Loading...
HomeMy WebLinkAboutAQ_GEN_PLNG_20200903_SIP_SO2-NAAQS_Att1SOCAttachment 1 Special Order by Consent (SOC 2017-002) Made and Entered into Pursuant to North Carolina General Statute 143-215.110 by and between Blue Ridge Paper Products, Inc. and the Environmental Management Commission (This page intentionally left blank) BEFORE THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ) STATE OF NORTH CAROLINA ) ) SPECIAL ORDER BY CONSENT COUNTY OF HAYWOOD ) ) IN THE MA TIER OF: ) BLUE RIDGE PAPER PRODUCTS, INC. ) [FACILITY ID 4400159] ) soc 2017-002 This SPECIAL ORDER BY CONSENT ("ORDER") is made and entered into pursuant to North Carolina General Statute 143-215.110 by and between BLUE RIDGE PAPER PRODUCTS, INC. ("COMPANY") and the ENVIRONMENT AL MANAGEMENT COMMISSION, an agency of the State ofNorth Carolina ("COMMISSION"). WITNESSETH: I. The COMPANY and the COMMISSION do hereby stipulate and agree to the following: A. The COMP ANY owns and operates a pulp and paper mill (SIC Code 2621) located at 175 Main Street in Canton, Haywood County, North Carolina ("Facility"). The Facility operates under Air Quality Permit Number 08961 T20 ("Permit"), which was issued by the North Carolina Division of Air Quality ("DAQ") on June 30, 2017. B. The United States Environmental Protection Agency ("U.S. EPA") modified the Primary National Ambient Air Quality Standard ("NAAQS") for sulfur dioxide ("SO2") to a I-hour standard in 2010. 75 Federal Register 35520. The standard is 75 parts per billion ("ppb") and compliance is determined by measuring the 99th percentile of 1-hour daily maximum concentrations each year and averaging those values over three years. C. General Condition II of the Facility's Permit addresses exceedances of ambient standards. 32230924v2 IL Ambient Air Quality Standards fl 5A NCAC 02D .0501 (c)] In addition to any control or manner of operation necessary to meet emission standards specified in this permit, any source of air pollution shall be operated with such control or in such manner that the source shall not cause the ambient air quality standards in 15A NCAC 02D. 0400 to be exceeded at any point beyond the premises on which the source is located. When controls more stringent than named in the applicable emission standards in this permit are required to prevent violation of the ambient air quality standards or are required to create an offset, the permit shall contain a condition requiring these controls. D. Rule 15A NCAC 02D .0401(c) states: (c) No facility or source of air pollution shall cause any ambient air quality standard in this Section to be exceeded or contribute to a violation of any ambient air quality standard in this Section except as allowed by Rules .0531 or .0532 of this Subchapter. E. Rule 15A NCAC 02D .0402(e) states: (e) The one-hour primary standard is met at an ambient air quality monitoring site when the three-year average of the annual (99th percentile) of the daily maximum one-hour average concentrations is less than or equal to 75 ppb, as determined in accordance with Appendix T of 40 CFR Part 50. F. In accordance with U.S. EPA's August 21, 2015 Data Requirements Rule for the 20101-Hour SO2 PrimaryNAAQS, 80 Fed. Reg. 51052, DAQ established an SO2 monitor approximately 150 feet west of the Facility's fence line ("Monitor"), in order to assist DAQ and U.S. EPA in determining whether ambient air surrounding the Facility meets the new SO2 NAAQS. G. Pursuant to a consent decree entered by the Northern District of California against U.S. EPA in Sierra Club v. McCarthy, Case No. 13-cv-03953-SI, U.S. EPA must determine whether the ambient air surrounding the Facility meets the new SO2 NAAQS no later than December 31, 2020. H. 40 C.F.R. Part 63, Subpart DDDDD (the "Boiler MACT Rule") requires the Facility to install Maximum Achievable Control Technology to reduce its emissions of hazardous air pollutants from certain boilers at the Facility. Pursuant to Section 112(j) of the Clean Air Act, 42 U.S.C. § 7612(j), DAQ determined that the Facility must be in compliance with the Boiler MACT Rule no later than May 20, 2019. I. In order to comply with the Boiler MACT Rule, the Facility has been permitted to, and must complete the installation of approximately $50 million in planned improvements (the "Boiler MACT Improvements"), no later than May 20, 2019. The Boiler MACT Improvements will include the installation of two new, natural gas-fired boilers, the installation of wet scrubbers and rebuilt electrostatic precipitators on two additional coal-fired boilers and the permanent shutdown of two coal-fired boilers at the conclusion of the project. 