
chloroform (67-66-3) 1.32E+01
formaldehyde (50-00-0) 1.59E-02
methylene chloride (75-09-2) 5.79E+03 1.83E+00
methyl ethyl ketone (78-93-3) 3.42E+01 7.57E+00
methyl mercaptan (74-93-1) 2.40E-02
phenol (108-95-2) 1.46E-01
I-G10036 Causticizer (Center) (No. 10-TK-
010)
Causticizer (East) (No. 10-TK-009)
Causticizer (South) (No. 10-TK-
025)
Causticizer (West) (No. 10-TK-011)
Causticizer (North) (No. 10-TK-
026)
acetaldehyde (75-07-0) 8.56E-01
acrolein (107-02-8) 1.19E-02
ammonia (7664-41-7) 1.10E+01
benzene (71-43-2) 4.93E+00
carbon disulfide (75-15-0) 3.37E-01
chloroform (67-66-3) 1.17E-01
formaldehyde (50-00-0) 7.01E-03
n-hexane (110-54-3) 2.56E-01
methylene chloride (75-09-2) 4.12E+01 1.48E-02
methyl ethyl ketone (78-93-3) 1.20E-01 3.02E-02
phenol (108-95-2) 4.10E-03
G23066.k No. 1 Fiberline Building Ventilation
Fugitives
acetaldehyde (75-07-0) 2.76E+01
Permit 08961T29
Page 139
Table 2.2 H.1 Toxic Air Pollutant Emission Limits
Permit ID No. Emission Source Description Toxic Air Pollutant (CAS No.)
Emission Limit
(lb/yr) (lb/day) (lb/hr)
G23066.l
G03006
-common
exhaust
No. 2 Fiberline Building Ventilation
Fugitives
No. 2 Pine Fiberline Brownstock
Washer System
acetaldehyde (75-07-0) 1.03E+01
acrolein (107-02-8) 5.65E-02
benzene (71-43-2) 5.23E+01
1,3-butadiene (106-99-0) 2.53E+02
carbon disulfide (75-15-0) 1.86E+01
carbon tetrachloride (56-23-5) 4.16E+04
chloroform (67-66-3) 5.95E+00
cresol (1319-77-3) 1.04E+01
formaldehyde (50-00-0) 4.67E-01
n-hexane (110-54-3) 4.30E+03
hydrogen sulfide (7783-06-4) 3.43E+00
methylene chloride (75-09-2) 5.98E+02 1.76E-01
methyl ethyl ketone (78-93-3) 1.14E+02 2.26E+01
methyl mercaptan (74-93-1) 7.92E-02
phenol (108-95-2) 1.41E+00
vinyl chloride (75-01-4) 2.94E+03
G24092 Hardwood Brownstock High
Density Storage
acetaldehyde (75-07-0) 1.71E-01
benzene (71-43-2) 2.91E-01
chloroform (67-66-3) 3.55E+02
n-hexane (110-54-3) 3.75E+00
hydrogen sulfide (7783-06-4) 4.78E-01
methyl ethyl ketone (78-93-3) 4.83E+00 9.39E-01
methyl mercaptan (74-93-1) 3.26E-03
phenol (108-95-2) 4.99E-01
G24094 Pine Brownstock High Density
Storage
acetaldehyde (75-07-0) 1.71E-01
benzene (71-43-2) 2.91E-01
chloroform (67-66-3) 3.55E+02
n-hexane (110-54-3) 3.75E+00
hydrogen sulfide (7783-06-4) 4.78E-01
methyl ethyl ketone (78-93-3) 4.83E+00 9.39E-01
methyl mercaptan (74-93-1) 3.26E-03
phenol (108-95-2) 4.99E-01
G11025
G11045
No. 4 Power Boiler Flyash Transfer
Silo
Utility Boiler Flyash Handling
System Main Flyash Silo
arsenic and inorganic arsenic
compounds
1.32E-01
beryllium (7440-41-7) 2.31E-01
cadmium (7440-43-9) 9.14E-03
manganese and compounds 1.24E-01
nickel metal (7440-02-0) 3.09E+00
Permit 08961T29
Page 140
Table 2.2 H.1 Toxic Air Pollutant Emission Limits
Permit ID No. Emission Source Description Toxic Air Pollutant (CAS No.)
Emission Limit
(lb/yr) (lb/day) (lb/hr)
G16082 WTP Aeration and Digestion Basins acetaldehyde (75-07-0) 3.70E+01
ammonia (7664-41-7) 1.85E-01
cresol (1319-77-3) 7.19E-02
formaldehyde (50-00-0) 2.04E-01
methyl ethyl ketone (78-93-3) 6.26E+02 1.22E+02
phenol (108-95-2) 2.58E-02
I-G23066.c Coal Handling Fugitives arsenic and inorganic arsenic
compounds
5.34E-06
beryllium (7440-41-7) 9.43E-06
cadmium (7440-43-9) 3.70E-07
manganese and compounds 4.81E-03
nickel metal (7440-02-0) 2.05E-04
State Enforceable Only Requirement
2. TOXIC AIR POLLUTANT EMISSIONS LIMITATION AND REPORTING REQUIREMENTS
a. Pursuant to 15A NCAC 02Q .0711 “Emission Rates Requiring a Permit,” for each of the below listed toxic air
pollutants (TAPs), the Permittee has made a demonstration that actual emissions do not exceed the Toxic Permit
Emission Rates (TPERs) listed in 15A NCAC 02Q .0711. The facility shall be operated and maintained in such a
manner that emissions of any listed TAPs from the facility (excluding those sources exempt under 15A NCAC 02Q
.0702 "Exemptions" and those sources subject to an applicable requirement under 40 C.F.R. Parts 61 or 63, or subject
to a case-by-case maximum achievable control technology (MACT) permit requirement), including fugitive
emissions, will not exceed TPERs listed in 15A NCAC 02Q .0711.
i. A permit to emit any of the below listed TAPs shall be required for this facility if actual emissions from all
sources will become greater than the corresponding TPERs.
ii. PRIOR to exceeding any of these listed TPERs, the Permittee shall be responsible for obtaining a permit to emit
TAPs and for demonstrating compliance with the requirements of 15A NCAC 02D.1100 "Control of Toxic Air
Pollutants.”
