Loading...
HomeMy WebLinkAboutAQ_F_0800107_20120118_CMPL_InitNot 1836 Eastchester Dr. NA LLC,;NS mcw Suite 108 High Point,NC 27265 O: 360.750.3583 Energy Solutions Group F: 360.750.3483 A ycl January 17, 2012 Mr. Robert Fisher Regional Air Quality Supervisor Washington Regional Office NCDENR-Division of Air Quality 943 Washington Square Mall Washington, NC 27889 RE: Notice of Commencement of Operations Dear Mr. Fisher, Thank you again for your continued assistance in the process of securing a Construction and Operating permit our Biomass Cogeneration Facility which is being constructed at 3539 Governors Rd., Lewiston, NC. Per the requirement for Air Permit No. 10126R01, Section A, Specific Conditions and Limitations, Paragraph 6, 15 A NCAC 2D.0524 "New Source Performance Standards", NSPS Reporting Requirements. This paragraph stipulates that permit holder is required to notify the Regional Supervisor, DAQ, in writing, of the commencement date of operation(40 CFR 60.7). Please accept this memorandum in meeting this requirement of notification that physical, on-site operation commenced on January 17, 2012, on the biomass cogeneration facility at 3539 Governors Rd., Lewiston, NC. If I can be of further assistance,please do not hesitate to call. Regards, Wellons Energy Solutio , -ell President&General Manager-Wellons Energy Solutions, LLC President-W.E. Partners II, LLC DEC EOWE JAN 18 2012 DA0 WARO