32230924v2 J. As of December 2016, the facility's three-year facility-wide SOi actual emissions average was approximately 7,600 tons per year. While construction of the Boiler MACT Improvements is ongoing, the Facility's actual SO2 emissions are estimated to decrease as follows: 1. By December 31, 2017 -estimated emissions decrease of approximately 1,000 tons per year; 2. By October 31, 2018 -estimated emissions decrease of approximately 1,500 tons per year; 3. By November 30, 2018 -estimated emissions decrease of 1,500 tons per year; and 4. By December 31, 2018 -estimated emissions decrease of 1,100 tons per year. J. Since required monitoring began on January 1, 2017, the Monitor has detected 1- hour daily maximum concentrations exceeding the SO2 standard. Until the Boiler MACT Improvements are complete, the Company and DAQ expect the Monitor will periodically detect additional I-hour daily maximum concentrations of SO2 greater than 75 ppb. K. An Addendum to Notice of Violation and Notice of Recommendation for Enforcement ("NOV/NRE") was issued to the facility on June 8, 2017, for violations of Permit General Condition II which requires compliance with I SA NCAC 02D .0501(c). The NOV/NRE amended the March 14, 2017, NOV and included the SO2 exceedances referenced in paragraph I.J. L. By letter dated June 23, 2017, the COMPANY disputed that it is presently in violation of Permit General Condition II or 15A NCAC 02D .0501(c). M. The COMPANY commenced operation of two new, natural gas-fired boilers (225 mmBTU/hour) (the "New Gas Boilers") at the Facility during the second quarter 2017. N. The COMPANY permanently shut down the Facility's "Big Bill" coal-fired boiler in July 2017. 0. The COMP ANY proposes to limit emissions of SO2 after completion of the Boiler MACT Improvements to comply with the SO2 NAAQS. The COMP ANY also proposes to apply for a modification of its Permit to incorporate an appropriate limit. THEREFORE, the COMMISSION and the COMP ANY, desiring to resolve and settle the compliance issues between them and in order to memorialize the COMPANY's commitments to 32230924v2 complete the Boiler MACT Improvements and, thereafter, to limit the Facility's emissions ofSO2, have agreed to enter into this ORDER with the following terms and conditions: II. The COMP ANY, desiring to operate in a safe and environmentally sound manner during the period of this ORDER and thereafter in accordance with the rules and regulations of the COMMISSION, does hereby agree to perform the following activities: 32230924v2 A. Improvements Milestones: 1. The COMP ANY will commence initial operation of the rebuilt electrostatic precipitators and new wet scrubbers on the Facility's "Riley Coal Boiler" by October 31, 2018. 2. The COMP ANY will commence initial operation of the rebuilt electrostatic precipitators and new wet scrubbers on the Facility's ''Number 4" coal-fired boiler by November 30, 2018. 3. The COMP ANY will permanently shut down the Facility's "Peter G" coal-fired boiler by December 31, 2018. 4. No later than 14 days after the deadline for completing each milestone required in Paragraph II.A, the COMP ANY shall submit a written certification to the Air Quality Regional Supervisor, Asheville Regional Office, DAQ, stating whether such milestone has been performed. B. Testing and Reporting: 1. Following initial startup of the rebuilt electrostatic precipitators and wet scrubbers on the Riley Coal Boiler, the COMPANY will operate said precipitators and wet scrubbers in accordance with good operational and air pollution control practices at all times. An SO2 emissions reduction source test report will be submitted to DAQ within 180 days of "Riley Coal Boiler" scrubber initial operation. Such report shall include SO2 mass emissions, scrubber control efficiency, and associated operational parameters. 