b. In accordance with the approved application, the Permittee shall maintain records of operational information
demonstrating that the TAP emissions from non-exempt sources do not exceed the TPERs as listed below:
Table 2.2 H.2 – TPER Limitations
Pollutant (CAS Number)
Carcinogens
(lb/yr)
Chronic
Toxicants
(lb/day)
Acute Systemic
Toxicants (lb/hr)
Acute Irritants
(lb/hr)
Benzyl Chloride (100-44-7) 0.13
Chlorobenzene (108-90-7) 46
Di(2-ethylhexyl)phthalate
(117-81-7) 0.63
Ethylene dibromide (106-93-4) 27
Ethylene dichloride (107-06-2) 260
Hexachlorodibenzo-p-dioxin
(57653-85-7) 0.0051
Methyl chloroform (71-55-6) 250 64
Methyl isobutyl ketone (108-10-
1) 52 7.6
Permit 08961T29
Page 141
Table 2.2 H.2 – TPER Limitations
Pollutant (CAS Number)
Carcinogens
(lb/yr)
Chronic
Toxicants
(lb/day)
Acute Systemic
Toxicants (lb/hr)
Acute Irritants
(lb/hr)
Perchloroethylene (127-18-4) 13,000
Pentachlorophenol (87-86-5) 0.063 0.0064
Polychlorinated Biphenyls
(1336-36-3) 5.6
Styrene (100-42-5) 2.7
Tetrachlordibenzo-p-dioxin
(1746-01-6) 0.00020
1,1,2,2-Tetrachloroethane
(79-34-5) 430
Toluene (108-88-3) 98 14.4
Trichloroethylene (79-01-6) 4000
Trichlorofluoromethane
(75-69-4) 140
Xylene (1330-20-7) 57 16.4
Permit 08961T29
Page 142
I. Best Available Retrofit Control Technology
State Enforceable Only Requirement:
1. 15A NCAC 02D .0543 BEST AVAILABLE RETROFIT CONTROL TECHNOLOGY
Based on the review of Permit Application 4400159.06E, and with the consideration of comments received from
interested parties, the DAQ has determined that Best Available Retrofit Technology (BART) for the following
emission sources subject to the requirements contained in 15A NCAC 02D .0543 “Best Available Retrofit
Technology” is no additional controls.
Emission Source Description
G08020 No. 10 Recovery Furnace
G08021 No. 11 Recovery Furnace
G08022a Black Liquor Oxidation System
G08023 No. 10 Smelt Dissolving Tank
G08024 No. 11 Smelt Dissolving Tank
Permit 08961T29
Page 143
J. Facility-wide SO2 Emission Sources
1. 15A NCAC 02D .0501(c): COMPLIANCE WITH NATIONAL AMBIENT AIR QUALITY STANDARDS
a. Pursuant to 15A NCAC 02D .0501(c), when controls more stringent than named in the applicable emission
standards in Section .0500 are required to prevent violation of the ambient air quality standards or are required to
create an offset, the permit shall contain a condition requiring these controls. To this end, the Permittee submitted
Permit Application No. 4400159.18E, which included a modeling demonstration showing compliance with the 1-
hour SO2 NAAQS using the emission limits included in Table 2.2 J.1 below.
Emission Limitations [15A NCAC 02Q .0508(f)]
b. The Permittee shall be subject to the emission limitations for SO2 in Table 2.2 J.1 below.
Table 2.2 J.1
SO2 Emission Limitations
ID No. Source Description
Allowable
Emission Rate,
lb/hr
G08020 No. 10 Recovery Furnace – black liquor solids (BLS) -
normal operation
28.0
G08020 No. 10 Recovery Furnace – ultra low sulfur diesel (ULSD)
- startup and shutdown
0.54
G08021 No. 11 Recovery Furnace - BLS - normal operation 28.0
G08021 No. 11 Recovery Furnace - ULSD - startup and shutdown. 0.54
G08023 No. 10 Smelt Dissolving Tank 0.42
G08024 No. 11 Smelt Dissolving Tank 0.42
G09028 No. 4 Lime Kiln 6.28
G09029 No. 5 Lime Kiln 10.47
G11039 Riley Coal Boiler 61.32
G11040 No. 4 Power Boiler 82.22
G11042 Riley Bark Boiler 68.00
I-G12077 Calendar natural gas and/or propane hot oil heaters 0.012
16-CU-001 1850 hp Backup Diesel Generator (Engine) 0.022
I-G23066.f-ire 200 hp Fire Control Generator #1 (Engine) 2.43E-03
I-G23066.f-ire 200 hp Fire Control Generator #2 (Engine) 2.43E-03
I-G23066.f-gen 64 hp Lime Kiln Emergency Generator (Engine) 7.77E-04
I-G23066.f-gen 227 hp Lime Kiln Emergency Generator (Engine) 2.75E-03
I-G23066.f-rec 100 kW Recovery Furnace Emergency Generator (Engine) 1.42E-03
G08022a Black Liquor Oxidation System 2.50
G11050 No. 1 Natural Gas Package Boiler 0.13
G11051 No. 2 Natural Gas Package Boiler 0.13
Operating Restrictions [15A NCAC 02Q .0508(f)]
c. To ensure the emission limitations in Table 2.2 J.1 will not be exceeded, the Permittee shall be subject to the
following requirements:
i. For the Nos. 10 and 11 Recovery Furnaces (ID Nos. G08020 and G08021), during startup and shutdown, and
normal operation as needed, fire only fuel oil with a maximum sulfur content of 15 ppm (ULSD).
ii. For the Nos. 10 and 11 Smelt Dissolving Tanks (ID Nos. G08023 and G08024), meet the scrubber
monitoring, recordkeeping and reporting requirements in Section 2.1 N.3.d through N.3.g.
iii. For the No. 4 and No. 5 Lime Kilns (ID Nos. G09028 and G09029) meet the following requirements:
(A) SO2 emissions shall be continuously controlled by the scrubbers identified in Section 2.2 D and;
(B) Shall meet the scrubber monitoring, recordkeeping and reporting requirements associated with the Nos. 4
and 5 Lime Kilns in Section 2.2 D.1.f through D.1.r, above.
iv. For the black liquor oxidation system (ID No. G08022a), meet the scrubber monitoring and recordkeeping
requirements at Section 2.1 M.1.d through M.1.e. The Permittee shall maintain a 3-hour block average for
each scrubber parameter at or above the levels shown in Section 2.1 M.1.e.
Permit 08961T29
Page 144
v. For the engines identified in Table 2.2 J.1, fire only fuel with a maximum sulfur content of 15 ppm (ULSD).
vi. For the Natural gas and/or Propane Heaters installed on the Calendar Section of the No. 19 Paper Machine,
and Nos. 1 and 2 Natural Gas Package Boilers (ID Nos. I-G12077, G11050, and G11051), fire only natural
gas or propane.
vii. For Riley Bark, Riley Coal and the No. 4 Power Boilers (ID Nos. G11042, G11039 and G11040), meet the
following requirements. These requirements do not apply when firing only natural gas.
