HomeMy WebLinkAboutAQ_F_0800107_20110328_CMPL_InitNot / 1836 Eastchester Dr.
/ LLONS , Suite 108
High Point,NC 27265
Ener V Solutions Group 0: 360.750.3 F: 360.750.3483
g 1 83
OR00lo-)
r�
Pr�
March 25, 2011
Mr. Robert Fisher
Regional Air Quality Supervisor
Washington Regional Office
NCDENR- Division of Air Quality
943 Washington Square Mall
Washington, NC 27889
RE: Notice of Commencement of Construction
Dear Mr. Fisher,
Thank you again for your continued assistance
ce in the process of securing
a Construction and Operating
permit our Biomass Cogeneration Facility
p g which
c is beingconstructed at 3539 Governors Rd Lewiston-
Woodville, North Carolina.
Per the requirement for Air Permit No. 10126R00, Section A, Specific Conditions and Limitations,
Paragraph 6, 15 A NCAC 2D.0524 "New Source Performance Standards", NSPS Reporting
Requirements. This paragraph stipulates that permit holder is required to notify the Regional Supervisor,
DAQ, in writing, of the commencement date of construction(40 CFR 60.7).
Please accept this memorandum in meeting this requirement of notification that physical, on-site
construction will commence on March 28, 2011, on the biomass cogeneration facility at 3539 Governors
Rd, Lewiston-Woodville, North Carolina.
If I can be of further assistance,please do not hesitate to call.
Regards,
Wellons Energy Solutions,
Garald-B C--ottretr �—
President& General Manager-Wellons Energy Solutions, LLC
President-W.E. Partners I1, LLC
p E C E D NI
MAR 2 8 2011
DAQ WARO