HomeMy WebLinkAboutAQ_F_0800107_20161003_CMPL_Fac-Ltr Huddleston, Betsy From: Huddleston, Betsy Sent: Monday, October 03, 2016 5:34 PM To: Garald Cottrell Cc: Chad Hoggard (Chad.Hoggard@Weilons.com) Subject: Cofield Permit Renewal with S63 BACT conditions Hey Garald, Jeff finished the revised BACT review for Cofield and I've finished the draft permit! It's in review, and I should be able to share it with you in a couple of days to get your comments. I have written the new BACT condition such that your October 2015 testing on boiler ESB-1 counts as your initial BACT testing. ESB-2 will be due exactly two years from the ESB-1 test, on October 13, 2017. The permit will require once per 8-years testing of each boiler(count from the date of the last test performed for each). Jeff is supposedly working on the Lewiston BACT determination now. Everything went fine with the Cofield inspection last week. However,we did not find the biennial tune up records for the Cofield and Lewiston boilers (where you do CO test with the hand held meter before and after the tune-up)that are required by the Boiler GACT(and are required by the permits). I believe Cofield's were last done March 2014, and Lewiston's were last done January 2014. Do you happen to have those records? I also want to remind you about the GACT Compliance Reports that are due every other year. You submitted them for both facilities in 2015 as required, so the next is due by March V next year. You don't have to submit this report if you have no excess emissions or deviations from the permit,just keep it on file. If there's something to report,the deadline to submit will be March 15th. The report elements are found in the federal register at 40 CFR 63.11225(b)(1-4). Do you happen to have those records? It might be a good idea to generate this report annually with your synthetic minor report to prevent forgetting about it, but it's up to you. An issue with the ESP secondary power was discovered during the inspection at Lewiston. We looked at records starting at January 1, 2016. Many of the 12-hr averages on the daily operator logs are less than 3 kW, which is the minimum that was set during the GACT performance testing. Rather than keeping Chad late in the day, I took copies of logs showing low secondary power back with me to the office. We need to dig further into your data to determine what is going on with the low secondary power, so the following questions/observations come to mind: 1) Did ya'II get the saved ESP data de-encoded so that it can be accessed for review? r operating? 2) Do the 12-hour averages somehow include some time where the boilers are not 3) Do the 12-hour averages include startup and shutdown periods for the boilers/ESP? 4) Chad and I were thinking items 2-3 above may be occurring, but we did spot some days where the boilers were supplying full steam load all day and the ESP was below 3 kW. After you've had a minute to mull over the above, please give me a call to discuss. Thank you! Betsy Huddleston Division of Air Quality North Carolina Department of Environmental Quality 252 948 3836 office 252 975 3716 fax Betsy.Huddleston(Dncdenr.gov i Huddleston, Betsy From: Garald Cottrell <Garald.Cottrell@Wellons.com> Sent: Monday, October 17, 2016 9:40 PM To: Huddleston, Betsy Subject: Hello Betsy Apologize. Not ignoring you but busy. .,. ., I'll make the necessary time to review tomorrow. Question...Typically, we only had to test for one boiler to meet past requirements... why do we need to test each boiler to meet the new requirement of BACT when it's not even an EPA requirement? Not sure how we can do this at Lewiston as we have a common stack for three boilers... Garald Cottrell President Wellons Energy www.wellonsenergy.com (C) 336.339.9055 Sent from my Verizon,Samsung Galaxy smartphone 1 From: Garald Cottrell [mailto:Garald.Cottrel[@Wellons.com] Sent: Monday, November 07, 2016 12:28 PM To: Huddleston, Betsy<betsy.huddleston@ncdenr.gov> Subject: RE: Cofield Permit Renewal and Lewiston Inspection Results Only one question. Page 6, 12c"The tests must be completed within 30 days of the eight-year span between test dates"? Are you saying that when we do the "additional testing"which is each boiler, once during some time period in the next eight years,they have to be testing within 30 days of each other? So, in summary,we have to do another test of the second boiler which meets the Initial Compliance Test by October, 2017. Once that is done, we have to test each boiler again sometime within the next eight years? From: Huddleston, Betsy [mailto:betsy.huddleston@ncdenr.gov] Sent: Friday, November 4, 2016 5:27 PM To:Garald Cottrell <Garald.Cottrell@Wellons.com> Cc: Fisher, Robert<robert.fisher@ncdenr.gov> Subject:Cofield Permit Renewal and Lewiston Inspection Results Hi Garald, Have you been able to get your comments together on the Cofield draft permit? I'd like to issue next week. Also, in my 10/03/2016 email to you I listed some questions concerning my inspection at the Lewiston facility on 9/29/2016. The ESP kW 12-hr averages recorded on the operator log sheets and data on the control panel is indicating the secondary power has been below the limit established by your compliance testing on the boiler for the GACT. This is a compliance issue that cannot wait any longer to be resolved. Are you free to talk either on Monday or Tuesday afternoons? Betsy Huddleston Division of Air Quality North Carolina Department of Environmental Quality 252 948 3836 office 252 975 3716 fax Betsy.H uddleston(a).ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 Huddleston, Betsy From: Garald Cottrell <Garald.Cottrell@Wellons.com> Sent: Monday, November 07, 2016 1:12 PM To: Huddleston, Betsy Subject: RE: Cofield Permit Renewal and Lewiston Inspection Results If you would re-word, I would appreciate it. I would just use the language you used below. 30 day before and 30 day after the 10/13/2023.... Much clearer. In regards to Lewiston, I'm getting ready to send you a spreadsheet with the data that we can discuss. From: Huddleston, Betsy [mailto:betsy.huddleston@ncdenr.gov] Sent: Monday, November 7, 2016 1:07 PM To: Garald Cottrell<Garald.Cottrell@Wellons.com> Subject: RE: Cofield Permit Renewal and Lewiston Inspection Results Yes you would perform testing on the second boiler no later than 10/13/2017. The first boiler's next test date is set at .Y P g . 10/13/2023, but scheduling of the testing has some wiggle room in that a 60-day window is established (30 days prior to and 30 days after the 10/13/2023 set date)to get it completed. The same window would apply to the other boiler's eight-year testing. I can try to re-word this in the permit to clarify, if you wish. Do you have time for a conference call later this afternoon, or do you want to try for tomorrow? Betsy Huddleston Division of Air Quality North Carolina Department of Environmental Quality 252 948 3836 office 252 975 3716 fax Betsy.Huddleston(d)ncdenr.gov 943 Washington Square Mall Washington, NC 27889 NaA ,-Nothing Compares_-,,.t.. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Huddleston, Betsy From: Huddleston, Betsy Sent: Monday, November 07, 2016 1:13 PM To: 'Garald Cottrell' Subject: RE: Cofield Permit Renewal and Lewiston Inspection Results Thank you! Betsy Huddleston Division of Air Quality North Carolina Department of Environmental Quality 252 948 3836 office 252 975 3716 fax Betsy.Huddleston(d-)ncdenr.gov 943 Washington Square Mall Washington, NC 27889 -_�Nothing Compares---.,- Email correspondence to and from this address is subject to the !North Carolina Public Records Law and may be disclosed to third parties. From:Garald Cottrell [mailto:Garald.Cottrell@Wellons.com] Sent: Monday, November 07, 2016 1:12 PM To: Huddleston, Betsy<betsy.huddleston@ncdenr.gov> Subject: RE: Cofield Permit Renewal and Lewiston Inspection Results If you would re-word, I would appreciate it. I would just use the language you used below. 30 day before and 30 day after the 10/13/2023.... Much clearer. In regards to Lewiston, I'm getting ready to send you a spreadsheet with the data that we can discuss. From: Huddleston, Betsy [mailto:betsy.huddleston@ncdenr.gov] Sent: Monday, November 7, 2016 1:07 PM To:Garald Cottrell <Garald.Cottrell@Wellons.com> Subject: RE: Cofield Permit Renewal and Lewiston Inspection Results 1 Yes,you would perform testing on the second boiler no later than 10/13/2017. The first boiler's next test date is set at 10/13/2023, but scheduling of the testing has some wiggle room in that a 60-day window is established (30 days prior to and 30 days after the 10/13/2023 set date) to get it completed. The same window would apply to the other boiler's eight-year testing. I can try to re-word this in the permit to clarify, if you wish. Do you have time for a conference call later this afternoon, or do you want to try for tomorrow? Betsy Huddleston Division of Air Quality North Carolina Department of Environmental Quality 252 948 3836 office 252 975 3716 fax Betsy.Huddleston(o)ncdenr.gov 943 Washington Square Mall Washington, NC 27889 R:1 -'=`�Nothing Compares---,_ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Garald Cottrell [mailto:Garald.Cottrell@Wellons.com] Sent: Monday, November 07, 2016 12:28 PM To: Huddleston, Betsy<betsy.huddleston@ncdenr.gov> Subject: RE: Cofield Permit Renewal and Lewiston Inspection Results Only one question. Page 6, 12c"The tests must be completed within 30 days of the eight-year span between test dates"? Are you saying that when we do the "additional testing" which is each boiler, once during some time period in the next eight years,they have to be testing within 30 days of each other? So, in summary,we have to do another test of the second boiler which meets the Initial Compliance Test by October, 2017. Once that is done, we have to test each boiler again sometime within the next eight years? From: Huddleston, Betsy [mailto:betsy.huddleston@ncdenr.gov] Sent: Friday, November 4, 2016 5:27 PM To:Garald Cottrell<Garald.Cottrell@Wellons.com> Cc: Fisher, Robert<robert.fisher@ncdenr.gov> Subject:Cofield Permit Renewal and Lewiston Inspection Results 2 Huddleston, Betsy From: on behalf of Garald Cottrell <Garald.Cottrell@Wellons.com> Sent: Tuesday, November 08, 2016 5:36 PM To: Huddleston, Betsy Subject: RE: Request for calculation according to Subpart 6J I am in the process of getting the 6 min readings now.We'll re-run once I have the data. We need to show a 3.0 average, correct? I have the tune-up records on my old laptop. I'll be in the office on Friday and I'll forward if that is ok. From: Huddleston, Betsy [mailto:betsy.huddleston@ncdenr.gov] Sent: Monday, November 7, 2016 3:47 PM To: Garald Cottrell<Garald.Cottrell@Wellons.com> Subject: Request for calculation according to Subpart 6.1 Garald, Since many of the 12-hour average records for 2016 are showing below the 3 kW minimum compliance limit set by your GACT stack test back in 2012, the next careful step to hopefully show compliance is to calculate rolling 30-day kW averages according to the method described in the current Boiler GACT language. Therefore, please compile and submit 2016 secondary power data as prescribed below: The regulation requires a minimum of one measurement every 15 minutes and those measurements averaged over each block hour,which I believe your system already does. Then the hour averages are summed over 30-days divided by the number of hours in the 30 days. The regulation equation is as follows: On_,HPVi (Eq.31 Where:30-day average = t2 Hpvi=the hourly parameter value for hour i n=the number of valid hourly parameter values collected over 30 boiler operating days The same calculation would be conducted for each consecutive hour as it goes by to create a 30-day rolling average. This is why I asked if you had managed to get the access issues to all of the data resolved. What's helpful in this situation is data collected during periods of startup and shutdown, monitoring system malfunctions or out-of-control periods, repairs associated with monitoring system malfunctions,or required monitoring system quality assurance or quality control activities may be removed from the 30-day rolling average calculations. Keep in mind startup is associated with when you begin sending steam to Valley Proteins/Perdue processes. If you do remove any startup/shutdown periods from the average,they must be documented with boiler data. Any data removed for monitor issues needs to be documented as to the reason why. Any data removed from the average that is associated with monitor downtime/malfunctions must be noted in the annual compliance certification that is required under§63.11225 in the regulation. Also, Chad and I did not find the biennial tune up records for the Cofield and Lewiston boilers(where CO test is done with the hand held meter before and after the tune-up)that are required by the Boiler GACT(and are required by the permits) during the inspection. I believe Cofield's were last done March 2014, and Lewiston's were last done January 2014. Have the tune-ups been conducted this year and may I have copies of the tune-up records? I would like to talk about the calculations with you tomorrow afternoon after you've had some time to digest this email. Would 3:00 be ok? Betsy Huddleston Division of Air Quality North Carolina Department of Environmental Quality 252 948 3836 office 252 975 3716 fax Betsy.Huddleston(cDncdenr.gov 943 Washington Square Mall Washington, NC 27889 t: -5='^`Nothin9 Compares...,,, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Garald Cottrell [mailto:Garaid.Cottrell@Wellons.com] Sent: Monday, November 07, 2016 1:35 PM To: Huddleston, Betsy<betsy.huddleston@ncdenr.gov> Subject: Bookl.xlsx Betsy This is the ESP data averaged per day and 30 day rolling average. I have to get on the road but feel free to call me on my cell. Garald Cottrell President Wellons Energy Solutions © 336.339.9055 WWW.welIonsenergV.com Garald.cottrell@wellons.com 2 Huddleston, Betsy From: Garald Cottrell <Garald.Cottrell@Wellons.com> Sent: Friday, November 11, 2016 3:32 PM To: Huddleston, Betsy Subject: RE: Request for calculation according to Subpart 6J Attachments: DEQ Memo.pdf Betsy Back in the office but I could not get the files off my old laptop so I'm scanning the hard copies that I had in my files at the office. Jim was able to pull the data from the ESP for the last year but he averaged the 6 minute readings into an hourly basis. I asked for the raw data but the internet is down at Lewiston. I'm going to look at the hourly data and see what it looks like. Thanks again. Garald From: Huddleston, Betsy [mailto:betsy.huddleston@ncdenr.gov] Sent:Thursday, November 10, 2016 3:30 PM To: Garald Cottrell<Garald.Cottrell@Wellons.com> Subject: RE: Request for calculation according to Subpart 6.1 That'll be fine. Betsy Huddleston Division of Air Quality North Carolina Department of Environmental Quality 252 948 3836 office 252 975 3716 fax Betsy.H uddleston(a)-ncdenr,gov 943 Washington Square Mall Washington, NC 27889 �.: '> Nlothing Compares-,-.- Email correspondence to and from this address is subject to the North Carolina Public(records Law and may be disclosed to third parties. 1 WEP II Lewiston ESP kW Data original Secondary Daily KW Rolling 30 KW data Average Average AM PM 1/1/2016 9.8 15.5 12.65 1/2/2016 9.8 8.6 9.2 1/3/2016 1.8 13.9 7.85 1/4/2016 9.7 0 9.7 1/5/2016 8.7 16.4 12.55 1/6/2016 11.3 8.2 9.75 1/7/2016 6.9 12.2 9.55 1/8/2016 8.7 7.3 8 1/9/2016 9.9 7.5 8.7 1/10/2016 3.1 6.2 4.65 1/11/2016 3.1 0 3.1 1/12/2016 6.6 11.7 9.15 1/13/2016 10.5 8.5 9.5 1/14/2016 7.3 5.9 6.6 1/15/2016 6.2 6.5 6.35 1/16/2016 3.8 3.6 3.7 1/17/2016 3.6 2.7 3.15 1/18/2016 3.3 3 3.15 1/19/2016 2.8 2.9 2.85 1/20/2016 2.7 4.3 3.5 1/21/2016 2.9 3.2 3.05 1/22/2016 3.1 3.1 3.1 1/23/2016 2.4 2.7 2.55 1/24/2016 3.3 3 3.15 1/25/2016 2.6 2 2.3 1/26/2016 2.6 4.1 3.35 1/27/2016 3.6 2.4 3 1/29/2016 4.6 3.9 4.25 1/30/2016 4.6 5.6 5.1 6.0 1/31/2016 3.4 2.8 3.1 5.7 2/1/2016 3.3 3.3 3.3 5.5 2/2/2016 3.9 4.7 4.3 5.3 2/3/2016 4.6 4.3 4.45 5.1 2/4/2016 3.5 3.9 3.7 4.8 2/5/2016 3.9 4.2 4.05 4.6 2/6/2016 3.7 6.1 4.9 4.5 2/7/2016 6.5 5.7 6.1 4.4 2 2/9/2016 1.9 11.4 6.65 4.3 �,� 6vu 2/10/2016 7.7 5.3 6.5 4.5 2/11/2016 6.9 6 6.45 4.4 2/12/2016 5.9 4.2 5.05 4.2 2/13/2016 5.5 3.6 4.55 4.1 2/14/2016 3.9 4.1 4 4.0 2/15/2016 3.8 4.4 4.1 4.1 2/16/2016 8.2 7.6 7.9 4.2 2/17/2016 4.6 3.9 4.25 4.3 2/18/2016 3.5 4.2 3.85 4.3 2/19/2016 4.1 6.2 5.15 4.4 2/20/2016 9.7 12.5 11.1 4.7 2/21/2016 7 7.5 7.25 4.8 2/22/2016 4.3 3.8 4.05 4.9 2/23/2016 5.1 10.5 7.8 5.0 2/24/2016 10.1 6.5 8.3 5.2 2/25/2016 7.2 4 5.6 5.3 2/26/2016 7.7 5.8 6.75 5.4 2/27/2016 3.5 2.9 3.2 5.4 2/28/2016 2.5 2.7 2.6 5.3 2/29/2016 3.2 2.8 3 5.2 3/1/2016 2.7 3.8 3.25 5.2 3/2/2016 3.8 2.5 3.15 5.2 3/3/2016 2.4 3 2.7 5.2 3/4/2016 3.2 3.2 3.2 5.1 3/5/2016 3.6 2.7 3.15 5.1 3/6/2016 2.3 2 2.15 5.1 3/8/2016 0.6 0.5 0.55 4.9 3/9/2016 4.2 3.1 3.65 4.8 3/10/2016 2.5 3.3 2.9 4.7 3/11/2016 3.0 3.1 3.05 4.6 3/12/2016 2.9 2.8 2.85 4.5 3/13/2016 2.7 2.5 2.6 4.4 3/15/2016 2.9 2.6 2.75 4.3 3/16/2016 4.5 4.1 4.3 4.3 3/17/2016 2.8 2.6 2.7 4.1 3/18/2016 2.2 2.5 2.35 4.1 3/19/2016 2.7 2.4 2.55 4.0 3/20/2016 2.5 2.2 2.35 3.9 3/22/2016 5.1 3.8 4.45 3.6 3/23/2016 3.3 2.2 2.75 3.5 3/24/2016 4.1 2.9 3.5 3.3 3/25/2016 3.9 2.1 3 3.2 3/26/2016 3.9 2.5 3.2 3.1 3/29/2016 4.5 4.5 3.0 3/30/2016 3.8 3.9 3.85 3.0 3/31/2016 3.0 3.0 3 3.0 4/1/2016 3.3 3.5 3.4 3.0 4/2/2016 4.4 3.5 3.95 3.1 4/3/2016 2.9 2.3 2.6 3.0 4/5/2016 2.6 2.9 2.75 3.1 4/6/2016 2.9 2.9 2.9 3.1 4/7/2016 2.7 3.3 3 3.2 4/8/2016 3.1 2.3 2.7 3.1 4/9/2016 2.6 3.5 3.05 3.1 4/10/2016 4.8 3.6 4.2 3.2 4/11/2016 2.6 1.0 1.8 3.1 4/12/2016 3.7 6.2 4.95 3.2 4/13/2016 3.1 3.0 3.05 3.2 4/14/2016 4.0 4.0 4 3.3 4/15/2016 3.0 2.3 2.65 3.2 4/16/2016 2.6 2.3 2.45 3.2 4/17/2016 2.5 1.8 2.15 3.2 4/19/2016 4.8 3.2 4 3.3 4/20/2016 2.3 2.1 2.2 3.2 4/21/2016 2.3 2.2 2.25 3.1 4/22/2016 5.6 4.0 4.8 3.2 4/23/2016 2.6 2.5 2.55 3.2 4/24/2016 2.3 2.8 2.55 3.2 4/25/2016 3.6 9.0 6.3 3.3 4/26/2016 4.8 4.1 4.45 3.3 4/27/2016 4.3 3.4 3.85 3.4 4/28/2016 2.6 2.4 2.5 3.3 4/29/2016 2.7 2.3 2.5 3.2 4/30/2016 2.3 2.4 2.35 3.2 5/1/2016 2.4 2.2 2.3 3.2 5/3/2016 4.4 3.2 3.8 3.2 5/4/2016 2.6 2.2 2.4 3.2 5/5/2016 2.4 2.6 2.5 3.2 5/6/2016 2.2 2.2 2.2 3.1 5/7/2016 2.6 2.5 2.55 3.1 5/8/2016 2.2 2.0 2.1 3.1 5/9/2016 5.8 2.9 4.35 3.1 5/11/2016 3.2 2.9 3.05 3.1 5/12/2016 3.2 2.5 2.85 3.1 5/13/2016 2.7 2.9 2.8 3.1 5/14/2016 3.0 0.7 1.85 3.0 5/16/2016 0.7 0.6 0.65 2.9 5/17/2016 1.7 5.8 3.75 3.0 5/18/2016 11.6 3.2 7.4 3.1 5/19/2016 2.9 3.7 3.3 3.1 5/20/2016 2.8 2.4 2.6 3.1 5/21/2016 2.8 3.2 3 3.2 5/24/2016 10.1 10.1 3.4 5/25/2016 3.8 10.1 6.95 3.4 5/26/2016 9.3 2.8 6.05 3.5 5/27/2016 3.1 2.9 3 3.5 5/28/2016 2.9 3.9 3.4 3.5 5/29/2016 4.0 4.2 4.1 3.6 5/30/2016 3.9 3.0 3.45 3.6 6/1/2016 11.5 4.8 8.15 3.9 6/2/2016 4.7 3.4 4.05 3.9 6/3/2016 3.0 3.0 3 3.9 6/4/2016 4.0 3.8 3.9 3.9 6/5/2016 3.5 3.8 3.65 4.0 6/7/2016 3.2 4.8 4 4.1 6/8/2016 3.2 3.3 3.25 4.1 6/9/2016 3.1 3.0 3.05 4.1 6/10/2016 3.2 3.6 3.4 4.1 6/11/2016 3.5 3.2 3.35 4.1 6/12/2016 3.9 2.8 3.35 4.1 6/13/2016 3.4 3.4 4.2 6/14/2016 6.3 4.0 5.15 4.2 6/15/2016 3.4 2.8 3.1 4.3 6/16/2016 3.4 3.5 3.45 4.3 6/17/2016 3.7 4.1 3.9 4.2 6/18/2016 3.7 4.2 3.95 4.2 6/19/2016 3.5 3.1 3.3 4.2 6/21/2016 5.1 4.8 4.95 4.3 6/22/2016 4.1 6.0 5.05 4.3 6/23/2016 4.0 4.3 4.15 4.1 6/24/2016 4.7 4.0 4.35 4.0 6/25/2016 4.1 4.5 4.3 3.9 6/26/2016 4.2 2.6 3.4 3.9 6/28/2016 10.1 3.5 6.8 4.1 6/29/2016 3.7 3.8 3.75 4.1 6/30/2016 3.7 4.6 4.15 4.1 7/1/2016 4.6 3.9 4.25 3.9 7/2/2016 4.7 5.0 4.85 4.0 7/3/2016 4.7 4.2 4.45 4.0 7/6/2016 6.4 4.3 5.35 4.1 7/7/2016 3.5 4.2 3.85 4.1 7/8/2016 3.7 2.9 3.3 4.1 7/9/2016 2.8 2.7 2.75 4.1 7/10/2016 2.6 2.7 2.65 4.1 7/11/2016 2.5 2.5 4.0 7/12/2016 6.1 4.8 5.45 4.1 7/13/2016 2.9 2.6 2.75 4.1 7/14/2016 2.9 3.1 3 4.0 7/15/2016 2.5 2.6 2.55 4.0 7/16/2016 2.5 2.7 2.6 3.9 7/17/2016 2.6 3.7 3.15 3.9 7/18/2016 3.2 3.2 3.9 b'b S6'E 6'E 0'17 9TOZ/S/6 b'b S6'9 S'9 b'L 9TOZ/b/6 Z'b SO'b ZT 6'£ 9TOZ/E/6 Z'b 8'b VT Z's 9TOZ/Z/6 T'b T'b b'b 8'E 9TOZ/T/6 T'b SZ'E Z'E E'E 9TOZ/TE/8 IT SZ'S Z'£ E'L 9TOZ/OE/8 T'b SZ'£ T'E b'E 9TOZ/6Z/8 TIP b E'E LT 9TOZ/sZ/8 T'b ST L'b ET 9TOZ/LZ/8 TIP ST'E E'E 0'E 9TOZ/9z/8 T'b T'E 0,E Z'E 9TOZ/sz/8 IT Z'b 917 8'E 9TOZ/bZ/8 0'b b'£ b'E 9TOZ/EZ/8 0'b SS'E 87 ET 9TOZ/Zz/8 017 b £'b LE 91OZ/OZ/8 IT STT ST 8'z 9TOZ/6T/8 T'b 87 L'Z 6'Z 9TOZ/8T/8 E'b E 87 Z'E 9TOZ/LT/8 Ell 6'S 6'E &L 9TOZ/9T/8 Z'b 6'T 6'T 9TOZ/ST/8 ZIP TT L'£ S'b 9TOZ/bT/s Z'b SS'£ ST E'£ 9TOz/ET/s TIP 9'E TE TE 9TOZ/ZT/8 IT SOT &E Z'b 9TOZ/TT/8 Z'b S917 LE 9'S 9TOZ/OT/8 T'b SZ'OT ET Z'9T 9TOZ/6/8 8'E b'S Vs 9TOZ/8/8 L'E SS'8 O's T'6 9TOZ/L/8 9'E L'£ Z'b Z'E 9TOZ/9/8 9'E E'E S'E VE 9TOZ/S/8 9'E T'E E'E 67 9TOZ/b/8 9'E 67 0'E 87 9TOZ/E/8 L'E SL'b L'z 8'9 9TOZ/Z/8 L'E b'Z b'Z 910Z/T/8 8'E S67 67 0'E 91OZ/OE/L 8'£ SVS 0*9 617 9TOZ/6Z/1 8'E SE'E L'E 0'E 91OZ/8Z/L 6'E SUE T'E 0'E 9TOZ/LZ/L 6'E SUE VE 0'E 91OZ/9Z/L 6'E 87 87 9TOZ/SZ/L 0'b S'E Z'E 8'E 9TOZ/bZ/L 017 Sb'E 9'E E'E 91OZ/Ez/L 0'b Z'E 0'E VE 9TOZ/ZZ/L T'b S6'S S'8 VE 9TOZ/TZ/L IT b'E b'E VE 9TOZ/OZ/L T'b 8'8 b'b Z'ET 9TOZ/6T/L 9/7/2016 3.0 3.8 3.4 4.1 9/8/2016 3.0 3.1 3.05 3.9 9/9/2016 3.6 4.0 3.8 3.9 9/10/2016 3.6 3.6 3.6 3.8 9/11/2016 3.4 3.4 3.4 3.8 9/12/2016 3.7 3.7 3.7 3.8 9/13/2016 3.4 5.1 4.25 3.8 9/14/2016 3.8 3.9 3.85 3.9 9/15/2016 4.0 3.5 3.75 3.8 9/16/2016 4.0 4.1 4.05 3.9 9/17/2016 3.9 4.2 4.05 3.9 9/18/2016 3.7 3.8 3.75 3.9 9/19/2016 5.1 4.3 4.7 4.0 9/20/2016 3.3 3.0 3.15 3.9 9/21/2016 3.9 6.0 4.95 4.0 9/22/2016 3.2 3.4 3.3 4.0 9/23/2016 3.6 3.0 3.3 3.9 9/24/2016 3.5 4.1 3.8 4.0 9/25/2016 5.0 2.5 3.75 4.0 9/26/2016 2.6 7.4 5 4.0 Operators Signatures: IN i e( 1 � Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. 8 t A dLR B 3-RC 3_R A 3'_R 3 3iR C 3_R A I 3:i B �_;i C LLR A 9�2 3 ' 3 Water Meter Reading 6 90 3 Steam Flow KPPH 't,C 7 Steam Pressure Header �4 !Steam Pressure Line Exhausts Stack Temp. 131 4 91 3`4 jClean Viewing Windows, Metering and dropout Furnace Draft "H20 i7,71, -143 Drum Level/Valve % 3,4 S1 ss -79 ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM S" ESP Purge Air Heater Duct Control Temp LI ESP Purge Air Heater Over trip Temp a i 1 G ESP Field #1 Secondary Voltage ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp 3 3,�L -7 Blow Down Water Column v v / i Blotiv Down Triple Low Switch r `� Blow Down Sight Glass a 'Boiler Gas Outlet Temp SW Sfb 5W Bottom Blow Front Sidewall Header ✓ / ✓ Soot Blow Economizer ✓ r Bottom Blow Back Sidewall Headers ✓ ✓ ✓ (Soot Blow Airheater ✓ `/ inspect Multiclone Discharge Inspection Door ,r Air Compressor PSI to Ito Ito Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ✓ f Blow town Air Compressor Water Trap ✓ '� � � Turbine Bearing Temp AIA Turbine Bearing Vibration All, ZIA Turbine Oil Level 3� v t r D Fan Outlet Temp �x �s 5 ass X'S', *7 • A � � -7 ;�?S Grate Water Pump (#operating) and Pressure 72' I � 70 Grate Water Temperature L2 � I� Feedwater Pump (#operating) and Pressure G 70 Ash Container Inspection and Level ✓ ESP Ash Auger inspection Lj ESP Ash Roto Lock inspection Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection ✓ tv Start sequence on all grates(Cells and Dropouts) W L L Feed auger Bolts lVvJ ay X15 '1r7 J-0 Z/Z Y � - Z `C •� Z -� Lis + h° 1 Z-AV Q 9 s 1/7 t1Z(o 1z-7 '7/, 2- z/Z,� s /9 s/ 7 G 12-q 9 ,5 Operators Signatures: L),-A ��, r Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A B'R B 1 BLR C BLR A BLR B BLR C BLR A I BLR B I BLR C BLR A I BLR B B: Water Meter Reading Stearn Fow KPPH 7u L Z Li ; Steam Pressure Header rS v '- I L)C Steam Pressure Line IZ t Z 5 Exhausts Stack Temp. --�)4 Clean Viewing Windows, Metering and dropout LX ✓ Furnace Draft "H20 it�s I6,x 10,X-( 7 -7IZ Sa,w q JL 't 11 lL Drum Level/Valve% a - , 5a g, L Ln j ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp I us � 1 11e c� ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage p !I,`Z ESP Hopper Heater#1 Temp ( 2 0 e ESP Hopper Heater#2 Temp Blow Down Water Column / ✓ Blow Down Triple Low Switch 77/ Blow Down Sight Glass Boiler Gas Outlet Temp 5� - S s� . 5 0 Bottom Blow Front Sidewail Header Soot Blow Economizer t/ Bottom Blow Back Sidewail Headers Soot Blow Airheater r, Inspect Multiclone Discharge inspection Door .� Air Compressor PSI lie Air Compressor Temp U o Air Compressor Separator and Dryer Filter Uiff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration ,4, Turbine Oil Level 11 /r✓ .q,// FD Fan Outlet Temp Gyc I Z9 250 1v5OZ6 .50 1a4L0 a: Grate Water Pump (#operating)and Pressure 7 5 ,?C Grate Water Temperature -7 ' iGe Feedwater Pump (#operating) and Pressure &C (wv Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection / Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE t�siv l- ii A 7 = tot, L G L eri vd yGG'D i4v G L/2 /jOL:S ✓ i ��� J Operators Signatures• �G.