(A) SO2 emissions shall be continuously controlled by wet scrubbers as indicated in Table 2.2 J.2.
(B) Perform inspections and maintenance of the scrubbers as recommended by the manufacturer.
(C) Install, operate, and maintain continuous monitoring systems (CMS) for scrubbing liquid pH and
scrubbing liquid flowrate as required by Table 2.2 J.2.
(D) Each CMS shall meet the requirements of 40 CFR 63.7525(d) through (g) and 63.7535, except that, in
lieu of 40 CFR 63.7525(d)(4), the Permittee shall determine for each required parameter in Table 2.2 J.2
the 3-hour block average.
(E) The Permittee shall maintain the 3-hour block average for each parameter indicated in Table 2.2 J.2 at or
above the levels confirmed or re-established by the most recent performance test approved by DAQ that
demonstrate compliance with the corresponding emission limits at all times, except as allowed at Section
2.2 J.1.e. The operating parameter values confirmed or re-established by the results of the most recently
conducted performance test approved by DAQ at the time of permit issuance are shown in Table 2.2 J.2
below, except as allowed at Section 2.2 J.1.e, below. The 3-hour block average of all recorded readings
shall be calculated after every 3 hours of operation as the average of the evenly spaced recorded readings
in the previous 3 operating hours (excluding periods described in 40 CFR 63.7535(b) through (d).
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0501 if these requirements are not met.
Table 2.2 J.2
Source
ID No.
Source
Description
Control
Device ID
No. Description
Minimum
Scrubber
Recirculation
Flow, gpm
Minimum
Scrubber
Liquid
pH
Date of
Performance
Test*
G11039 Riley Coal Boiler 11-CD-005-02 wet caustic scrubber 3,819 5.7 11/20/2018
G11040 No. 4 Power Boiler 11-CD-006-03 wet caustic scrubber 4,395 6 12/18/2018
G11042 Riley Bark Boiler 11-CD-016-02 venturi-type wet scrubber 1,084 6.1 12/19/2018
flow
11/1/2019 pH
* Date upon which the operating parameter values are based, is the most recently conducted performance test approved by DAQ at the
time of permit issuance.
Testing Requirements [15A NCAC 02Q .0508(f)]
d. Under the provisions of NCGS 143-215.108, the Permittee shall demonstrate compliance with the emission limits
in Table 2.2 J.1 above on an annual basis by testing the sources in Table 2.2 J.3 below in accordance with General
Condition JJ. Testing shall be conducted under operating scenarios representing worst case SO2 emission rates.
Annual performance tests must be completed no more than 13 months after the previous performance test, unless
an alternate date is approved by the DAQ. Exceptions to annual testing requirements are as follows:
i. For the Nos. 4 and 5 Lime Kilns (ID Nos. G09028 and G09029), if the results of a test are less than
50 percent of the emission limit in Table 2.2 J.1, above, the Permittee shall be required to stack test only once
every five years following the previous stack test for that source. The Permittee shall conduct an SO2
performance test within 180 days after resumption of normal operations following modifications to the lime
kiln scrubbers.
ii. For Riley Bark, Riley Coal and the No. 4 Power Boilers (ID Nos. G11042, G11039 and G11040), if the
results of a test are less than 80 percent of the emission limit in Table 2.2 J.1, above, the Permittee shall be
required to stack test only once every five years following the previous stack test for that source.
If the results of a test are above the limit given in Table 2.2 J.1 above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0501.
Permit 08961T29
Page 145
Table 2.2 J.3
ID No. Source Description
G08020 No. 10 Recovery Furnace - BLS - normal operation
G08021 No. 11 Recovery Furnace - BLS - normal operation
G09028 No. 4 Lime Kiln
G09029 No. 5 Lime Kiln
G11039 Riley Coal Boiler
G11040 No. 4 Power Boiler
G11042 Riley Bark Boiler
e. The parametric values confirmed or re-established from the most recent performance test approved by DAQ do not
apply during performance testing.
f. If, during performance testing, the parameter values are not adhered to and are more stringent (i.e, the minimum
flow and/or pH is greater), the Permittee shall submit a request to revise the value(s) in the permit at the same time
the test report required pursuant to General Condition JJ.4 is submitted. The permit revision will be processed
pursuant to 15A NCAC 02Q .0514. If, during performance testing, the parameter values are not adhered to and are
less stringent, the Permittee may request to revise the value(s) in the permit pursuant to 15A NCAC 02Q .0515.
If a permit revision is required per 02Q .0514 and is not submitted, the Permittee shall be deemed in
noncompliance with 02D .0501.
Recordkeeping [15A NCAC 02Q .0508(f)]
g. In addition to any recordkeeping requirements in Section 2.2 J.1.c, above, the following requirements shall apply:
i. The results of inspection and maintenance on the scrubbers installed on the Riley Coal, Riley Bark, and No. 4
Power Boilers (ID Nos. G11039, G11042 and G11040) shall be maintained in a logbook (written or
electronic format) on-site and made available to an authorized representative upon request. The logbook shall
record the following:
(A) the date and time of each recorded action;
(B) the results of each inspection;
(C) the results of any maintenance performed on any control device; and
(D) any variance from manufacturer’s recommendations, if any, and corrections made.
ii. Records of all scrubber monitoring data and calculated averages for the parameters in Table 2.2 J.2.
iii. For the Nos. 10 and 11 (ID Nos. G08020 and G08021) Recovery Furnaces:
(A) record date, time and duration of all start up and shutdowns; and
(B) keep fuel supplier certification records for all fuel oil fired during all start up and shutdowns. The
certifications shall meet the requirements of 40 CFR 60.48c(f).
iv. For the engines identified in Table 2.2 J.1, keep fuel supplier certification records for all fuel oil fired. The
certifications shall meet the requirements of 40 CFR 60.48c(f).
v. For the scrubber on the Black Liquor Oxidation System (ID No. G08022a), maintain records of the 3-hour
block averages for the monitoring parameters in Section 2.1 M.1.e.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0501 if these records are not maintained.
