Loading...
HomeMy WebLinkAboutAQ_F_0800107_20130221_CMPL_NOCS 0 F k L LO N%v"AA 104 Mellen Rd. New Bem,NC 28562 Energy Solutions Group 0: 360.750.3583 F: 360.750.3483 February 13, 2013 Ms. Betsy Huddleston Washington Regional Office NCDENR-Division of Air Quality 943 Washington Square Mall Washington,NC 27889 RE: Notice of Compliance Status Dear Ms. Huddleston; Thank you for visiting our facility located at Lewiston, NC. We appreciate your time and consideration. While you have not identified any major violations or issues, you have identified that a Notice of Compliance Status has not been filed with the NCDEQ as required. Please accept this Notice of Compliance Status as required under Permit#10126RO1. • This facility complied with the requirements in § 63.11214 to conduct an initial tune-up of the boiler." • No secondary materials that are solid waste were combusted in any affected unit. • Startups and shutdowns are conducted according to the manufacturer's recommended procedures. Should you have additional questions or require additional information, please do not hesitate in contacting me at the number above. Sincerely, Lra President F E S 2 1 2013