�1• fi '�' Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C I BLR A I BLR B BLR C BLR A I BLR B B,R C KR A 1 8!.R B i3,R C Water Meter Reading 7Nv� Steam Fiow KPPH , 7.g� LO' Steam Pressure Header a �_ c`{ Steam Pressure Line 41 Z "S 1 Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout U Furnace Draft "H20 11,�� I, l n 13 Drum Level/Valve% ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Ali, Heater Over trip Temp I ►'mil 1 3Q ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage 11L� ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp as y Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header _ Soot Blow Economizer L/ Bottom Blow Back Sidewall Headers Soot Blow Airheater s- Inspect Multiclone Discharge Inspection Door Air Compressor PSI ji j «j L Air Compressor Temp < S 1 5 i Air Compressor Separator and Dryer Filter Diff ;i Lam' Blow Down Air Compressor Water Trap v Turbine Bearing Temp Turbine Bearing Vibration 4 sL i Turbine Oil Level y Y2 FD Fan Outlet Temp Grate Water Pump (#operating)and Pressure 70 � Grate Water Temperature 2{ 21 S 1 Feedwater Pump(#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection 71 Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE `~-- r�tsn,c /i�rr 0 r " o rvc %vrZ(jtwC KK% c D ,i Operators Signatures: �t Date:! 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B 9LR C 8LR A BLR 8 BLR C BLR A BLR B 1 BLR C BLR 4 BLR B B,R Water Meter Reading 1113 Od uc Steam Flow KPPH ' L-r? I:F � Steam Pressure Header ,steam Pressure Line i a i,)-"? Exhausts Stack Temp. n � t Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 %•� 14 �k � j� 4 IS 4l / Drum Level /Valve% ESP KW 12 Hr.Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp q 1L ESP Purge Air Heater Over trip Temp I-7 1 • is ESP Field#1 Secondary Voltage �.0 G ESP Field #2 Secondary Voltage Nr"I ESP Hopper Heater#1 Temp �2-yq L_��� �i o?7 ` ESP Hopper Heater#2 Temp Se, Blow Down Water Column `J Blow Down Triple Low Switch i/ Blow Down Sight Glass Boiler Gas Outlet Temp j J G Bottom Blow Front Sidewall Header ✓ r v Soot Blow Economizer Bottom Blow Back Sidewall Headers77 J Soot Blow Airheater Inspect Multicione Discharge Inspection Door J `� Air Compressor PSI L) �' v Air Compressor Temp < F' Air Compressor Separator and Dryer Filter Diff ✓ ✓ ✓ ✓ Blow Down Air Compressor Water Trap ✓ '� Turbine Bearing Temp Turbine Bearing Vibration a A) � Turbine Oil Level FD Fan Outlet Temp S 50 All Grate Water Pump (#operating) and Pressure �L �� `� Z 7 o Grate Water Temperature VI Feedwater Pump (#operating) and Pressure C Ash Container Inspection and Level ✓ ..� ESP Ash Auger Inspection ESP Ash Roto Lock inspection ✓ U' Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE �, �'^ d Operators Signatures: ��►.� — �ls '�"" Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. B R A BLR B BLR C B R A BL R B BLR C KR A BLR d BLR C BLR A dLR d BL Water Meter Reading 3� Nov Steam Fiow KPPH y cel 6_. r l F Steam Pressure Header —] ? Steam Pressure Line Z l Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout ✓ ✓ .✓ Furnace Draft"H20 J 3 7 I2� 1t ZI Z IZ� �I 7-7 )I� i1.4Z i2 Drum Level/Valve% ESP KW 12 Hr. Avg AM cj ESP KW 12 Hr. Avg PM � ESP Purge Air Heater Duct Control Temp 91-4 c 1� G ESP Purge Air Heater Over trip Tema ESL #1 Secondary Voltage 7 Field#2 Secondary Voltage i ESP Hopper Heater#1 Temp u'� � � ESP Hopper Heater#2 Temp — Blow Down Water Column -✓ / Blow Down Triple Low Switch Blow Down Sight Glass �/ = ✓ Boiler Gas Outlet Temp 5',25 Bottom Blow Front Sidewall Header Soot Blow Economizer V `� Bottom Blow Back Sidewall Headers Soot Blow Airheater - Inspect Multiclone Discharge Inspection Door Air Compressor PSI O Z c Air Compressor Temp / 7S 7- I Air Compressor Separator and Dryer Filter Diff � Blow Down Air Compressor Water Trap ✓ i Turbine Bearing Temp Turbine Bearing Vibration -� Turbine Oil Level FD Fan Outlet Temp �, o 5 y5 `� Zq�; d29C Zt5; 25 7� it Grate Water Pump (#operating)and Pressure L-;; 1-7 Grate Water Temperature Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ✓ ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&D TE Operators Signatures CC-Ul �� `/ � /�, �T�" Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR 8 BAR C BLR A I B!.R B I BLR C BLR A I BLR B I BLR C BLR A i3LR B B R C Water Meter Reading Steam Flow KPPH Steam Pressure Header `� � _� �C� 2 Steam Pressure Line 17 -7 Exhausts Stack Temp. I. I = Clean Viewing Windows, Metering and dropout Furnace Draft"H20 � 'lG f,Z l S Z . ��.�`'�k'i✓r' �3 '�. �z (6 �D Drum Level J Valve ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM , ESP Purge Air Heater Duct Control Temp ` ESP Purge Air Heater Over trip Temp �� `�� , ( ESP Field#1 Secondary Voltage �'7 ESP Field#2 Secondary Voltage S' ESP Hopper Heater#1 Temp 2 1 ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp KI Bottom Blow Front Sidewall Header ✓ `� Soot Blow Economizer Bottom Blow Back Sidewali Headers ✓ Soot Blow Airheater Inspect Multiclone Discharge inspection Door Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer kter Uiff v Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level T,l} % FQ Fan Outlet Temp Grate Water Pump (#operating) and Pressure J �� Grate Water Temperature Z,1 %�� 2 5 Feedwater Pump(#operating) and Pressure 0 %�� 'C' 6 Ash Container Inspection and Level v ESP Ash Auger Inspection ESP Ash Roto Lock Inspection w' Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection t INSPECT FIRE EXTINGUISHER/MONTHLY INTADATE =t�tsiv t- A14 rt r � � c ;lOZ �, � 1 Operators Signatures: Z kl-1 a 1 Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B 1 BLR C I R A BLR B I BLR C BLR A 1 BLR B I BLR C BLR A Bt.R B 3,R Water Meter Reading , _ -Z Ia Steam Fiow KPPH 5� Steam Pressure Header 2 7 `1 -7 Steam Pressure Line 2 -") IZ`-; J -Z q3 Exhausts Stack Temp. Z 17 7 �2 Clean Viewing Windows, Metering and dropout Furnace Draft "H20 � 1�t7 I�5 j J", i %7c ID' D Z �z4 q,V l �tl,� Drum Level/Valve% u )"I jlob - 0- `I — 3'3 ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp c ESP Purge Air Heater Over trip Temp l'3 r( /��� ESP Field#1 Secondary Voltage `L✓ 2 • g ESP Field#2 Secondary Voltage - l •' ESP Hopper Heater#1 Temp ✓ ` 2e7lr -� ESP Hopper Heater#2 Temp fry 2C� Z� Blow Down Water Column ✓ Blow Down Triple Low Switch J Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header t Soot Blow Economizer ✓ �' '� `� Bottom Blow Back Sidewall Headers L- Soot Blow Airheater v '✓ Inspect Multicione Discharge Inspection Door Air Compressor PSI 1 J Air Compressor Temp r7 S 1 •7 1 S Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level �T FD Fan Outlet Temp Grate Water Pump (#operating)and Pressure Grate Water Temperature Z{ 7 Feedwater Pump(#operating) and Pressure 761C li Ash Container Inspection and Level E/ ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE =t�siv I- 114 C a l 0 arc� A-c G-��2 �3�L;s ✓ Operators Signatures: ��,L� l � Date:�2 , 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. B!R A B RR B BLR C 8,11 A T R B 31-1 C BAR A BA B BA C B'..R A TA B I a Water Meter Reading Steam F:ow KPPH 2 Steam Pressure Header IS -7 Steam Pressure Line 12 Z 2 Exhausts Stack Temp. 2 7 7 Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 2 I t 16>3 ' 1 v' Drum Level/Valve% 2i 1 sty '-� ESP KW 12 Hr. Avg AM - 1 ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp I Lt . ESP Field#1 Secondary Voltage ' ESP Field#2 Secondary Voltage LI n ESP Hopper Heater#1 Temp 3� z7d ESP Hopper Heater#2 Temp 2-7 Blow Down Water Column Blow Down Triple Low Switch ✓ �/ -� Blow Down Sight Glass V J Boiler Gas Outlet Temp 40 Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers v Soot Blow Airheater v J V Inspect Multiclone Discharge Inspection Door L Air Compressor PSI t i a IvD 0 Air Compressor Temp ►7 1'2 c Air Compressor Separator and Dryer Piiter Diff ✓ ,/ Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 3/� 2 FD Fan Outlet Temp z iz j, a Zx -lie; Grate Water Pump(#operating) and Pressure 1 tip' Grate Water Temperature Feedwater Pump (#operating) and Pressure 5 2 G u Ash Container Inspection and Level ESP Ash Auger Inspection L/ ESP Ash Roto Lock Inspection ✓ ✓ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE f-c C:� i4�L•-L it Lan L i f ,..,.�' Operators Signatures: il��l / �� Date: //,-1, 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR 3 BLR C 81R A 1 51 R B BUR C BLR A BLR d I BLR C I BLR A BLR B BLR Water Meter Reading y I S= _ Steam F!'ow KPPH �L 1�G SS Steam Pressure Header 3 soZ y Steam Pressure Line rz 1 Z Exhausts Stack Temp. 2 - Clean Viewing Windows, Metering and dropout 1-1 ✓ Furnace Draft "H20 /3LS i.5le /,)c Drum Level/Valve% AL r �► S/ rj �� y� ` 31 ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM 2, ESP Purge Air Heater Duct Control Temp 11y CI G 4 ESP Purge Air Heater Over trip Temp 5v lqq t ESP Field#1 Secondary Voltage 3.�f 'L k 3 , ESP Field#Z Secondary Voltage -7, 6 `f� s ESP Hopper Heater#1 Temp zfl 2 )L- ESP Hopper Heater#2 Temp L 3`i Z O Z 3 2 Blow Down Water Column ✓ ✓ ✓ ✓ �/ Blow Down Triple Low Switch ✓ ✓ Blow Down Sight Glass ✓ ✓ Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header �' ✓ ./ Soot Blow Economizer ,� ✓ ✓ ✓ Bottom Blow Back Sidewall Headers / ✓ Soot Blow Airheater ✓ ✓ T r:. Inspect Multiclone Discharge Inspection Door ✓ VLM Air Compressor PSI , I Z 1 c o Air Compressor Temp Air Compressor Separator and (Dryer Filter Uiff ✓ ,� ✓ Blow Down Air Compressor Water Trap ✓ ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp 25 z s, D Z Z d Z 2-101 Z 701 1 6 Grate Water Pump(#operating) and Pressure 2 Grate Water Temperature z f Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level t� ✓ ✓ ✓ ESP Ash Auger Inspection ✓ .f ✓ ✓ i ESP Ash Roto Lock Inspection ✓ Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection �/ ✓' INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE r -=x�siv L- I�it Tr i ivrtl3t�ris /<�' �� / Date: z� Operators Signatures:, 1� 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs, B:R A I BL R 3 1 BA C SLR A I B!R B BLR C BLR A 1 131-4 a 1 B,R C 3A A 1 a!R a a Water Meter Reading l L-IS 7-6 Steam F'!ow KPPH G z', �. . 7 ? Steam Pressure Header & J 1sZ Steam Pressure Line v20 C i 1✓ ! Exhausts Stack Temp. 124'� Clean Viewing Windows, Metering and dropout ` Furnace Draft"H20 Drum Level/Valve% L<.` Cc � S 7 3 f 3i ESP KW 12 Hr. Avg AM 3 3 ESP KW 12 Hr. Avg PM s.D ESP Purge Air Heater Duct Control Temp c / 03 ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage 1V - ESP Field#2 Secondary Voltage s5,p yd a ' �42 IL ESP Hopper Heater#1 Temp Z` 2 it ESP Hopper Heater#2 Temp Gf z� Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass — - Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header -- Soot Blow Economizer Bottom Blow Back Sidewall Headers — — Soot Blow Airheater — — Inspect Multiclone Discharge Inspection Door Air Compressor PSI I Air Compressor Temp !' v 7l Air Compressor Separator and Dryer Filter Diff ✓ ✓ - Blow Down Air Compressor Water Trap ,✓ Turbine Bearing Temp /V/% Turbine Hearing Vibration ? ✓ Turbine Oil Level FD Fan Outlet Temp zs Grate Water Pump (#operating) and Pressure G' �0 Grate Water Temperature 7 ' 1 r L Feedwater Pump (#operating) and Pressure (; pv c-ry S iso Ash Container inspection and Level ✓ ✓ �' ESP Ash Auger Inspection ✓ ✓ ✓ ESP Ash Roto Lock Inspection ✓ f/ Fuel Bunker Conveyor Chain Inspection ✓ ✓ Fuel Incline Conveyor Chain Inspection ✓ (/ / ✓ INSPECT FIRE EXTINGUISHER/MONTHLY 1NTI&DATE �/ r�.►� Tv,Z�j tr✓[: i< C Operators Signatures: Date: 12r i 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. B!R A I BLR B BLR C EILR A B!.R B BLR C BLR A I BLit d I BLR C BLR A BLR B 3LR C Water Meter Reading Steam Fow KPPH 2I Z S Steam Pressure Header Z Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft"H20 i sas �s:sa v.yc Drum Level/Valve% �s sc 2y 3 3 ESP KW 12 Hr.Avg AM z ESP KW 12 Hr. Avg PM 2.0 ESP Purge Air Heater Duct Control Temp �� ) ESP Purge Air Heater Over trip Temp ( � .Sa ESP Field#1 Secondary Voltage 3Z 46 ESP Field#2 Secondary Voltage 14" `( ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column ✓ Blow Down Triple Low Switch �� ✓ ✓ `� Blow Down Sight Glass Boiler Gas Outlet Temp �-l�c y�t� 5 t v SID SrU Bottom Blow Front Sidewall Header f ✓ ✓ Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door -- ✓ Air Compressor PSI 11C I � lD Air Compressor Temp ► i S Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp r✓►g " Turbine Bearing Vibration .,ws Turbine Oil Level t FD Fan Outlet Temp � v 235 Z3S 7� 2 2 SO o Z-.50 Z c Grate Water Pump (#operating) and Pressure Grate Water Temperature 2 5 21 21 Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ✓ `� ESP Ash Roto Lock Inspection i Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE — -=sRsn.l- 2 ry t?Jr.-lc� Cof 3� Operators Signatures: G<.n t-aI I 1Ju,n "e Date: //26 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A SLR B BLR C BLR A I ILA B BLR C KR A I BLR B I BLR C 3LR A 1 BLR B I 3: Water Meter Reading �i SI 3 7 ' Steam Fow KPPH SS,ct Steam Pressure Header 3 Z 3 Li Steam Pressure Line z3 6 Z- 3 a 3 Exhausts Stack Temp. 3h r5 3`� 3 Clean Viewing Windows, Metering and dropout ✓ `� `� Furnace Draft "H20 c%Tt ) 3r-) I cl"A 9d 16,5 1as( a IZ ie ' ii !7�{ lv,�i Drum Level/Valve% Z� ss t Gv SZ 3 S 3 7 5L4 u ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp 33 13 i ESP Purge Air Heater Over trip Temp t 5► l e O i 7 ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage SZ,y ESP Hopper Heater#1 Temp t Y" 2 ESP Hopper Heater#2 Temp c 30 3t Blow Down Water Column J I/ Blow Down Triple Low Switch i r IV Blow Down Sight Glass ✓ r v v Boiler Gas Outlet Temp 52a Szv za I G 5(G 5 IU Bottom Blow Front Sidewall Header ✓ ✓ _' v Soot Blow Economizer ✓ ✓ `� Bottom Blow Back Sidewall Headers ^� J ✓ ✓ `� Soot Blow Airheater / - t✓ Inspect Multiclone Discharge Inspection Door ,� ✓ Air Compressor PSI Air Compressor Temp t "7 S ( 7 �a Air Compressor Separator and Dryer Filter Diff ✓ V Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp •�v� ��'f{ /�' Turbine Bearing Vibration ^�� /t/j'l� R Turbine Oil Level FD Fan Outlet Temp 2So z5„ -zcv z50 Zi) 2S, 77 ?_7 Grate Water Pump (#operating)and Pressure 90 .10 Gt D 75 Grate Water Temperature 2 t 2 17 Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ✓ ESP Ash Roto Lock Inspection ✓ i/ Fuel Bunker Conveyor Chain Inspection ✓ -� �/ Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE =srtsn.d- A14 rt tot) '779 - r v r2 13 tr✓c /<v.. k L4 LT7 7, �� Operators Signatures: Gq �� Dater 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR 37 BLR C BLR A I BLR B I BLR C BLR A I BLR B 1 BLR C BLR A BLR B BL Water Meter Reading quC Stearn Flow KPPH Z 33 < Steam Pressure Header �s -x 17 36.5' Steam Pressure Line Cv 17-5 1 ZLI �2 Exhausts Stack Temp. O'S 3 12 3 Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 fd / i I'll iyyt 03 iy 2ti wwY 73 451 Z. Drum Level /Valve% 20 Z `/ 1. 3/ 53 - fo r✓•( ESP KW 12 Hr. Avg AM ESP KW 12 Hr, Avg PM ESP Purge Air Heater Duct Control Temp /2) 3 ESP Purge Ali- Heater Over trip Temp 00 O 2� ESP Field#1 Secondary Voltage Z.S t4l. 11 LI,2 �o ESP Field#2 Secondary Voltage -7 5 52,0 g ESP Hopper Heater#1 Temp 3 �i ESP Hopper Heater#2 Temp 3 12- Blow Down Water Column ✓ Blow Down Triple Low Switch ✓ ,./ l Blow Down Sight Glass ✓ ✓ i Boiler Gas Outlet Temp 7-7- Sry io .� Bottom Blow Front Sidewall Header ✓ ' Soot Blow Economizer ✓ J ✓ / Bottom Blow Back Sidewall Headers ./ w ✓ Soot Blow Airheater - J - Inspect Multiclone Discharge Inspection Door ✓ Air Compressor PSI U i r, ilo 1 1 U Air Compressor Temp 7 t )s / Air Compressor Separator and Dryer Filter Diff ✓ Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level vu FD Fan Outlet Temp 23S Z2S1 z5b c 'z(e 2.6o zcs 20- L-5--0 Grate Water Pump (#operating)and Pressure C10 SCS Grate Water Temperature 2 t'7 L 1) 2 i 21 Feedwater Pump(#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ✓ ✓ �/ ESP Ash Roto Lock Inspection ✓ ✓ Fuel Bunker Conveyor Chain Inspection �/ r Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE — t�s�vL- i3.9Tr 1 i�Jyy i v,2,d tr✓v it w' �7 � 3`i � U Operators Signatures: Dater 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C 8,R A I B_R B I BLR C BLR A 1 1L4 d 1 BLR C 3A A I BLR B B� Water Meter Reading - �.0� Steam Flow KPPH 14,6;� �` ,/S q t,;55 ,G Steam Pressure Header /99 Zi4 Steam Pressure Line Exhausts Stack Temp. �Gb' 31S' Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 h. I . f i �Y.bz 1d,5: p t IIALA 7.V?. . , Drum Level/Valve % j a zy 6 5 / 3 1� Z`f ESP KW 12 Hr. Avg AM ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp L ESP Purge Air Heater Over trip Temp 7 ESP Field#1 Secondary Voltage y D, ESP Field#2 Secondary Voltage - 6 �3 ESP Hopper Heater#1 Temp 311 3 i 3 c(e ESP Hopper Heater#2 Temp 306 ? Z- Blow Down Water Column ✓ Blow Down Triple Low Switch ✓ / ✓ Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewail Header / ✓ '� So ot Blow Economizer ✓ ✓^ / ✓ ✓ Bottom Blow Back Sidewall Headers ✓ ,/ ✓ f Soot Blow Airheater - inspect Multicione Discharge inspection Door ✓ ✓ J Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Uiff ✓ ✓ Blow Down Air Compressor Water Trap J Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp 7 2� 26v ZYv COZ -7 Z. �.) > Grate Water Pump (#operating) and Pressure (� eg Grate Water Temperature 214j 2 i b L Feedwater Pump (#operating) and Pressure ZO L10 & (C) Ash Container inspection and Level ✓ ESP Ash Auger Inspection ✓ �/ ESP Ash Roto Lock Inspection ✓ Fuel Bunker Conveyor Chain Inspection ✓ '� �� Fuel incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE — -- =sRs�, 00 0 2L4 �7= Operators Signatures: ` ar Gcn Date: / 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. B!R A B!R 3 BLR C B,R A I 3_.R B 1 3L C BLR A I BLR B BLR C BLR A BLR B &P! Water Meter Reading Steam Flow KPPH Steam Pressure Header Steam Pressure Line 12- 5 it 3 2 Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft"H20 ?_5 f 1,0Z lo,/o Drum Level/Valve % ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp E5P Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp 3 ESP Hopper Heater#2 Temp �'i' ! ` ' Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass K Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ Soot Blow Economizer _ n f f {� ✓ Bottom Blow Back Sidewall Headers ✓ f ✓ Soot Blow Airheater Inspect M.ulticlone Discharge Inspection Door Air Compressor PSI t Air Compressor Temp l7 Air Compressor Separator and Dryer Filter Uiff ✓ f '' Blow Down Air Compressor Water Trap `� ✓ `� Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level Gti i( z v FD Fan Outlet Temp 25" 0 d 26S zGS LG 2L Grate Water Pump(#operating)and Pressure 4s0 1;111 � Grate Water Temperature 2 12 .l Feedwater Pump (#operating) and Pressure G 1 L) Ash Container Inspection and Level ESP Ash Auger Inspection ✓ ✓ ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ ✓ Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE ^ =r�ts�v 6- 1114 r& 0 C7Z� Operators Signatures: Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. B_R A B!R 3 1 3_R C BLR A B!.R B BUR C I BLR A I BLR a I BLR C BLR A I BLR 8 BL Water Meter Reading 15Z 06 Steam Flow KPPH : 7S = s ,y Steam Pressure Header Steam Pressure Line 2 G 12-3 130 Stack Temp. 2 R 3 31 3 3 12- Clean Viewing Windows, Metering and dropout V/ Furnace Draft "H20 Ls X?i i� HIS h�1 iU09 12,141 12GG Drum Level/Valve% 27f 5 �o 7 5S G 2- 125 ESP KW 12 Hr. Avg AM l `� ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage '3 Z 315•-d ESP Field#2 Secondary Voltage Lf q 13 15 ESP Hopper Heater#1 Temp 2 5 Z tbG 2G ESP Hopper Heater#2 Temp 2-C, Blow Down Water Column f '� Blow Down Triple Low Switch ✓ ✓ ✓ Blow Down Sight Glass v Boiler Gas Outlet Temp qtf o - Y ` ,.0v 5Up Sw 5�^/ Bottom Blow Front Sidewall Header ✓ �' L' ,i Soot Blow Economizer J ✓ Bottom Blow Back Sidewall Headers v `' _ -� ✓ Soot Blow Airheater V U Inspect Multiclone Discharge Inspection Door 1/ Air Compressor PSI t 10 Ito i its Air Compressor Temp 17 tl 05 Air Compressor Separator and Dryer Filter Diff .� ✓ ✓ Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Hearing Vibration Turbine Oil Level t/ `/Z FD Fan Outlet Temp '150 2 1Z:J tGs zGS zc;, s zc3 zcs Grate Water Pump (#operating) and Pressure j r{C $S Grate Water Temperature 2 t 21 Z 1 7 Feedwater Pump (#operating) and Pressure L.2 Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ✓ -� Fuel Bunker Conveyor Chain Inspection ✓ L/ Fuel incline Conveyor Chain Inspection ✓ ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE iv rZ C;rr✓'C /<✓ �� Operators Signatures: Date:-�-.2 C 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr. BLR A I BLR B I BLR C &R A I KR B I 6LR C BLR A BLR B 1 BLR C BLR A BLR B Water Meter Reading uZ3 ?Cn ' Steam Fiow KPPH 7'7 i v Steam Pressure Header .;ZSy ZqG 1 G Steam Pressure Line I O-L I Z( 2 - Exhausts Stack Temp. j- Clean Viewing Windows, Metering and dropout ✓ �� Furnace Draft"H20 i(4(,, 10 5•6s ,.r3 7.Sf w. q Drum Level/Valve % -7 A? y 7 t L &S 3 '2 3 ESP KW 12 Hr.Avg AM 7 7 ESP KW 12 Hr. Avg PM S, ESP Purge Air Heater Duct Control Temp Off' / 15 r ESP Purge Air Heater Over trip Temp /5 6 I S ESP Field#1 Secondary Voltage 7--- ESP Field#2 Secondary Voltage 7! `� •1 ESP Hopper Heater#1 Temp .O 3 Y ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass J Boiler Gas Outlet Temp 5p° S`` Bottom Blow Front Sidewall Header ✓ `� `� Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ f Soot Blow Airheater l `� ✓ Inspect Multiclone Discharge Inspection Door Air Compressor PSI /v Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ✓ ✓ Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp x Turbine Bearing Vibration sr Turbine Oil Level 3 L /Z FD Fan Outlet Temp �,2.5 1- , Aso z s� � sa z 6 o ��s L6u Z`/✓ Z Grate Water Pump(#operating)and Pressure -Zv 9v Grate Water Temperature r Z I S sZ K Feedwater Pump(#operating)and Pressure C /J c z/U Ash Container Inspection and Level ✓ ✓ ESP Ash Auger Inspection ✓ ESP Ash Rota Lock Inspection ✓ Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE =xAsi [- t; r �� Operators Signatures: Q-� Date: L'Z Z22 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr, BLR A I RR B I BLR C 8LR A I KR B I BLR C BLR A BLR 8 I BLR C BLR A I Bt.R B Water Meter Reading 37 5 92G Steam Fiow KPPH �l Steam Pressure Header z ' 3 -54C"7 Steam Pressure Line z5 2?5 Exhausts Stack Temp. 1 3c5 Clean Viewing Windows, Metering and dropout .� V Furnace Draft°H20 vlx2 t)`•y! i`► Drum Level/Valve% 5. c) i3I ; i z ) I ESP KW 12 Hr.Avg AM ESP KW 12 Hr. Avg PM 2 ESP Purge Air Heater Duct Control Temp e2 ESP Purge Air Heater Over trip Temp 6t ESP Field#1 Secondary Voltage e),o 3c o ESP Field#2 Secondary Voltage S 5 o ESP Hopper Heater#1 Temp 3 3c I Uzc% ESP Hopper Heater#2 Temp Blow Down Water Column ✓ ��� Blow Down Triple Low Switch ✓ ./ Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ '� Soot Blow Economizer Bottom Blow Back Sidewall Headers -� Soot Blow Airheater ✓ '� 'J Inspect Multiclone Discharge Inspection Door Air Compressor PSI 1 ' to ho Air Compressor Temp 1 -71. 175. Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 1 FD Fan Outlet Temp c Grate Water Pump(#operating)and Pressure 741 Grate Water Temperature L 15 7 Feedwater Pump (#operating)and Pressure O- 6 t3 � v Ash Container Inspection and Level ESP Ash Auger Inspection ✓ `� ESP Ash Roto Lock Inspection ✓ ✓ L Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE %-'.tAsnG- A14rot �J � iL,213tr✓L C, !o n rOperators Signatures: ' ILA Date 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B 9LR C tlLR A I IRR B BLR C I BLR A BLR B BLR C BLR A BLR B £ 2 Water Meter Reading ' g Steam Fiow KPPH ���s Steam Pressure Header �Z Steam Pressure Line Z ZS ZS ) Exhausts Stack Temp. c I z`° �sb Clean Viewing Windows,Metering and dropout Furnace Draft"H20 .2 I C 1 l`/al Z.2E II �G ✓ Drum Level/Valve % ESP KW 12 Hr.Avg AM ESP KW 12 Hr.Avg PM � ESP Purge Air Heater Duct Control Temp (� 13s t 1 ESP Purge Air Heater Over trip Temp � A � ESP Field#1 Secondary Voltage - ESP Field#2 Secondary Voltage " 2'D ESP Hopper Heater#1 Temp 7 �� ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch 'f Blow Down Sight Glass Boiler Gas Outlet Temp �Z Bottom Blow Front Sidewali Header i � ` � Soot Blow Economizer - Bottom Blow Back Sidewall Headers Soot Blow Airheater ✓ Inspect Multiclone Discharge Inspection Door +� ✓ `� Air Compressor PSI I�i v Ito , Air Compressor Temp ' 7 S Air Compressor Separator and Dryer Filter Uiff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level \\� FQ Fan Outlet Temp `��� Z75 2G"�' Grate Water Pump(#operating)and Pressure 72 Grate Water Temperature Z �� Feedwater Pump(#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE /?14 re 3 '2-s C,:5 s Operators Signatures: l- it,x r it i�� Date:2 Z i 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr! BLR A I BLR B I BLR C 0L9 A I BLR B 1 B!R C BLR A BUR B 1 BLR C BLR A 61.R 0 Water Meter Reading Steam Flow KPPH ra. _ ; �c _ 1-1 � _ l Steam Pressure Header -7G5 J Steam Pressure Line I' Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft"H20 7 11, Drum Level/Valve% 7� HE ESP KW 12 Hr.Avg AM 3 2 ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp 0 ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage >, el 21, 1 L ESP Field#2 Secondary Voltage A16 7�" l `i e ESP Hopper Heater#1 Temp S pp p ESP Hopper Heater#2 Temp 6-7 1 - i Blow Down Water Column ✓ ✓ ✓ Blow Down Triple Low Switch ✓ -/ ✓ Blow Down Sight Glass Boiler Gas Outlet Temp o Bottom Blow Front S idewali Header Soot Blow Economizer ✓ Bottom Blow Back Sidewall Headers ✓ ✓ i Soot Blow Airheater -� Inspect Multiclone Discharge Inspection Door ✓ / Air Compressor PSI Air Compressor Temp 1 7v S /�7 t � S Air Compressor Separator and Dryer Filter Diff ill' Blow Down Air Compressor Water Trap Turbine Bearing Temp ,J A Turbine Bearing Vibration !A Turbine Oil Level 1 ' �•� - FD Fan Outlet Temp ST ,;.'i Grate Water Pump(#operating)and Pressure &% _ Grate Water Temperature 2 l� a 1 Feedwater Pump(#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ✓ ✓ 'r Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ,/ INSPECT FIRE EXTINGUISHER/MONTHLY INTADATE Operators Signatures: ', Dater _ 1 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr! BLR A I BLR B I BLR C BLR A I BLR B I 8LR C BLR A I BLR B I BLR C BLR A I BLR B Water Meter Reading ��Yv37c Steam Now KPPH Steam Pressure Header ai Steam Pressure Line ` Exhausts Stack Temp. b l i9 Ago Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 /. '6� /7 1914 3 1 -tilt. Drum Level/Valve°o 1,3 `' ESP KW 12 Hr.Avg AM ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ( ' r' -1 ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage �v • ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp 3 Blow Drawn Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer ✓ ✓ �� �� '� -' Bottom Blow Back Sidewall Headers ✓ / ✓ J Soot Blow Airheater ✓ inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp d Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration JJ' - t4h Turbine Oil Level 1 c? 6 W FD Fan Outlet Temp Grate Water Pump(#operating)and Pressure Grate Water Temperature 2 '"� `1 d 17 Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level -� �/ ✓ ESP Ash Auger Inspection ✓ `� r ESP Ash Roto Lock Inspection / ✓ w Fuel Bunker Conveyor Chain Inspection J (Z Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE 01 Operators Signatures: c, n Dater 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs BLR A I BLR B 1 BLR C B;R A I MR B BLR C BLR A I BLR B BLR C BLR A BLR 6 Water Meter Reading Zy/ ;z- Steam Flow KPPH �S1S J, 7v Steam Pressure Header 35N 3-s<s Steam Pressure Line t 7- -Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 yY 9 IS y 1-2 ti �✓ :ram Drum Level/Valve %G 3N ESP KW 12 Hr.Avg AM ESP KW 12 Hr. Avg PM S ESP Purge Air Heater Duct Control Temp Z 1 X i t io ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage Y22-1 ESP Field#2 Secondary Voltage S 3 3 Sr ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch _— Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewali Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater / ✓ - -- Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp r`2 z5 S Air compressor Separator and Dryer filter Diff Blow Down Air Compressor Water Trap ✓ �! Turbine Bearing Temp Al A Turbine Bearing Vibration MIA Turbine Oil Level % r FD Fan Outlet Temp Grate Water Pump(#operating)and Pressure 1� 7e o Grate Water Temperature 2,1 L Feedwater Pump (#operating)and Pressure (, L� Ash Container inspection and Level / r ESP Ash Auger Inspection ri ESP Ash Roto Lock Inspection ./ Fuel Bunker Conveyor Chain Inspection (/ ✓ / /� Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE MA rAsi L.- t?14 U �i O sv,Z J3 rr�0 11 4.1 Operators Signatures: 11 "' t\ Dater; 'T— 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr BLR A I BLR B BLR C 9LR A I BLR B I BLR C BLR A I BLR B I BLR C BLR A I BLR B Water Meter Reading 3 �Z Steam Fiow KPPH Steam Pressure Header A OD Steam Pressure Line I 1a< Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout ✓ Furnace Draft H2O 1a. F - :as 10� /-,.7� • ,. . Drum Level/Valve% is 3 ' " '- �/ a . �2 ESP KW 12 Hr.Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp i -f ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage 141k.3 J 4 �• `� ESP Hopper Heater#1 Temp go — ,l i y ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch -� Blow Down Sight Glass ✓' f Boiler Gas Outlet Temp ''' q0 �� S Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater ✓ - _ Inspect Multiclone Discharge Inspection Door " Air Compressor PSI ho /O Air Compressor Temp f 7� 7 Air Compressor Separator and Dryer Filter Diff / ✓ - Blow Down Air Compressor Water Trap / Turbine Bearing Temp 1111A. AIIA Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp �. . zm = ''c Grate Water Pump(#operating) and Pressure Grate Water Temperature al IV Q2i �' a►iy Feedwater Pump(#operating)and Pressure Ash Container inspection and Level i ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ ✓ ' Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTADATE /-1 1—t ,=sits c- A14 re �0 7 /- � � i'I �t;L v .4-v t-�rt 13�Lry ✓ � ---� -� Operators Signatures: Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 01 0 rs. BLR A BLR B BLft C KR A IRR B 1 8LR C BLR A I BLR B BLR C BLR A I BLR B 1 B Water Meter Reading 3 ` ' Stearn Now KPPH �' Zi�".G,; q`se Steam Pressure Header cI 1 t v`a 31 Steam Pressure Line i * - Exhausts Stack Temp. `s Clean Viewing Windows,Metering and dropout Furnace Draft"H20 1, Lr. •� 10, I0,81 Il Drum Level/Valve% €' - c-# 1 S•Z_ ESP KW 12 Hr.Avg AM ' ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp f I 106 ESP Purge Air Heater Over trip Temp -f► ��`` I SI ESP Field#1 Secondary Voltage _ ESP Field#2 Secondary Voltage `( 5 �y `- '!`' ' ' ESP Hopper Heater#1 Temp �� ESP Hopper Heater#2 Temp 2 '-� Psi& Blow Down Water Column Blow Down Triple Low Switch � `....... v "� Blow Down Sight Glass -� Boller Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers i Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Uiff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration ✓.fit Turbine Oil Level U FD Fan Outlet Temp -10 `lam' ` 07�1 Grate Water Pump (#operating)and Pressure - _ '- 7 Grate Water Temperature ► -LC� `��`�` � ) Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE q'Li �Z t b Operators Signatures: Date;3/5/ 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr! BLR A B!R B BLR C I 91R A I B!R B I BUI C BL7 A I SO B BLR C BLR A dl.R B Water Meter Reading 1°I Steam Fow KPPH Steam Pressure Header l steam Pressure Line ia3 / S Exhausts Stack Temp. L30 8 a D Clean Viewing Windows, Metering and dropout to., Furnace Draft"H20 Drum Level/Valve% 4 /d 6 3 ESP KW 12 Hr.Avg AM 3.6 ESP KW 12 Hr.Avg PM �2.-1 ESP Purge Air Heater Duct Control Temp i U$ ESP Purge Air Heater Over trip Temp IS ESP Field#1 Secondary Voltage 3&. 1 _-Ipl- ESP Field#2 Secondary Voltage A ESP Hopper Heater#1 Temp 31 '5)D ESP Hopper Heater#2 Temp 21% Z` Blow Down Water Column v ,� Blow Down Triple Low Switch Blow Down Sight Glass r Boiler Gas Outlet Temp 00 520 520 Bottom Blow Front Sidewalt Header ✓ ,� Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ T Soot Blow Airheater Inspect Multicione Discharge Inspection Door rr ,� ✓ Air Compressor PSI ho D Air Compressor Temp 175 I Air Compressor Separator and Dryer filter Diff Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level ULL FD Fan Outlet Temp a50 �6 sU Z Grate Water Pump(#operating)and Pressure of -7 a Grate Water Temperature IS Z\ Feedwater Pump(#operating)and Pressure $$O (U Ash Container inspection and Level ✓ ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ,� ✓ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTADATE .`rAx-ev L- AFe re- 100 N7 Operators Signatures: (�j�!r� //Z�� +-� Date: T— 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr BLR A BLR B BLR C 8LR A I IRR B 8M C BLR A B R a I BLR C 301 A 61-R B Water Meter Reading Steam Fow KPPH 12,3 Steam Pressure Header Steam Pressure Line Z Z / r 20 cl Exhausts Stack Temp. " 3 3 H- 311 Clean Viewing Windows, Metering and dropout ✓ ✓ Furnace Draft H2O / }y 1 23 IY,Sy 1 ,zC iFJ3 Drum Level/Valve Sb 1 'Z `7rj a 7 ESP KW 12 Hr.Avg AM ESP KW 12 Hr. Avg PM 1 ESP Purge Air Heater Duct Control Temp cSP Purge Air Heater Over tr ip Temp ) 7 i�r 6 S ESP Field#1 Secondary Voltage ` ESP Field#2 Secondary Voltage I�j sc f ESP Hopper Heater#1 Temp I z" ?i C ESP Hopper Heater#2 Temp I iO Blow Down Water Coiumn v `' Blow Down Triple Low Switch77 Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ �✓ ✓ Soot Blow Economizer ✓ / �� Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI JC r i / O Air Compressor Temp Air Compressor Separator and Dryer Filter Diff v ✓ d Blow Down Air Compressor Water Trap ✓ ✓ �� Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump(#operating)and Pressure v-: Grate Water Temperature ZZ Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level .% r/ �� ✓ ESP Ash Auger Inspection ✓ t/ ESP Ash Roto Lock Inspection ✓ / Fuel Bunker Conveyor Chain Inspection ✓ .� Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE -� — v i v,:�j err G; k v-•' �'. � %��L to �4�L•-G i2 )3�L.� ✓ - --- '/ -_-- �, --- Operators Signatures:��.,',��-� ��2L','` �/� �,�� � - Date: 700 Hr-,. 1300 Hrs. 1900 Hrs. 0100 Hn IILR A BL R II 1 aLR C 8LR A B!R B 81 R C aLR A I B!B B 6i k C BLR A Ht.R iJ Water Meter Reading f �' Steam Fiow KPPH �' Steam Pressure Header %' ' z 17— Steam Pressure Line2- Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft"H20 w64t VU y 11,55 .So IAA 7 Drum Level/Valve ' 3 3 3-► 96 ESP KW 12 Hr.Avg AM '•`� ESP KW 12 Hr. Avg PM -'. ESP Purge Air Heater Duct Control Temp f ESP Purge Air Heater Over trip Temp IO ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage J Sr; ESP Hopper Heater#1 Temp i ESP Hopper Heater#2 Temp '-,t I 3 t y 3 l6 C� Blow Down Water Column ✓ V11 to, Blow Down Triple Low Switch \ ✓ f Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ ✓ +� Soot Blow Economizer ✓ ✓ '�_ `� Bottom Blow Back Sidewall Headers Soot Blow Airheater - inspect Multiclone Discharge Inspection Door Air Compressor PSI \ J 1110 to Air Compressor Temp Air Compressor Separator and Dryer Filter Diff �� ✓ Blow Down Air Compressor Water Trap �' J Turbine Bearing Temp Turbine Bearing Vibration - Turbine Oil Level FD Fan Outlet Temp Grate Water Pump(#operating)and Pressure 70 Grate Water Temperature 2 2 f Feedwater Pump(#operating)and Pressure `a r 0 Ash Container Inspection and Level �/ ✓ ESP Ash Auger Inspection ESP Ash Roto Lock Inspection �% ✓ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ✓ f INSPECT FIRE EXTINGUISHER/MONTHLY iNTADATE —' r0 e ators Signatures: to k anSP Date. '3 �t n� -' 700 Hrs. 130Q Hrc, 1900 Hrs. 01co Hr� �F,�j :. �?_�;a a:n a a!';c a�;a a��ta E1:;c 3:.�a:� �Vtira:e? Meter Reading Steam Fow KPPH r (a • � `i•7�S o?7. � Aga Steam Pressure Header (� - as 3o�C9 Stearn Pressure Line Exhausts Stack Temp. �� y Clean Viewing Windows, Metering and dropout ,o,� /d Furnace Draft"H20 1� 176 11" I0`2 � �•� - ) Drum Level/Valve o y ESP KW 12 Hr.Avg AM 'o ESP KW 12 Hr. Avg PM 3 5 ESP Purge Air Heater Duct Control Temp 1 � aca' O / ESP Purge Ali Neater Over tr ip Tet tip ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage 6�- 1 O ESP Hopper Heater#1 Temp 3 30& ESP Hopper Heater#2 Temp 1 2 Blow onvin warer Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Side wall Headers ✓ '� '� '� Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ Air Compressor PSI C� I U O Air Compressor Temp J Air Compressor Separator and Dryer Filter Uiff ✓ ✓ `� Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level � Fug' UL� FD Fan Outlet Temp 15 75 a7 Grate Water Pump(#operating)and Pressure 1 Grate Water Temperature Feedwater Pump (#operating)and Pressure 570 Ash Container Inspection and Level ✓ ESP Ash Auger Inspection ✓ ESP Ash Roto Lock inspection ✓ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE �'S' 9135 '�' Operators Signatures: i re t / ( ia, j Date:' /!-? 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hr: 0La A I BRR R I B0 R C BAR A I B'..R B I BUR C OLR A I BLB B 1 GLR c I Bf.R a I al.w f3 Water Meter Reading Steam Fiow KPPH Steam Pressure Header o�q 330 '3-j4 Steam Pressure Line 1ai4 l a`1 Exhausts Stack Temp. 3 1 733Q Clean Viewing Windows, Metering and dropout AO.- Furnace Draft"H20 id .6 91 0,11 10M 10M 11.01 Drum Level/Valve°o yy 23 51 ga 3C, ESP KW 12 Hr.Avg AM 01• ESP KW 12 Hr. Avg PM o� ESP Purge Air Heater Duct Control Temp 19 150� 7 E-SP Purge Air Heater Over trip Temp I6)q VO9C ESP Field#1 Secondary Voltage /-//, 1 ESP Field#2 Secondary Voltage q t n ESP Hopper Heater#1 Temp I I Lt 3P A i r B ESP Hopper Heater#2 Temp 3 J Blow Dawn Water Column ✓ ✓ t/ Blow Down Triple Low Switch ✓ ✓ ✓ '✓ Blow Down Sight Glass `✓ `� Boiler Gas Outlet Ternp SAS a 30 Bottom Blow Front Sidewail Header ✓ Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater inspect Multiclone Discharge Inspection Door / ✓ Air Compressor PSi o i10 O t/A Air Compressor Temp i 7 S 17.5- 175 C 't Air Compressor Separator and Dryer Filter Uiff ✓' ✓ � Blow Down Air Compressor Water Trap f ✓ ✓ Turbine Bearing Temp Turbine Bearing Vibration 4 Turbine Oil Level 14L Iu k FD Fan Outlet Temp 975 XT 5 �•5' O ;, PAS Grate Water Pump(#operating)and Pressure v -7a -7:2 -7cP Grate Water Temperature 21 1216 v! Feedwater Pump(#operating)and Pressure 5y0 5�80 i Ash Container inspection and Level ✓ ✓ ESP Ash Auger inspection ✓ ✓ ✓ ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ ✓ ✓ Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE ,{/ -^ sRsivG- A14 rer 71 1 e �' 1. �e, Date: 3�-i3-1c Operators Signatures: r 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. B:.l A E3!E;3 B_:2 C 1A A 1 B:R B I Bl'2 C BL"i A 8 R i3 0-'i C 3.i2 V ate-' Meter Reading a U Steam Pow KPPH Stearn Pressure Header 1� Steam Pressure Line Exhausts Stack Temp. ,o Clean Viewing Windows, Metering and dropout Furnace Draft"H20 Drum Level/Valve�o ESP KW 12­­Hr.Avg AM t�ESPKW 12 W. Avg PMpurge AE eater Duct Control TempPurge Aeater Over ti o Temp ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage 9 ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp WOW nt✓n Waf?r Column � Blow Down Triple Lour Switch � Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Slow Economizer___` __ ___ -✓ - - s Bottom Blow Back Sidewall Headers ✓ Soot Blow Airheater / Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Uiff f Blow Down Air Compressor Water Trap Turbine Bearing Temp YV a Turbine Hearing Vibration 4 -turbine Oil Level FD Fan Outlet Temp -70 Grate Water Pump(#operating)and Pressure BO Grate Water Temperature Feedwater Pump(#operating)and Pressure Ash Container inspection and Level ESP Ash Auger Inspection LSP Ash Koto Lock inspection Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE A).7,Z J4 _0v 6- li ri T ^ -�-�- Oaeraiors Signatures: /C�C Date 700 Hr,-. 1300 Hrs. 19nO Hrs. 010i1 Hr: 3 F;_R C i?.'i A 1 311 1? I 3''1 C &74 A I i3:-R 3 EL;; C 1A A R u lWater Meter Reading _ Stearn F ow KPPH ? Steam Pressure Header Steam Pressure Line L!k± axhau5t�SuckTemp. Clean Viewing Windows, Metering and dropout ✓ `� Z i I po�7 o rb Furnace Draft"H20 � Drum Level/Valve o ESP i(W 12 Hr.Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp IESP PurgN Air Heater Over tr ip Tt t-op 17 ESP Field#1 Secondary Voltage �• ,ESP Field#2 Secondary Voltage c�>Z ESP Hopper Heater#1 Temp Z I ESP Hopper Heater#2 Temp F3iow Down Water Column Blow Down Triple Loty Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewail Header _— Soot Blow Economizer Bottom €Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI r?/ Air Compressor Temp 75 Z7 2 Air Compressor Separator and Dryer Filter Diff Slow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration i-urbine Oil Level yuZ FD Fan Outlet Temp 476 Grate Water Pump(#operating)and Pressure Grate Water Temperature 2 l E 'z 1 Feedwater Pump (#operating)and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock inspection ✓ ' Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE Oaerators Signatures: Ok,+f 14 are L Date:166 700 Hrt. A00 Hrs. 1900 Hrs. 0100 Hrs lWa� ter Meter Reading Stearn F ow KPPH `L-I Steam Pressure Header 2- • 02 Steam Pressure Line 2 � 7_ 2 � O� Exhausts Stack Temp. 38�'- -- Dean viewing windows, Metering and dropout ✓ / ) v ✓ Pur nice Draft"H2C /. c+ u /""�" ( ���+ /1,43 1(. Q Drum Level/Valve o .3 '�'� >I L- 1 P� i� ? ESP KW 12 Hr.Avg AM �-rt ESP KW 12 Hr.Avg PM ESN Purge Air Heater Duct Control Temp i' 1 1 ESP Purge Air Heater Over tr ip Temp ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage � I Z rr � ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp 3r�1 l S 1 3 Btovr On1,m Water Column ✓ B!ow Down Triple Low Switch ✓ ✓ ./ Blow Down Sight Glass - ✓ ✓ `J Boiler Gas Outlet Temp Bottom Blow Front Sidewail Header ,✓ Sao_t___ — _ __—_��_ ✓.. .J Slow Economizer ., Bottom Blow Back Sidewall Headers Soot Blow Airheater ✓ ✓ __ . Inspect Multiclone Discharge Inspection Door Air Compressor PSI 2 10 Air Compressor Temp 7 Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap c/ Turbine Bearing Temp Turbine Hearing Vibration Turbine Oil Level FD Fan Outlet Temp is 7� '��� �r (oU D 1-2-75 Grate Water Pump(#operating)and Pressure 66 Grate Water Temperature . f1 _1 2 l"� Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level -� ✓ ✓ ESP Ash Auger Inspection ✓ i ESP Ash Roto Lock inspection �✓ Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection Z7 / INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE .✓ ✓ ��*�� � Operators Signatures: f� v1,� / Date:3-/4 -, 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C 0LR A I BLR B 1 SLR C BLR A I BLR B I BLR C I BLR 0.I BLR B B Water Meter Reading Steam Flow KPPH �✓ 0 `7 ) Steam Pressure Header Steam Pressure Line Ids Exhausts Stack Temp. D i Clean Viewing Windows, Metering and dropout Furnace Draft"H20 bb JU a: b(� /D f 14)2, �? it,;c Drum Level/Valve% S ✓�' -o ` ESP KW 12 Hr.Avg AM ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp i3 1LZ ►�`_1 ESP Purge Air Heater Over trip Temp '2 a r ESP Field#1 Secondary Voltage '// ESP Field#2 Secondary Voltage N"'. '•��' ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass ✓ -� 1 �- Boiler Gas Outlet Temp 54° S'y S '✓ i� '= Bottom Blow Front Sidewall Header Soot Blow Economizer ✓ `� •� -r Bottom Blow Back Sidewall Headers ✓ -� Soot Blow Airheater - Inspect Multiclone Discharge Inspection Door ✓ -� Air Compressor PSI i J J i' Air Compressor Temp Air Compressor Separator and Dryer Filter Diff �/ ✓ ✓ i Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp ;t2o du o1G5 �v � e-115 2/-n — � Grate Water Pump(#operating)and Pressure 7,' Grate Water Temperature o21 L, k Feedwater Pump(#operating) and Pressure 30 Ash Container inspection and Level ✓ i ESP Ash Auger Inspection -� ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE =tRs� t- i;f1 Tt �C J it�4. I vr2{�tr✓t%' f1 u.. �' �j 1176 Operators Signatures: / t',l i Date:3 700 Hr-. 1300 Hrs. 1900 Hrs. 01{;0 Hrs. 3' A 8!.ra 3 vt '1 -1 A 3'??? ;S' C d!"2 A KA 3 ?C 9..2> k.j 6 �Gliate? Meter Reading 'R Steam Fow KPPH 7. &3 Steam Pressure Header 3i � Steam Pressure Line I ao /d a Exhausts Stack Temp. 3 3 �� 3 ' Clean Viewing.Windows, Metering and dropout f Furnace Draft"H20 ,53 o i !' 7l i3 Urum Level/Valve fb 3 c ESP KW 12 Hr.Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over ti iN Temp ISS oZ ESP Field#1 Secondary Voltage 4i' �l0 ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp 3C6 ESP Hopper Heater#2 Temp 3 i f 2- E3low Da.Ajn Wnfpr Column 'o- Blow Down Triple Low Switch Stow flown Sight Glass Boiler Gas Outlet Temp 530 5 30 Bottom Blow Front Sidewall Header >/ ✓ � ✓ '� � Soot Blow Economizer _ �_ v �' _ `✓ Bottom Blow Back Sidewall Headers v >, Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ ..� Air Compressor PSI 10 c' Air Compressor Temp 17 Air Compressor Separator and Dryer Filter Uiff ✓ Wow Down Air Compressor Water Trap ✓ J `� Turbine Bearing Temp § TpOWBearing Vibration Tu ail Level C - Clutlet Temp ass a aG • 5 IV 960 Grate Water Pump(#operating)and Pressure Grate Water Temperature oZ 1 e__ l f 2 Feedwater Pump(#operating)and Pressure 0 Ash Container Inspection and Level ✓ ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ ✓ Fuel Incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE O;)e,ators Signatures: anie i6e. Date: -3h8h 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs• Kea 18!R3 1 3t..2c '1,1a I IRH 5 'tC aLlA 0i.-,iB I G.-'{C 1Aa Water• Meter Reading Stearn Fiow KPPH 6 3. �a , r Z Steam Pressure Header <- I Z g6 3t Cl Steam Pressure Line 124 -?- Lj Exhausts Stack Temp. a z 3 o G Clean Viewing Windows, Metering and dropout v' Furnace Draft "H20 et$y KJ S z s: 2'3 t e�SH 4,6 (2.uz lac Drum Leve{/Valve ESP KW 12 Hr.Avg AM �^ ESP KW 12 Hr. Avg PM a S ESP Purge Air Heater Duct Control Temp )a 8 13 ESP Purge A4 Heater Over tt 1p Tet-op 175- ESP Field#1 Secondary Voltage qo•a ' Li OtC` ESP Field#2 Secondary Voltage 8 •O ESP Hopper Heater#1 Temp 3t 5 1 ESP Hopper Heater#2 Temp 31D Lv 3z2 Blow Doan Water Column � ✓ '� `� Blow Down Triple Lour Switch ✓ Blow Down Sight Glass Boiler Gas Outlet Temp 5,E0 54PO 66 Bottom Blow Front Sidewall Header ✓ .� Soot Now Economizer Bottom Blow Back Sidewali Headers ✓ ✓ '� v Soot Blow Airheater inspect Multiclone Discharge Inspection Door Air Compressor PSI 1i0 Air Compressor Temp 175 Air Compressor Separator and Dryer Filter€jiff v Blow Down Air Compressor Water Trap ✓ `� V/ Turbine Bearing Temp Turbine Bearing Vibration }� Turbine Oil Level FD Fan Outlet Temp o?�5 is �.t� �� txl, � 26S z_ 21b 2( Grate Water Pump(#operating)and Pressure $d �� Z Grate Water Temperature Feedwater Pump(#operating)and Pressure 5 aG? Ash Container Inspection and Level ✓ �� ESP Ash Auger Inspection ✓ r f ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ r/ Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE 0;erators Signatures: Do-n%e 1 f��� Date: y + 700 Hr:. 1300 Hrs. 1900 Hrs. Oleo Hrs. J!=�;+ E3'_R3 3 ;tc .+ia 3'.RE? iRRC &IA B.R3 0,44C 1AA .a 3 Neater 'Meter Reading < 2s5 7 L' ,Steam Pow KPPH Steam Pressure Header Steam Pressure line Exhausts Stack Temp. 3 2-5 ' Clean Viewing Windows, Metering and dropout Furnace Draft"H20 Drum Level/Valve';'a- ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM 2. ESP Purge Air Heater Duct Control Temp ,2-6 4 cSP Purgc-Air Heater Ovee tr iN Tertip i 7L ESP Field#1 Secondary ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp 3 ESP Hopper Heater#2 Temp �'`IU< ti` ✓ ' Blow Dn,,�jn W;4tPr Column ✓ ✓ B!ow flown Triple Low Switch r � Blow Down Sight Glass 1 Boiler Gas Outlet Temp St0 Sjd Bottom Blow Front Sidewall Header .i I Soot Blow Economizer Bottom f3low Back Sidewall Headers X -x Soot Blow Airheater ✓ Inspect Multiclone Discharge Inspection Door 7 ✓ / Air Compressor PSI I Air Compressor Temp 1 Air Compressor Separator and Dryer Filter Diff �✓ Blow Down Air Compressor Water Trap ✓ '' Turbine Bearing Temp Turbine Bearing Vibration i� Turbine Oil Level VAI FD Fan Outlet Temp Grate Water Pump(#operating)and Pressure Z " Grate Water Temperature 1 f Feedwater Pump (#operating)and Pressure Ash Container inspection and Level •/ ESP Ash Auger Inspection ✓ ✓ 4 LSP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE s►C �v L- /i TC I U u ;f f 3 z�, 0;7erators Signatures: Q Date:„�1, Q.-, 700 Hr,. Mf.1 Hrs. 1900 Hrs. 0100 Hrs 3�TAFIEQ3, FLIC 1A a 3:11 B a:I c &I A aA a I e 1 c 1A A !.R 4`Jater Meter Reading ,St_eam F aw KPPH i� AA Steam Pressure Header Steam Pressure Line exhausts Stack Temp. Clean Viewing Windows, Metering and dropout curnace Draft"H20 Drum Level/Valve A ESP KW 12 Hr.Avg AM 1S ESP KW 12 Hr. Avg PM 'L,2 ESP Purge Air Heater Duct Control Temp LSP Purge Ait Heater Over ti ip Temp ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blom Donn WafiPr Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp i Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Hack Sidewall Headers IInrrprt Multiclone Discharge inspection veal l •.,viiiCircba�i� i€ii:ii i tt __._.—_ `` -mnrnccnr Cnnnrntnr nnri t7rvpr f:ltPr f)tff Turbine Bearing Temp 1 Turbine Hearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump(#operating) and Pressure i I l I 1 IL\ri, i I..Iii ii+i it lil ifliill .i ESP Ash Auger lnsoeetion l l I f LSP Ash Roto Lock Inspection . ,w•., v\........ .-v.,.•.,v. v....... ...ter.-........-.. 1 _ 1 1 IINSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE -I /z Operators Signatures: DQ f e 1 2 I Date: s -- — 700 Hr-. 1300 Hrs. 1900 Hrs. 0100 Hrs. $Lia f3:E13 3 2C _,Ia TR9 811C &71A BLSd 0,_:1C 9J1 A c!.Ri3 3 1�4efater meter Reading 2�'�f S� ,Steam Fow KPPH 3K,�` Stearn Pressure Header ` Z 7 35H 305 � Steam Pressure Line 12 L4 faL1 l oZ3 Exhausts Stack Temp. �z 3i6 33 i 1 Clean Viewing Windows, Metering and dropout Furnace Draft"H20 i i,os i3.3� �i,z O O O Q.3� f�ib4 10,s •YI l�.' =ii„ Drum Level/Valve o zq �� Sl ya gK �r 1 ESP KW 12 Hr.Avg AM i ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp n ESP Purge Ate Heater Over ti ip Tettiu i S 7 ESP Field#1 Secondary Voltage 21 a y/` a � ESP Field#2 Secondary Voltage Ag, L 55, a �•i� ' 313 ESP Hopper Heater#1 Temp 1 3 aS ESP Hopper Heater#2 Temp 3 Slaw Dnvin Wafer Column ✓ ✓ ✓ -� v I I ✓ Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp ILO V C ± Bottom Blow Front Sidewall Header ✓ Soot Blow Economizer ____ _ _ __.