2. Following initial startup of the rebuilt electrostatic precipitators and wet scrubbers on the Number 4 coal-fired boiler, the COMPANY will operate said precipitators and wet scrubbers in accordance with good operational and air pollution control practices at all times. An SO2 emissions reduction source test report will be submitted to DAQ within 180 days of "No. 4" coal-fired boiler scrubber initial operation. Such report shall include SO2 mass emissions, scrubber control efficiency, and associated operational parameters. 3. The COMPANY will submit an SO2 emissions source test report to DAQ for the Riley Bark Boiler, No. 10 recovery Furnace and No. 11 Recovery Furnace at the same time as the test required in paragraph II.B.lor II.B.2, whichever is later. The test requirement under II.B.3 can be satisfied with a test performed and submitted at any point within 2 years prior to the II.B.1 or II.B.2 submittal. 4. The COMPANY shall submit a facility-wide SO2 emissions summary to DAQ with the last test report required under paragraph H.B. C. The COMP ANY shall submit a complete permit application including SO2 emission limits and modeling that will demonstrate compliance with the one hour SO2 NAAQS by March 1, 2018. DAQ will issue a permit with SO2 emission limits containing a compliance date no earlier than December 31, 2018. III. The COMMISSION agrees that, except as provided in the terms and requirements of this ORDER, the COMP ANY shall not be subject to a separate Notice of Violation or other enforcement action related to the I-hour SO2 NAAQS or compliance with 15A N.C.A.C. 02D .0402 during the term of this ORDER. In the event DAQ receives sufficient data from the Monitor to demonstrate the average annual 99th percentile of 1-hour daily maximum concentrations of SO2 for the period between January 1, 2017, up to and including, December 31, 2019 will exceed 7 5 ppb, the COMPANY agrees to pay DAQ a stipulated penalty in the amount of $5,000.00. This amount shall be due and payable within 30 days of the COMP ANY receiving written notice of same from the DAQ Director. By entering into this SOC and agreeing to pay this stipulated penalty, the COMP ANY does not concede liability for the alleged violations described in the NOV/NRE. In the event that the COMP ANY fails to comply with any deadline as set out in this ORDER or fails to achieve final compliance with any applicable requirement of this ORDER, the COMP ANY agrees that, unless excused under Paragraph IV, the COMP ANY will pay DAQ stipulated penalties according to the following schedule: Deadlines and Re g uirements Sti(!ulated Penalties Failure to meet requirements in paragraph II.A. $500.00 per day for the first 5 days and $1000.00 per day thereafter Failure to comply with the SO2 emissions limit $500.00 per day for the first 5 days and in the permit described in paragraph II.C. $1000.00 per day thereafter Failure to comply with any deadline or $500.00 per day for the first 5 days and operating requirement in Paragraph II .B or $1000.00 per day thereafter 11.C. Any daily maximum I-hour SO2 measurement $1,000.00 per exceedance exceeding 75 ppb at the Monitor between April 1, 2019 and the expiration of this ORDER. 32230924v2 Failure within thirty (30) days of receipt of the DAQ Director's written demand to pay stipulated penalties will be grounds for a collection action, which the Attorney General is hereby authorized to initiate. The only issue in such an action will be whether thirty (30) days has elapsed. IV. The COMPANY'S obligation to comply with the requirements set forth in this ORDER for which a stipulated penalty may be assessed may be delayed or excused only to the extent that noncompliance is caused by circumstances beyond control of the COMP ANY, as determined by the DAQ Director. Failure to obtain funding will not be considered an event beyond the COMP ANY'S control. If any such delaying event occurs, the COMP ANY shall notify DAQ in writing within ten (10) days of encountering or discovering the delaying event, describing in detail the event or delay, the precise