Loading...
HomeMy WebLinkAboutAQ_F_1800462_20230109_CMPL_CompRpt_Annual22 f I I ( � dC4(0 CO factors For: CO (lb/ton) Year: 2022 Send to Plant Dryer 0.13 Silo filling/loadout 0.00253 ig es possible GO CO emissions from CO emissions from silo emissions from Total CO Month Asphalt Tonnage dryer,tons filling/loadout,tons burners*,tons emissions,tons January 4990.14 0.324 0.006 0.04 0.37 February 0 0.000 0.000 0.00 0.00 March 3546.01 0.230 0.004 0.04 0.27 April 12604.3 0.819 0.016 0.04 0.87 May 7281.55 0.473 0.009 0.04 0.52 June 14968.21 0.973 0.019 0.04 1.03 July 8208.17 0.534 0.010 0.04 0.58 August 8909.93 0.579 0.011 0.04 0.63 September 12064.21 0.784 0.015 0.04 0.84 October 11937.83 0.776 0.015 0.04 0.83 November 7107.69 0.462 0.009 0.04 0.51 December 8184.24 0.532 0.010 0.04 0.58 Annual Totals 2021 1 99,802.28 6.49 0.13 0.43 7.04 *The facility has two burners(I-ES2 and I-ES3)with a combined rating of 1.3 million Btu/hr. Both can run either natural gas or No.2 fuel oil,but natural is the worst case scenarion so it will be used.The emission factor is 0.082 Ibs/but.The spreadsheet is set up as an if/then function so that no emissions are included if no asphalt was produced.that month and the maximum is inculeded if the facility operated at all.This will slightly overestimate emissions. NC DEPARTMENT OF ENVIRONMENTAL QUALITY RECEIVED JAN 0 9,2023 MOORESVILLE REGIONAL Q FRCE DIVISION O;FAN;R G p,RLny REVISED Midcontractors 2022x]s