___ �_ _ ✓ " ✓ <� Bottom Blow Back Sidewall Headers ✓ -� '� Soot Blow Airheater '✓ ''� inspect Multiclone Discharge inspection Air Compressor PSi ' 110 ll0 i Air Compressor Temp I� f�s' ~' Air Compressor Separator and Dryer Filter Uiff Blow Dawn Air Compressor Water Trap ✓ '✓ ` Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level `q 3 � ,�; s z a-7s ass a7 a7s -7s- �s .,.. FD Fan Outlet Temp 2 z � K Grate Water Pump(#operating)and Pressure -N S� Grate Water Temperature i t c Feedwater Pump(#operating)and Pressure Ash Container inspection and Level ✓ ESP Ash Auger inspection ✓ '� `" ESP Ash Roto Lock Inspection ✓ '� Fuel Bunker Conveyor Chain Inspection '� ✓ '� `� Fuel incline Conveyor Chain Inspection 1/ ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE Ouerarors Signatures: r,�',r: :�1 k i>�: date; -' - 700 Hrt. i300 Hrs. 2 900 Hrs. Oleo Hrs. �'.i;3 s_t ?_4 7. i? iC d iA Tit:3 G •iC I %jpter Reading 3 v irP2rSt F o�v tiF'PH '> < SO, 5 ure Header 5 ,,team Press �l 3l Stearn Pressure Line > la�l . I a� _ xnaust=,Stack Temp. ' 3ak �Cienn Viewing Windows, Metering and dropout 1r-urn�sce Draft "IH2C r;?' {; y. 7 9.7,5" lb,G !l. logy v,5 %�r 1i4�� tt% Uru �rr� Level/Valve b •>:' yam; ';' � {S•7 S S 51 /� lOe� f ESP KW 12 Hr.Avg AM � ESP ICW 12 Hr. Avg PM a,a �— _. -ESP Purge Air Heater Duct Control.Temp /3B hel7 cSP Purge Ati Heatet Ove, t►ip Tetiiu i' cl FSP HOW#1 Secondary Voltage ° y/'7" i ESP Field#2 Secondary Voltage ESP Hopper Heater C Temp 3l0 j 3 a1 ESP Hopper Heater#2 Temp J ` 1 L - (ji,ow t)n;vn WnrPr Column B!oW 'Down?ripie Low SwitCh Blow Down Sight Glass , 5 � Boiler Gas Outlet Ten 50 SSv 5S rp = � ✓ ✓ } Bottom Blow r"Font Sidewa11 Header -' ---,Hl Soot Blow Economizer Bottom Blow Back Sidewail Headers - ^----- � �� `�I ✓ `✓ Soot Blow Airheater Inspect Multiclone Nicharge Inspection. Door Air Compressor PSI l75 Air Compressor Temp `•%' Air _.ompressor Separator and Dryer Filter Difr Blow Doan Air Compressor Water Trap Turbine Bearing Temp } �� Turbine Bearing Vibration Turbine Oil Level � cp Fan Outlet?imp ,�G� ,;;-�" �z ;j., �75 a7S a7S 7.5` Grate Water Pump(#operating) and Pressure �'` 6Y �g Grate Water Temperature all �!1 r l7 Feedwater Pump(#operating) and Pressure 5/0 Ash Container Inspection and Level v `' ESP Ash Auger inspection ESP Ash Roto Lock inspection Fuel Bunker Conveyor Chain Inspection Incline Conveyor Chain Inspection i� ✓ `� MECT FIRE EXTINGUISHER/MONTHLY INTI&DATE T� ;> 63 a Oarr arors Signatures 700 Hrt. 1300 Hrs. 1900 Hrs. Oleo Hrs. A 3t i.3 is_•2 72: i3!72 A '3.A 3 ,C 3.i2 , i ? Meter Reading ,s ea!-n C:()w WPH ,Steam Pressure Header n Pressure wine is xnausts Stack Temp. - Ciean Viewing Windows, Metering and dropout � 'r q,� � � �t ,Y lo, /a.�j .3C� KJ•3tJ ia.i�"=f,�: i';l."-, i� 4 PiJrnace Di aft 4IH2O ; Drum Level/Valve% ESP M 12 Hr. Avg AM iESP KW 12 Hr. Avg PM U- SP Purge Air Heater Duct Control Temp j tsp purge Aft Heater Ovet ti ip Tectip i FSPField elei d#1 Secondary Voltage ,S ' IESP "ieid#2 Secondary Voltage FSP Hopper Heater#1 Temp FSP Hopper Heater#2 Temp ?r '� 310 3l , t ?' gicnv i)n,vn Wnror Column i ✓ "-!Ow )own 1 ripie Loy.'Switch Biow Down Sight Glass 777 'Boiler Gas Outlet Temp 5/O Bottom Blow Front Sidewail Header ✓ ` '� — PIC li Soot Blow Economizer -- -- - - -- 'Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Muiticlone Discharge inspection Door - % � '� ✓ '� Air Compressor PSI > ts li 10 h Air Compressor Temp EE Air Compressor Separator and Dryer Filter Diff >✓ Blow Down Air Compressor Water Trap J� T urbine Bearing Temp i Turbine Bearing Vibration i'' 3�`l 3 --- "i urbine Oil Level y FD Fan Outlet Temp jGrate Water Pump(#operating) and pressure i v Grate Water Temperature6-60 'j' Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection "Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain inspection i!VSPFCT FIRE EXTiNGUISHEit/MONTHLY INTi&DATE Jai 8 w sxz;v l- AJII T41:' Ocerators Signatures: Date: 700 Wt. i30f) Hrs. 1900 Hrs. Oleo +S. 7 �j C 3A C. 3:'i A i3: ��,7 j:ccz, Rpading iSle,,;DarnZ-.ow <PPH ±1 I steam Pressure Header j;teacn Pressure tine o -2 17 ,z- Clean Viewing Windows, Metering and dropoui j!Pu-n;jce Dtaft "H20 da, 7z z 11 2-5 3 tl_tI o ,urn Level/Valve ESP KW 12 Hr. Avg AM-ESP KW 12 Hr-. Avg PM ESP Purge Air Heater Duct Control TTempf 'A b, 2L)l 7-7 ASP Purge Air ll Over ti i1i Terns) FSP Field#1 S Cond@i V Voltage 'J LZ ESP Field#2 Secondary Voltage FSP Hopper Heater#1 Ternp 3 1 G ESP Hopper Heater#2 Temp (vow f)n,,vn Wst(sr Column R!ow-Down Triple Low Switch Blow Down Sight Glass !Boller Gas outlet Ternp IBottorn Blow Front Sidewall Header Soot Blow Economizer- > Bottom Blow i3ack Sidewalf Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI 110 Air Compressor Temp I Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp ITu rbine urbine Bearing Vibration Y/1 Turbine Oil Level 1_2A 2,1 1"zt,5m S Outlet Temp FI) Far, Grate Water Pump(#operating) and Pressure Grate Water Temperature Feedwater Pump (#operating) and Pressure- Ash Container lnspecti:)n and Level ESP Ash Auger Inspection LSP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ Fuel incline Conveyor Chain Inspection V INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE �Z 71 Ocera-,ors Signatures: 61 vi U Hcs Da ze."LL -i 700 Hri. 1300 Wv. DIXV" fs. ",a.L�?- mw er Reading 9q- ZI ) �yea!jj C-ovj <PPH 3 3 0 3 lstea,r Pressure Header I I Z& 24 11-3 ',;team Pressure Line �Y7 . 0 xna u sts Stack Hemp. Cie-an Viewing Windows, Metering and dropoull ✓ f:o-nice Dian 0 At', 16-S) 1-0 0q i II,03 lD­um Levei/Valve L,a 1 0 -z, lo 31 to 1-2 IS ESP KW 12 Hr.Avg AM L1-L—i ESP KW 12 Hr. Avg PM 1 .29 Purge Air Neater Duct Control Temp Esi, i L * 116 1 Purg-Ao Heatuf0vC, t'V I LAi,z q i-SP=F!ie!d#3 Secondary Voltage q da Voltage e C _219 'y i sp Field*#2 Secondary Voltage '303 1- 0 1 1 FSD Hopper Heater#J Temp t 4C .r:5P Hopper Heater#2 Temp fj,10v,1 Oman t1f;irpr G01fin"n k-/ B.Ow Down "i ripie tow Switchf K Blow Down Sight Glass 57J e) 1Boiler Gas Outlet Temp I 30-,torn Blow Front Sidewall Header Soot Biow Economizer Bottom ulow Back Sidewal; Headers Af ✓ 500t Blow Airheater inspect rAulticlone Discharge Air Compressor PSI .Air Compressor Temp V Air Compressor Separator and Dryer filter Difif wow Down Air Compressor Water Trap Turbine Bearing Temp T_ T urbine Bearing Vibration urbine Oil Levet' 5v 2- �Ln r�_Irl Cutlet D Fan Outlet Temp i Grate Water PUrrIp(#operat;n and Pressure &CA-) Fcedwater Pump (#operating)and Pressure__;�_'� Ash Container Inspection and Level FSP Ash Auger Inspection I[SP Ash Roto Lock Inspection PLAel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE Operators Signatures: r�i� 1\'? Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR 3 1 BLR C BLR A 81 R B BLR C BLR A BLR B BLR C 31R A I BLR B I BLR C Water Meter Reading Steam Flow KPPH r_> % l� . 73 Steam Pressure Header 4 c act Steam Pressure Line ? d r -y i. Exhausts Stack Temp. . Clean Viewing Windows, Metering and dropout —� Furnace Draft H2O Drum Level/Valve % %F �� ' O �6 ESP KW 12 Hr. Avg AM ' ESP KW 12 Hr. Avg PM _ ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp c r ESP Field#1 Secondary Voltage 0 i 4 r�' ESP Field#2 Secondary Voltage f _ ESP Hopper Heater#1 Temp13 r"� ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass V Boilet Gas Outlet Temp - Bottom Blow Front Sidewall Header Soot Now Economizer x Bottom Blow Back Sidewall Headers Soot Blow Airheater = Inspect Multiclone Discharge Inspection Door Air Compressor PSI n I IO Air Compressor Temp / r ' � � -75- Air Compressor Separator and Dryer Filter Diff _ v Blow Down Air Compressor Water Trap / '' ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil LevelcA�\ FD Fan Outlet Temp 2;, c--o 1 %/2 I Zl_:2751 a 751,2-7.5 Grate Water Pump(#operating)and Pressure ps Grate Water Temperature Feedwater Pump(#operating)and Pressure '>�' ��� �� 560 Ash Container Inspection and Level '® ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ! '� Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE Operators Signatures: p 14 Z DQe k Date:LIAR116 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I B!R B 1 BLR C I 8LR A I BLR B BLR C I BLR A I BLR B tBLR C I BLR A 9LR B 1 9LR C Water Meter Reading T--z Steam Flow KPPH ;WY/ Steam Pressure Header 5 y 3 2 27 Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout ✓ Furnace Draft "H20 104 10.0 13 7!5/ lF62 Drum level/Valve% 33 t ! 1 0 gIMi✓ 7 l�v t RT,Y777 ESP KW 12 Hr. Avg AM �•y - loop ESP KW 12 Hr. Avg PM 3. ESP Purge Air Heater Duct Control Temp ). ZO ESP Purge Air Heater Over trip Temp -74 ESP Field#1 Secondary Voltage Zjl-S qO .<0 D ESP Field#2 Secondary Voltage 5T3 7 ESP Hopper Heater#1 Temp 316 0 Og ESP Hopper Heater#2 Temp 3/ 7 5 —5 l� Blow Down Water Column ✓ ✓ `✓ Blow Down Triple Low Switch •� ✓ ✓ '� Blow Down Sight Glass ✓ ✓ ✓ '� Boiler Gas Outlet Temp 610 Sa 5/0 ` ` KM- Bottom Blow Front Sidewall Header v .� _ ✓ `° Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ v `� Soot Blow Airheater x `� Inspect Multiclone Discharge inspection Door �/ ✓ " ✓ Air Compressor PSI 110 d O Air Compressor Temp — Air Compressor Separator and Dryer Filter Diff ,i ✓ ./ Blow Down Air Compressor Water Trap ✓ ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp 2731900 ;t O 7 275 Aln Z. Z�5 Grate Water Pump(#operating)and Pressure /iii 7Z Grate Water Temperature of 14 2�y Feedwater Pump (#operating)and Pressure sk 675 O Ash Container Inspection and Level v ESP Ash Auger Inspection v v ESP Ash Roto Lock Inspection v ✓ Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE —�- r'sAsn,L•- /? 4 re �P fvrZl3lr✓L A1—, /09 �� 1� _Operators Signatures: mg 4f L Untk Date: W3114 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. 3LR A BLR 3 BLR C I B;R A B!R B BLR C KR A BLR B B..R C BLR A BLR B BLR Water Meter Reading 331go q pO Steam F ow KPPH Steam Pressure Header JAZ Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft "H20 Drum Level/Valve Va ESP KW 12 Hr. Avg AM a•` ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESPP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage ESP Field #2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp Air comoressor Separator and Dryer Filter miff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Hearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump(#operating) and Pressure Grate Water Temperature Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE Operators Signatures: &tj &rek Date: I// /k 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR 3 1 B'_R C I BLR A B'_R 3 1 Bi.R C BAR A I BA B 1 BLR C I 3A A I B1-14 B 1 B,R C Water Meter Reading 19 ow Steam Fiow KPPH Uq j 1--!— .15 0 S Steam Pressure Header1A 4 Steam Pressure Line Exhausts Stack Temp. 3( �— Clean Viewing Windows, Metering and dropout Furnace Draft"H20 �j"cz (651 ID.d+ FI Drum Level/Valve% 3 IL 34 ESP KW 12 Hr. Avg AM 0.0 ESP KW 12 Hr. Avg PM 0.0 ESP Purge Air Heater Duct Control Temp I ESP Purge Air Heater Over trip Temp 1 4 ESP Field#1 Secondary Voltage L4 IN ESP Field#2 Secondary Voltage a ESP Hopper Heater#1 Temp 3 5 ;,� 7 ESP Hopper Heater#2 Temp Blow Down Water Column ' ` 4. Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header _ f Soot Blow Economizer - Bottom Blow Back Sidewall Headers c� Soot Blow Airheater Inspect Multiclone Discharge Inspection Door �- Air Compressor PSI Air Compressor Temp i S Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap +� Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level z FD Fan Outlet Temp 250 2so ZSo z°o zs� z Grate Water Pump(#operating)and Pressure Grate Water Temperature 22� Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE l ;fr,K X-&t- 1?/4 U Operators Signatures: /nA- Date: /E 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I B!R 3 1 BLR C ALR A I KR B 1 BLR C BLR A I BL R d 1 BLR C BLR A I BLR B BLR C Water Meter Reading -3 ,2I rd• QD Steam Flow KPPH C-A , I �15 U) �i ,5 `(.'•, �t: Steam Pressure Header 3 3 I�, 9 1c, Steam Pressure Line lo�� 7- Z =' Exhausts Stack Temp. 304 3 ID 3 i Clean Viewing Windows, Metering and dropout ✓ ✓ ✓� Furnace Draft"H20 11•,2 1.71 1 11 1 vIzl 1 L% r 20 I,3110 z5 ) t i 1 J Drum Level/Valve% c�-1 -19 63 ESP KW 12 Hr. Avg AM x, i ESP KW 12 Hr. Avg PM n2,9 ESP Purge Air Heater Duct Control Temp p i I v 11 -' ESP Purge Air Heater Over trip Temp Igi I ESP Field#1 Secondary Voltage L11.a yip ESP Feld#2 Secondary Voltage 41d.9 LA L4S, ESP Hopper Heater#1 Temp 2 ESP Hopper Heater#2 Temp eCG a 2 E 0 2 {C Blow Down Water Column ✓ ✓ ✓ ' Blow Down Triple Low Switch ✓ ✓ ✓ V , T71' Blow Down Sight Glass ✓ ✓ ✓ = Boiler Gas Outlet Temp 5ov sic si u Bottom Blow Front Sidewall Header ✓ ✓ ✓ r Soot Blow Economizer v ✓ ✓ '� -� ✓ Bottom Blow Back Sidewall Headers ✓ ✓ .� `� Soot Blow Airheater ✓ •� ✓ `� Inspect Multiclone Discharge Inspection Door ✓ ✓ ✓ �= `� Air Compressor PSI f Id l 10 Air Compressor Temp S ' Air Compressor Separator and Dryer Filter Diff ✓ � "� � Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp �2570 256 (10 f,L. 7Lo BLS Zc-S Zc.S Grate Water Pump (#operating)and Pressure -7A 2- �., Grate Water Temperature a I iL ' Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level ✓ ✓ `� ESP Ash Auger Inspection ✓ ✓' -� ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ,i Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE rya rr r v�Z 13.rfv C A w ►L1 S 'Ce v 2301-r5 i �)//' Operators Signatures: '� �1•. Date: '•+ 700 Hrs. 1300 Hrs. 1900 Hrs. 010 Hrs. BLR A BLR B BLR C BLR A I BLR B I BLR C BLR A BLR B BLR C BLR A BLR B BLR C Water Meter Reading Steam Flow KPPH Steam Pressure Header 2 Steam Pressure Line Exhausts Stack Temp. 31 3 S- Clean Viewing Windows, Metering and dropout ✓ Furnace Draft "H20 �(� ��{ ZI ,s6 S•,`/ j,!+= i�! if�r( ` �7 �I Drum Level/Valve % Z 3 %1 2 S r", ESP KW 12 Hr. Avg AM Z `( ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage o I 0, 0� �v v ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp -77SC�S --log 0 d� ESP Hopper Heater#2 Temp 5i Blow Down Water Column7. ✓ '" '' Blow Down Triple Low Switch ✓ Blow Down Sight Glass �' ✓ ✓ ` "" Boiler Gas Outlet Temp v - Bottom Blow Front Sidewall Header ✓ ✓ -ram �' % '� Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ Soot Blow Airheater `� `� V' • � Inspect Multiclone Discharge Inspection Door ✓ ✓ v f Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 3 FD Fan Outlet Temp Grate Water Pump(#operating)and Pressure Grate Water Temperature Z_ I 1 2 1`/ Feedwater Pump(#operating)and Pressure i /lJ Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ✓ '� Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE — — �tRs 13 Operators Signatures: lna J -+ Date: q--7-) 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C 9LR A BLR B BLR C BLR A BLrft B BLR C BLR 4 I BLR B BLR C Water Meter Reading i;: i' % Y Steam Flow KPPH r'•!�,'l `" 7 Steam Pressure Header 43 Steam Pressure Lined - 3 Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout `� �✓ Furnace Draft"H20 n' Z ./" `' <' >, ' / �G t 9.5 o.) sit., Drum Level/Valve% ESP KW 12 Hr. Avg AM - OWN ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp z-4 - ESP Purge Air Heater Over trip Temp 1 70 t - ESP Field#1 Secondary Voltage qd v goS ESP Field#2 Secondary Voltage '- s`" 6k-', 0 ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp ' '� -� r Blow Down Water Column ✓ Rom` Blow Down Triple Low Switch .� ✓ ✓ `" Blow Down Sight Glass ✓ `� °'� Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ v' -� - Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ -� Soot Blow Airheater ✓ ✓ ✓ - '; Inspect Multiclone Discharge Inspection Door ✓ ✓ '- Air Compressor PSI j/v Air Compressor Temp Air Compressor Separator and Dryer filter Diff �-� ✓ Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 2 �'' f1 FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure ( `- r' Grate Water Temperature Z ' - Cditd Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level ✓ ✓ ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection -� ✓ Fuel incline Conveyor Chain inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE r �t�tsn,l•- /�ATG Operators Signatures: 1rw t F 1 Date: - 161- 700 Hrs. 1300 Hrs. 1900 Hrs. 02 0 Hrs. BLR A I BLR B 1 BLR C BLR A I BLR B I BLR C BLR A I BLit B 1 BLR C I BLR A I BLR B 1 BLR C Water Meter Reading Stearn Fiow KPPH Will -"c.v Steam Pressure Header lq53 �5� HCt Steam Pressure Line �-1 1 I aS Exhausts Stack Temp. t a 3;tq 325- Clean Viewing Windows, Metering and dropout �j" ✓ ci ✓ Furnace Draft"H20 2Z 2 IQ•S 10,5 10,60 16% /0:5 lv. 8c 0 Drum Level j Valve% (0 qq 7 1 -23 R1 15-6 110 5` -4 ESP KW 12 Hr. Avg AM t ESP KW 12 Hr. Avg PM . ESP Purge Air Heater Duct Control Temp I u'v I 0Q 1 31 / ESP Purge Air Heater Over trip Te-nip G 17 l ESP Field#1 Secondary Voltage 0 •` 0,5 go,S ESP Field#2 Secondary Voltage -27- 1. q 1 59 .9 ' ESP Hopper Heater#1 Temp 2 q 6,- 2q5 30 ESP Hopper Heater#2 Temp of 9 1 "305 i1 Blow Down Water Column v ✓ ✓ `' j ✓ ✓ ✓ Blow Down Triple Low Switch ✓ ✓ ✓ ✓ Blow Down Sight Glass �/ `� �r "'f` ✓ r '" Boiler Gas Outlet Temp .,, Ste) ' Bottom Blow Front Sidewall Header ✓ ✓ ✓ ✓ " ° Soot Blow Economizer '� '✓ `✓ ' Bottom Blow Back Sidewall Headers Soot Blow Airheater ✓ ✓ `r Inspect Multiclone Discharge Inspection Door ✓ ✓ ✓ '� Air Compressor PSI Ito 110 fid Air Compressor Temp J 2-0 Air Compressor Separator and Dryer Filter Diff ✓ ✓ Blow Down Air Compressor Water Trap ✓ `� Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level lea F.4 t1 I Fti 11 FD Fan Outlet Temp a75 a55 a10 -270 256 19-70 -7 Grate Water Pump(#operating)and Pressure Grate Water Temperature Z ! a!1 1 Feedwater Pump(#operating)and Pressure jCO 5y0 S(v0 Ash Container inspection and Level ✓ ✓ ESP Ash Auger Inspection �/ ✓ ESP Ash Roto Lock Inspection �/ ✓ ✓ Fuel Bunker Conveyor Chain Inspection �/ ✓ ✓ Fuel Incline Conveyor Chain Inspection �/ ✓ ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE el"•� TvrZ$tr✓� KK' 35-7 /304-r5 ,i Operators Signatures: -DGrti,I —Der`e-'k Date:�4 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C 8UR A I B!.R B I BUR C BLR A I BLR 8 I BLR C BLR A I BLR 8 8LR C Water Meter Reading Steam Flow KPPH �/ �U 6a.q 8 ad q 3 Steam Pressure Header 21 Steam Pressure Line !a3 � S^ oZ Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout ✓ ✓ Furnace Draft "H20 - 3� U•`l� 0 7' 16 w,gi 1 D ` Drum Level J Valve% J41 & I 1 as 40 Al 4 yu y ESP KW 12 Hr. Avg AM a.6 ESP KW 12 Hr. Avg PM 3 S ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage i a,d 5.3 ESP Hopper Heater#1 Temp '' 78 P 757 ESP Hopper Heater#2 Temp y3 L 7" Blow Down Water Column Blow Down Triple Low Switch ✓ ✓ '� Blow Down Sight Glass - 71v— all Boiler Gas Outlet Temp a'' � �i '= il-V y50 Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater inspect Multiclone Discharge Inspection Door '� ✓ Air Compressor PSI 6p 110 110 iG Air Compressor Temp Z 5 l Air Compressor Separator and Dryer filter Diff / Blow Down Air Compressor Water Trap ✓ ✓ '� Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level y FD Fan Outlet Temp aua 2�c 'ouo� 5 �6o UQ SC3 -s w� Grate Water Pump(#operating)and Pressure Grate Water Temperature 2 1 oZ 17 4 Feedwater Pump(#operating)and Pressure �c C) 5' O 560 &`'v Ash Container Inspection and Level ✓ ✓ �� ESP Ash Auger Inspection ✓ v ESP Ash Roto Lock Inspection v Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection v ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE -� Operators Signatures:��ti ( ,. ��r✓ /Z Date: q' v !G 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. 9LR A I BLR B BLR C BLR A BL9,13 I BLR C BLR A BLR B BLR C BLR A BLR B BLR C Water Meter Reading ? " Steam Flow KPPH In Steam Pressure Header 14 Steam Pressure Line Exhausts Stack Temp. ' t Clean Viewing Windows, Metering and dropout Furnace Draft"H20 tcc Drum Level/Valve% ESP KW 12 Hr. Avg AM ' ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp i ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage �. ESP Field#2 Secondary Voltage . ESP Hopper Heater#1 Temp y ESP Hopper Heater#2 Temp 's Blow Down Water Column L t Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers v Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Ii u Air Compressor Temp i 5 Air compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump(#operating)and Pressure b Grate Water Temperature Feedwater Pump (#operating)and Pressure Ash Container Inspection and Level ✓� ESP Ash Auger Inspection ✓' ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection ./ INSPECT FIRE EXTINGUISHER/MONTHLY INTADATE Operators Signatures: /4V Date: q1jq11j, 700 Hrs. 1300 Hrs. 1900 Hrs. 010 Hrs. -BLR 1 K11 3 1 BLR C 8LR A I E11,R B BLR C BLR A BLR 3 BLR C BLR A I E3LR 8 BLR Water Meter Reading !33,jq3goc) E I Steam Flow KPPH %,,I-nq !q q.I(a 3(v,vT Steam Pressure Header aqz 304 :W4 Steam Pressure Line 130 Exhausts Stack Temp. 360 qg Clean Viewing Windows, Metering and dropout ---- Furnace Draft"H20 ivaqI/O.U4 -rkl )5 JA-A /I�Lg k)q Drum Level/Valve% g 777 ESP KW 12 Hr.Avg AM ESP KW 12 Hr. Avg PM C4 0 ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp J t)'� i'Ya to ,ESP Field#1 Secondary Voltage 1103 -10 ESP Field#2 Secondary Voltage ('00 q4 ESP Hopper Heater#1 Temp 096 C&6 ESP Hopper Heater#2 Temp 30G OCR 334 Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp 51S S -51S Bottom Blow Front Sidewall Header Soot Blow Economizer ✓A x Bottom Blow Back Sidewall Headers A-. Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI 1/0 Air Compressor Temp Os Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level F. 'VIP FD Fan Outlet Temp '95.5 asc, dLn tp C, 1.4.qo lj(.5 Grate Water Pump(#operating)and Pressure -SIN SW& 90 Grate Water Temperature CP C 'qIq - 091 Feedwater Pump (#operating)and Pressure 5io '5 qO 550 Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE - ;fz,K X-,fv Z- 1?.,4 re-: .3-7 vo lye ry 12 13_rry if A 64-1 15 �5 Operators Signatures: (a r`ie >! QeN Date: -114ell6 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A dLR 3 BLR C BLR A 1 d!.R B BLR C BLR A I BLR d 1 BLR C I 3LR A ji BLR B I BLR C Water Meter Reading Steam Flow KPPH �7 21 Steam Pressure Header -�3119 1 7 Steam Pressure Line Exhausts Stack Temp. 1'1 32 Clean Viewing Windows,Metering and dropout ✓ `� Furnace Draft"H20 i5 c,� Q,4 9,6/ w, Drum Level/Valve % -3 4 90 :53 S'# ESP KW 12 Hr. Avg AM f Y - ESP KW12 Hr. Avg PM o7. 3 ESP Purge Air Heater Duct Control Temp If 12- 5 ESP Purge Air Heater Over trip Temp i Z ESP Field#1 Secondary Voltage 4 ESP Field#2 Secondary Voltage } `1 ESP Hopper Heater#1 Temp i�95 j1f 7 ESP Hopper Heater#2 Temp 309 3 z>; Blow Down Water Column x Blow Down Triple Low Switch T :z Blow Down Sight Glass Boiler Gas Outlet Temp : 30 Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers / v Soot Blow Airheater Inspect Multicone Discharge inspection Door Air Compressor PSI lio Jfo X/O Ito Air Compressor Temp Air Compressor Separator and Dryer Filter Diff i '� ✓ Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration ✓U Turbine Oil Level 3 FD Fan Outlet Temp So QGz t�� Grate Water Pump(#operating)and Pressure Grate Water Temperature z t Feedwater Pump (#operating)and Pressure y(? Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY iNTI&DATE :tKs 1- 1314rt $ �o i v d,rj tr✓is /l�% a is Operators Signatures: 1�;e Date:. � ���"e 1 T— 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR 3 1 BLR C I 9LR A I BLR B I BUR C BLR A I BLR B 1 BLR C 3LR A I BLR B BLR C Water Meter Reading J 3 56`ly Steam Flow KPPH 5G,,27 /`I �•�1 Steam Pressure Header 17 a 339 Steam Pressure Line 11L '56- Ja5 as, Exhausts Stack Temp. 31 ab 331 Clean Viewing Windows, Metering and dropout ✓ All l)10.i Cimv,Furnace Draft"H20 3q Drum Level/Valve% zs 6 3 aZ7 OSYa"Zb '33 a q ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM 3-z ESP Purge Air Heater Duct Control Temp a5 157 t(oC> >3 ESP Purge Air Heater Over trip Temp 7 Rv6 a l l s�o ESP Field#1 Secondary Voltage H `If. ESP Field#2 Secondary Voltage Ll y,I q5,,b ESP Hopper Heater#1 Temp 3 f o 309$ 36 ESP Hopper Heater#2 Temp �� 3 l6 3 v�1 0 y Blow Down Water Column ✓ '� v ✓ Blow Down Triple Low Switch ✓ ✓ Blow Down Sight Glass •� -' 4, '� ' ✓ Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ ✓ ✓ _ Soot Blow Economizer ✓ '� ✓ ✓ v� Bottom Blow Back Sidewall Headers Soot Blow Airheater `� ' ✓ ✓ Inspect Multiclone Discharge Inspection Door Air Compressor PSI r0 110 110 <<U Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ✓ ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level F!Itrc 6►11 � FD Fan Outlet Temp 1,�� GS abs 6 75 '7 ?7 (� b7, g< Grate Water Pump(#operating)and Pressure 70 70 7A '7 2- Grate Water Temperature �2 3 i i9l9 �f 7 Feedwater Pump(#operating)and Pressure %o 560 610 O Ash Container Inspection and Level ✓ to, ESP Ash Auger Inspection ✓ ✓ ESP Ash Roto Lock Inspection ✓ ✓ '� Fuel Bunker Conveyor Chain Inspection c� ✓ `� Fuel incline Conveyor Chain Inspection ✓ ✓ ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE — ^' 'tctsn�l- 1?Are IOU 00 100 ice, r"A 6 tr✓cs A ru-' 1 6 5 3 15 1' q1---1. Njeeators S!gnafures: Daze-. Z//=/)-1 . 