Reporting [15A NCAC 02Q .0508(f)]
h. Within 30 days of a request from the DAQ, the Permittee shall submit a report of any maintenance and repairs
performed on any control device.
i. In addition to any reporting required in Section 2.2 J.1.c above, the Permittee shall submit a summary report of the
monitoring and recordkeeping activities given in Sections 2.2 J.1.c through g above postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June. All instances of deviations from
the requirements of this permit must be clearly identified.
Permit 08961T29
Page 146
SECTION 3 - GENERAL CONDITIONS (version 5.3, 08/21/2018)
This section describes terms and conditions applicable to this Title V facility.
A. General Provisions [NCGS 143-215 and 15A NCAC 02Q .0508(i)(16)]
1. Terms not otherwise defined in this permit shall have the meaning assigned to such terms as defined in 15A
NCAC 02D and 02Q.
2. The terms, conditions, requirements, limitations, and restrictions set forth in this permit are binding and
enforceable pursuant to NCGS 143-215.114A and 143-215.114B, including assessment of civil and/or criminal
penalties. Any unauthorized deviation from the conditions of this permit may constitute grounds for revocation
and/or enforcement action by the DAQ.
3. This permit is not a waiver of or approval of any other Department permits that may be required for other aspects
of the facility which are not addressed in this permit.
4. This permit does not relieve the Permittee from liability for harm or injury to human health or welfare, animal or
plant life, or property caused by the construction or operation of this permitted facility, or from penalties therefore,
nor does it allow the Permittee to cause pollution in contravention of state laws or rules, unless specifically
authorized by an order from the North Carolina Environmental Management Commission.
5. Except as identified as state-only requirements in this permit, all terms and conditions contained herein shall be
enforceable by the DAQ, the EPA, and citizens of the United States as defined in the Federal Clean Air Act.
6. Any stationary source of air pollution shall not be operated, maintained, or modified without the appropriate and
valid permits issued by the DAQ, unless the source is exempted by rule. The DAQ may issue a permit only after it
receives reasonable assurance that the installation will not cause air pollution in violation of any of the applicable
requirements. A permitted installation may only be operated, maintained, constructed, expanded, or modified in a
manner that is consistent with the terms of this permit.
B. Permit Availability [15A NCAC 02Q .0507(k) and .0508(i)(9)(B)]
The Permittee shall have available at the facility a copy of this permit and shall retain for the duration of the permit term
one complete copy of the application and any information submitted in support of the application package. The permit
and application shall be made available to an authorized representative of Department of Environmental Quality upon
request.
C. Severability Clause [15A NCAC 02Q .0508(i)(2)]
In the event of an administrative challenge to a final and binding permit in which a condition is held to be invalid, the
provisions in this permit are severable so that all requirements contained in the permit, except those held to be invalid,
shall remain valid and must be complied with.
D. Submissions [15A NCAC 02Q .0507(e) and 02Q .0508(i)(16)]
Except as otherwise specified herein, two copies of all documents, reports, test data, monitoring data, notifications,
request for renewal, and any other information required by this permit shall be submitted to the appropriate Regional
Office. Refer to the Regional Office address on the cover page of this permit. For continuous emissions monitoring
systems (CEMS) reports, continuous opacity monitoring systems (COMS) reports, quality assurance (QA)/quality control
(QC) reports, acid rain CEM certification reports, and NOx budget CEM certification reports, one copy shall be sent to the
appropriate Regional Office and one copy shall be sent to:
Supervisor, Stationary Source Compliance
North Carolina Division of Air Quality
1641 Mail Service Center
Raleigh, NC 27699-1641
All submittals shall include the facility name and Facility ID number (refer to the cover page of this permit).
E. Duty to Comply [15A NCAC 02Q .0508(i)(3)]
The Permittee shall comply with all terms, conditions, requirements, limitations and restrictions set forth in this permit.
Noncompliance with any permit condition except conditions identified as state-only requirements constitutes a violation
Permit 08961T29
Page 147
of the Federal Clean Air Act. Noncompliance with any permit condition is grounds for enforcement action, for permit
termination, revocation and reissuance, or modification, or for denial of a permit renewal application.
F. Circumvention - STATE ENFORCEABLE ONLY
The facility shall be properly operated and maintained at all times in a manner that will effect an overall reduction in air
pollution. Unless otherwise specified by this permit, no emission source may be operated without the concurrent
operation of its associated air pollution control device(s) and appurtenances.
G. Permit Modifications
1. Administrative Permit Amendments [15A NCAC 02Q .0514]
The Permittee shall submit an application for an administrative permit amendment in accordance with 15A NCAC
02Q .0514.
2. Transfer in Ownership or Operation and Application Submittal Content [15A NCAC 02Q .0524 and 02Q .0505]
The Permittee shall submit an application for an ownership change in accordance with 15A NCAC 02Q.0524 and
02Q .0505.
3. Minor Permit Modifications [15A NCAC 02Q .0515]
The Permittee shall submit an application for a minor permit modification in accordance with 15A NCAC 02Q .0515.
4. Significant Permit Modifications [15A NCAC 02Q .0516]
The Permittee shall submit an application for a significant permit modification in accordance with 15A NCAC 02Q
.0516.
5. Reopening for Cause [15A NCAC 02Q .0517]
The Permittee shall submit an application for reopening for cause in accordance with 15A NCAC 02Q .0517.
H. Changes Not Requiring Permit Modifications
1. Reporting Requirements
Any of the following that would result in new or increased emissions from the emission source(s) listed in Section 1
must be reported to the Regional Supervisor, DAQ:
a. changes in the information submitted in the application;
b. changes that modify equipment or processes; or
c. changes in the quantity or quality of materials processed.
If appropriate, modifications to the permit may then be made by the DAQ to reflect any necessary changes in the
permit conditions. In no case are any new or increased emissions allowed that will cause a violation of the emission
limitations specified herein.
2. Section 502(b)(10) Changes [15A NCAC 02Q .0523(a)]
a. "Section 502(b)(10) changes" means changes that contravene an express permit term or condition. Such changes
do not include changes that would violate applicable requirements or contravene federally enforceable permit
terms and conditions that are monitoring (including test methods), recordkeeping, reporting, or compliance
certification requirements.
b. The Permittee may make Section 502(b)(10) changes without having the permit revised if:
i. the changes are not a modification under Title I of the Federal Clean Air Act;
ii. the changes do not cause the allowable emissions under the permit to be exceeded;
iii. the Permittee notifies the Director and EPA with written notification at least seven days before the change is
made; and
iv. the Permittee shall attach the notice to the relevant permit.
c. The written notification shall include:
i. a description of the change;
ii. the date on which the change will occur;
iii. any change in emissions; and
iv. any permit term or condition that is no longer applicable as a result of the change.
d. Section 502(b)(10) changes shall be made in the permit the next time that the permit is revised or renewed,
whichever comes first.
