Loading...
HomeMy WebLinkAboutAQ_F_3600026_20230119_PRMT_CmbPrmtFile_T36RESCINDROY COOPER Governor ELIZABETHS RISER Secretary MICHAEL A. ABRACZINSKAS Director 1 («MM NORTH CAROLINA Environmental Quality January 19, 2023 Mr. Matt Haynes District Environmental Manager Darlmg Ingredients Inc. - Gastonia 1309 Industrial Drive Fayetteville, NC 28301 SUBJECT: Rescission Request Application No. 3600026.22C Darling Ingredients Inc. - Gastonia Facility ID: 3600026, Gastonia, Gaston County Permit Class: Title V Permit No. 03590T36 Dear Mr. Haynes: The Division of Air Quality has reviewed your letter and supporting documentation received December 13, 2022 requesting rescission of Permit No. 03590T36. Based on this information, the facility does qualify for exemption from permittmg. The only stationary source still at the facility is a natural gas fired boiler (29.5 million Btu per hour maximum heat input). North Carolina Administrative Code (NCAC) ISAParagraph 2Q .0102(h)(1)(B) provides exemption for "fuel combustion equipment (excluding intemal combustion engines) firing exclusively natural gas or liquefied petroleum gas or a mixture of these fuels." Therefore, in accordance with your request. Air Quality Permit No. 03590T36 is hereby rescinded, effective the date of this letter. It should be noted that this exemption from permitting does not exempt Darling Ingredients Inc. - Gastonia from complying with the applicable emission control standards including. Furthermore, should you decide to modify the processes such that the result is an increase of emissions above the emission thresholds given above, an Air Quality Permit or Registration may be required, and you should contact this Regional Office prior to such actions for a permit or registration applicability determination. NCHTHGAHOliVANORTH GAHQUVA North Carolina Department of Environmental Quality | Division ofAir Quality J MooresviUe Regional Office \ 610 East Center Avenue, Suite 301 | Mooresville, NC 28115 Departmcat o? Etn6nun«(tai Quality^ 704 663 1699 TI 704 663 6040 F Mr. Matt Haynes January 19, 2023 Page 2 This exemption from the permitting requirement is based upon your statement that this facility has been and will be operated under the threshold levels as outlined in the Regulation 15ANCAC 2Q .0102(d). Please be advised that the operation of any air pollution emission sources which results in increased emissions in excess of the threshold levels specified in 15ANCAC 2Q.0102(b)(2) without an Air Quality Permit is a violation of 15ANCAC 2Q.0101, "Required Air Quality Permits." If this facility is required to obtain an Air Quality permit in the future because of increased emissions, each day of operation of the emission sources without an Air Quality Permit represents a separate violation. Such violations may be subject to enforcement action pursuant to NCGS 143-215.114A. Please remember that you are required to submit all required periodic reports (e.g., quarterly, semiannual, annual. Annual Emissions Inventory, etc.) and, in particular, an Annual Compliance Certification for the partial period ending with the date of this rescission letter by the reporting deadline. Please be aware that even though your facility may no longer be subject to permitting requirements, the operations must still comply with all applicable state and federal laws and regulations. The attached Facility Compliance Tracking Checklist may be of help to you in verifying you remain in compliance with certain federal and state regulations. It may also aid in determining if you remain below the emissions threshold. You may use this checklist at your discretion as it is intended to be used as a guidance document only. Furthermore, it is DAQ's intent to periodically conduct compliance assurance visits at exempt facilities. If you have any questions with reference to the above matter, please do not hesitate to contact Jermifer Manning at 704-235-2224. Sincerely, Melinda Wolanm, Regional Supervisor JAM Enclosure c: Laserfiche https //ncconnect sharepomt coin/sites/DAQ-MRO/Counties/GASTON/00026cbp/T36_RESCIND docx i Facility Compliance Tracking Checklist revised 06-16-2016 Calendar Year ! iiznr r i "i ^ - :Are calendar year emissions below exemption threshold?□lYes D No ; 7 r : i 1 ■■-■ Annual Throughput (quantity of materials made or processed) • ; f i.e. concrete, asphalt, cotton, woodwaste generated, etc.)1 ■ ; ' ■Units (i.e. tons, pounds, bales, etc.)1 Quantity of Fuels Combusted: t 1 — !Natural Gas ■ft^ iNo. 2 fuel oil Sulfur Content 1 1 gallons 7pg ■1 I gallons Wood 1 I i ■tons '1 ■Linkto NSPS and NESHAP rule guidance: 1 •j I . http://decj.nc.gov/about/divisions/air-quality/air-quality-permlts/specific-permit-conditions-regulatorY-guIde iNSP^Dc subject boilers: : Does fuel oil contain_>J3.5% sulfur? 'Was report submitted semi-annually? , 0 Yes O'Yes U|No O'No 0;N/A O'N/A Didjyou conduct timely opacity monitoring for >30mmBtu boilers on fuel oil?0 Yes NESHAP 61 subject boilers: Date of last biennial/5yr tune-up? i Compliance certification on site? 1■NESHAP 4Z / NSPS 41 / NSPS 41 subject engines: ■ Ne w emergency and n_Qn-ern^ejgencv engines:^^■Certificate of Conformity on 5it^_ SDoes fuel oil contain >0.0015% sulfur? O No ' O'N/A OlYes □ Yes □■Yes O O'N/A No I OiN/A O^No O No O N/A N/A Existing emergency engines: 'Date of last oil change/analysis, belt/hose/filter/plugs inspection & maintenance? I Number of hours run for non-emergency {Includes testing & maintenance)?O 1 Existing non-emergency engines using a Diesel Oxidation Catalyst (DOC)^:, ; Date of last compliance source test? _ , I ; Notice of testing submitted ? 60 days priorto testing? ' N/A N/A □ Yes OlNo D|N/A o:n/a !Did source test show compliance?I Does fuel oil contain >0.00i5% sulfur? !_ i , is temperature continuously recorded and tracked asa 4 hour roiling average? n Yes Yes Yes ^1 No DlN/A oiNoTaiNM' IJNo i oIn/a 1 Is pressure drop recorded rnonthly?Yes Facility-wide Applicability: ■Visible emissions >20% from any sources/devices? O No O N/A Yes O'No ' Anysigns of dust leaving property or any complaints?Yes □ No Any new sources ^control devices added? Were they evaluated for permitting?n Yes Yes u No O No 'inspection & Maintenance on control devices?u Yes 0 No ! 0,N/A '■•The checklist is being prodded only as a guidance document CompMng v^ith this checklist does not ensure compliance with j the regulations and does not absolve you from ensuring ■your facility is in compliance with all appropriate air quajity regulations.'