700-Hr:.. i300 Hrs. 19VU Ht's. 0.1 C 1 vs 5 -i:d 1 -t:i CR 1{j tA Roadinf, '7 �PPH ,S-e@rr Pressure Header I 5rearn Pressure Line r' } !a$ _____ 6 l , ---- .................... xna USt.,,Stack Temp. .3i U i 32-1 4— I C;ep.,,viewing Windows,%14etering and dropout q, -SM01 a3 10. jf.�;kcl lot xn.ice Di af, t i;iq '31 5b 94 i)-urn Level/ValveIq ESP M 12 Ht.Avg AM ESP KW 12 Hr. Avg PM a. Heater Duct Control Temp 1q41 3 Purg*-�Ail Heater'Over t'ffJ Tet 11 'I Is P Field#1 Secondaf y Voltage L,,:SP !:ieid#2 Secondary Voltage ��'—I " ry) Hopper Heater#3 Ternp ja 3i(o I FSP Hopper Heater#2 Te 7- 7 -7 fj,,c)w omwn 1Af;3rPr Column 310w -Down triple Lov.,Swit(h Blow Down Sight Glass ......... V1 5,qo!!5,qo -,;/-/o I Boiler Gas Outlet T enip ✓ 71 Bo-qom Blow Front Sidewall Header Soot Blow Economizer I Ev,J�. -maim i6ottorn 1310%-4 Sack Sidewall Headers Isuot Blow Airheater inspect r%4ulticlone Discharge Inspection Door Air Compressor PSI Ito I 110 ILO Air compressor TOM Air Compressor Separator and Dryer 01ter Diff R,fow Down Air Compressor Water Trap Turbine Searing Temp Turbine 3earing Vibration 1-i Urbine Oil Level 31,44 �D Far,Outlet 7emp, 70 7A lGrate Wa: r Primp(#ope-a-ring)and Pressure '7 o Grate Water Temperature a/ as I all- Peedwater Pump(#operating)and Pressure "0 Ash Container Inspection and Level L-SP Ash Auger Inspection ESP Ash Roto Lock Inspection 1z ueI Bunker Conveyor Chain Inspection I_ Fuel incline Conveyor Chain Inspection I.NSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE iv ---------1_ too 100 i -'x"4 Operators Signatures:'.PP + e— `' Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C I BLR A I BLR B I BLR C BLR A I BLR 8 BLR C BLR A I BLR B 1 BLR C Water Meter Reading ' °o Steam Flow KPPH /4 Sl{ SO, 10 Steam Pressure Header '31-1 33 Steam Pressure Line 15t�s I aG i0-a Exhausts Stack Temp. ;t Cl cf 3 A 3 �( Clean Viewing Windows, Metering and dropout r/ ✓ ✓ Furnace Draft"H20 iu, , I0.3b lo.a3 ►o,; 10,6 ?a; Drum Level/Valve % 5 i 7 IoZ 1 b (0 3-;;t Z/-7 9 7 E? 3-7 d a' ESP KW 12 Hr.Avg AM .3 ESP KW 12 Hr. Avg PM a�o2 ESP Purge Air Heater Duct Control Temp /c?q )qg ljq ESP Purge Air Heater Over trip Temp i9(, ESP Field#1 Secondary Voltage 4 q I.a L v ESP Field#2 Secondary Voltage S j , S.c c� ESP Hopper Heater#1 Temp 10 - a f 3 a ESP Hopper Heater#2 Temp ,330 33 Blow Down Water Column ✓ ✓ ✓ ,� Blow Down Triple Low Switch / / ' ✓ Blow Down Sight Glass ✓ '� ✓ ✓ Boiler Gas Outlet Temp 7 r f 1 15730 5-30 53 Bottom Blow Front Sidewall Header ✓ _ Soot Blow Economizer ✓ ✓ F '_ v e. r� Bottom Blow Back Sidewall Headers ,/ ;� Lf Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ ,/' ,� ✓ v Air Compressor PSI i0 110 O / Air Compressor Temp )S 1"7 75- /7 Air Compressor Separator and Dryer Filter Diff ✓' ✓ ,/ Blow Down Air Compressor Water Trap ,� ✓ Turbine Bearing Temp d(/ Turbine Bearing Vibration Turbine Oil Level 3 3 3 �a FD Fan Outlet Temp 5 i .24-v ,26c 9 oZ70 ' 270 270 ' 2o Grate Water Pump(#operating) and Pressure 7 -7d V '?13 Grate Water Temperature aI I oZ f Feedwater Pump (#operating) and Pressure 5 O 580 fTocs Ash Container Inspection and Level �^ ✓ ,i ✓ ESP Ash Auger Inspection �/ ✓ ESP Ash Roto Lock Inspection v ✓ Fuel Bunker Conveyor Chain Inspection f ✓ Fuel Incline Conveyor Chain Inspection ✓ ,i ✓ ;/ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE 14/ O v SaoY.- iv i2�j tiv is 11� � d 0-e-a-,Ors S!gnatures: 700 Hf't- i3Of)Ht*,z. 1900 Hrs. OJUV -s- .,A 11 L -- I ,-, �, i-,. :i .: Me'.er RPadifM :s,eam z-ow<PPH 2" ,5teEm Pressure Header 2, j-,;,,eam Pes,:r.re One li:xnaust-.Stack Temp. -3 3 - Clean viewing Windows,Metering and dropout 1,421 C,-21 21 41,57 ':f:-Ljrnace Dtaft*:H20 — '0 1 00 rD'rumLevel/Va',Ve &o 1 7,1 - ESP KW 1-2 Hr.Avg AM ESP KW 12 Hr. Avg PM sij Purge Air Heater Duct Control Temp it ASP purg*-Ait Heater'Over 'Ll ip Tetba) 7 SP Field#1 Secondary Voltage a 66. 1 ESP !:ieid#2 Secondary Voltage Heater#] Tc-MP 32-7 r:sp Hopper Heater#2 Temp L/ Blow Down!riple Low Switch Blow Down Slight Glass Boiler Gas Outlet Terrip C� Bottom Blow Front Sidewall Header A Soot Blow Economizet- iBowtom Blow f3ac:c Sidewafl' Headers I X- - I.— — 5oot Blow Airheater inspect rOulticlone Discharge Inspection Door Air Compressor PSI -- Comp.ressorl emp 75- zm� AiL__ Air(..ompressot Separator and Dryer filter Diff ✓------ ✓ ✓ Now Down Air Compressor Water Trap Turbine Bearing Temp, Turbine Bearing Vibration Y2, Z vei Z W 2 �q urbine Oil Le MI 2L]7L If L cD Fan Outlet Te,ma Q)(V 0 'Grate Water PUMP(#operating)and Pressure Grate Water Temperature i eedwater Pump(#operating)and Pressure -/jQ --ii0— Ash Container Inspection and Level VI ESP Ash Auger inspection ESP Ash Roto Lock Inspection rue) Bunker Conveyor Chain Inspection Fuel incline Co Inspection Conveyor Chain t\ir.PFCT FIRE EXTINGUISHER/MONTHLY INTI&DATE ice 10 j L Operators Signatures: 700 Wt. 13U0 Hr-;. 19VO His. +'s- 1,i A J:it 3] 3--Ic ;;-.I A -].:I-I I -,;: ;C.i J:i A I ir4il I V-•i C 3A A -::j Mpter Read; s,,pani 1:7ow WH Istewr Pressure Header b 5team Pressure line iExnaum Stack Temp. 32� 3 Clean viewing Windows,Metering and dropout, ' T10 Purn-ice Diaf� ':H20 i I T to 2L, Drum Level/Valve orb ESP i(W 12 Hr.Avg AIM ESP KW 12 Hr.Avg PM - Si'Purge Air Heater Duct Control Temp -"SP Purg*-!Aii Heatel,ovc*i w1i Tervio 'Ll 0,1 rSP Field#1 Secondary Volta Le 17 Secondary Voltage • FSDHopper Heater#3 Temp FSP Hopper Heater#2 Temp, i 3a3 jj.,c)w onvin Wntor Cofumn q!ow;Jown I rf pie LW,T—, ---L Blow Down Sight Glass Boller Gas Outlet Temp Sea Bottom Blow Front Sidewall Header x soot Blow Economizer Bottom l3low Back Sidewalf Headers Soot Blow Airbeater inspect Multiclone,Discharge Inspection Door ✓ Air.Compressor PSI LL2 Ito Air Compressor Temp Z!EL Air Compressor Separator and DryerHiter Uifff- Blow Down Air Compressor Water Tiap Turbine Bearing Temp I Turbine Bearing Vibration urbine Oil Level �D Fan Outlet Temp 6, -7 jGrate Water Pump(#operating)and Pressure 10 Grate Water Temperature 2 Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level FSl?Ash Auger Inspection 7 LSP Ash Roto Lock inspection i-Liel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE iOQ Date.-/ Ooerarors 9griatures- 700 Wt. 1.30f)Hre, 1900 His. WCO, Hrs A a; —]- . C - I 1:7;C I &I A 41-4 a V..;i C I-- I A 3 - :'.' ate!me-er Reading S 3111 :-Ow<PPH"P 1�4 steam Pressure Line i aust&Stack Temp. w ------ Clean -Ing Windows, Metering and dropoul !Furnace Dt aft':H20 771 Drum Level I Valve';S ESP i(w 12 Hr.Avg AM ESP KW 12 Hr.An PM fsv Pow Air Heater Duct Control Te"11) ASP Purge Alt Heater OVel t'tfJTetyif, r:SP Fie, ndaiv Volta d#1-Sero Le SP Field#2 Seconda,y Voltage ...........T� FSP Hopper Heater#1 Tq_MP FS (VOW 1),n-vin wator Column 3!ow Dowd I riple Low Switd, i31ow Down St ht Glass Boller Gas Outlet TPnr'P �Bottom Blow Front Sidewall Header Saot Blow Economizes Bottom Blow Back Sideivall Headers Soot Blow Airheater Inspect rOulticlone Discharge Insp ctlan Door Air Compressor PSI 1 Air Compressor Temp Air Compressor Separator and Dryer Oter Ujff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Purbine Oil Level I GD Fan Outlet Tema Z ng)and Pressure ------ rate Water PumP(#OPerats Grate W Temperature Grate Water Temperature Feedwater Pump(#Operating)and Pressure Ash Container Inspection and Level F'SP Ash Au Ins ection ESP Ash Roto Lock Inspection i-Uel Bunker Conveyor Chain Inspection_ Fuel incline Conveyor Chain Inspection I)JSPECT FIRE EXTINGUISHER/MONTHLY INTADATE Ti 0^,era ors Signatures: �C 700 Hr!.. 130f)Mrs. 19VCI Ht's. WC-011 H;7 3--i A 1 &:1 4 1-.1 C L-I'% 3A d'-4 A I 31A is Meter Reading, s,,eam 1:7ow WPH ,Steam Pressure Header Stearn Pressure Line — i.Exnaustf Stack Temp. Ciean viewing Windows,Metering and dropout lqgq 1)16DIO 1-11rnace Di aft':H20 zzZ o rL—)runiLevel/Valve% !_ESP_K­W12 Hr.Avg AtM --- - L ESP KW 12 Hr.Avg PIM *:Si,Purge fol Temp L A:lr Heater Duct Cont I;sp Field#3 Seconclaty Voltage .........Field#2 Secondary voltVoltageZ17. ESP Hopper Heater#J Temp FSP Hopper Heater#2 Temp Aj C/ V, t/ N q!0W i)own 1 rf pie Low Stvitch V_ glow Down Sight Glass �46 Boller Gas Outlet Terni) 32 Bottom Blow Front Sidewafl Header Soot Blow Economizer [jottom Blow daclt Sidewall Headers 0 Blow Airheater Soot inspect Multiclone Discharge inspection Door Air Compressor Psi emp - .Air Compressor I Air(ompressor Separator and larger 0ter UK Blow Down Air S2TRressor Water Trap Turbine Bearing Temp R- iTurbine Hearing Vibration ITUrbine Oil Level— F0 Fan Outlet=emp Grate Water Pump(#operating)and Pressure Grace Water Temperature i eedwater Pump(#operating)and Pressure (Xv, Ash Container l2spection and Level fSP Ash Auger Inspection ESP Ash Roto,Lock Inspection i•jel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE 10-7 •at ors S1 natures: e Date:y > OAe a.o K f�...___.. — 700 Hr!.. 130f1 Hrr. 19VU Hr s. 0 j U y i l. iA a:i':! .-i_iC ✓f4 7.;,-4 1'';C. d.iA T4 C aR• i ' - U �. ateY yte:.e Reading t eani':-ow C6`PNS.5 R :31`LM Steam Pressure Header 1� 5 (;team Pressure Line _ i z.6 icxnaum Stack Temp. 3t z OO' .Clean viewing Windows,Metering and dropoui !RimaceDraft'#H20 it 4,qs )H, )1 70U1 Aj 10 i < Valve ;o t arum Leve;/ `'` ESP KW 12 Hr.Avg AM ` , 7 ESP KW 12 Hr.Avg PM 3• Sis Purge Air Heater Duct Control Temp (Yl ASP Purt. Air Heater Ove, trip � l Temp 'u 9l ASP Field#1 Secondaryy Voltage LI 1 o. tSP Field#2 Secondary Voltage 53. So ro O FSP Hopper Heater#J Temp FSP Hopper Heater#2 Temp 3 �- 3 a� t;la+.•.r 0main Whrt*r Column ✓ , r q!ow'Down 1r1pie Lot: Swit(b ✓ J � ' " glow Dat�rn Sight Glass J Boiler Gas Outlet Temp soo S ' Bottom Blow Front Sidewail Header - ^ _ x - Soot Blow Economizer '� -- Bottom Blow Hack Sidewali Headers Soot Blow Airheater inspect Muiticlone Discharge Inspection. Door Air Compressor PSI o Air Compressor Temp. t 5 i 7S Air Compressor Separator and Dryer Hiter Vifi Blow gown Air Compressor Water Trap 'turbine Bearing Temp � Turbine Hearing Vibration yt j A114 i 1 a Turbine Oil Levei LD Fan Outlet Temp 2�� d 7v axes jGrate Water Pump(#operating)and Pressure 2 G Grate Water Temperature Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level -✓ '� FSP Ash Auger Inspect ion }LSP Ash Koto Lock inspection i-uel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ►vSPECT FIRE EXTINGU ISHER MANTHLY INTADATE lLXI Ooerators Signatures: Date: 700 Hri. 1300 Hr�. 19VO His. fll{:J H+s. + 3 1A J`ct3 3_IC t•� 3.-:"? __ '�� d_ti, i9:.t: } ;t. i Vle:er Readin_; 3 �� �Siears► �:-ow<NPH Steam Pressure Header Stearn Pressure Line 1 30 __l '? I d s icxnausts Stack Temp. Clean Viewing Windows,Metering and dropout. !i:urn.rce Drat:"H2C I Drum Level /vim ioc I Valve S 3z ESP KW 12 Hr.Avg AM cSP KVi/ 12 Mr.Avg PM 2. ) is Sij Purge Air Heater Duct Control Temp i E*SP Purge Ail Heater Ovei tr tp Tenip I SP Field#3 Secondary Voltage io,y ►ESP Field#2 Secondary Voltage SO ESP Hnpper Heater#3 Temp 3►`d ESP Hopper Heater#2 Ternp 31 i R;a�v tTe;rm W jtPr Cnfumn / °' ✓ T �/ �/ `!Ow tDotvil I riple Low switc)r � glow Down Slitht Glass •Boiler Gas Outlet Lemp Bottom Blow Front Sidewall Header x x f Soot Blow Economizet Bottom Blow8act 5idewalt Headers ^ X X Soot Blow Airheater inspect Multiclone Discharge Inspection Door �/ ✓ Air Compressor PSI l fo 0 Air Compressor Temp 17 S Air Compressor Separator and Dryer Hiter Di ✓ / Blow Down Air Compressor Water Trap ' ✓� Turbine Bearing Temp Turbine Bearing Vibration y ;urbine Oil Level T' FD Fan Outlet Ternp ZS'i z f 1 2 SS ' 75 rt jGrate Water Pump(#operating)and Pressur-e S2 Grate Water Temperature Feedwater Pump(#operating)and Pressure Ash Container inspection and Level {ASP Ash Auger Ins ecUon ILSP Ash Kota Lock inspection ..,� i-uel Bunker Conveyor Chain Inspection ✓ '' Fuel incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUiSHERJMONTHLY iNTI&DATE 00erators S.gnatures: '��<<�f / � 4 Date.: z5 / 700 Hr!.. 130f)Hrc. 1900 Hrs. OIC"l H(S. I 3.i A di i1 3 3_•R C d_'(A 1 WA Ei _=i C 14 Mpter Reading CS;ea►}t �:-ow WPH ply, T om_ 1Ste� a�essure Header �;reain Pressure Line i Fxnausts Stack Temp. Clean Viewing Windows,Metering and dropout ✓ `f � ;rurnace Diaf_':H20 3 6T .3 .SSiw. tt f Drum Level/Valve LAS ESP KW 12 Hr.Avg AM !rSP KW 1Z Mr.Avg PM 2,� �- -S Purge Air Heater Duct Control Temp 'ASP PurgN Air Neater Ove, tr rp Tett�u �� 1 � f rSP Field#I Secondar�Volta e i < +cSP Field#2 Secondary Voltage FSP Hopper Heater#J Temp FSP Hopper Heater#2Temp (v w nn:vn WnrOT Cofumn ✓ '� t q!o�vDown 1 riple Lot.,SwitclI ✓ ✓ � � 'f gtow Down Si ht Glass � `�� '✓ � Boiler Gas Outlet Temp 5 '1 � 5CV Bottom Blow Front Sidewall Header X X '� Soot Blow Economizer ✓ ✓ _ ✓ '� '� 4 Bottom lilow Back Sidewall HQaders �C ✓ ✓ Soot Blow Airheater ✓ `� '� `� Inspect rviuiticione Discharge Inspection Door Air Compressor PSI 110 Air Compressor Temp � Air Compressor Separator and Urver Hiter Uiff ✓ Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Searing Vibration Turbine Oil Level 1(z i , roil r:p Fan Cutlet Temp 1i,5 S lcS 275 Lo b a� IGrate Water Pump(#operating)and Pressure / C�z Grate Water Temperature zI Z Z v'ZoZS Feedwater Pump{#operatin )and Pressure EAU S C, Ash Container Inspection and Level ✓ ESP Ash Au er Inspection ✓ '� ✓ '� I LSP Ash Hoto Lock inspection ✓ '� Fuel Hunker Conveyor Chain Inspection ✓ Fuel incline Conveyor Chain Inspection ✓ '� '� NSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE rrxxdv L- K.I rr 1 Nerators S!gncitures: Date: ,V/30, 700 Hr!.. 130f) Hrs. 19110 His. I01--H,S i A -.f -- I- A: -'; 7; d.'i A 3 1 C a.;I -33 930. Meter Read;ng earn �::omj�PPH 5-0"-/3 1­7 ,Steam Pressure Header a7-1 J�'Team Pressure Une 3 ;Aq Exnaustt5 Stack TeMP-,-- Clean Viewing Windows,Metering and dropoul 241q3 .63'761) 7.7q 6 ':Pwnace fjiaf-. ':H2C JiDrum Level/Va;ve% /C7-- I ESP i(W 12 Hr.Avg Alm a.3 ESP KW 12 Hr. Avg PM a. �Si, Porge Xir Heater DUCt Control Temp --,SP Put,&A,# H atef Over tf op Temp -:SP Field#1 Secondaty Voltage 39 Voltage F.sD Hopper Heater#J Temp c7 FSP Hopper Heater#2 Temp 33 1 IVOW nimom Whtfir Column 1�7 q!0W -)own 1 rf ple Boiler Gas Outlet Temp I Bottom Blow Front Sidewall Header I Soot Blow Economizer Sidewalf Headers Bottom Blow Back ISOM Blow Airheater Inspection Door inspect roulticlone Discharge In tL Air Compressor PSI Air Compressor hemp 175 Air Compressor Separator and Urver f-ilter Diff Slow Down Air Compressor Water Trap Turbine Bearing Temp I—Turbine Bearing Vibration i.urbine Oil Level �D Fan Outlet Temp rate Waver pump(#operating)and Pressure Grate Water Temperature qq Feedwater Pump(0 operating)and Pressure o Ash Container Inspection and Level P'SP Ash Auger inspection 1ESP Ash Roto Lock Inspection keel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection ✓ INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE 100 ooe•a ors Signatures: E, DaCe: 51AR14 700 Hrr" Mf)Ht,,; 1900 His. (21GD iir 4. :t. r, &R a a_•:r �:t a �: a �:.t c a.+a a a z_{C 3.�1 Nj%v ..,....._,.._... ,,;ems am Pressure Header J;reartl Pressure tine -- . Exnaust:.Stack Temp. {Clep,11 Viev0ng Windows,Metering and dropoui � z a6 +C! $'JItO --------�----- -— 45 3 1 !Drum Level/Valve 7'o ESP i(W 12 Hr.Avg AM Ci _ (cSP KW 12 Hr.Avg PM v Purge Htr Heater Duct Control Temp IS 13e !� P F-Aft Hetiter'OVC" Lisp Tetiui 2L _ IrSP F!e'd#1 SerMndatY V01ta a �v y0. (� 5P Field#2 Secondary Voltage i . L Sc� I FSO Hopper Heater#5 Temp ��H 1 3 (S 3r7 FSP Hopper Heater#2 Tema �'t 3-2 1 R;o�a�?o.Jn 4'J:ft•Pt'C.alumn 310sv )owll it+pit;Lot: Switch Blow Down Sight Glass � Boiler Gas Outlet Temp ' U Bortom Blow Front Sidewall Header ' ,Saoi Biativ Economizer r3ottom 131ow t3acK Sidewall Headers Soot Blow Airheater v inspect Ivlulticione Discharge Inspection Door Air Compressor PSI ! ` d O Air Compressor i emp ____r_ - t (orrtpressot Separator and!liver Hiter Uiff ✓ ____..� .__._ .l '� RIMDc—Air Compressor Water T!ap ✓ i urbine Bearing Temp ITurp a Bearing Vibration -----� �•i UrgitlC C111 Levci L l L L-) Fan Outlet?emp 2�c zee i 7v of o agate Water Pttnmp(#Operating) and Pressure Crate Water TemperUture i Z Z7 �i � Feedwater Pump(#operating)and Pressure Ash Container Inspection and Level ESP Ash Auger lnspeciion f - 1/ jl:5P lash Koto Lock Inspecti011 !/ i-uel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE `d3 Ooera.ors Signatures: se'n ;)ate• L� 700 Hr!.. i.R00 W4. 19110 Hrs. Qi.f:U l-lrs. l.. r1 Biii3 s_2C r i ,'ati�te:er Read;nk 5/• S}Parzi 4�aw{PPH ,Steam Pressure Header 33 3 i 4 a ;learn Pressure t the loll;3 i Z� ----t----- � ---- i xnausts Stack Temp. 3 i 3 z i� ICiean Viewing Windows,Metering and dropout ✓ `� !PUrnace Dtaf"•`H20 a I .22 y4 2-5 3 z 74 �{ +Drum level/Valve$o ESP KW 12 Hr.Avg AM y,y ESP KW 12 Hr.Avg PM a �_ c5i'Purge Htr Heater Duct Control Temp 136 i Hc► 'Sp PurgvN Air HeaW Ovc t tr tfj Teti it) Ig g }rSP Field#1 Secondary Voltage !'SP yield#2 Secondary Voltage 53. 1 a yrG FSo Hooper Heater#1 Ternp aq C FSP Hopper Heater#2 TemP c 3 z •� l;tow 1?ntam W.ftPr Gniumn ✓ �' �' iwow Down?ripie tor:Switch ✓, v ✓ low Down S? ht Glass ✓ , Kit E3oiler Gas Outlet Ternp wo Bottom Blow Front Sidewall Header - ^' ✓ ✓ ✓ Soot Blow£conomizet ✓ ✓ x � Bottom Blow Sack Sidewall Headers ✓ +� Soot Blow Airheater ✓ '� '� inspect rAulticlone Discharge inspection Door ✓ v ✓ Air Compressor PSI I D O J Air Compressor Temp Sa i� Air f:ompressor Separator and Oryer filter Riff ✓ Blow Down Air Compressor Water Trap ✓ urbine Bearing Temp Turbine Bearing Vibration ..i urbine Oil level r�oZ �Z �D� Fa Outlet Temp 0160 60 a*C_ Grate Water Pumo{#operating)and Pressure Grate Water Temperature a Ib ZZ i r� Feedwater Pump(#operating)and Pressure SAID G Ash Container inspection and Level v ✓ '� ESP Ash Auger Inspection ✓ '� }LSP Ash Hoto lock inspection ✓ i-uer Bunker Conveyor Chain Inspection ✓ Fuel incline Conveyor Chain Inspection ✓ ✓ •� NSPECT FIRE EXTINGUISHER/MONTHLY INTi&DATE — =r !G"U Ooerators S*11citures: Date: 700 Hr!.. 130f)Hrs. 1900 Hrs. 11(s. A I a..a 3 C ;!-.I•A 1 31:1`3 c d.-I ;3,-;t a 3.1 A td !k.*,,a,.er .MP,qer Recadinf,, s,eam c:ow!(PPH i,Stevr Pressure Header 7 ZIA I.- I a7 15tea 1 Pressure Line 1-1 -S� ffxnaum Stack Temp, '3 30 7A cienn viewing Windows,Metering and dropoui !Purnzice z Draft'�H20 4 q& , ,.urn!) Level/Va;ve Wo 1Z L �—,,:S—P KW 12 Hr.Avg AM —--------- ESP KW 12 Hr.Avg PM —WO Purge Air Heater Duct Control Temp i-:,,Sp Purgt�Air Heater Over t'W Temp r'SP Field#1 Secondary Voltage____ t 'SP !:ieid#2Seco la,'YVO'Tage ndary Voltage FSO Hopper Heater#3 Temp3 i 1 -3 12 1�1- SIS------- -Z"7 FSP Hopper Heater#2 Temp L3z--. ----- ---- —1/ 1/ / 13,10%xi I)n-,ajn Wntpr Cnftjmn / ... Blow f Jown I I rfpie Lot.,Switch Blow Down Sight Glass 7 Boiler Gas OutleT Temp N I Bottom Blow Front Sidewall Header �x Soot Blow Economizer X, Bottom alow Back Sidewall Headers Soot Blow Aitheater inspect Multiclone Discharge Inspection Door Air Compressor PSI Ito Air Compressor Temp Air Compressor Separator and Diver Hiter Diff Blow Down Air Compressor Water Trap 'Irurbine Bearing Temp, Turbine Bearing Vibration urbine Oil Level Y� ff4 QED Fan outlet Temp i9 S 07c I jGrate Water Pump(#operating)and Pressure & J:�.-7 Grate Water Temperature ZZ ......... Pcedwater Pump(#operating)and Pressure 5qO 5 46 Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Hoto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTIMATE .7 Operators Signatures: 700 Hr!.. 13011 Hr!;. 19VLI Hr's. 0.1ev Hrs. 3 1A 3 il3 3_•rC" a� mater Reading S�P.ai71 ` 0%v VPH Z 35.99 S6• �I ,S.eam Pressure Header 30a 31 S +;tearn Pressure Line 1.18 ---- Fxnaum Stack Temp. } 3119 333 •began Viewing Windovvs,Metering and dropout v1 .. i�, r�urn.ice vial "H20 9•y0 `i•�y la.q 9.3y .75- lo. 7. q I`�Gy U Jrun��Level J Valve ro� I S va S oZ5 84 �l7 �lS 6 9 v? ESP KW 1,2 Hr.Avg AM 2 z ESP KW 12 Hr.Avg PM L Sig Porgea Air Heater Duct Control Temp 1 A9 1 2-7 cSP Pur' r Air Hratur UVef tie�Te3ry,u ;SP Field#1 Secondary Volta a `� 39•9 9. 5 ^ i c SP Fleld#2 Secondary Voltage 60.0 yG 9 FSP Hopper Heater#) Temp / a 8 3 306 a© FSP Hopper Heater#2 Temp 'Lv ayy 315 R;awj nn;vn W7tPr Cat,4mn ✓ '� `� `� B!ow sown TO Lot:'Switch ✓ � ✓ ' `' '' alow Down Sight Glass ✓ `� Boiler Gas Outlet Temp atz ie5 •5ao , Sao 5_ 0 i Bottom Stow Front Sidewalt Header x Soot Blow Economizer _ _ __�•� ✓ X � V Bottom Blow Flack Sidewall Headers X Soot Blow Airheater inspect Nluiticlone Discharge inspection Door ✓ ✓ '' Air Compressor PSI 1 110 ►i o Air Compressor Tennp 1-7 S 17 5 Air t:ompressor Separator and l7ryer Filter Uift �' Blow Down Air Compressor Water Trap ✓ `� 'turbine nearing Temp Turbine Bearing Vibration 'a rif u•i urbine Olt Level RFD Fan outlet Temp So a5° aSo aGo a6o a6o a(fa � IGrate Water Pump(#operating)and Pressure �7 Z -7a `7a �S Grate Water Temperature 2 Z3 a i a l ai Feedwater Pump(#operating)and Pressure 1� 30 600 (00 Ash Container Inspection and Level `' "' ESP Ash Au er Inspection �✓ '' `� v 1 ESP Ash Moto Lock inspection ✓ '� (-Lief Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection ✓ "" INSPECT FIRE EXTINGUISHERIMONTHLY INTI&DATE =s c r;;:isre T' Sl �13 a ;r 06-erators Srgnatures: 700 Hr!.. 1:109 Hrs. 19V0 Hrs. MCC H's. "i C n Meter Read; 57 0-7 ;:�uw WH 413= !Steam Pressure Header oW L-srearn Pressure Une 10,21 Da I Exnaust..,Stack"riernp. Cienn Viewing Windows,Metering and dropoul &L f':ornpce Diaf�'1-120 ---- 11!)rum Level/Va;ve Vo 0 7.3 !ESP i(W.12 Hr. - 2.4 Avg AM' - FSP KW 12 Hr. Avg PM Sis Purge Air Heater Duct Control Temp 139 L ji:'SPPut:'NAit Neater over v sp Teti ip 199 ► i,;SP Field#1 Secondaty Voltage 39-.2 39-Ll Voltage 140,i 0 . 1 FS0 Hopper Heater#J Temp 0 :30 FSP Hopper Heater#2 Temp I)n*,,jn Whtpr Coh-IM" q!0W Down I riple Low Switch 7 1 Biow Down Sight Glass Boller Gas Outlet Ternp Bottom Blow Front Sidetvall Header -- Soot BlowEconomizer I 1Bottom Blow Baca Sidewall Headers 5t)ot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI lie 110 Air Compressor Temp Air Compressor Separator and Orver Hiter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp ITurbine Bearing Vibration '31.q urbine Oil Level n=rn(!O=" I.X701-n7==1 L �Ff) Fan Outlet Temp Grate Water Pump(#operating)and Pressure Grate Water Temperature all a 16 -7 Fcedwater PUMP(#operating)and Pressure 55 Ash Container inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection 'i-,jel Bunker Conveyor Chain Inspection ✓ Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTADATE 4/ v ve 00,e-a-ors S"glicitures: Derek -OQLn;e I Dale:- 700 Hri-.- 130f)Ht,t;. 19R) HI's (7, J. I.." iak,.il:3 3.-.1 Ic .1•% 7. -.4 A i3'.;l il 3.Q v"'Iter Meter Readl 1 .3 qo 3-7-3. !Steven Pressure Header OOLIJ/U Stearn Pressure Line 'L'xnp,us,t-. Stack e Windows,Meterinp.and dropoii Cie l", I 11 viewing W! !Pxnoce Drat, H2O': Jiun-i Level/Valve T1 Cs—p i(W 12 Ht.Avg AM ESP KW 12 Hr.Avg NO Sij pk LuRp A:,.,, Heater Duct Control Temp 'Sp, Alit Heater'O i t:SP Field#1 Seconclat y Voltage sP ieid#2 Secondary Voltage Fso Hopper Heatcr#j Ternp FSP Hopper Heater#2 Ten1t) J q:o,L-j on-vin Mitt Caft#Mn q, tow .)own triple Lo.-.,Swit(l, Blow E)own Sight Glass Boiler Gas Outlet rPrrif) i3r)-Ltorn Blow Front sidewall Header io`ot—Blom- ,Econornizet, i80I-tom 1,31ow Back Sidewalf Headers ---4 Soot Blow Airheater inspect Mufficlone Discharge Inspection Door Air COMPMSSOr PSI Air compressor I emp_ Air(onipressor Separator and Di ver filter Uiff Slow j)own Air Compressor Water Ti ap "ursine hearing Temp ITUrbine Bearing Vibration Turbine Oil Levei 1 A— rLn r...,. �f) Fan Outlet 7emp !ting)and Pressure Fceclwater Pump(#operating)and Pressure Ash Container Inspection and Level f-.SP Ash Auger Inspection [SP Ash Roto Lock Inspection ;_,.lei Bunker Conveyor Chain ins p ection Fuel incline Conveyor Chain inspection 1.,NJSFECT FIRE EXTINGUISHER/MONTHLY INTI&DATE iAj ----------- �� or,era--ors S!jInatures'. 700 Wt. 130f)Hr�- 19VO Hrs. 01(110 Hrs- '1 -SA C A —7)7 la"e? Meter Reading !S,,p.a!jj 1:7ow :!'PH —3-3::2. Pressure Header J;team Pressure tine lvxnaustS Stack Temp. mean vipiving Windows, MeteringanddroPoul Y-71 dA,;21 !pu-n,-Ice Dtaft'H20 .Drum Level/Valve rs c5p KW 12 Mr.Avg AM FSP KW 12 Or.Avg PM Purge Air Heater Duct Control Temp -1-sp Ptjrg�Air Heater ovk,,f v sp Tento -ondat y Voltage ASP Field#1 Set i ASPIF:leid#2 Secondary Voltage FSD Hopper HeaterM TeMP ij ESP Hopper Heater#2 Temp (j,,n%-j nn,.-jn wjtPrcnf,,mn .!ow q w Switch i)own Triple Lott' alow Down S!Rht Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header X Soot Blow Economizer �BottomBlow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air compressor i emp V, �7— Air Compressor Separator and Weer Hter Uiff Blow )own Air Compressor Water Ty ap 7 urbine Bearing Temp Turbine hearing Vibration 3 urbine Oil Level FD Fan outlet Temp 20 Grate Water pump(#operating)and Pressure223 Grate Water Temperature I eedwater Pump(#operating)and Pressure Ash Container inspection and Level Ash Auger inspection ESP Ash Roto,Lock Inspection i-oel Bunker Conveyor Chain Inspection Fuel incline Conveyor Chain Inspection INSPECT FIRE EXTINGUISHER/MONTHLY INTI&DATE 35 it,irt; QoeratorsS'gnarures: ► ...