3. Off Permit Changes [15A NCAC 02Q .0523(b)]
The Permittee may make changes in the operation or emissions without revising the permit if:
a. the change affects only insignificant activities and the activities remain insignificant after the change; or
b. the change is not covered under any applicable requirement.
4. Emissions Trading [15A NCAC 02Q .0523(c)]
Permit 08961T29
Page 148
To the extent that emissions trading is allowed under 15A NCAC 02D, including subsequently adopted maximum
achievable control technology standards, emissions trading shall be allowed without permit revision pursuant to 15A
NCAC 02Q .0523(c).
I.A Reporting Requirements for Excess Emissions and Permit Deviations [15A NCAC 02D .0535(f) and 02Q
.0508(f)(2)]
“Excess Emissions” - means an emission rate that exceeds any applicable emission limitation or standard allowed by any
rule in Sections .0500, .0900, .1200, or .1400 of Subchapter 02D; or by a permit condition; or that exceeds an emission
limit established in a permit issued under 15A NCAC 02Q .0700. (Note: Definitions of excess emissions under 02D .1110
and 02D .1111 shall apply where defined by rule.)
“Deviations” - for the purposes of this condition, any action or condition not in accordance with the terms and conditions
of this permit including those attributable to upset conditions as well as excess emissions as defined above lasting less
than four hours.
Excess Emissions
1. If a source is required to report excess emissions under NSPS (15A NCAC 02D .0524), NESHAPS (15A NCAC 02D
.1110 or .1111), or the operating permit provides for periodic (e.g., quarterly) reporting of excess emissions, reporting
shall be performed as prescribed therein.
2. If the source is not subject to NSPS (15A NCAC 02D .0524), NESHAPS (15A NCAC 02D .1110 or .1111), or these
rules do NOT define "excess emissions," the Permittee shall report excess emissions in accordance with 15A NCAC
02D .0535 as follows:
a. Pursuant to 15A NCAC 02D .0535, if excess emissions last for more than four hours resulting from a
malfunction, a breakdown of process or control equipment, or any other abnormal condition, the owner or
operator shall:
i. notify the Regional Supervisor or Director of any such occurrence by 9:00 a.m. Eastern Time of the
Division's next business day of becoming aware of the occurrence and provide:
● name and location of the facility;
● nature and cause of the malfunction or breakdown;
● time when the malfunction or breakdown is first observed;
● expected duration; and
● estimated rate of emissions;
ii. notify the Regional Supervisor or Director immediately when corrective measures have been accomplished;
and
iii. submit to the Regional Supervisor or Director within 15 days a written report as described in 15A NCAC
02D .0535(f)(3).
Permit Deviations
3. Pursuant to 15A NCAC 02Q .0508(f)(2), the Permittee shall report deviations from permit requirements (terms and
conditions) as follows:
a. Notify the Regional Supervisor or Director of all other deviations from permit requirements not covered under
15A NCAC 02D .0535 quarterly. A written report to the Regional Supervisor shall include the probable cause of
such deviation and any corrective actions or preventative actions taken. The responsible official shall certify all
deviations from permit requirements.
I.B Other Requirements under 15A NCAC 02D .0535
The Permittee shall comply with all other applicable requirements contained in 15A NCAC 02D .0535, including 15A
NCAC 02D .0535(c) as follows:
1. Any excess emissions that do not occur during start-up and shut-down shall be considered a violation of the
appropriate rule unless the owner or operator of the sources demonstrates to the Director, that the excess emissions
are a result of a malfunction. The Director shall consider, along with any other pertinent information, the criteria
contained in 15A NCAC 02D .0535(c)(1) through (7).
2. 15A NCAC 02D .0535(g). Excess emissions during start-up and shut-down shall be considered a violation of the
appropriate rule if the owner or operator cannot demonstrate that excess emissions are unavoidable.
Permit 08961T29
Page 149
J. Emergency Provisions [40 CFR 70.6(g)]
The Permittee shall be subject to the following provisions with respect to emergencies:
1. An emergency means any situation arising from sudden and reasonably unforeseeable events beyond the control of
the facility, including acts of God, which situation requires immediate corrective action to restore normal operation,
and that causes the facility to exceed a technology-based emission limitation under the permit, due to unavoidable
increases in emissions attributable to the emergency. An emergency shall not include noncompliance to the extent
caused by improperly designed equipment, lack of preventive maintenance, careless or improper operation, or
operator error.
2. An emergency constitutes an affirmative defense to an action brought for noncompliance with such technology-based
emission limitations if the conditions specified in 3. below are met.
3. The affirmative defense of emergency shall be demonstrated through properly signed contemporaneous operating
logs or other relevant evidence that include information as follows:
a. an emergency occurred and the Permittee can identify the cause(s) of the emergency;
b. the permitted facility was at the time being properly operated;
c. during the period of the emergency the Permittee took all reasonable steps to minimize levels of emissions that
exceeded the standards or other requirements in the permit; and
d. the Permittee submitted notice of the emergency to the DAQ within two working days of the time when emission
limitations were exceeded due to the emergency. This notice must contain a description of the emergency, steps
taken to mitigate emissions, and corrective actions taken.
4. In any enforcement proceeding, the Permittee seeking to establish the occurrence of an emergency has the burden of
proof.
5. This provision is in addition to any emergency or upset provision contained in any applicable requirement specified
elsewhere herein.
K. Permit Renewal [15A NCAC 02Q .0508(e) and 02Q .0513(b)]
This 15A NCAC 02Q .0500 permit is issued for a fixed term not to exceed five years and shall expire at the end of its
term. Permit expiration terminates the facility's right to operate unless a complete 15A NCAC 02Q .0500 renewal
application is submitted at least six months before the date of permit expiration. If the Permittee or applicant has
complied with 15A NCAC 02Q .0512(b)(1), this 15A NCAC 02Q .0500 permit shall not expire until the renewal permit
has been issued or denied. Permit expiration under 15A NCAC 02Q .0400 terminates the facility’s right to operate unless
a complete 15A NCAC 02Q .0400 renewal application is submitted at least six months before the date of permit
expiration for facilities subject to 15A NCAC 02Q .0400 requirements. In either of these events, all terms and conditions
of these permits shall remain in effect until the renewal permits have been issued or denied.
L. Need to Halt or Reduce Activity Not a Defense [15A NCAC 02Q .0508(i)(4)]
It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to halt or reduce the
permitted activity in order to maintain compliance with the conditions of this permit.
