Loading...
HomeMy WebLinkAboutAQ_F_0800107_20110328_CMPL_InitNot / 1836 Eastchester Dr. / LLONS , Suite 108 High Point,NC 27265 Ener V Solutions Group 0: 360.750.3 F: 360.750.3483 g 1 83 OR00lo-) r� Pr� March 25, 2011 Mr. Robert Fisher Regional Air Quality Supervisor Washington Regional Office NCDENR- Division of Air Quality 943 Washington Square Mall Washington, NC 27889 RE: Notice of Commencement of Construction Dear Mr. Fisher, Thank you again for your continued assistance ce in the process of securing a Construction and Operating permit our Biomass Cogeneration Facility p g which c is beingconstructed at 3539 Governors Rd Lewiston- Woodville, North Carolina. Per the requirement for Air Permit No. 10126R00, Section A, Specific Conditions and Limitations, Paragraph 6, 15 A NCAC 2D.0524 "New Source Performance Standards", NSPS Reporting Requirements. This paragraph stipulates that permit holder is required to notify the Regional Supervisor, DAQ, in writing, of the commencement date of construction(40 CFR 60.7). Please accept this memorandum in meeting this requirement of notification that physical, on-site construction will commence on March 28, 2011, on the biomass cogeneration facility at 3539 Governors Rd, Lewiston-Woodville, North Carolina. If I can be of further assistance,please do not hesitate to call. Regards, Wellons Energy Solutions, Garald-B C--ottretr �— President& General Manager-Wellons Energy Solutions, LLC President-W.E. Partners I1, LLC p E C E D NI MAR 2 8 2011 DAQ WARO