�.� ;�a%t�:�''-/u, -- - ~` 700 Wt. i30(t Hrc. 19t10 firs. 01ltu iii Tf::r --1Ar s-; 3-A r 11%;late' ;i wer Reading l�1lear�rRli �•a� �Z � '� `'Y,S, ;team Pressure Header i' ;,icearn Pressure tine a� Z -•.•-•�ZCn S It:xnausts Stack Temp. Clean Viewing Windows,Metering and dropout ✓ �'� _ `� '� !r:urnace Iii-A "1-i2C .4a y. Drum Level/Valve 4-S ESP KW 12 Hr.Avg AM _ t FSP KW 12 Hr.Avg PM irurge Air Heater Duct Control Temp 1�Air Heater'Ovei t►rN T�ryui 2'�\ r..SR Puri; � � •--� ci.aZ FSP Field#] Serundaty Volta e + O c"SP rieid)#Z Secondary Voltage 40— i=Sp Moi�per Heater#1 Temp FSP Hopper Heater#2 Temp Xla— r;tovi In.,un uv:�ter Catumn '� ✓ ✓ Wow Down I riple Lot:,Switch '� � glow Down Sight Glass Boiler Gas Outlet Temp I s bottom Blow Front Sidewail Header ✓ X X _ av�-)t Blow C►r7^Jfnize", _. ..____ __ __ �- - ! � --- ✓ l 17 Air(Qrrlpr es$Or i 8T#1p — Air(.ompres$or Separator and Dryer t-filter Uiff / ✓ _...� _. ;flraw Down Air Com ressor Water;'rap ✓ �/ j ✓ ri`•`tS nip S A r5,i.6,ne Bearing Vibration --. - I..ursine Oil Level --------------- �s>S J') 'FM Fan 0u*0et?err:p i " 7 s 7p rr•IPdwater Rumn 1#onerating)ano Pressure - - ----_-'�. _ter �..;:;.� :.,,_ � � ,/ •/ . �.,..._ � 'H.711\rV11�411.Hs. .ry Y..��v..�. - •� t i t Llel Bunker Convevor Ln_am inspecno_n_ —_ ! `'76 ) -�aQ---- .'1�1s. r,.rc C:poa�f:.frL`. �YIAT1 / lJC./L� i58LGa:SII�f i•i:l i of{� 1'�^i- ^{r4 :l LSi t% .`'t• li 'SteaT. Pressure meatier 'J:�a� Kati .�. ie.,r�(,ew;ng Windows.Metering aril dF0!DV_ � ✓ :�,..-,,.,.....r !�tlr�?:r�8u:at '►l2C a__ -- ff.80`lo.o� ti.0 52 171i° 3. LSD KW 1 Re- Avg PM m�_ � a•9 t fur Q?trt�e�tervitGiContr,ol Temp ---- NO r:.: Y .].:i ' l `r. nif iiea<i:i a.v."> 1.=j.t !e: .i! I ,f`� AjC:U 1R1�Ct:.aa i~'.f�(Y 4jie- � ww„o. "a`e.' ✓�• SW T I u;,_::oer Neater it] Temp j 2 E 31Co U. 'St Hlui ;le, htI a!Ci ht fCf++t+ y R�0-,v Down Sight Gass -r„er Gins uut�e�; s erf'P �'SQO:� ?�;r.n* �':?'Ap`Tyr'-ti``�`r"-ti`g _.__.---_.._...-... _ .._...._ .__.�-.._.J.._✓3 ✓ _ _ _ _ { i W ELK S;o�zvaF>HPaders +� ' ii�,: sF o #Soot Slow AlrPeater t rat � ::. c2:�:: IIQ t +.'0.. Wr{eittpreSSOF 5eVafJz0f ✓f y t t iiLCi: 3af _ �._ . ✓ 1000, aFiV�f urii• tT. Lck i A.6i '-i urbir:e Oil ?eVC! .yt Temp rOa.Jt.•�) ;(oc. eratIna'and Pressure ! /2 Feedvrater Pump t#Elm at,"M and Pressure 5�0 ✓ Poe ✓ ' .n . ng„ .�._� firer: i•�.p�:> ✓ Z ✓ f i i {i uel Bunker ConveVort rvain inspertian ✓ ✓ ✓ }C &,AT �7 i12dlN;�IA( _._� '� Zr� t 4ri;� '.tee•[� _ e • 3�t��83 155 e^cm P.eSStUre meeoer J o , ' _ f 130 ` _._J �- A9 1 2'?'JleWll"R` I.-IdOWS.Metering and rdfooOut i i/ � � i ✓ 3 �/ .Ga'Ia.aS'1i.�8i U" �'�s •Z�. ���--�1�-'� va t..t:. 77 .v4 77 KspKVV12A=_Avg �ry3 ,.cu Ott{rye :r dearer duct�€�ntrot imca J38 �S2 1 N qo !;:co rho -,er heater#1 Y`mP 3i( E 3 � 3!'lY 7'lQ4i��G° TiLALZi $!i ,'i:,•�9+ 1 '�'-P° Yi' .13t `• ''f-,�;° i�3:a-•}Seri ''. _.+..-. t✓ 1/ t i R yv Dmvn Sight Glass I ✓ ✓ i lBooer Gos Out e€ ie.ffi _ {�0'S = t,Bottom iiiwe w e k S;oewali HP&ders�.y�ie'v S�i�. 'Soot 131ow AM'Water 1,10 F \� t ` NO i fAfr compressor Separator ar+u DI Ver l'ff isle: .. -„ r ;�:. - �.�rrarass3 ,t Y.:�tei fi.cy ? ✓ ✓ '` `� ` /' . ;� rbe Sear nR Y_fbra}iori f j rl'urb O Level v ^ F s,nn 70 c R70 L�✓�255 Zap :29c dso - ��770 sc ; 1#lrr�grat nir 3��=s3ggcg�rs� d r __ I'! tN ;r Ternoe-lull a__�,_ P �►"j E Z3 l 7 i o'�/ � i Feedwater Pump to operating)and{Pressure a r 5y0 5/0 �3*'iE#L�rY•3:>?C.!(snS-r'+$��iun 1 ✓ S%uel Hun{cer Conveyor 4-naln Inspection ' ✓ ' � � `/ -70 zoo --5-- `{ :)ate: 5 (31, t 5v ,S-,pajjj --ovv VY11-4 -5:5 Stesf—r Pressure "ea0er = 36 ZICI r+.- lr�!,I.Ile TPf"!I 34-7 %7 t MA'10,39 fil'o gin., C K;AF I j!l x1f HIP,3tp-r ChIct Control efflP sr RuIg,A4 p Ceid-#2 Iseccmda?v VC-Itage -YzA -Sp Ho!: #1 'Te'Tern.'Ver He,,$4 C r2k 0A -Am Sigh!Vass te✓x 510 :-60 #6010ef t7t'S ChAllet TeWfif) 4ewal?14 011cm k3ack S. !Soot Blow Alf"eater -4 7 - -7 L 5' IA!r arid L*-,V& -&ivn Atf I.A urbine 3earilig Vibration IV !':'jrhlne Oil -eve! .0 ArTcl'Pressur 9 ICA .c3ratp,Water'Farr-perav fe mgj and Pressure tit/- Feedwater Puma 19 opef at -01—A A-a In n r n I So';RM'Mo two nseer-tion I i uel Sumer Conveyor main ins -ecfton I mtCvcrT cior cynmr-i 1;c;4;:R im ny4-Ti4Lv iNTADATf: r Vz fe rwv k 3-70 'late;5 �Y/ �� /r 700 urn t 'Jlo mg ii z ,< �i''Z•pr'4,l,il'�AI RFY��:f4{{ E � .. .. ;=tea.{� � ........... :seam, .ot. 3 �7 !steam Pressure Header 3 (L �; e-w viewing WiiF's#t'ihi1S-,4eterling and d'PIDUI � ✓ ��-1"-�•-7- ✓ tFiirm,;ce Dmft "H2.0 f 22 Vd- tC �iri 4lY__ f,�rrr j r�=ti„fir l.'. F ;;;cP KW '12 Ht.Avg Pry p.}r a Air Heater Duct Contra!Temp t r3 rut f^'A14 �?.a ._...'�3 —• ._ _'..l,. i!�.tf�*0 vim,... # �'� s '`• r Sa REid r#2 Seconda' voltagee� ._ f ''_.�._ `T 5 l::ca HiDoyer Neater#3 Ternp rt3t` f7�}ifJC! iY�gLCi i�i taifif� t # � ! # ✓ / - ate::rs�•� .yG't_iG: J�'tla f�a a.al:.a:t�� __ ____-ro +�+Tn"v "foie wok;'Switch — ,. / � ✓ �} Bimv ],own c; ht Glass � _- - � , ✓ �/' i �r� # r �Bo#ier Gas OiAtiet eraf) oottom Blow RoOt Siaewail faders tSoot Blow Airrteater itrispect Y t:%t_6QP .,.jc._' a te ii►e£is: \/ i _ ; _ PSI ter TC1---o;t':pa"$&sic TemP - ✓ --�. _ ...a. : ✓ ✓ 1 fAir Lompressor 5eparatur iFriu�,rep r�:,c: :..�. ✓ #Murbine 3ear;ngVitsrat;rx� i ._ t c;Srbine Qli Level r'i�.t:`y T�s..ra iSv t Sv cG:^. . y. g g G p filnnpratiA$i fifth Pressure i �� ' Grate terTernper_a:ute__ l Zt�° Ong er P M .in anti Pressure 5 k.,D Ieedwater Puma i>r ouera# g! ! ✓ `Piyil Ti�t:Z ic�{iS"'i#'.r:..�s.,,�j�r:nrt �r1�S.':Yt�: � ,/✓ e ` ,ESP "r ! (►.I!ger••17!v?mot+CfI J Sr As*z 3r to-OCK InspectuM `/ t ✓ i t-uef Sumter Conveyor Cnain inspection i+ticUcr? t iif6 CiiT4r i:t #{tdFR%1Vtf1l�{T}i V iNT-,&DATE 'DertL Pat - 6 v Alm-" :eS 16 74 sir. i3obMd7 W.� i '4Aw 74?, PPf4 i Stems am Pressure Header 14 :P. Presspre i_!nt 3.33- -r!E Stgok T e—n 'Neal viewing Windows, Metering and dropout 3 , gijrn,,,zce Dmft`H20 10,7 001 I'S A 1-35 _11Y-13-1 AvS A-V - - - '1 W!FSP K2 Hr.Avg PM G - - -A Porge Xr Heater DUCT Controi hemp aq J 131 Purg,A4 Heatc,0VLC. t'1P Te"11) L -�-sP Fle-rd#2 Secondary Vc'tage jq FS?Hc)uoer Heater#1 TC."n" �Wo.,v D0%VA Sight Glass V ler Gas Outiet Terno , I q0t!0M jJ10w Back Sidewall Headers t,500T 13jow.44orheatef I& A!- 17 jAir Cor"Pre"Or I emp WI 'Alf compressur Separator and Orver hatter Jifil i&C�%v CjL%vvn.Air Compi esii�r%Xaterl"t Trap IToe Bearing Mbration urblne Oil Level o m p R TO-1 il trite Water Terrverattife Feedwater Pump t I'Asn Conta-W-ter in, pe tt rS A RO Lock mspectoW i i uel SunKer Conveyor Chain ins ed OA V TI&DATE HjCUK;4FR1%A(1N'TI4',.Y IN %/0 izFr«ir; 1�; 30 -70 ":,,^ •�• c«3rb Tl,mrt i a�1 - -{ ! �57 I 3 a7�a tea:, V ieyyIrri}g yalandOWS,i` e"er'r'?g and dFODOu ?•firmice Uu&"H2t� •G( `Io,1( '10,7 ' & q ss K4 A ice~'_ , Avg ?M Cis Pur p Aft Heater DULL C011l 01 eMOCf ► /�' )���/��_ ,::;p 't id#2 Se:.ondag:Voltage , •"7 ! _ l 4 Ica Hopper Heater tt3 YesnP._Y,___v--_- :.. � - -•..�.--r--. _,.i i ...... j rrlt' �FU(Jfib1 ,i�ua�. Ire .c... r• ��� i R3^ jx *t<Down Sight GlasS Y Jv 'Sri l� ' �.b rj10 ' - � ir: r,: :;:J - - ':uC'siii:V,s tY;• Z^ i �. iy ` } / /� it", P;.;nw►rj,)n j37C#2t_v _ __ � _-- _._. ...f. 9ram-( IRO-L-ryn '-flow Back sidewalt,Headers hoot Blow A►f"eater . ✓ - _- fair t..OrnpreSSor Sepaiaior aiou u'rVer ltii e - ,. �t'.+7re ii?TPMTi E rM ' r$' ne $ear=ng Vib Rtior, { i i-orbine Oil leve,� (isrsnorat;n?;amid'P#'essure e Water 1Fcedwater Pump t4 operatongj and Pressuie r^t} tirh {S!tAS�...° Ktsiri`t/1 ! I ii-uel Bunker Conveyor 4r+a?rt #nsd'ersiun �:I�: ' "c..,�n�p.fit , r�... .. ✓, 3 t ..._.. �-- --+--""-"`_ is�Eeoe�:' CiQ� CSiT#ni{'???tii.?+t^fi'�1!?c".?1???•?�`f;?'+�±'-�eV't+`�t ? �C �'� /' # Arr j J.iA i2'ii j 1, c A j 3-4 Ei i 4.t C i C>t Vim Xha Lim Staci( Temiri: -'rn Level "V'3F-ve L"-C� sp 1 ma AL LLae-_u sp KW 2 H, Avg AM ---------------- widary Vaitage sq, qq.1 2 jq k 7e0p--7 i 301 I A in lsi rF wf i tip j7 0 LIN— Froj*,t 5!dewaF' Header SVIOW T Sao-, 8;G'w x P. ;on Do -71 A it�dgarvnspe e Ict. or t 414— !�ii.r-Lompfessiu, Pai o Ai T r: CO!w .!O,p5sc,r Water r em, VA10 v-t Tern 2--4cic -!— ;Grate V%f 37LCf PUMP and'Pif=61 la Z 1�7 1a.33 !n ro r!fta— ectc .and Leve! 7 iFSP Ash Aijger inspecuar, i r oie SPEL T FiRE EA-ljriG:U-i3hc-.ij0A V­1411$1-7 L2 ......... r 00eralors S,' natures: 700 Wt. 1300 Ht"s.- 19VLI His. J_i A tj;;I:i !j:;j-'j X:4 C d,"l A WA ii V..-. I I i_.1 t: R d; 17-6 Vjewj1,g Wirldows,Mietering and drOPOIJI. 77T ArM 60 I t5q 19. J, -ice drat:itatt'H20 3 J_rum Level/Valve'Ab J.'77i I H- Atl asrvv " .Avgiv ; P KIW 12 Hr. Avg Pm :S 7-Sij1 3 5 ptirge A',.r Heater Duct Comfol Temp g(, 2 ------4— �-i '5 _dirt " - VA c'et'd#,&, 2&(g j 30v -�;20 r 1 Temp FFri. Hower!q eat # "Ea Lie U �R—10 1—v D L, tit 1'aoiier Gas Outiet Tlewfq) V/ Evn-Fronornizer- T I I i,ctmm flow Back Sideviva"Headers 1500t Now Aif heatalf _L1 PSI Aw(:-)repressor Temp art t.ornpresser _,veoafalor arid ii jiFi lIfLcr %O16i mp A.! Tooln 'TI-ffb- ine RelrlrAQ Vibration 17orbilne Oil LeVC1 ')�7,p !,27 (.5 a- , 'vet I-em.yo and Pressure reffemPeratwe Z. I T-1-1-11-- Feedwater Pump ji?opewl"$!land Pf esbw(e %0 J_ _vP ash Rmo Oct(inspection sunKer Conveyor 4,"in onspecooft L/ c 0 L- E, r T j Z i 0 C,:- ;w T NTH1 Y INTI&DATE A Mai+ —an't.—( * ::B e A -,- ll--i A I i2',i-4 1 3--i C i Atq- L�ej i 4/. Ak I 6 lea qjD (W4* 2 Hr. Ava A M 140 its I—To jawvo),; tee 1 -7 v LOW- Siciewalf Header JY I t "nor( I mousim"W" 71 e ri)ine deanvig ......... iG,ate Watei Pump ffforJL2rall f and I ;s;;,L S-Z- 7 -15'�6 H Ash Auser inspecitor, %001 0- -k-i M- E)M vufj ItWilAUN13—se —21 M5 Operators Signatures: Date: `ZI - 16- 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A BLR B I BLR C BLR A I BLR B 1 BLR C BLR A BLR B BLR C Water Meter Reading ___ Steam Flow KPPH (e 3 7S Steam Pressure Header 2CS Steam Pressure Line 1 U 1. i -20 Exhausts Stack Temp. "3 3 Clean Viewing Windows, Metering and dropout Furnace Draft °H20 /5 l0 53 y53 &5q 1),7z 1[O.T, a."! I"�51 i►; / G'ia !K,N -1"V2 Drum Level/Valve % ESP KW 12 Hr. Avg AM U ESP KW 12 Hr.Avg PM ` ESP Purge Air Heater Duct Control Temp ZS 1575 ESP Purge Air Heater Over trip Temp 7�' 020� Igg ESP Field#1 Secondary Voltage 3 6,7 ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp 0 6) 3�u ESP Hopper Heater#2 Temp 615 Blow Down Water Column Blow Down Triple Low Switch V/ ✓ Blow Down Sight Glass Boiler Gas Outlet Temp v 0501 1ao a6 Bottom Blow Front Sidewall Header ✓ j �� �/ Soot Blow Economizer / Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ �/ j Air Compressor PSI Air Compressor Temp 1 !7 Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp �(1 Turbine Bearing Vibration /y Turbine Oil Level Ica FD Fan Outlet Temp 's aZ�° o o76-S �'S �,:,.rzvu Grate Water Pump(#operating)and Pressure Grate Water Temperature L 17 Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection f ,/ ESP Ash Roto Lock Inspection ✓ + ,/ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) �/ ,/ ✓ ✓ /l ✓ Feed auger Bolts ✓ ✓ ,� ,/ Operators Signatures: l>c�n i E ( 3Z.- Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C BLR A BLR B BLR C BLR A BLR B BLR C BLR A BLR 6 3LR C nFurnace ter Reading Flow w KPPH ssure Header 20 33� ssure Line 13 tack Temp. cs ing Windows, Metering and dropout ✓ , raft "H20 W '" ►yS► ti,clS ?ESL. ' ,' '? „ �,gS `' �.�; `A 56Z Drum Level/Valve% ESP KW 12 Hr. Avg AM S � Le� c�. 3' aS DES 6� ESP KW 12 Hr. Avg PM � I ESP Purge Air Heater Duct Control Temp t 3 ESP Purge Air Heater Over trip Temp 4 ESP Field#1 Secondary Voltage 31,1 y: �• ESP Field#2 Secondary Voltage 5,A,'5 - ESP Ho� pper Heater#1 Temp Sig ' ESP Hopper Heater#2 Temp ��I z5 Blow Down Water Column J ✓ J Blow Down Triple Low Switch ✓ ✓ v Blow Down Sight Glass Boiler Gas Outlet Temp -e Sco 5 co �:,co Bottom Blow Front Sidewall Header ,i r 'Soot Blow Economizer / X Bottom Blow Back Sidewall Headers i Soot Blow Airheater ✓ f Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp (? fe r � Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap f Y , ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 3) 3 =D Fan Outlet Temp o 26a 260 3rc, &O p Zoo irate Water Pump (#operating)and Pressure 50 3 � gyrate Water Temperature �X%-7 4�r ZL Z =eedwater Pump (#operating) and Pressure <u0 \sh Container Inspection and Level :SP Ash Auger Inspection f J ASP Ash Roto Lock Inspection uel Bunker Conveyor Chain Inspection ✓ uel Incline Conveyor Chain Inspection tart sequence on all grates (Cells and Dropouts) .l f ; e/ eed auger Bolts Operators Signatures: �n*e 1 Ai I'llDate: S/a.,6 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A I BLR B 1 BLR C BLR A I BLR B I BLR C 8LR A BLR B BLR C Water Meter Reading A Gjl?--) Steam Flow KPPH S1,02 Ai 1 71 Steam Pressure Header Z15 bZl Ila Steam Pressure Line 12 Exhausts Stack Temp. < L43 Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 ! /Z, �•ya Drum Level/Valve % 14 ESP KW 12 Hr.Avg AM ESP KW 12 Hr.Avg PM 2I ESP Purge Air Heater Duct Control Temp I Ae6 c( ESP Purge Air Heater Over trip Temp t ^j ESP Field#1 Secondary Voltage ESP Feld#2 Secondary Voltage S S , ESP Hopper Heater#1 Temp 3t 3 '3 2-V IS 144 3,2 3 3Z ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass .� ✓ Boiler Gas Outlet Temp StJ S c o ;,o S r< Te, Bottom Blow Front Sidewall Header Soot Blow Economizer ✓ ,i k J Bottom Blow Back Sidewall Headers ✓ ✓ ✓ Soot Blow Airheater ✓ i Inspect Multiclone Discharge Inspection Door ,/ ✓ L,. �, Air Compressor PSI Air Compressor Temp ! 7 1 Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp N Turbine Bearing Vibration N Turbine Oil Level 3/ y FD Fan Outlet Temp Grate Water Pump (#operating)and Pressure ? crp Grate Water Temperature z Icl 2 ,• 2) ) Feedwater Pump (#operating)and Pressure 513C Z'�0 Sy Ash Container Inspection and Level / J ESP Ash Auger Inspection / V- l ESP Ash Roto Lock Inspection ✓ ✓ fuel Bunker Conveyor Chain Inspection =uel Incline Conveyor Chain Inspection / Start sequence on all grates (Cells and Dropouts) ✓ ✓ ✓ / =eed auger Bolts ✓ j % - ✓ ✓ Operators Signatures: M6,I-+ Date:S %z7 /C 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C BLR A I BLR B I BLR C BLR A BLR B I BLR C BLR A BLR B I BLR C Water Meter Reading �y5 iqo Steam Flow KPPH 0(02- -5 ,-7,c� , L%•7 Steam Pressure Header .C) 75�c -3 Z 1 Steam Pressure Line 12- Exhausts Stack Temp. 3y3 7 75 • r s�E Clean Viewing Windows, Metering and dropout ✓ ✓ ,, - Furnace Draft "H20 iot3c 0AH 7,ci1 T AS? Drum Level/Valve % 33 c,- (,7 •j j Y (�'Z 54' �S ESP KW 12 Hr. Avg AM 3;1 ESP KW 12 Hr. Avg PM 2- ESP Purge Air Heater Duct Control Temp i ` '7 ESP Purge Air Heater Over trip Temp I� 2 G ESP Field#1 Secondary Voltage ESP Field #2 Secondary Voltage ��U �• _-� �'T: &- ESP Hopper Heater#1 Temp 32-c 33 . .�f 32y 3?Z 33,7, ESP Hopper Heater#2 Temp Blow Down Water Column y �i ✓ Blow Down Triple Low Switch Blow Down Sight Glass ✓ Boiler Gas Outlet Temp Sco �co Sco F^Z� Bottom Blow Front Sidewall Header ; ✓ �/ ,/ Soot Blow Economizer ✓ , x �/ �f Bottom Blow Back Sidewall Headers ✓ X Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI 9 L Z+ O Air Compressor Temp S 7 •� Air Compressor Separator and Dryer Filter Diff V ✓ Blow Down Air Compressor Water Trap �� ,j V, Turbine Bearing Temp Turbine Bearing Vibration — Turbine Oil Level 3J fj t 'L I X FD Fan Outlet Temp 015 it; 9,5 511-C 51aloS �v� Grate Water Pump (#operating) and Pressure p 2 9� Grate Water Temperature if 1-7 a21 -7 Feedwater Pump (#operating) and Pressure 5 Lill ,Ash Container Inspection and Level ESP Ash Auger Inspection / v ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection / Fuel Incline Conveyor Chain Inspection j ✓ Start sequence on all grates (Cells and Dropouts) Feed auger Bolts 71 v �/ ,/ ✓ 114 V,-M Operators Signatures: I AIf f / -fe k Date: S-/U&Ij 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A BLR B I BLR C BLR A I BLR B I BLR C BLR A I BLR B BLR C Water Meter Reading 9/5e0 Steam Flow KPPH O,aa ,W, I Q- Steam Pressure Header o2 ��� "tea Steam Pressure Line oZ� Exhausts Stack Temp. 5/ Clean Viewing Windows, Metering and dropout r/ v' Furnace Draft "H20 q.SA w )I W,4, 1 717S tc�)eff 10.4" lug Irl /I•fb Drum Level/Valve % 31/ 1411 1-V 151 L ESP KW 12 Hr. Avg AM ;Z ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp ! -) ACC ESP Purge Air Heater Over trip Temp j 10 ESP Field#1 Secondary Voltage -3g, ESP Field#2 Secondary Voltage 60.3 ESP Hopper Heater#1 Temp �t ?a G` ESP Hopper Heater#2 Temp I ip /"7 3 Blow Down Water Column Blow Down Triple Low Switch ,� ,� ✓ L Blow Down Sight Glass ✓ ✓ 67 Boiler Gas Outlet Temp 5730 530 530 Bottom Blow Front Sidewall Header Soot Blow Economizer ✓ Bottom Blow Back Sidewall Headers X Soot Blow Airheater7- 17 Inspect Multiclone Discharge Inspection Door ,� Air Compressor PSI j (C - 10 l fCh Air Compressor Temp j ']j Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level Y FD Fan Outlet Temp 75-Q 750 7 L 2�,1 7C7S o't7 ,�7 Grate Water Pump (#operating) and Pressure g$ Z U Z- is Grate Water Temperature 9t 2-0 "- lL Feedwater Pump (#operating) and Pressure Sao 105A-ell �Fd Ash Container Inspection and Level ✓ ESP Ash Auger Inspection ✓ ✓ ESP Ash Roto Lock Inspection ✓ �/ Fuel Bunker Conveyor Chain Inspection ✓ ,/ �/ Fuel Incline Conveyor Chain Inspection ✓ Start sequence on all grates (Cells and Dropouts) ✓ ✓ ✓ ✓ ✓ ,� Feed auger Bolts v v �/ ✓ ✓ Operators Signatures: I n;e N Date: 611011& 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A BLR B BLR C BLR A I BLR B BLR C BLR A BLR B BLR C Water Meter Reading V $ -- ----- Steam Flow KPPH Steam Pressure Header 3ici 3,Y2 Steam Pressure Line -35 `; , i ZS Exhausts Stack Temp. 6 3 3-/ Clean Viewing Windows, Metering and dropout Furnace Draft"H20 `).y6 --8-1 ia.gy In: Drum Level/Valve% 17 l 31 8y ,:1 g; 24 ii Y9 ESP KW 12 Hr. Avg AM 3.a ESP KW 12 Hr.Avg PM 3. 6 ESP Purge Air Heater Duct Control Temp IN© u 1 til ESP Purge Air Heater Over trip Temp I; al9 Jai / ESP Field#1 Secondary Voltage 3�, 6 Z 7,- 35.3 ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp 3 o2U r 3 3 3 3 / ESP Hopper Heater#2 Temp 33 Blow Down Water Column ✓ ,� �� Blow Down Triple Low Switch ✓ ✓ Blow Down Sight Glass v ✓ ✓ ' Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ! Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ,✓ v Air Compressor PSI Ito Air Compressor Temp I 75 Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap i i Turbine Bearing Temp A i Turbine Bearing Vibration �;4 Turbine Oil Level V A K I 3i j FDFanOutletTemp a65- ,26� ��S" ,� 'c :,- 7� ^ ' ; �< Zv �7s z7s z�rr Grate Water Pump (#operating) and Pressure 72 `5� Grate Water Temperature q-3kU 2i y Feedwater Pump (#operating) and Pressure -7� S 5�� a J ';-U S C- n Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection v Fuel Incline Conveyor Chain Inspection ,i i Start sequence on all grates(Cells and Dropouts) ,✓ ✓ i ✓ ✓ / Feed auger Bolts ✓ ✓ / ✓ Operators Signatures: an;z 1 Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 01 Hrs. BLR A 1 BLR B BLR C BLR A I BLR B BLR C BLR A I BLR B BLR C BLR A BLR B BLR C Water Meter Readingu� Steam Flow KPPH Steam Pressure Header Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft"H20 INS3 6,76 16,p( Drum Level/Valve % Z- I q I ESP KW 12 Hr. Avg AM 3 - 5 ESP KW 12 Hr. Avg PM -S!2- ESP Purge Air Heater Duct Control Temp Ma. Al 1% ESP Purge Air Heater Over trip Temp n ESP Field#1 Secondary Voltage ),v - , ESP Field#2 Secondary Voltage 55 �- ESP Hopper Heater#1 Temp 3 z(. 2-7 �i ^ ESP Hopper Heater#2 Temp Blow Down Water Column ✓ ✓ " _- Blow Down Triple Low Switch Blow Down Sight Glass ,/ Boiler Gas Outlet Temp 2S. SZ15 z s Bottom Blow Front Sidewall Header / Soot Blow Economizer ✓ / Bottom Blow Back Sidewall Headers Soot Blow Airheater ✓ ✓ ✓ Inspect Multiclone Discharge Inspection Door ✓ ✓ - i' Air Compressor PSI )(0 U Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ✓ Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp r/,; A/ Turbine Bearing Vibration Turbine Oil Level �1 4( FD Fan Outlet Temp 2 5 zl Grate Water Pump (#operating) and Pressure �? Grate Water Temperature i A Feedwater Pump (#operating) and Pressure 45 4sh Container Inspection and Level j ESP Ash Auger Inspection / t/ _SP Ash Roto Lock Inspection =uel Bunker Conveyor Chain Inspection ✓ / =uel Incline Conveyor Chain Inspection / Start sequence on all grates(Cells and Dropouts) ✓ ✓ =eed auger Bolts ✓ ✓ J Operators Signatures: „„ti�� �� Date: e;� / 1G 700 Hrs, 1300 Hrs. 1900 Hrs. 0100 Hrs. 3LR A BLR B BLR C 3:R A 3_R B B_R C B.-R A 31-R 3 31-R C BLR A BLR 3 31-R C Water Meter Reading Steam Flow KPPH r" �taa 4 r Y Steam Pressure Header Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft "H20 Drum Level /Valve ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field 41 Secondary Voltage ESP Field #2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure Grate Water Temperature Feedwater Pump (# operating) and Pressure 4sh Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Duel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection Start sequence on all grates (Cells and Dropouts) =eed auger Bolts Operators Signatures: `moo t - L.,� Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR Bj BLR C BLR A I BUR B I BLR C BLR A BUR B I BLR C BLR A BLR 8 BLR C Water Meter Reading �`1Q o c1 G1 _ Steam Flow KPPH ���-�} , 1/, 07 Steam Pressure Header TAawt 19�1:1 1 ac%y 3;L1 Steam Pressure Line •34'C% I Exhausts Stack Temp. LR `;� a 3 s 3 Clean Viewing Windows, Metering and dropout ,,� .✓ ,/ Furnace Draft "H20 (0 5- la.7 St//,(, 10,53` y$ ru. 79 to,1u 7 1 Drum Level /Valve % 31 0� 50 3� ss sS ESP KW 12 Hr. Avg AM 3,y� ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp )5 16 141 ESP Purge Air Heater Over trip Temp, -2/0 Ili© ESP Field#1 Secondary Voltage G 35.y 1%, ESP Field #2 Secondary Voltage 31!5, ESP Hopper Heater#1 Temp L nL/ 36 13 25 ESP Hopper Heater#2 Temp '30c, Blow Down Water Column ,� ✓ ✓ Blow Down Triple Low Switch ,, �, ✓ Blow Down Sight Glass v ✓ v Boiler Gas Outlet Temp ScX� 5CY'i 5cx" Bottom Blow Front Sidewall Header Soot Blow Economizer ,✓ ,/ Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ ✓ Air Compressor PSI / 1iO he Air Compressor Temp 17 �s� � 75 Air Compressor Separator and Dryer Filter Diff �✓ Blow Down Air Compressor Water Trap ,s ;✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level -fiA 4A FD Fan Outlet Temp5vSc'.�x �70 7G zzs ins z�s Grate Water Pump (#operating) and Pressure ILI -73 Grate Water Temperature '�JGL �219 2� Feedwater Pump (#operating) and Pressure 60 5S0 Sb� IAsh Container Inspection and Level v, ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ✓ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection I p Start sequence on all grates (Cells and Dropouts) ✓ ,i ,,. ✓ f Feed auger Bolts Operators Signatures: Der e k e Date: G 1 lG 700 Hrs. 1300 Hrs. 1900 Hrs. 010 Hrs. BLR A I BLR B BLR C BLR A I BLR B BLR C BLR A BLR B BLR C BLR A BLR B BLR C Water Meter Reading 3Q9263 "�- ------- Steam Flow KPPH 7, 7 Steam Pressure Header 3 5 3,25- 315 19 Steam Pressure Line i 25 IoZC, Ids Exhausts Stack Temp. '33 3 Clean Viewing Windows, Metering and dropout ✓ ✓ ,i --- Furnace Draft "H20 f6,55 lq,o / l.?3 10,03 11. i 0 .33q0 1/0 -t. l°t Drum Level/Valve % -• 19 .33 ( Sg 60Z -13 q 7 44 ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM y,C ESP Purge Air Heater Duct Control Temp 1 3 16 s / /1/•3 ESP Purge Air Heater Over trip Temp i 7 a15 ;W6 193 ESP Field#1 Secondary Voltage 7, s.3 3 - 3 •7 ESP Field#2 Secondary Voltage 3 5 .6 W,, 1.7 tood- ESP Hopper Heater#1 Temp 3 i'1 313 33I 9 ESP Hopper Heater#2 Temp - 30 7 31 Blow Down Water Column �- Blow Down Triple Low Switch / ✓ / �. Blow Down Sight Glass ✓ ,� ,� ,� Boiler Gas Outlet Temp fo Sio 51a Sic �bU S6G Bottom Blow Front Sidewall Header Soot Blow Economizer / X ,/ Bottom Blow Back Sidewall Headers ,/ x v' Soot Blow Airheater ,✓ i Inspect Multiclone Discharge Inspection Door ✓ .� / / ✓ v Air Compressor PSI tic Ito 10$ l iv Air Compressor Temp 1$O j s30 '7S Air Compressor Separator and Dryer Filter Diff ✓ Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level Y,;L PS IIed FD Fan Outlet Temp as aYG IiAso 9RD 1990 .-W • -Js laic, Grate Water Pump (#operating) and Pressure ? 70( -710 Grate Water Temperature Z{ y a)c 11 I Feedwater Pump (#operating) and Pressure SGO 5-7O 510 4sh Container Inspection and Level ✓ ESP Ash Auger Inspection „ ✓ r ESP Ash Roto Lock Inspection ✓ ✓ ,� =uel Bunker Conveyor Chain Inspection J =uel Incline Conveyor Chain Inspection hart sequence on all grates(Cells and Dropouts) ✓ t/ ✓ ,/ =eed auger Bolts ✓ ✓ ✓ „ ✓ ,/ Operators Signatures: Date: -f ILL 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B FUR C BLR A I BLR B I BLR C BLR A I BLR B BLR C BLR A I LR B FBLR C Water Meter Reading 3'49 V 33 Steam Flow KPPH - i J 1 33, 7 K.c�15- . K Steam Pressure Header 1,1 o29 Steam Pressure Line P 1 Exhausts Stack Temp. 31 y �, le Clean Viewing Windows, Metering and dropout C/4wncd ,i Furnace Draft "H20 ! .0 iq 6.3 j,0,$ el•o4 .3$ Wo3 Drum Level/Valve % 54 Y0 17 X1 yoZ ESP KW 12 Hr. Avg AM 3 ESP KW 12 Hr.Avg PM a.g ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp 19 ,�13 a!O o;2 o ESP Field#1 Secondary Voltage 3v z 3$, 3 7. 