M. Duty to Provide Information (submittal of information) [15A NCAC 02Q .0508(i)(9)]
1. The Permittee shall furnish to the DAQ, in a timely manner, any reasonable information that the Director may request
in writing to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit or to
determine compliance with the permit.
2. The Permittee shall furnish the DAQ copies of records required to be kept by the permit when such copies are
requested by the Director. For information claimed to be confidential, the Permittee may furnish such records directly
to the EPA upon request along with a claim of confidentiality.
N. Duty to Supplement [15A NCAC 02Q .0507(f)]
The Permittee, upon becoming aware that any relevant facts were omitted or incorrect information was submitted in the
permit application, shall promptly submit such supplementary facts or corrected information to the DAQ. The Permittee
shall also provide additional information as necessary to address any requirement that becomes applicable to the facility
after the date a complete permit application was submitted but prior to the release of the draft permit.
O. Retention of Records [15A NCAC 02Q .0508(f) and 02Q .0508 (l)]
The Permittee shall retain records of all required monitoring data and supporting information for a period of at least five
years from the date of the monitoring sample, measurement, report, or application. Supporting information includes all
calibration and maintenance records and all original strip-chart recordings for continuous monitoring information, and
copies of all reports required by the permit. These records shall be maintained in a form suitable and readily available for
Permit 08961T29
Page 150
expeditious inspection and review. Any records required by the conditions of this permit shall be kept on site and made
available to DAQ personnel for inspection upon request.
P. Compliance Certification [15A NCAC 02Q .0508(n)]
The Permittee shall submit to the DAQ and the EPA (Air and EPCRA Enforcement Branch, EPA, Region 4, 61 Forsyth
Street SW, Atlanta, GA 30303) postmarked on or before March 1 a compliance certification (for the preceding calendar
year) by a responsible official with all federally-enforceable terms and conditions in the permit, including emissions
limitations, standards, or work practices. It shall be the responsibility of the current owner to submit a compliance
certification for the entire year regardless of who owned the facility during the year. The compliance certification shall
comply with additional requirements as may be specified under Sections 114(a)(3) or 504(b) of the Federal Clean Air Act.
The compliance certification shall specify:
1. the identification of each term or condition of the permit that is the basis of the certification;
2. the compliance status (with the terms and conditions of the permit for the period covered by the certification);
3. whether compliance was continuous or intermittent; and
4. the method(s) used for determining the compliance status of the source during the certification period.
Q. Certification by Responsible Official [15A NCAC 02Q .0520]
A responsible official shall certify the truth, accuracy, and completeness of any application form, report, or compliance
certification required by this permit. All certifications shall state that based on information and belief formed after
reasonable inquiry, the statements and information in the document are true, accurate, and complete.
R. Permit Shield for Applicable Requirements [15A NCAC 02Q .0512]
1. Compliance with the terms and conditions of this permit shall be deemed compliance with applicable requirements,
where such applicable requirements are included and specifically identified in the permit as of the date of permit
issuance.
2. A permit shield shall not alter or affect:
a. the power of the Commission, Secretary of the Department, or Governor under NCGS 143-215.3(a)(12), or EPA
under Section 303 of the Federal Clean Air Act;
b. the liability of an owner or operator of a facility for any violation of applicable requirements prior to the effective
date of the permit or at the time of permit issuance;
c. the applicable requirements under Title IV; or
d. the ability of the Director or the EPA under Section 114 of the Federal Clean Air Act to obtain information to
determine compliance of the facility with its permit.
3. A permit shield does not apply to any change made at a facility that does not require a permit or permit revision made
under 15A NCAC 02Q .0523.
4. A permit shield does not extend to minor permit modifications made under 15A NCAC 02Q .0515.
S. Termination, Modification, and Revocation of the Permit [15A NCAC 02Q .0519]
The Director may terminate, modify, or revoke and reissue this permit if:
1. the information contained in the application or presented in support thereof is determined to be incorrect;
2. the conditions under which the permit or permit renewal was granted have changed;
3. violations of conditions contained in the permit have occurred;
4. the EPA requests that the permit be revoked under 40 CFR 70.7(g) or 70.8(d); or
5. the Director finds that termination, modification, or revocation and reissuance of the permit is necessary to carry out
the purpose of NCGS Chapter 143, Article 21B.
T. Insignificant Activities [15A NCAC 02Q .0503]
Because an emission source or activity is insignificant does not mean that the emission source or activity is exempted
from any applicable requirement or that the owner or operator of the source is exempted from demonstrating compliance
with any applicable requirement. The Permittee shall have available at the facility at all times and made available to an
authorized representative upon request, documentation, including calculations, if necessary, to demonstrate that an
emission source or activity is insignificant.
U. Property Rights [15A NCAC 02Q .0508(i)(8)]
This permit does not convey any property rights in either real or personal property or any exclusive privileges.
Permit 08961T29
Page 151
V. Inspection and Entry [15A NCAC 02Q .0508(l) and NCGS 143-215.3(a)(2)]
1. Upon presentation of credentials and other documents as may be required by law, the Permittee shall allow the DAQ,
or an authorized representative, to perform the following:
a. enter the Permittee's premises where the permitted facility is located or emissions-related activity is conducted,
or where records are kept under the conditions of the permit;
b. have access to and copy, at reasonable times, any records that are required to be kept under the conditions of the
permit;
c. inspect at reasonable times and using reasonable safety practices any source, equipment (including monitoring
and air pollution control equipment), practices, or operations regulated or required under the permit; and
d. sample or monitor substances or parameters, using reasonable safety practices, for the purpose of assuring
compliance with the permit or applicable requirements at reasonable times.
Nothing in this condition shall limit the ability of the EPA to inspect or enter the premises of the Permittee under
Section 114 or other provisions of the Federal Clean Air Act.
2. No person shall refuse entry or access to any authorized representative of the DAQ who requests entry for purposes
of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any
such authorized representative while in the process of carrying out his official duties. Refusal of entry or access may
constitute grounds for permit revocation and assessment of civil penalties.
W. Annual Fee Payment [15A NCAC 02Q .0508(i)(10)]
1. The Permittee shall pay all fees in accordance with 15A NCAC 02Q .0200.
2. Payment of fees may be by check or money order made payable to the N.C. Department of Environmental Quality.
Annual permit fee payments shall refer to the permit number.
3. If, within 30 days after being billed, the Permittee fails to pay an annual fee, the Director may initiate action to
terminate the permit under 15A NCAC 02Q .0519.