cause( s) of the event or delay, the measure(s) taken and to be taken by the COMPANY to prevent or minimize the event or delay, and the schedule by which those measures will be implemented. If the COMP ANY establishes good cause for its failure to comply with any part of this ORDER, (i.e., noncompliance was caused by circumstances beyond the control of the COMPANY), DAQ and the COMPANY jointly may stipulate and agree to a written modification of this ORDER. Extension of any compliance date pursuant to this Paragraph shall not extend any subsequent deadlines established in the ORDER unless the subsequent deadline is dependent upon completion of the earlier deadline. V. The COMPANY agrees to waive any rights it may have to seek judicial review to challenge this ORDER or to seek a stay of enforcement of this ORDER in connection with any judicial review of the State Implementation Plan. The COMMISSION acknowledges that this waiver does not prohibit the COMP ANY from seeking modification of this ORDER if any regulatory standards upon which this ORDER is based are changed subsequent to its execution. In such cases, the COMP ANY may petition that the ORDER be modified to reflect those regulatory changes. VI. Any violation of Air Quality Standards not resolved by this ORDER shall subject the COMPANY to appropriate enforcement action pursuant to N.C.G.S. §§ 143-215.114A, 143-215.114B and 215.l 14C. VII. All notices and reports required from the COMP ANY by this ORDER shall be delivered to: Brendan Davey, P .E., Regional Air Quality Supervisor N.C. Department of Environmental Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 All payments required from the COMP ANY by this ORDER shall delivered to: 32230924v2 Enforcement Group -Payments NCDEQ-DAQ Mail Service Center 1641 Raleigh, North Carolina 27699-1641 VIII This ORDER constitutes full and final resolution and satisfaction of all matters addressed herein and any and all claims or prospective claims that the COMMISSION has or may have regarding the matters addressed herein, as of the date this ORDER is approved by the COMMISSION. This ORDER shall not affect the COMP ANY'S obligation to comply with any Federal, State, or local laws or regulations. IX. Final approval and entry into this ORDER are subject to the requirements that the COMMISSION give notice of proposed consent order to the public, and that the public have at least thirty (30) days within which to comment on the ORDER. X. Should any provision of this ORDER be declared by a court of competent jurisdiction to be inconsistent with Federal or State law and therefore unenforceable, the remaining provisions hereof shall remain in full force and effect. XI. Any modifications of this ORDER must be agreed to in writing signed by both parties. XII. Except as otherwise set forth herein, this ORDER is not and shall not be intei:preted to be a permit or modification of an existing permit under Federal, State or local law, and shall not be construed to waive or relieve the COMP ANY of its obligations to comply in the future with any permit. XIII. In the event of termination of operations and closure of the FACILITY, the COMPANY shall notify the DIRECTOR in writing, within five (5) business days of the earlier of (i) the date any Workers Adjustment and Retraining Notification (WARN) Act, notification, or (ii) FACILITY closure. Receipt of said notification from the COMP ANY by the DIRECTOR shall terminate any obligations of the COMPANY pursuant to this ORDER, including those pertaining to stipulated penalties, and this ORDER shall become null and void in its applicability to the COMP ANY. The COMPANY acknowledges its responsibilities pursuant to this ORDER from the date of final approval and entry of this ORDER, through the date of receipt by the DIRECTOR of notification of closure required by this Paragraph or the date of expiration of this ORDER, whichever is earlier. XIV. This ORDER is effective on execution by the COMMISSION and shall expire on December 31, 2019 . 32230924v2 ATTESTED: APPROVED AND ACCEPTED: BY: DATE: ' 32230924v2 Stephen J. Hutchins General Manager Blue Ridge Paper Products, Inc DATE: 'fi?/1 1 ---7--7-+----'-----'--------