8 -I,-- ESP Field#2 Secondary Voltage - !/fs, / 60, 1 , , ESP Hopper Heater#1 Temp ;0 3a 330 ESP Hopper Heater#2 Temp f 3,RC, Blow Down Water Column Blow Down Triple Low Switch ✓ v ,� Blow Down Sight Glass ✓ ,i ,� Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ Soot Blow Airheater ✓ ,� Inspect Multiclone Discharge Inspection Door / ✓ v Air Compressor PSI 110 Air Compressor Temp ISO Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ,� ✓ 1/ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level ? FD Fan Outlet Temp 3"� � a qvo I--Is ago avT lat35*w Grate Water Pump (#operating) and Pressure ;t- 79 72 i Grate Water Temperature Feedwater Pump(#operating) and Pressures 5$uv10 r Ash Container Inspection and Level i ✓ ESP Ash Auger Inspection ✓ ,� ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ ✓ Fuel Incline Conveyor Chain Inspection ✓ Start sequence on A grates (Cells and Dropouts) / ✓ I ✓ ✓ v r / Feed auger Bolts ✓ ✓I ✓ ,/ / Operators Signatures: ! ,J re k Date: 7 6// 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B I BLR C BLR A I BLR B I BLR C BLR A BLR B I BLR C BLR A BLR B BLR Water Meter Reading 5-Q8 . Steam Flow KPPH '1 a R _, gZj, 7-A Steam Pressure Header a;y0 2-7 :AU Steam Pressure Line I a 2 a Exhausts Stack Temp. (— Clean Viewing Windows, Metering and dropout / ✓ ,i Furnace Draft "H20 3q .7310,dg el&A -VS rl.71 Drum Level /Valve% 35 3a 1 61 155 '30 6 7 V ESP KW 12 Hr. Avg AM 6, ESP KW 12 Hr. Avg PM Li. ESP Purge Air Heater Duct Control Temp N 7 15 a ESP Purge Air Heater Over trip Temp Igg 2 )( I ESP Field#1 Secondary Voltage 3`],a `�.8�- 111 _ 5 --7. ESP Ficild #2 Secondary Voltage (�G, I (,,O•a 55 . (,o, O ESP Hopper Heater#1 Temp 36 Arc., f-17 1 3vp f� ESP Hopper Heater#2 Temp — 36 — Blow Down Water Column ✓ .� ✓ ✓ ✓ Blow Down Triple Low Switch v ✓ ✓ ,i Blow Down Sight Glass ►., v, ✓ ✓ ✓ ✓ Boiler Gas Outlet Temp 530 530 53o ZS � Bottom Blow Front Sidewall Header ✓ ✓ ✓ I ✓ / ✓ Soot Blow Economizer v ✓ ✓ Bottom Blow Back Sidewall Headers ✓ ✓ ✓ ✓ ,/ �/ Soot Blow Airheater ✓ ✓ ✓ ✓ Inspect Multiclone Discharge Inspection Door ✓ '�' ✓ Air Compressor PSI 110 1 U I!O Air Compressor Temp 17 1 55 175- Air Compressor Separator and Dryer Filter Diff ,� ✓ ✓ ,.- Blow Down Air Compressor Water Trap ,� ✓' ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp g5 a ass: -7ol 71 ekqx l6 . Grate Water Pump (#operating) and Pressure a 7y '2 `7(- 63 Grate Water Temperature 21 B Z Z a 1�; Feedwater Pump(#operating) and Pressure 590 ! 1 570 Ash Container Inspection and Level ,� ✓ ;� ESP Ash Auger Inspection ,� ,✓ ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Y Fuel Incline Conveyor Chain Inspection ✓ Start sequence on all grates(Cells and Dropouts) v ✓ ✓ ./ ✓ -� ✓ ,� ✓ Feed auger Bolts ✓ .l ✓ ✓ / ✓ v-7n Operators Signatures: mci, Date:7/7116, 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A I BLR B I BLR C BLR A 8LR B BLR C BLR A I BLR B BLR Water Meter Reading 53aa� ,Do/ Steam Flow KPPH Steam Pressure Header �Z 3 1 Steam Pressure Line I a G 2 61 c1 Exhausts Stack Temp. 3y `'��' 3 of 5 Clean Viewing Windows, Metering and dropout ✓ ✓ ✓ Furnace Draft "H20 a3 1 k F&A 6�, }?q ` -3 .(o qi.W,& `t.b Io,t1 Drum Level/Valve% 5.3 S$ 6-9 2 (A yy �a -7'1 ESP KW 12 Hr.Avg AM 3 S ESP KW 12 Hr. Avg PM ii,of ESP Purge Air Heater Duct Control Temp I g(p IL ESP Purge Air Heater Over trip Temp ft !q 7 ESP Field#1 Secondary Voltage 3$, ( 1 "7.to ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp 3-�3 326 J:��' 311 ESP Hopper Heater#2 Temp — 3o� Blow Down Water Column ✓ .� ✓ ,% t/ Blow Down Triple Low Switch ✓ ✓ ✓ ✓ Blow Down Sight Glass ,� ✓ ✓ / Boiler Gas Outlet Temp 55U 6-5 56,0 5 b Bottom Blow Front Sidewall Header ✓ Soot Blow Economizer ✓ / r Bottom Blow Back Sidewall Headers ✓ ✓ ✓ Soot Blow Airheater ,� ✓ .% Inspect Multiclone Discharge Inspection Door ✓ ;/ ,� ,/ Air Compressor PSI Ito Air Compressor Temp 175 Air Compressor Separator and Dryer Filter Diff / ✓ Blow Down Air Compressor Water Trap ✓ ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level — / FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure g r✓ p'Q Grate Water Temperature alb Feedwater Pump(#operating) and Pressure ) 55U j 6 Ash Container Inspection and Level v .,J ESP Ash Auger Inspection ESP Ash Roto Lock Inspection v Fuel Bunker Conveyor Chain Inspection •/ Fuel Incline Conveyor Chain Inspection ,� ✓ ✓ Start sequence on all grates(£eHs and Dropouts) I. ,/ t/ vloo, v Feed auger Bolts JL . � 1 ,,7 ) H Operators Signatures: ba- Date: -7/$/14, 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A BLR 8 1 BLR C BLR A BLR B I BLR C BLR A I BLR 9 8LR Water Meter Reading 3534a8. Steam Flow KPPH L11. $D LA Steam Pressure Header Steam Pressure Line 1 aq Exhausts Stack Temp. 331 3, Q 3, 3 0 Clean Viewing Windows, Metering and dropout v ✓ Furnace Draft"H20 10,a 101'7 �.`11 i� Y g. +t,87 y� t4. Drum Level/Valve% �1 -60 j ESP KW 12 Hr.Avg AM 3.1 ESP KW 12 Hr. Avg PM a.�1 ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp L9J ESP Field#1 Secondary Voltage 3911 ESP Field#2 Secondary Voltage 511 -1 ESP Hopper Heater#1 Temp 31-1 ESP Hopper Heater#2 Temp Blow Down Water Column ✓ Blow Down Triple Low Switch ,� ,� �' �! ✓ Blow Down Sight Glass v ✓" `� Boiler Gas Outlet Temp SSG 5/& 51ol Z, �'v S Bottom Blow Front Sidewall Header Soot Blow Economizer v ✓ ✓ ✓ Bottom Blow Back Sidewall Headers ✓ ✓ Soot Blow Airheater +� J Inspect Multiclone Discharge Inspection Door ,� ✓ ,i ✓ Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ,i / ✓ ✓� Blow Down Air Compressor Water Trap ✓ ✓ ✓' Turbine Bearing Temp Turbine Bearing Vibration AJ A .� Turbine Oil Level V,;L. Od � FD Fan Outlet Temp 29D 980 080 2 : f -7 po w z,, 2>S J5 1 Grate Water Pump(#operating) and Pressure 1 L S ? " Grate Water Temperature a 11 2 1 Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ✓ ✓ ✓ ESP Ash Auger Inspection ✓ f �✓ ESP Ash Roto Lock Inspection ✓ ✓ �✓ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ✓ J �.% Start sequence on all grates(Cells and Dropouts) ✓ ,� ✓ -J L= " �� Feed auger Bolts ✓ ✓ ` Operators Signatures: �W►�e/ ��._- . Date: 7 146 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A I BLR 8 BLR C BLR A I BLR 8 I BLR C BLR A I BLR B BLR Water Meter Reading 0 a''= Steam Flow KPPH y qk6 #S'W. 8+ S,o+j Steam Pressure Header [&3 -3a.4 305 Steam Pressure Line 1a6 + 2-4 Exhausts Stack Temp. 3` a Clean Viewing Windows, Metering and dropout ✓ ✓ - ✓ Furnace Draft"H20 11I.Ss 10,E 1 , / 11� Y Drum Level/Valve% tA 1 75 33 Z HC z ESP KW 12 Hr.Avg AM 2 $ ESP KW 12 Hr.Avg PM 2.7 ESP Purge Air Heater Duct Control Temp 1 L43 i u I5 ESP Purge Air Heater Over trip Temp 712 QU2c" ESP Field #1 Secondary Voltage 3 ,c, 37, 1 2 ESP Field#2 Secondary Voltage 9 S�.9 yS.i 2 ESP Hopper Heater#1 Temp LA3Qo 32 ESP Hopper Heater#2 Temp j3i t 3av 3 -33 Blow Down Water Column ✓ Blow Down Triple Low Switch ✓ ✓ Blow Down Sight Glass ✓ ✓ Boiler Gas Outlet Temp 550 550 5-50 Bottom Blow Front Sidewall Header ,✓ ✓ ✓ Soot Blow Economizer ✓ X Bottom Blow Back Sidewall Headers i ✓ Soot Blow Airheater ✓ ✓ Inspect Multiclone Discharge Inspection Door f ✓ 1 v r/ Air Compressor PSI Ito 110 + 1 i+o Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ✓ f v� Blow Down Air Compressor Water Trap ✓ ✓ ✓ ✓ Turbine Bearing Temp J Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp a15 1.-1 5 g- 10 5 2)5 2?S 2)S Grate Water Pump(#operating)and Pressure $ g 7✓ 70 Grate Water Temperature z G c2+ � 2x Feedwater Pump (#operating) and Pressure 2 5 gv 65 3 5 6� Ash Container Inspection and Level ✓ ✓ �' ESP Ash Auger Inspection ✓ ✓ ✓ ✓ ESP Ash Roto Lock Inspection 1 V Fuel Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection Start sequence on all grates (Cells and Dropouts) v f Feed auger Bolts ✓ ✓ ,f '� ✓ Operators Signatures: C:4n Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A I SLR B BLR C BLR A BLR B BLR C BLR A BLR S SLR Water Meter Reading Steam Flow KPPH n 1 Steam Pressure Header Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft"H20 Drum Level J Valve% ESP KW 12 Hr. Avg AM ESP KW 12 Hr.Avg PM Z,'7 ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economiser Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure Grate Water Temperature Feedwater Pump(#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection 'Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) Feed auger Bolts Operators Signatures: 11 . t+k//3, Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B 3LR C BLR A I 3LR B I BLR C BLR A I 3LR 8 I BLR C BLR A BUR B I BLR Water Meter Reading S 3 --- Steam Flow KPPH W i-M ^ oZ�/. U$ O J! Steam Pressure Header o;Cly a35 Steam Pressure Line v I015 Ia (ZG Exhausts Stack Temp. 3 A(0 3 �� Clean Viewing Windows, Metering and dropout ✓ / Furnace Draft"H20 i,,1'I Drum Level/Valve% al 3( 6-7 ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp 141 ESP Purge Air Heater Over trip Temp 9IC1 a)$ 1a1e ESP Field#1 Secondary Voltage 37.0 3D�� ESP Field#2 Secondary Voltage .G 53�`I ESP Hopper Heater#1 Temp 3cq 3/5- 3t� ESP Hopper Heater#2 Temp 910 33 3u Blow Down Water Column ✓ ✓ Blow Down Triple Low Switch ✓ ,,- Blow Down Sight Glass ✓ y Y Boiler Gas Outlet Temp 5Un SZ)v Bottom Blow Front Sidewall Header V c ✓ Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ ✓ ,� Soot Blow Airheater :� ✓ Inspect Multiclone Discharge Inspection Door - r" ✓ ✓ -- - Air Compressor PSI (10 I10 Ito Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ✓ ,i Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp a50 aSO JR60 Z60 26e 26.- Grate Water Pump(#operating)and Pressure 7 -7to Grate Water Temperature IR I Cl xZ Feedwater Pump (#operating) and Pressure 00 0 S b Ash Container Inspection and Level ✓ ,/ ESP Ash Auger Inspection ,/ ,i ✓ ESP Ash Roto Lock Inspection ✓ Fuel Bunker Conveyor Chain Inspection ,i J Fuel Incline Conveyor Chain Inspection ✓ ✓ �' Start sequence on all grates (Cells and Dropouts) ✓ ✓ ,� v ✓ Feed auger Bolts ✓ ✓ ,i ✓ 1 , Operators Signatures: \^� per Date: ,,z// 700 Hrs. 1300 H 1900 Hrs. 01 0 Hrs. BLR A I BLR B 1 3LR C BLR A I 3LR B I BLR C BLR A I 3L R B I 3LR C BLR A I BLR 3 1 BLR Water Meter Reading 5 S 40 `�Z .v - Steam Flow KPPH S`I,q 37. 56p. a a Steam Pressure Header 3Z9 33d of el 4dam_ Steam Pressure Line la ;,q4 Exhausts Stack Temp. 3 Clean Viewing Windows, Metering and dropout All, ✓ Furnace Draft "H20 lbfi(, l :Si 9•sff .56 ci.re I lo.c' 4.ti c 11, 4 Drum Level/Valve % 14 L 114 S 6 36 31 e{a 35 IJ9 , &-b- oZy ESP KW 12 Hr. Avg AM 4, ESP KW 12 Hr. Avg PM 14,J ESP Purge Air Heater Duct Control Temp I S p $ 16 1 5� ESP Purge Air Heater Over trip Temp Lo0 5;tv I a 20 i ESP Field #1 Secondary Voltage 37. ' ESP Field#2 Secondary Voltage SZ, S.`t 56• 9i ESP Hopper Heater#1 Temp 3 ict 1 -3a a t ESP Hopper Heater#2 Temp - -S - Sot 33 Blow Down Water Column Blow Down Triple Low Switch v v Blow Down Sight Glass ' �f Boiler Gas Outlet Temp 575-v 55v 55- Bottom Blow Front Sidewall Header Soot Blow Economizer ✓ '� Bottom Blow Back Sidewall Headers n �c Soot Blow Airheater Inspect Multicione Discharge Inspection Door i ✓ Air Compressor PSI Ito I O(v 116 Air Compressor Temp t IKu 1�c' Air Compressor Separator and Dryer Filter Diff v , Blow Down Air Compressor Water Trap ✓ �- ;Turbine Bearing Temp .J 'Turbine Bearing Vibration 9 Turbine Oil Level Yf FD Fan Outlet Temp zr.s Zc5 Z(4 Sv a�S c7 7 Grate Water Pump (#operating) and Pressure ? Grate Water Temperature z(g a.7kv o�1c1 Feedwater Pump(#operating) and Pressure 6 IO ' Ash Container Inspection and Level ✓ v ESP Ash Auger Inspection ✓ ESP Ash Roto Lock Inspection y ✓ Fuel Bunker Conveyor Chain Inspection ✓ v Fuel Incline Conveyor Chain Inspection �' ✓ Start sequence on all grates(Cells and Dropouts) . ✓ ✓ Feed auger Bolts ✓ ✓ ' Operators Signatures: Date: 7-/:3 A 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A I BLR B BLR C BLR A BLR B I BLR C BLR A I BLR B I BL Water Meter Reading �'laGb 06' --- Steam Flow KPPH t- q. </ 0, /I Steam Pressure Header -004- 330 30 T Y-j Steam Pressure Line 14 1ac1 /0 -1 Exhausts Stack Temp. 34 33-A 3 Clean Viewing Windows, Metering and dropout f ✓ '✓ Furnace Draft "H20 -il ic, ^+ 1.9(, 10-fO 10.65 q ,5n q`/ t1. 4,9-c I i Drum Level/Valve % U5 1 S0 lo,A 5t7c (vn ESP KW 12 Hr. Avg AM a.q ESP KW 12 Hr. Avg PM 60 ESP Purge Air Heater Duct Control Temp ' Cl .15 ESP Purge Air Heater Over trip Temp ,; 3 = ( c,, ESP Field #1 Secondary Voltage 36,0 37 ^a."') ESP Field#2 Secondary Voltage 5z J/, 1 5(6. 9 ESP Hopper Heater#1 Temp 3 t 6 3; ,A ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater ' Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp + Air Compressor Separator and Dryer Filter Diff ✓ v v Blow Down Air Compressor Water Trap ✓ ✓ '� Turbine Bearing Temp z' .a N Turbine Bearing Vibration ' 4 ti Turbine Oil Level + 'ol 1 �'I !z FD Fan Outlet Temp pv a 7s'i 1.275 Grate Water Pump (#operating) and Pressure ',J ,A -7 Grate Water Temperature 101 p aaol IR ig y t Feedwater Pump (#operating) and Pressure 600 5(0 5-,60 Z cv C, Ash Container Inspection and Level rV v ESP Ash Auger Inspection ✓ ✓ ✓ ESP Ash Roto Lock Inspection ✓ ✓ Fuel Bunker Conveyor Chain Inspection ✓ +/ ✓ Fuel Incline Conveyor Chain Inspection ✓ ✓ ✓ Start sequence on all grates(Ceps and Dropouts) i &A Feed auger Bolts ti� a� ✓ ✓ '� Operators Signatures: .!/ ram Date: 7 /y-/C, 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A I BLR B BLR C BLR A I BLR B 1 BLR C BLR A I BLR B BL Water Meter Reading `f`l.'a �u — Steam Flow KPPH y'S �b. $ Steam Pressure Header 3;q " i)4 Steam Pressure Line 1 a—? Exhausts Stack Temp. 3'L 34/ -3 Clean Viewing Windows, Metering and dropout (9u� ,/ 1,' L", Furnace Draft "H20 `i.ys `.vj .113 `J-651,0J I(•�: Drum Level/Valve% ado 1 S aC 9SI 4/7 3� a ESP KW 12 Hr. Avg AM .q ESP KW 12 Hr.Avg PM 3• ESP Purge Air Heater Duct Control Temp i � T37.'4 j�oESP Purge Air Heater Over trip Temp ,0 � �3ESP Field#1 Secondary Voltage 3Ic I 39. 1 3 2,1 ESP Field#2 Secondary Voltage Nil. h' 5-3, 1 v.9 415. 8 ESP Hopper Heater#1 Temp 3 331 31 3 go 33-3 ESP Hopper Heater#2 TempaLz `� Blow Down Water Column ✓ Blow Down Triple Low Switch ✓ Blow Down Sight Glass Boiler Gas Outlet Temp s►� _ 4 L" s 63b 5 5C 560 Bottom Blow Front Sidewall Header Soot Blow Economizer ✓ Bottom Blow Back Sidewall Headers ✓ ✓ `� Soot Blow Airheater ✓ ✓ ✓ Inspect Multiclone Discharge Inspection Door ✓ ✓ v - ✓ Air Compressor PSI t e dg 11L) Air Compressor Temp 11WO Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ✓ +/ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp 7� �- ` d.7 t1 h5 �i5 o?�vcZ�O G T '05 975 Grate Water Pump (#operating)and Pressure 7u 7a 7A 7'_5' Grate Water Temperature . I l 1 a-c' Feedwater Pump (#operating) and Pressure i L)6 � C� �O (yU0 Ash Container Inspection and Level ESP Ash Auger Inspection 4' ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection V ✓ Fuel Incline Conveyor Chain Inspection t1 ;,. I,,- Start sequence on ali grates(Ce11s and Dropouts) v ✓ Feed auger Bolts ✓ ✓ �� Operators Signatures: !�,���, y- �sC!� rn�F,t )") Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR 8 1 BLR C BLR A I BLR 8 1 BLR C BLR A BLR B I BLR C BLR A I BLR B BL Water Meter Reading -ls,_ tL U$ Steam Flow KPPH , -7 3$, (`� S �� C Stearn Pressure Header I'd 1 )7 TOO, Steam Pressure Line 1,3,5 12q 1 2.S Exhausts Stack Temp. T:,-I -5 1 Clean Viewing Windows, Metering and dropout ✓ ✓ Furnace Draft "H20 I ib - q,E-7 $,5 ¢,ld 1l y v) 2 1, S ) 90 lily Drum Level/Valve% 7v ( 40 6 L S` '2-V 70 ESP KW 12 Hr.Avg AM 2 S ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp 170i �22 ?7 ESP Field #1 Secondary Voltage -) t; 1-1, G ESP Field#2 Secondary Voltage t. 3 511,3 SS 7 (o.Cc ESP Hopper Heater#1 Temp ��14 ESP Hopper Heater#2 Temp 331 3�' Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass l :� Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header i Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door. v' Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ✓ Blow Down Air Compressor Water Trap Turbine Bearing Temp i Turbine Bearing Vibration Turbine Oil Level f^v' ' W 3 ` FD Fan Outlet Temp = "c -°5 125 7-IS 175 1-15 "75 27I Grate Water Pump (#operating) and Pressure gy Grate Water Temperature 2/$ 1 Feedwater Pump (#operating) and Pressure t c ; 5 S 6 t Ash Container Inspection and Level ✓ v ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection tl r' Start sequence on all grates(Cells and Dropouts) f 1 ✓ Feed auger Bolts ✓ ✓ ✓ �- -% _Operators Signatures: ! Date: 7- W f C 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A I 3LR B I BLR C BLR A I BLR B 1 BLR C BLR A BLR B BLR Water Meter Reading 5 q`79 Steam Flow KPPH 5& ,7-5 S,"7 Steam Pressure Header -7 < 3 Steam Pressure Line Jz Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout ✓ �� Furnace Draft"H20 %, �3C ( D7 / /C,SS Iv of S,2 Drum Level/Valve% - l Z9 s 2 ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM � ESP Purge Air Heater Duct Control Temp -7 (S ESP Purge Air Heater Over trip Temp 4/61 ESP Field#1 Secondary Voltage ,S 9 ESP Field#2 Secondary Voltage Z.q LI Z. ESP Hopper Heater#1 Temp j 3 l L ESP Hopper Heater#2 Temp 3 Blow Down Water Column �. ✓ f Blow Down Triple Low Switch ✓ ✓ ✓ Blow Down Sight Glass ✓ .6 Boiler Gas Outlet Temp Bottom Blow Front Sidewali Header �" ✓ Soot Blow Economizer ✓ ' Bottom Blow Back Sidewall Headers ✓ Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI i C fro Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ✓ Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level Z FD Fan Outlet Temp G `� �'� Z ss z ss z rf Grate Water Pump (#operating) and Pressure o Grate Water Temperature Feedwater Pump(#operating)and Pressure SG p R Ash Container Inspection and Level y ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ✓ ` Fuel Bunker Conveyor Chain Inspection ✓ �- Fuel Incline Conveyor Chain Inspection ✓ Start sequence on all grates(CeHs and Dropouts) -- Feed auger Bolts ✓ v ✓ r` Operators Signatures: we:t71 Date: I-1 - 1 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C BLR A 84R B BLR C BLR A BLR B BLR C BLR A BLR B BL Water Meter Reading Steam Flow KPPH Steam Pressure Header Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft"H20 Drum Level/Valve ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM -7 ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field #1 Secondary Voltage ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure Grate Water Temperature Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) Feed auger Bolts Operators Signatures: f)1741��'�(,� 1 Date:7- 71� 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B 1 BLR C BLR A I BLR B I BLR C BLR A I BLR B BLR C BLR A I BLR B BL Water Meter Reading EC Steam Flow KPPH a L4 0 '7 Steam Pressure Header '{ Steam Pressure Line 5 Z Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout 411 ✓ Furnace Draft "H20 I A4 /o.GV 9. Drum Level/Valve% ESP KW 12 Hr. Avg AM .Z ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp ,� = ESP Purge Air Heater Over trip Temp 1 all 1 ESP Field#1 Secondary Voltage 37,7 ESP Field#2 Secondary Voltage ��•" �� . ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp 8`! 333 Blow Down Water Column Blow Down Triple Low Switch % Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewal► Header Soot Blow Economizer y Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI 1 1 v Air Compressor Temp Air Compressor Separator and Dryer Filter Diff ✓ Blow Down Air Compressor Water Trap ✓ +� Turbine Bearing Temp A,1A �A, Turbine Bearing Vibration ,l _ Turbine Oil Level 94i I, FD Fan Outlet Temp 1 2-?" I",0 -'�- '{ Grate Water Pump (#operating) and Pressure Z 12"L Grate Water Temperature 14 �L- Feedwater Pump (#operating) and Pressure )04-5 Ash Container Inspection and Level Jv' ESP Ash Auger Inspection 1/ ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) Feed auger Bolts Operators Signatur Date: -7/a2311, 700 H rs. 1300 H rs. 1900 H rs. 0100 H rs. BLR A rBLR 8 I BLR C BLR A BLR B I BLR C BLR A I BLR B BLR C BLR A BLR B 3L Water Meter Reading 356133. eo Steam Flow KPPH 05-, 7 TA— Steam Pressure Header 30 k Steam Pressure Line '1 Z -15-14S Exhausts Stack Temp. 33,;� l Clean Viewing Windows, Metering and dropout v Furnace Draft "H20 mil.&9 10.0 1 q3 ) 1' _ ) Drum Level/Valve% ESP KW 12 Hr. Avg AM ESP KW 12 Hr.Avg PM 3. & _ ESP Purge Air Heater Duct Control Temp 14/7 ESP Purge Air Heater Over trip Temp l+ ESP Field #1 Secondary Voltage 3 , aIle- ESP Field#2 Secondary Voltage 60.0 ESP Hopper Heater#1 Temp 0 ESP Hopper Heater#2 Temp 333 Blow Down Water ColumnfF Blow Down Triple Low Switch16/ '� Blow Down Sight Glass ✓ '� ✓ Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ ✓ ✓ Soot Blow Economizer ✓ v '� `� Bottom Blow Back Sidewall Headers ✓ '� Soot Blow Airheater '� ✓ Inspect Multiclone Discharge Inspection Door ✓ ,� ✓ `� Air Compressor PSI 00 I O Air Compressor Temp )-75 )25 L' Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ✓ '� Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp 0L7 oZ7 qO I Z5L, Z O's Grate Water Pump (#operating) and Pressure Grate Water Temperature Feedwater Pump (#operating) and Pressure I -]an L Ash Container Inspection and Level -� ESP Ash Auger Inspection v '� ESP Ash Roto Lock Inspection ✓ `� Fuel Bunker Conveyor Chain Inspection ✓ '� Fuel Incline Conveyor Chain Inspection ✓ Start sequence on all grates(Cells and Dropouts) '� ✓ Feed auger Bolts '� '' ✓ '� `� � � Operators Signatures: ��G,' / ��/2'� Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B I BLR C BLR A BL B BLR C BLR A BLR B BLR C BLR A BLR B 3L Water Meter Reading 3s6�sa,°D Steam Flow KPPH — Steam Pressure Header -- Steam Pressure Line Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout Furnace Draft "H20 Drum Level/Valve % ESP KW 12 Hr. Avg AM 3. ESP KW 12 Hr. Avg PIM 3. ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field #1 Secondary Voltage ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI Air Compressor Ternp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure Grate Water Temperature Feedwater Pump (# operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection Start sequence on all grates (Cells and Dropouts) Feed auger Bolts Operators Signatures: [14'r` Orre k Date:'7P /6 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C BLR A 1 BLR B BLR C BLR A BLR B BLR C BLR A I BLR B I BL Water Meter Reading — Steam Flow KPPN LIA Steam Pressure Header 101TZ 71 231 33., Steam Pressure Line t ZS 2- 1 Exhausts Stack Temp. 4 f Clean Viewing Windows, Metering and dropout Furnace Draft "H20 :wja (q,W1 5,m o 2,qq 1C,13 fy.j-- /y.I Drum Level/Valve% 5C, 3S ESP KW 12 Hr. Avg AM Q, $ ESP KW 12 Hr.Avg PM 0. 0 ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp 2 zr ESP Field #1 Secondary Voltage 3 7 �7 5 3gr ESP Field#2 Secondary Voltage G-o, C S Ci 'i S ESP Hopper Heater#1 Temp S zLI 32f-) 3 1. 4 ESP Hopper Heater#2 Temp 33 32 Blow Down Water Column '� l ✓ Blow Down Triple Low Switch .. Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer j Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door - — y" '- - — AirCompressorPSl ►iO i ° �L Air Compressor Temp Air Compressor Separator and Dryer Filter Diff >f Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level i-u FD Fan Outlet Temp 14s 2ta Grate Water Pump (#operating) and Pressure I61 Ce Grate Water Temperature L .:Z2 Z z z Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ✓ Start sequence on all grates (Cells and Dropouts) ✓ ✓ v `' Feed auger Bolts f `" ✓ MaA :ODate perators Signatures: 4 �� Y� ,ZF 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A -BLR B1 BLR C BLR A I UR B BLR C BLR A I BLR B BLR C BLR A I BLR B 1 BL Water Meter Reading -72 LJ3�xl, Steam Flow KPPH 0'OZ) 411, Steam Pressure Header 3 U 3 Steam Pressure Line 20 r Z S 1 dq Exhausts Stack Temp. 502, �� Salo Clean Viewing Windows, Metering and dropout v Furnace Draft"H20 1Ci'7 Drum Level/Valve% 5,A ESP KW 12 Hr.Avg AM t> ESP KW 12 Hr.Avg PM J.. ESP Purge Air Heater Duct Control Temp lnqt I v 15 ESP Purge Air Heater Over trip Temp 2.G I 22z Z Z o ESP Field#1 Secondary Voltage 37• (.n 3 ESP Field#2 Secondary Voltage �`7.y 3`,, ' S 1,5 ESP Hopper Heater#1 Temp 15Z-e- 303 �2g ESP Hopper Heater#2 Temp Blow Down Water Column �/ ✓ Blow Down Triple Low Switch ✓ Blow Down Sight Glass ✓ v Boiler Gas Outlet Temp 3.0 530 s3a Bottom Blow Front Sidewall Header ?C Soot Blow Economizer Bottom Blow Back Sidewall Headers '� x Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ - - - �- Air Compressor PSI Air Compressor Temp �j i5- 17 Air Compressor Separator and Dryer Filter Diff ✓ ✓ ✓ �-- Blow Down Air Compressor Water Trap ✓ ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 1z YZ ' FD Fan Outlet Temp 270 - f5 to Z.I z-7 ;L)S ;0,75 275- Grate Water Pump (#operating)and Pressure 7 Z 1� Grate Water Temperature 2 1 t 2Z 3 Feedwater Pump (#operating) and Pressure C'Z' G o ( pro 'fit, Ash Container Inspection and Level ESP Ash Auger Inspection ✓ ' ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection i Fuel Incline Conveyor Chain Inspection ✓ Start sequence on all grates(Cells and Dropouts) f vr ✓ ✓ ✓ v v ' % Feed auger Bolts ✓ " '� '� / � � o Operators Signatures: Date: /- �t'�' C� � �1 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A 9LR B BLR C BLR A BLR B BLR C BLR A BLR B BL Water Meter Reading ?5 16320L -- Steam Flow KPPH ECG . Z �, �Sb 50. Steam Pressure Header >S 1 73133 Steam Pressure Line I )01 S -� Exhausts Stack Temp. 3 30 3qq Clean Viewing Windows, Metering and dropout ✓ ✓ v Furnace Draft"H20 Jy� `' 115(.h.55 to,I-I q. 4 /G.t to,gq Drum Level/Valve % f ESP KW 12 Hr. Avg AM 1 ESP KW 12 Hr.Avg PM .U ESP Purge Air Heater Duct Control Temp /(, j'7O ESP Purge Air Heater Over trip Temp a l7 ESP Field #1 Secondary Voltage --7 `j 3$ ( 37. F ESP Field#2 Secondary Voltage 5T ji ESP Hopper Heater#1 Temp 311 ESP Hopper Heater#2 Temp 2 — 3671IS Blow Down Water Column ✓ �- Blow Down Triple Low Switch `✓ v Blow Down Sight Glass �'f �- ✓ Boiler Gas Outlet Temp > Bottom Blow Front Sidewal) Header ?C ; Soot Blow Economizer Bottom Blow Back Sidewall Headers Soot Blow Airheater �% ✓ v Inspect Multiclone Discharge Inspection Door V Air Compressor PSI Ito iO$ Air Compressor Temp 115 0 Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ,i v Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 9- ( 4u 1/ FD Fan Outlet Temp Z JC Z jv vZ'-ju 'oi`1U 3Gac� Grate Water Pump (#operating) and Pressure F $ Grate Water Temperature 2 Z A lei a 11 Feedwater Pump (#operating) and Pressure 50 ot: Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ✓ Fuel Bunker Conveyor Chain Inspection i/ ✓ Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Ce41s and Dropouts) v ,� ,✓ �' v Feed auger Bolts `� �' Operators Signatures: ()Jcrek nie Date: 7/30Y/9 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B I BUR C BLR A I BUR B I BLR C BLR A SLR B f BLR C BLR A BLR B SL Water Meter Reading Steam Flow KPPH q 7. 5-3 p, Stearn Pressure Header L7inl 311 -3 i3 Steam Pressure Line 13d, Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout u i Furnace Draft "H20 ci S3(o.0 Drum Level/Valve % o/ q0 q3 Llq ESP KW 12 Hr. Avg AM 3,O ESP KW 12 Hr.Avg PM , 9 ESP Purge Air Heater Duct Control Temp I6 fsv ESP Purge Air Heater Over trip Temp ESP Field #1 Secondary Voltage ?_;k ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp A 3�t ESP Hopper Heater#2 Temp -3;td 30 a Blow Down Water Column Blow Down Triple Low Switch Blow Down Sight Glass ,� ✓ ✓ Boiler Gas Outlet Temp stol 5Zo $gip Bottom Blow Front Sidewall Header Soot Blow Economizer �i ✓ ✓ Bottom Blow Back Sidewall Headers Soot Blow Airheater ✓ Inspect Multiclone Discharge Inspection Door ✓ �/ Air Compressor PSI 10S I i0 Air Compressor Temp 5 i 0 r Air Compressor Separator and Dryer Filter Diff ✓ .� Blow Down Air Compressor Water Trap ✓ ✓ +/ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level V 2 _ n FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure 1 Grate Water Temperature ,? 7 Feedwater Pump (#operating) and Pressure v Ash Container Inspection and Level ESP Ash Auger Inspection ,� ,i ✓ ESP Ash Roto Lock Inspection v Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection i ✓ Start sequence on all grates(Cells and Dropouts) I ✓ v ,� r Feed auger Bolts ;-/111 1 ,/ _Operators Signatures: ,, �L= Ak P I S—( Dater 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B I BLR C BLR A BLR B I BLR C BLR A BLR B I BLR C BLR A BLR B BL Water Meter Reading ' - Steam Flow KPPH D (� Steam Pressure Header `7 Steam Pressure Line 2 Exhausts Stack Temp. Clean Viewing Windows, Metering and dropout ✓ Furnace Draft "H20 y1,5,Z6 Drum Level/Valve % ESP KW 12 Hr. Avg AM ESP KW 12 Hr.Avg PM 0 ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp 1 ° ESP Field #1 Secondary Voltage 1 ESP Fielld#2 Secondary Voltage ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Temp _ Blow Down Water Column ✓ ✓ Blow Down Triple Low Switch Blow Down Sight Glass ✓ `� ✓ Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers X Soot Blow Airheater Inspect Multiclone Discharge Inspection Door / Air Compressor PSI Air Compressor Temp %•7 Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp da Turbine Bearing Vibration Turbine Oil Level 1 FD Fan Outlet Temp IT-1611-75 rKTwe Grate Water Pump (#operating) and Pressure Grate Water Temperature 22 2 Feedwater Pump (#operating) and Pressure d Ash Container Inspection and Level D ESP Ash Auger Inspection ✓ / ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) ✓ ./ Feed auger Bolts V— V7-n' I I� Operators Signatures: ���f,,' c}- �.�r� (,e- Date: i -,2-AL 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A I BLR B 1 BLR C BLR A I BLR B I BLR C BLR A I BLR B 1 BL Water Meter Reading 3- 2y$�`�" -�- -�- Steam Flow KPPH SCE • G5 �• `�W jL ►l Steam Pressure Header "Z v 3 33� Steam Pressure Line i J 2 (� I d Il Exhausts Stack Temp. v p j Z`"I 3 l Clean Viewing Windows, Metering and dropout �' ✓ �— Furnace Draft "H20 b I 9 Ec lk4,7 fC (339 IU.7; Drum Level/Valve % 0 1 ESP KW 12 Hr. Avg AM ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field#1 Secondary Voltage ESP Field#2 Secondary Voltage ESP Hopper Heater#1 Temp 3�� 1 ESP Hopper Heater#2 Temp 3 Blow Down Water Column ✓ ✓ Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header ✓ Soot Blow Economizer ✓ -� Bottom Blow Back Sidewall Headers Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ �/ i Air Compressor PSI 110 Air Compressor Temp ( -7`5 17 S Air Compressor Separator and Dryer Filter Diff ✓ u7 r" Blow Down Air Compressor Water Trap ✓ - Turbine Bearing Temp `A Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Z'7< "Z7o Zg� 7S �7. � G' Grate Water Pump (#operating)and Pressure Grate Water Temperature 17 `l Feedwater Pump (#operating) and Pressure ��L7 'e Ash Container Inspection and Level ESP Ash Auger Inspection ✓ ✓ V ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection ✓ ✓ Fuel Incline Conveyor Chain Inspection ✓` Start sequence on all grates (Cells and Dropouts) / ✓ ✓ ,/ i Feed auger Bolts ✓ ✓ ✓ ✓ i Operators Signatures: Date: $'/3//& 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B I BLR C BLR A BLR B I BLR C BLR A BLR B BLR C BLR A I BLR B BL Water Meter Reading IW35WO39 Steam Flow KPPH 5`1. 7 3 Steam Pressure Header 3l6 �( �ZZ oc, Steam Pressure Line ,�a S G(C ZCo la Exhausts Stack Temp. -3 Clean Viewing Windows, Metering and dropout V Furnace Draft "H20 i,65 q,&q .% ,1 Ci ,5 q-771 w,H Drum Level/Valve % a`I qO 5a ESP KW 12 Hr. Avg AM a.$ ESP KW 12 Hr.Avg PM 3. O ESP Purge Air Heater Duct Control Temp 15 i ESP Purge Air Heater Over trip Temp 199 ESP Field#1 Secondary Voltage "3G • 7 J' 2 ESP Field#2 Secondary Voltage S 7• S `( � �j •Co '�f. ESP Hopper Heater#1 Temp 31 7 31C 2- 18 ESP Hopper Heater#2 Temp '33y 0 Blow Down Water Column `� z- ✓ Blow Down Triple Low Switch ✓ Blow Down Sight Glass ✓ �- ✓ ✓ �' Boiler Gas Outlet Temp 5y0 5`o ,50 Bottom Blow Front Sidewall Header ✓ ✓ Soot Blow Economizer ✓ Bottom Blow Back Sidewall Headers ./ ✓ Soot Blow Airheater ✓ ✓ ✓ Inspect Multiclone Discharge Inspection Door ✓ Air Compressor PSI U Ito Air Compressor Temp 175 7 Air Compressor Separator and Dryer Filter Diff ,i ✓ ✓ ✓ Blow Down Air Compressor Water Trap ,/ ✓ ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level 3/4j FD Fan Outlet Temp 75 �S -2 5 si 1- V � 375 7 oZ75 Grate Water Pump (#operating) and Pressure C l SS 1-7 9T Grate Water Temperature vZ I $ " Z Z 'Z 55 t1 Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ,, I/ ✓ ✓ ESP Ash Auger Inspection ✓ ✓ ESP Ash Roto Lock Inspection `/ ✓ Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection e y p Start sequence on all grates(Cells and Dropouts) Feed auger Bolts ✓ 1 17f 77ri iI 77VI Operators Signatures: fei Date:8/# /6 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A I BLR 6 I BLR C BLR A 8LR 8 BLR C BLR A BLR B BL Water Meter Reading 3571/",aO' Steam Flow KPPH a(�, C �/ G Steam Pressure Header -Z -7 Q Steam Pressure Line I act c 33 Exhausts Stack Temp. '306 Clean Viewing Windows, Metering and dropout ✓ ✓ Furnace Draft "H20 10,qa 10,55j 10.8 iZ`i o a4� Drum Level/Valve% ,t3 5 5Z�° y3 �' ) Yqft ESP KW 12 Hr. Avg AM 2.1 ESP KW 12 Hr.Avg PM 3,3 ESP Purge Air Heater Duct Control Temp 10 /S ESP Purge Air Heater Over trip Temp ) l 2 1 vlei ESP Field#1 Secondary Voltage "?.41 3-31 ESP Field#2 Secondary Voltage 55 6 ESP Hopper Heater#1 Temp 305 i 5Z 3l V ESP Hopper Heater#2 Temp 310 310 Blow Down Water Column ✓ v ✓ ./ Blow Down Triple Low Switch ✓ ✓ ✓ Blow Down Sight Glass v ✓ ✓ ✓ Boiler Gas Outlet Temp 5-CO I 5-C7(j SC) Bottom Blow Front Sidewall Header L�- ✓ Soot Blow Economizer v ✓ ✓ Bottom Blow Back Sidewall Headers ,� ✓ ti/ Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI 110 C) U Air Compressor Temp ISO )'1S � 7 5 7 Air Compressor Separator and Dryer Filter Diff ,/ ✓ Blow Down Air Compressor Water Trap ;/ ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp V, J:aw I�kbO U � �7 ��} � ];s s Grate Water Pump(#operating) and Pressure (I) 5S 96 Grate Water Temperature G�x► Z ► Feedwater Pump (#operating)and Pressure (I '750 Ash Container Inspection and Level v ESP Ash Auger Inspection ✓ ✓ ESP Ash Roto Lock Inspection v Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection ✓ / Start sequence on all grates(CeHs and Dropouts) Feed auger Bolts s r Operators Signatures: << ��,�� Z Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A 1 B BLR C BLR A BLR B BLR C BLR A BLR B 3L Water Meter Reading `j Steam Flow KPPH Steam Pressure Header Steam Pressure Line —� Exhausts Stack Temp. �. Clean Viewing Windows, Metering and dropout �. Furnace Draft "H20 Drum Level/Valve ESP KW 12 Hr. Avg AM ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp ESP Field #1 Secondary Voltage ESP Field#2 Secondary Voltage ' ESP Hopper Heater#1 Temp ' ESP Hopper Heater#2 Temp Blow Down Water Column t Blow Down Triple Low Switch Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer Bottom Blow Back Sidewall Headers 1' Soot Blow Airheater Inspect Multiclone Discharge Inspection Door I Air Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap s Turbine Bearing Temp ' I Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp Grate Water Pump (#operating) and Pressure Grate Water Temperature Feedwater Pump (#operating) and Pressure Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) Feed auger Bolts Operators Signatures: �; I i - Date: 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B I BLR C BLR A I BLR B I ME_ BLR A BLR B I 8LR C BLR A BLR 8 1 SL Water Meter Reading Steam Flow KPPH Steam Pressure Header elf Steam Pressure Line Exhausts Stack Temp. 711 n Clean Viewing Windows, Metering and dropout ✓ ►/ Furnace Draft "H20 ►3.�► 1 �y� ai 1 1113 IZZ&I A 077 Drum Level/Valve% 36 ► -� -1R ESP KW 12 Hr.Avg AM ESP KW 12 Hr.Avg PM G -v ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp 70-7 ESP Field#1 Secondary Voltage �,p -3-1 93`7, ESP Field#2 Secondary Voltage y g.a 6 c" .C3 ESP Hopper Heater#1 Temp 3v9 3Zc� 3Z7 ESP Hopper Heater#2 Temp Blow Down Water Column ,/ Ll Blow Down Triple Low Switch % Blow Down Sight Glass Boiler Gas Outlet Temp s :o Bottom Blow Front Sidewall Header ✓ Soot Blow Economizer Bottom Blow Back Sidewall Headers - t/ Soot Blow Airheater Inspect Multiclone Discharge Inspection Door ✓ `/ l _ Air Compressor PSI vJimlc� Air Compressor Temp ! -7 / 7S Air Compressor Separator and Dryer Filter Diff  V Blow Down Air Compressor Water Trap ✓' / Turbine Bearing Temp /Vto Turbine Bearing Vibration Turbine Oil Level < , 310 FD Fan Outlet Temp ? ,5 Z`l Grate Water Pump (#operating)and Pressure 71 < Grate Water Temperature Feedwater Pump (#operating) and Pressure �p J U Ash Container Inspection and Level J ESP Ash Auger Inspection �' ✓ ✓ ESP Ash Roto Lock Inspection f V ✓ Fuel Bunker Conveyor Chain Inspection ,/ ✓ Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) Feed auger Bolts ,� +, V Operators Signatures: I ,f I \ Date: (tr 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C BLR A I BLR B BLR C BLR A BLR B BLR C BLR A I BLR B BL Water Meter Reading 1 0G:I Steam Flow KPPH � Steam Pressure Header �� G Steam Pressure Line 2� r Ids Exhausts Stack Temp. 3 Clean Viewing Windows, Metering and dropout ✓ Furnace Draft"H20 c Drum Level/Valve% 3� r�9 '7 3-6 ESP KW 12 Hr. Avg AM ESP KW 12 Hr.Avg PM ESP Purge Air Heater Duct Control Temp s8 ESP Purge Air Heater Over trip Temp del ESP Field #1 Secondary Voltage S-7 v _) ESP Field#2 Secondary Voltage 1 U(), 3 59. 1 ESP Hopper Heater#1 Temp ESP Hopper Heater#2 Tempi Blow Down Water Column -' ✓ -� Blow Down Triple Low Switch ✓ `� Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header 7C X Soot Blow Economizer Bottom Blow Back Sidewall Headers X Soot Blow Airheater ✓ Inspect Multiclone Discharge Inspection Door ,/ ✓ ✓ ✓ ✓ J Air Compressor PSI C Air Compressor Temp 17rJ l Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap Turbine Bearing Temp Turbine Bearing Vibration a Turbine Oil Level z " z FD Fan Outlet Temp Z 0 'Z("c- 27'S ��I; - d gas uss Grate Water Pump (#operating)and Pressure d Grate Water Temperature `-U dig Feedwater Pump (#operating) and Pressure (� �' �100 cc30 Ash Container Inspection and Level ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ✓ v Fuel Bunker Conveyor Chain Inspection v Fuel Incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) s% �/ ✓ / l Feed auger Bolts -711 �A Operators Signatures: ban'�e.` Date: B_;� -/Z tt 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A BLR B BLR C BLR A BLR B BLR C BLR A I BLR B BLR C 8LR A BLR 8 BL Water Meter Reading 36 2No7=`' Steam Flow KPPH 2 X i, Steam Pressure Header Steam Pressure Line a—rj Exhausts Stack Temp. ,3' "3> Clean Viewing Windows, Metering and dropout Furnace Draft "H20 3,41 N8 1,73 1C.0 �JL Drum Level/Valve % a$ 6:3 ESP KW 12 Hr. Avg AM 3: ESP KW 12 Hr.Avg PM . ESP Purge Air Heater Duct Control Temp f5� 7r1 S 3 ESP Purge Air Heater Over trip Temp ' ESP Field#1 Secondary Voltage '7•2 ESP Field#2 Secondary Voltage 6,0, t S ESP Hopper Heater#1 Temp 3 ic) 1 3.t4 ESP Hopper Heater#2 Temp Blow Down Water Column / f Blow Down Triple Low Switch ✓ Blow Down Sight Glass ✓ Boiler Gas Outlet Temp S3o Bottom Blow Front Sidewall Header �/ ✓ ;/ Soot Blow Economizer ✓ ✓ Bottom Blow Back Sidewall Headers x X X Soot Blow Airheater Inspect Multiclone Discharge Inspection Door Air Compressor PSI icy Ito Air Compressor Temp I i Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap ✓ / Turbine Bearing Temp �✓ Turbine Bearing Vibration Turbine Oil Level FD Fan Outlet Temp o 2Yo X 10 Grate Water Pump (#operating) and Pressure Grate Water Temperature Feedwater Pump (#operating) and Pressure (00 V G.10 Ash Container Inspection and Level f ESP Ash Auger Inspection ESP Ash Roto Lock Inspection ,f r Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain Inspection � Start sequence on all grates(Cells and Dropouts) / ✓ Feed auger Bolts r.: ✓ Operators Signatures: I-,:�n t ' i�er Date: �� ! /6, 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I 8LR B BLR C BLR A BLR B I BLR C BLR A I BLR B BLR C BLR A I BLR B BL Water Meter Reading 7,s Steam Flow KPPH 2C - " G,is Steam Pressure Header -,v ;2- Steam Pressure Line Exhausts Stack Temp. ,Z 3 -4v 33G Clean Viewing Windows, Metering and dropout Furnace Draft "H20 12,18 12,6,t 16 0 45 7 10•37 10, 9..2 Drum Level/Valve % I ors i 7n ESP KW 12 Hr.Avg AM z.� ESP KW 12 Hr.Avg PM 2•� ESP Purge Air Heater Duct Control Temp ,5 t I-7 iSl ESP Purge Air Heater Over trip Temp Lco a ESP Field#1 Secondary Voltage 3 ,c -; . -7 37, ESP FiL'ld#2 Secondary Voltage 4q,Z. Ste. ,V ESP Hopper Heater#1 Temp 3> 3 2� ESP Hopper Heater#2 Temp 37y1 — a 3 7 �3 Blow Down Water Column �- Blow Down Triple Low Switch �/ r Blow Down Sight Glass ,/ J Boiler Gas Outlet Temp r Bottom Blow Front Sidewall Header ✓ ✓ Soot Blow Economizer f % Bottom Blow Back Sidewall Headers ✓ / ✓ Soot Blow Airheater ✓ J ✓ i f ./ Inspect Multiclone Discharge Inspection Door J J / ✓ /^ Air Compressor PSI Ito Air Compressor Temp .75 Air Compressor Separator and Dryer Filter Diff / / L/ Blow Down Air Compressor Water Trap =/ / Turbine Bearing Temp J U Turbine Bearing Vibration A ; Turbine Oil Level FD Fan Outlet Temp '1 l75 L,c �� ;.-7 v S .�9S 27s 2 7s z 7 C Grate Water Pump (#operating) and Pressure 'e 2 .gam, 2 Grate Water Temperature z 1- a I! Feedwater Pump (#operating) and Pressure 7 v -7c Ash Container Inspection and Level ESP Ash Auger Inspection / ESP Ash Roto Lock Inspection / ✓ Fuel Bunker Conveyor Chain Inspection ,/ ✓ ! yr Fuel Incline Conveyor Chain Inspection ✓ ✓ Start sequence on all grates(Cells and Dropouts) Ll ✓ ✓ Y Feed auger Bolts 1/f L-1 Operators Signatures: Af % i2 Date:`6 `l i'G 700 Hrs. 1300 Hrs. 1900 Hrs. 0100 Hrs. BLR A I BLR B BLR C BLR A I BLR B I BLR C BLR A 9LR B BLR C BLR A I 9LR B 9L Water Meter Reading 5G ag? e` --- Steam Flow KPPH 2 ,s -7 .44 Z. 36.3,� Steam Pressure Header 3142 S1.5 �L- 3a(. Steam Pressure Line Z{3 Z. Exhausts Stack Temp. 3 95 1 3 Clean Viewing Windows, Metering and dropout �� ✓ ,/ ✓ Furnace Draft "H20 f-,.rc Drum Level/Valve% `( 7 S' X IG O ESP KW 12 Hr. Avg AM 2 1 ESP KW 12 Hr.Avg PM 315 ESP Purge Air Heater Duct Control Temp 15,q I 5`7 ESP Purge Air Heater Over trip Temp 2n1 Z-Icy tsl ESP Field #1 Secondary Voltage ,j6' Vz 31. ESP Field#2 Secondary Voltage 7 ca 61f. ESP Hopper Heater#1 Temp 323 57-y 31,11 ESP Hopper Heater#2 Temp — 3 3' 330 Blow Down Water Column ✓ v v Blow Down Triple Low Switch ✓ / ✓ ✓ J Blow Down Sight Glass ✓ '� ✓ ✓ 1 Boiler Gas Outlet Temp 5w s:v s Bottom Blow Front Sidewall Header ,/ ,/ ✓ Soot Blow Economizer Bottom Blow Back Sidewall Headers ✓ ✓ ✓ Soot Blow Airheater ✓ / / ✓ Inspect Multiclone Discharge Inspection Door ✓ ✓ Air Compressor PSI Ito d ' ► l!> Air Compressor Temp i 7 �—( � 1 J 175- Air Compressor Separator and Dryer Filter Diff "✓ v Blow Down Air Compressor Water Trap r Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level ` 2 \lc� FD Fan Outlet Temp 27c 1170 L�� `j c �i✓J �✓Z�d c�((? Q v 0 �lS Grate Water Pump (#operating)and Pressure Grate Water Temperature ztL 'L 2C: G Feedwater Pump (#operating) and Pressure o 70b 30 Ash Container Inspection and Level ✓ ESP Ash Auger Inspection ✓ ✓ ESP Ash Roto Lock Inspection f ✓ Fuel Bunker Conveyor Chain Inspection i ✓ ✓ ✓ Fuel Incline Conveyor Chain Inspection ✓ Start sequence on all grates(Cells and Dropouts) ✓ ./ V- ✓ ✓ Feed auger Bolts ✓ ✓ ✓ ✓ ✓ ✓ ✓ i Date: Operators Signatures: 700 Hrs. 1300 Hrs. 1900 Hrs. 010C Hrs. 3.R ti 3LR 3 3L 1 C 3L3 A 3..R B 9LR c 3_.1 ii 3-,1 3 3_i C 8LR A s1;3 is Water Meter Reading (Steam HOW KPPH (Steam Pressure Header a�� .Steam Pressure Line Exhausts Stack Temp. I Clean Viewing Windows,Metering and dropout � urnace Draft "H20 Drum Level/Valve % ESP KW 12 Hr. Avg AM 3.5 --Sp {W 12 Hr.Avg PM � ESP Purge Air Heater Duct Control Temp ESP Purge Air Heater Over trip Temp �t�4 11=SP Field #1 Secondary Voltage ESP Field#2 Secondary Voltage % i ESP Hopper Heater#1 Temp 3` 7 I ESP Hopper Heater#2 Temp 5 i Blow Down Water Column , Blow Down Triple Low Switch l Blow DOL'Jn Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer r Bottom Blow Back Sidewall Headers Soot Blow Airheater ' Inspect Multiclone Discharge Inspection Door ' Air Compressor PSI ' Air Compressor Temp ----- EE Air Compressor Separator and Dryer Filter Diff ✓ Blow Down Air Compressor Water Trap ✓ Turbine Bearing Temp Turbine Bearing Vibration Turbine Oil Level ^ i FD Fan Outlet Temp 70 -S Grate Water Pump (#operating) and Pressure 4U !Grate Water Temperature IFeedwater Pump (#operating) and Pressure L S� Ash Container Inspection and Level f ESP Ash Auger Inspection ESP Ash Roto Lock Inspection Fuel Bunker Conveyor Chain Inspection Fuel Incline Conveyor Chain inspection Start sequence on all grates (Cells and Dropouts) =eed auger$olts Operators Signatures: /l�C L 700 His. 1300 Hrs. 1900 Hrs. 010C Hrs. 3-;1 3 3A C 3_ ii B t 3 3_ti C ^. 9_ i Water Meter Reading , Steam Fiow KPPH 2 Z • Z Steam Pressure Header �� ;steam Pressure Line ZS 1 Exhausts Stack Temp. ICiean Viewing Windows, Metering and dropout 320 ff = eL urnace Draft"N20 ,L2 3 , 3 Zt — La I Drum Level/Valve% 5 D Es;) KW 12 Hr. Avg AM I ESP KW 12 Ht. Avg PM ESP Purge Air Heater Duct Control Temp , 1-q.X ESP Purge Air Heater Over trip Temp I� 7 cS? Field#1 Secondary Voltage U G ASP Field#2 Secondary Voltage er Neater#1 Temp j ESP Nopp �. � ,. •, _ — SSA ESP Hopper Heater#2 Temp ✓ B ow Down Water Column ✓ Blow Down Triple Low Switch ✓ ✓ Blow Down Sight Glass Boiler Gas Outlet Temp Bottom Blow Front Sidewall Header Soot Blow Economizer ✓ / i Bottom Blow Back Sidewall Headers ✓ ✓ r !Soot Blow Airheater ✓ �/ Inspect Multiclone Discharge Inspection Door Air-Compressor PSI Air Compressor Temp Air Compressor Separator and Dryer Filter Diff Blow Down Air Compressor Water Trap urbine Bearing Temp Turbine Bearing Vibration .�� �— 3 . Turbine Oil Level ,L i�D Fan Outlet Temp Z� a 7' � o�"�8d �� 170 Grate Water Pump (#operating) and Pressure l9 2 l� I'lla l Irate Water Temperature ��As�hContainer edwater Pump (#operating) and Pressure Inspection and LevelSP Ash Auger inspection i ESP Ash Roto Lock Inspection ✓ i�uei Bunker Conveyor Chain Inspection 'Fuel incline Conveyor Chain Inspection Start sequence on all grates(Cells and Dropouts) f ✓ ✓ eed auger Bolts � ,� Date: 7' � Operators Signatures: I Gt r 700 H s 1300 Hrs. 1900 Hrs. 010C irs. 8 1 H iS K 3 3 R C OR H 3_R B 9iR C 9_t it• s i C !? R AJ_;c f :;- NnJater Meter Reading 4;Z 09 iS eam F;o�.' <(PPH ZO -? j aaa (Steam Pressure Header 2 l l a 3 Steam Pressure Line i�25 �0 31 1 Exhausts Stack Temp. �a joean Viewing Windows, Metering and dropout 7Z 9 � tX> tD.d�� �� �v'gdto`5 "H20 �.�� a'� <. 5-1 r75 Furnace Dram t 3 `� 1 Drum Level/Valve % ESP KW 12 Hr. Avg AM ��— ESP KW 12 Hr.Avg PM , W61 !ESP Purge Air Heater Duct Control Tempr ESP Purge Air Heater Over trip Temp 36. 1 ;_SP Field #1 Secondary Voltage I FSP Field #2 Secondary Voltage i ESP Hopper Heater#1 Temp !ESP Hopper Heater#2 Temp ✓ 3iov: Down Water Column ✓ ,/ i Blot; Down Triple Low Switch ✓ ✓ Blow Down Sight Glass Z(,` Boiler Gas Outlet Temp ' �. �/ ✓ i Bottom Blow Front Sidewall Header ISoot Blow Economizer v' ✓ 'Bottom Blow Back Sidevral{ Headers � i Scot Blow Airheater ✓ V ✓ Inspect Multiclone Discharge Inspection Door ` `D t Air-Compressor PSI —I� 75 Air Compressor Temp - f ,/ Air Compressor Separato! and Dryer Filter Diff Blow Down Air Compressor Water Trap � Turbine Bearing Temp z Turbine Searing Vibration 77 r �Z Turbine oil Level I FD Fan Outlet Temp (Grate Water Pump (#operating) and Pressure 21ff 2 Ib IGrateWaterTemperature Feedwater Pump (#operating) and Pressure ✓ ✓ ✓ Ash Container Inspection and Level ESP Ash Auger inspection J 1ESP Ash Roto Lock Inspection L ✓ i Fuel Bunker Conveyor Chain Inspection ✓ � Fuel incline Conveyor Chain Inspection ✓ . J j ✓, v Start sequence on ail grates (Cells and Dropouts) J ✓ l;--eed auger$oits J J'� (�_ Ooerators Signatures: 11)u+ Ore Date: 9/cR8'//6 700 Hrs. 1300 Hrs. 1900 Hrs. 010C Hrs. d l ti dLi B 3_R C 3_R µ I 3_R 3 1 9_R C 3_1 A 1 3-LR 3 -`i C BLR A 1 3,11 :- l^Dater Meter Reading -37 i 7 50- OO i5term How <PPH (0'as .Gib SRO 3 . 15team Pressure Header a�0 +Steam Pressure Line I a H Z` z lay Exhausts Stack Temp. 550 G 81 jClean Viewing Windows, Metering and dropout ✓ ✓ ✓ � i= t"H20 1G. 1U,b tU.b( 2 3 q� `1-, to.51 lay s ornace Drat 1 Drum Level/Valve% 'aZ I 33 3^1 ( 2ra 3C, R G!S 4c, 6 3 ESP KW 12 Hr. Avg AM ESP KW 12 Hr. Avg PM ESP Purge Air Heater Duct Control Temp � 7 ASP Purge Air Heater Over trip Temp ei i ASP Field #1 Secondary Voltage 35. 6 3S� �0 '� ESP Field#2 Secondary Voltage 5� g 6ae i ESP Hopper Heater#1 Temp 31 31 i ESP Hopper Heater#2 Temp Biow Down Water Column i Blow Down Triple Low Switch ✓ `� � '� Blow Down Sight Glass ZS 2S Boiler Gas Outlet Temp 530 53 53 i Bottom Blow Front Sidewall Header ✓ ✓ ✓ ✓ J ?Soot Blow Economizer J � 'Bottom Blow Back Sidewall Headers ✓ J J Sooz Blow Airheater ✓ `� Inspect Multiclone Discharge Inspection Door Air Compressor PSI (os V f IU Air Compressor Temp Air Compressor Separato and Dryer Filter Dif# Blow Down Air Compressor Water Trap ✓ `� Turoine Bearing Temp Turbine Bearing Vibration 3y Turbine Oil Level ` FD Fan Outlet Temp ILI ba a6o a60 0 ' ' a6G ,c (Grate Water Pump (#operating) and Pressure j 17 !Grate Water Temperature IFeedwater Pump (#operating) and Pressure i� SOS Ash Container inspection and Level ✓ v ESP Ash Auger Inspection (ESP Ash Roto Lock Inspection i uei Bunker Conveyor Chain Inspection ✓ Fuel Incline Conveyor Chain Inspection ✓ '� '� Start sequence on al! grates(Cells and Dropouts) ✓ ✓ f J ✓ ✓ ✓ ,-eed auger$oits