X. Annual Emission Inventory Requirements [15A NCAC 02Q .0207]
The Permittee shall report by June 30 of each year the actual emissions of each air pollutant listed in 15A NCAC 02Q
.0207(a) from each emission source within the facility during the previous calendar year. The report shall be in or on such
form as may be established by the Director. The accuracy of the report shall be certified by a responsible official of the
facility.
Y. Confidential Information [15A NCAC 02Q .0107 and 02Q. 0508(i)(9)]
Whenever the Permittee submits information under a claim of confidentiality pursuant to 15A NCAC 02Q .0107, the
Permittee may also submit a copy of all such information and claim directly to the EPA upon request. All requests for
confidentiality must be in accordance with 15A NCAC 02Q .0107.
Z. Construction and Operation Permits [15A NCAC 02Q .0100 and .0300]
A construction and operating permit shall be obtained by the Permittee for any proposed new or modified facility or
emission source which is not exempted from having a permit prior to the beginning of construction or modification, in
accordance with all applicable provisions of 15A NCAC 02Q .0100 and .0300.
AA. Standard Application Form and Required Information [15A NCAC 02Q .0505 and .0507]
The Permittee shall submit applications and required information in accordance with the provisions of 15A NCAC 02Q
.0505 and .0507.
BB. Financial Responsibility and Compliance History [15A NCAC 02Q .0507(d)(4)]
The DAQ may require an applicant to submit a statement of financial qualifications and/or a statement of substantial
compliance history.
CC. Refrigerant Requirements (Stratospheric Ozone and Climate Protection) [15A NCAC 02Q .0501(e)]
1. If the Permittee has appliances or refrigeration equipment, including air conditioning equipment, which use Class I or
II ozone-depleting substances such as chlorofluorocarbons and hydrochlorofluorocarbons listed as refrigerants in 40
CFR Part 82 Subpart A Appendices A and B, the Permittee shall service, repair, and maintain such equipment
according to the work practices, personnel certification requirements, and certified recycling and recovery equipment
specified in 40 CFR Part 82 Subpart F.
2. The Permittee shall not knowingly vent or otherwise release any Class I or II substance into the environment during
the repair, servicing, maintenance, or disposal of any such device except as provided in 40 CFR Part 82 Subpart F.
Permit 08961T29
Page 152
3. The Permittee shall comply with all reporting and recordkeeping requirements of 40 CFR 82.166. Reports shall be
submitted to the EPA or its designee as required.
DD. Prevention of Accidental Releases - Section 112(r) [15A NCAC 02Q .0508(h)]
If the Permittee is required to develop and register a Risk Management Plan with EPA pursuant to Section 112(r) of the
Clean Air Act, then the Permittee is required to register this plan in accordance with 40 CFR Part 68.
EE. Prevention of Accidental Releases General Duty Clause - Section 112(r)(1) – FEDERALLY-ENFORCEABLE
ONLY
Although a risk management plan may not be required, if the Permittee produces, processes, handles, or stores any
amount of a listed hazardous substance, the Permittee has a general duty to take such steps as are necessary to prevent the
accidental release of such substance and to minimize the consequences of any release.
FF. Title IV Allowances [15A NCAC 02Q .0508(i)(1)]
This permit does not limit the number of Title IV allowances held by the Permittee, but the Permittee may not use
allowances as a defense to noncompliance with any other applicable requirement. The Permittee’s emissions may not
exceed any allowances that the facility lawfully holds under Title IV of the Federal Clean Air Act.
GG. Air Pollution Emergency Episode [15A NCAC 02D .0300]
Should the Director of the DAQ declare an Air Pollution Emergency Episode, the Permittee will be required to operate in
accordance with the Permittee’s previously approved Emission Reduction Plan or, in the absence of an approved plan,
with the appropriate requirements specified in 15A NCAC 02D .0300.
HH. Registration of Air Pollution Sources [15A NCAC 02D .0202]
The Director of the DAQ may require the Permittee to register a source of air pollution. If the Permittee is required to
register a source of air pollution, this registration and required information will be in accordance with 15A NCAC 02D
.0202(b).
II. Ambient Air Quality Standards [15A NCAC 02D .0501(c)]
In addition to any control or manner of operation necessary to meet emission standards specified in this permit, any source
of air pollution shall be operated with such control or in such manner that the source shall not cause the ambient air
quality standards in 15A NCAC 02D .0400 to be exceeded at any point beyond the premises on which the source is
located. When controls more stringent than named in the applicable emission standards in this permit are required to
prevent violation of the ambient air quality standards or are required to create an offset, the permit shall contain a
condition requiring these controls.
JJ. General Emissions Testing and Reporting Requirements [15A NCAC 02Q .0508(i)(16)]
Emission compliance testing shall be by the procedures of Section .2600, except as may be otherwise required in Rules
.0524, .0912, .1110, .1111, or .1415 of Subchapter 02D. If emissions testing is required by this permit or the DAQ or if
the Permittee submits emissions testing to the DAQ to demonstrate compliance, the Permittee shall perform such testing
in accordance with 15A NCAC 02D .2600 and follow the procedures outlined below:
1. The owner or operator of the source shall arrange for air emission testing protocols to be provided to the Director
prior to air pollution testing. Testing protocols are not required to be pre-approved by the Director prior to air
pollution testing. The Director shall review air emission testing protocols for pre-approval prior to testing if
requested by the owner or operator at least 45 days before conducting the test.
2. Any person proposing to conduct an emissions test to demonstrate compliance with an applicable standard shall
notify the Director at least 15 days before beginning the test so that the Director may at his option observe the test.
3. The owner or operator of the source shall arrange for controlling and measuring the production rates during the
period of air testing. The owner or operator of the source shall ensure that the equipment or process being tested is
operated at the production rate that best fulfills the purpose of the test. The individual conducting the emission test
shall describe the procedures used to obtain accurate process data and include in the test report the average
production rates determined during each testing period.
