Loading...
HomeMy WebLinkAboutAQ_F_0800109_20170220_CMPL_CompRpt • j Perdue Farms incorporated P.O.Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office (252)348-4200 February 20, 2017 Keep on File-Submit Upon Request Attn: Betsy Huddleston North Carolina Division of Air Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 RE: Biennial Tune-up and Compliance Certification— Air Permit# 102651102 Perdue Foods, LLC—Lewiston, NC Bertie County Dear Ms. Huddleston, This document is to fulfill recordkeeping requirements in Air Permit#102651102 issued to Perdue Foods, LLC located in Lewiston, NC. Please find enclosed biennial tune-up records for a tune-up/inspection of boilers ES-4 and ES-5 conducted on November 15, 2016. I certify that my facility has complied with the requirements in §63.11223 to conduct a biennial tune-up, as applicable, of each boiler. By my signature, 1 am certifying that my facility has complied with all relevant standards and other requirements of 40 CFR part 63 subpart JJJJJJ and certifying the truth, accuracy and completeness of this document. Respectfully submitted, Timothy Mizelle Environmental Manager Perdue Foods, LLC SC _m_ 23 A Family Commitment to Quality Since 19200D Charlotte(704)597-0003 Cb Greensboro(336)275-1631 Greer(864)968-3363 Sales do Service,Inc. Columbia(803)808-3366 Date: 11/15/2016 AREA SOURCE TUNING REQUIREMENTS Customer: Perdue Serial# L-60658 Model# CB 400-500-150ST Tune-Up Conducted By: Michael Bristow -Check the box as completed. TUNE UP PROCEDURES: *If procedure does not apply-note"NA" Inspect the burner Clean or replace any components of the burner as necessary. COMPLETE Adjust the burner as necessary to optimize the flame pattern. The Inspect the flame pattern adjustment should be consistant with the manufacturer's COMPLETE specifications,if applicatable. Ensure system is calibrated and fuctioning properly,if such a system COMPLETE Inspect the air/fuel ratio system is installed on the boiler. Optimize emissions consistent with the manufacturer's spec,if COMPLETE Optimize emission of carbon monoxide(co) available. Parameter Before After Measure CO and 02 levels in exhaust,before and Basis(wet/dry) DRY DRY COMPLETE after tune-up CO(ppmv) 57 6 02(%by volume) 1 6.2 4.5 Technician Data Sheet 02.x1s i Charlotte(704)597-0003 Cb Greensboro(336)275-1631 Greer(864)968-3363 BWM Sales dr Servlee,Inc. Columbia(803�08 3366 Date: 11/15/2016 AREA SOURCE TUNING REQUIREMENTS Customer: Perdue Serial# L-60657 Model# CBa00-500-150ST Tune-Up Conducted By: Michael Bristow •Check the box as completed. TUNE UP PROCEDURES: -if procedure does not apply-note"NA" COMMENTSINSPECT • ACTIONS REQUIREMENT DESCRIPTION Inspect the burner Clean or replace any components of the burner as necessary. COMPLETE Adjust the burner as necessary to optimize the flame pattern. The Inspect the flame pattern adjustment should be consistant with the manufacturer's COMPLETE specifications,if applicatable. Ensure system is calibrated and fuctioning properly,if such a system COMPLETE Inspect the air/fuel ratio system is installed on the boiler. Optimize emissions consistent with the manufacturer's spec,if COMPLETE Optimize emission of carbon monoxide(co) available. Parameter Before After Measure CO and 02 levels in exhaust,before and Basis(wet/dry) DRY DRY COMPLETE after tune-up CO(ppmv) 71 2 02(%by volume) 5.8 3.9 Technician Data Sheet 02.x1s s Factory Autf :ed Service C4, CB01 R CieaverBrookw Sales & Service, Inc. All Models - 24 Hr. Service o New & Used Boilers Charlotte (704) 597-0003 Greensboro (336) 275-1631 Columbia (803) 808-3366 Duncan (864) 968-3363 Job#: �f / Technician: ;� �•y/6� yo Date: j Customer: 4 ✓g.��e- P.O.#: Q �c�CI7Rc6,$ Y� T Street 'S City: �elL�� '" State: ! Zip: I MODEL NO.: /�C'� � G fc�/� UNIT NO.. i ' WARRANTY CONTRACT SERVICE ! N COMPLETE j1 f r Service Requested: a r -s- le,4)1' er-- e Cn, Ui�'�` !�2'"`'3 '&' ' 4.e Seo ����T , / �&s0 Services Rendered: �• !�'� .•':!cam f� �llsi..v;=�ic-.�-1,S'�'rs /l�C.Q{'�'�C'f /jS'. l�ffCc:��t �'I� r/�G�•/!�J 1:61 //✓�� .>r. G:G",!'C 1 fA1" /+"Cz,« —4_PC'r r^�R f lm5oe e:' 4�✓!'C f/q5 fe� I.nA�,yrr �// �r44, ` C� E,•o,r-� r�GnlS. G`C�v �;� -h �lc *t!%,�i,^•r. C!. r[i rn �:c1ff3� '7,' i.A� 4r i?roa'JC� / V� /, / ..CnG� ]` C /y t /rr. �J/4r'I fn'1"F A. f r /V �;Af, tl 1r4'-p ;/O'. �ff�ln r C'!� rrr,ns 1AiR �ci C .� lrn `rlr/ �!,,n; ci. cn DATE TIME FROM-TO MILES TRAVEL TIME JOB TIME Start Finish RT j OT RT OT QTY PART NO. MATERIAL UNIT PRICE SIGNATURE: Revised 3110 TECHNICIAN'S REPORT N--inn