HomeMy WebLinkAboutAQ_F_0800107_20130221_CMPL_NOCS 0 F k L LO N%v"AA
104 Mellen Rd.
New Bem,NC 28562
Energy Solutions Group 0: 360.750.3583
F: 360.750.3483
February 13, 2013
Ms. Betsy Huddleston
Washington Regional Office
NCDENR-Division of Air Quality
943 Washington Square Mall
Washington,NC 27889
RE: Notice of Compliance Status
Dear Ms. Huddleston;
Thank you for visiting our facility located at Lewiston, NC. We appreciate your time and consideration.
While you have not identified any major violations or issues, you have identified that a Notice of
Compliance Status has not been filed with the NCDEQ as required. Please accept this Notice of Compliance
Status as required under Permit#10126RO1.
• This facility complied with the requirements in § 63.11214 to conduct an initial tune-up of the
boiler."
• No secondary materials that are solid waste were combusted in any affected unit.
• Startups and shutdowns are conducted according to the manufacturer's recommended procedures.
Should you have additional questions or require additional information, please do not hesitate in contacting
me at the number above.
Sincerely,
Lra
President
F E S 2 1 2013