4. Two copies of the final air emission test report shall be submitted to the Director not later than 30 days after
sample collection unless otherwise specified in the specific conditions. The owner or operator may request an
extension to submit the final test report. The Director shall approve an extension request if he finds that the
extension request is a result of actions beyond the control of the owner or operator.
a. The Director shall make the final determination regarding any testing procedure deviation and the validity of
the compliance test. The Director may:
Permit 08961T29
Page 153
i. Allow deviations from a method specified under a rule in this Section if the owner or operator of the
source being tested demonstrates to the satisfaction of the Director that the specified method is
inappropriate for the source being tested.
ii. Prescribe alternate test procedures on an individual basis when he finds that the alternative method is
necessary to secure more reliable test data.
iii. Prescribe or approve methods on an individual basis for sources or pollutants for which no test method is
specified in this Section if the methods can be demonstrated to determine compliance of permitted
emission sources or pollutants.
b. The Director may authorize the Division of Air Quality to conduct independent tests of any source subject to a
rule in this Subchapter to determine the compliance status of that source or to verify any test data submitted
relating to that source. Any test conducted by the Division of Air Quality using the appropriate testing
procedures described in Section 02D .2600 has precedence over all other tests.
KK. Reopening for Cause [15A NCAC 02Q .0517]
1. A permit shall be reopened and revised under the following circumstances:
a. additional applicable requirements become applicable to a facility with remaining permit term of three or more
years;
b. additional requirements (including excess emission requirements) become applicable to a source covered by
Title IV;
c. the Director or EPA finds that the permit contains a material mistake or that inaccurate statements were made in
establishing the emissions standards or other terms or conditions of the permit; or
d. the Director or EPA determines that the permit must be revised or revoked to assure compliance with the
applicable requirements.
2. Any permit reopening shall be completed or a revised permit issued within 18 months after the applicable
requirement is promulgated. No reopening is required if the effective date of the requirement is after the expiration of
the permit term unless the term of the permit was extended pursuant to 15A NCAC 02Q .0513(c).
3. Except for the state-enforceable only portion of the permit, the procedures set out in 15A NCAC 02Q .0507, .0521, or
.0522 shall be followed to reissue the permit. If the State-enforceable only portion of the permit is reopened, the
procedures in 15A NCAC 02Q .0300 shall be followed. The proceedings shall affect only those parts of the permit
for which cause to reopen exists.
4. The Director shall notify the Permittee at least 60 days in advance of the date that the permit is to be reopened, except
in cases of imminent threat to public health or safety the notification period may be less than 60 days.
5. Within 90 days, or 180 days if the EPA extends the response period, after receiving notification from the EPA that a
permit needs to be terminated, modified, or revoked and reissued, the Director shall send to the EPA a proposed
determination of termination, modification, or revocation and reissuance, as appropriate.
LL. Reporting Requirements for Non-Operating Equipment [15A NCAC 02Q .0508(i)(16)]
The Permittee shall maintain a record of operation for permitted equipment noting whenever the equipment is taken from
and placed into operation. When permitted equipment is not in operation, the requirements for testing, monitoring, and
recordkeeping are suspended until operation resumes.
MM. Fugitive Dust Control Requirement [15A NCAC 02D .0540]
As required by 15A NCAC 02D .0540 "Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause
or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the
property boundary. If substantive complaints or excessive fugitive dust emissions from the facility are observed beyond
the property boundaries for six minutes in any one hour (using Reference Method 22 in 40 CFR, Appendix A), the owner
or operator may be required to submit a fugitive dust plan as described in 02D .0540(f).
"Fugitive dust emissions" means particulate matter from process operations that does not pass through a process stack or
vent and that is generated within plant property boundaries from activities such as: unloading and loading areas, process
areas, stockpiles, stock pile working, plant parking lots, and plant roads (including access roads and haul roads).
NN. Specific Permit Modifications [15A NCAC 02Q.0501 and .0523]
1. For modifications made pursuant to 15A NCAC 02Q .0501(c)(2), the Permittee shall file a Title V Air Quality
Permit Application for the air emission source(s) and associated air pollution control device(s) on or before 12
months after commencing operation.
2. For modifications made pursuant to 15A NCAC 02Q .0501(d)(2), the Permittee shall not begin operation of the air
emission source(s) and associated air pollution control device(s) until a Title V Air Quality Permit Application is
Permit 08961T29
Page 154
filed and a construction and operation permit following the procedures of Section .0500 (except for Rule .0504 of
this Section) is obtained.
3. For modifications made pursuant to 502(b)(10), in accordance with 15A NCAC 02Q .0523(a)(1)(C), the Permittee
shall notify the Director and EPA (EPA - Air Planning Branch, 61 Forsyth Street SW, Atlanta, GA 30303) in
writing at least seven days before the change is made. The written notification shall include:
a. a description of the change at the facility;
b. the date on which the change will occur;
c. any change in emissions; and
d. any permit term or condition that is no longer applicable as a result of the change.
In addition to this notification requirement, with the next significant modification or Air Quality Permit renewal, the
Permittee shall submit a page "E5" of the application forms signed by the responsible official verifying that the
application for the 502(b)(10) change/modification, is true, accurate, and complete. Further note that modifications
made pursuant to 502(b)(10) do not relieve the Permittee from satisfying preconstruction requirements.
OO. Third Party Participation and EPA Review [15A NCAC 02Q .0521, .0522 and .0525(7)]
For permits modifications subject to 45-day review by the federal Environmental Protection Agency (EPA), EPA’s
decision to not object to the proposed permit is considered final and binding on the EPA and absent a third party petition,
the failure to object is the end of EPA's decision-making process with respect to the revisions to the permit. The time
period available to submit a public petition pursuant to 15A NCAC 02Q .0518 begins at the end of the 45-day EPA
review period.
Permit 08961T29
Page 155
ATTACHMENT
List of Acronyms
AOS Alternative Operating Scenario
BACT Best Available Control Technology
Btu British thermal unit
CAA Clean Air Act
CAIR Clean Air Interstate Rule
CEM Continuous Emission Monitor
CFR Code of Federal Regulations
DAQ Division of Air Quality
DEQ Department of Environmental Quality
EMC Environmental Management Commission
EPA Environmental Protection Agency
FR Federal Register
GACT Generally Available Control Technology
HAP Hazardous Air Pollutant
MACT Maximum Achievable Control Technology
NAA Non-Attainment Area
NCAC North Carolina Administrative Code
NCGS North Carolina General Statutes
NESHAP National Emission Standards for Hazardous Air Pollutants
NOX Nitrogen Oxides
NSPS New Source Performance Standard
OAH Office of Administrative Hearings
PM Particulate Matter
PM10 Particulate Matter with Nominal Aerodynamic Diameter of 10 Micrometers or Less
POS Primary Operating Scenario
PSD Prevention of Significant Deterioration
RACT Reasonably Available Control Technology
SIC Standard Industrial Classification
SIP State Implementation Plan
SO2 Sulfur Dioxide
tpy Tons Per Year
VOC Volatile Organic Compound