HomeMy WebLinkAboutAQ_F_0800109_20170220_CMPL_CompRpt • j
Perdue Farms incorporated
P.O.Box 460
Lewiston Woodville, NC 27849
www.perdue.com®
Office (252)348-4200
February 20, 2017 Keep on File-Submit Upon Request
Attn: Betsy Huddleston
North Carolina Division of Air Quality
Washington Regional Office
943 Washington Square Mall
Washington, NC 27889
RE: Biennial Tune-up and
Compliance Certification—
Air Permit# 102651102
Perdue Foods, LLC—Lewiston, NC
Bertie County
Dear Ms. Huddleston,
This document is to fulfill recordkeeping requirements in Air Permit#102651102 issued to
Perdue Foods, LLC located in Lewiston, NC. Please find enclosed biennial tune-up records for a
tune-up/inspection of boilers ES-4 and ES-5 conducted on November 15, 2016.
I certify that my facility has complied with the requirements in §63.11223 to conduct a biennial
tune-up, as applicable, of each boiler. By my signature, 1 am certifying that my facility has
complied with all relevant standards and other requirements of 40 CFR part 63 subpart JJJJJJ and
certifying the truth, accuracy and completeness of this document.
Respectfully submitted,
Timothy Mizelle
Environmental Manager
Perdue Foods, LLC
SC
_m_ 23
A Family Commitment to Quality Since 19200D
Charlotte(704)597-0003
Cb
Greensboro(336)275-1631
Greer(864)968-3363
Sales do Service,Inc. Columbia(803)808-3366
Date: 11/15/2016 AREA SOURCE TUNING REQUIREMENTS
Customer: Perdue
Serial# L-60658
Model# CB 400-500-150ST
Tune-Up Conducted By: Michael Bristow
-Check the box as completed.
TUNE UP PROCEDURES: *If procedure does not apply-note"NA"
Inspect the burner Clean or replace any components of the burner as necessary. COMPLETE
Adjust the burner as necessary to optimize the flame pattern. The
Inspect the flame pattern adjustment should be consistant with the manufacturer's COMPLETE
specifications,if applicatable.
Ensure system is calibrated and fuctioning properly,if such a system COMPLETE
Inspect the air/fuel ratio system is installed on the boiler.
Optimize emissions consistent with the manufacturer's spec,if COMPLETE
Optimize emission of carbon monoxide(co) available.
Parameter Before After
Measure CO and 02 levels in exhaust,before and Basis(wet/dry) DRY DRY
COMPLETE
after tune-up CO(ppmv) 57 6
02(%by volume) 1 6.2 4.5
Technician Data Sheet 02.x1s
i
Charlotte(704)597-0003
Cb
Greensboro(336)275-1631
Greer(864)968-3363
BWM
Sales dr Servlee,Inc. Columbia(803�08 3366
Date: 11/15/2016 AREA SOURCE TUNING REQUIREMENTS
Customer: Perdue
Serial# L-60657
Model# CBa00-500-150ST
Tune-Up Conducted By: Michael Bristow
•Check the box as completed.
TUNE UP PROCEDURES: -if procedure does not apply-note"NA"
COMMENTSINSPECT • ACTIONS
REQUIREMENT DESCRIPTION
Inspect the burner Clean or replace any components of the burner as necessary. COMPLETE
Adjust the burner as necessary to optimize the flame pattern. The
Inspect the flame pattern adjustment should be consistant with the manufacturer's COMPLETE
specifications,if applicatable.
Ensure system is calibrated and fuctioning properly,if such a system COMPLETE
Inspect the air/fuel ratio system is installed on the boiler.
Optimize emissions consistent with the manufacturer's spec,if COMPLETE
Optimize emission of carbon monoxide(co) available.
Parameter Before After
Measure CO and 02 levels in exhaust,before and Basis(wet/dry) DRY DRY
COMPLETE
after tune-up CO(ppmv) 71 2
02(%by volume) 5.8 3.9
Technician Data Sheet 02.x1s
s
Factory Autf :ed Service
C4,
CB01 R CieaverBrookw
Sales & Service, Inc. All Models - 24 Hr. Service o New & Used Boilers
Charlotte (704) 597-0003
Greensboro (336) 275-1631
Columbia (803) 808-3366
Duncan (864) 968-3363 Job#:
�f /
Technician: ;� �•y/6� yo Date: j
Customer: 4 ✓g.��e- P.O.#:
Q �c�CI7Rc6,$ Y� T
Street 'S City: �elL�� '" State: ! Zip: I
MODEL NO.: /�C'� � G fc�/� UNIT NO..
i '
WARRANTY CONTRACT SERVICE ! N COMPLETE j1
f r
Service Requested: a r -s- le,4)1' er-- e Cn, Ui�'�` !�2'"`'3 '&'
'
4.e Seo ����T , / �&s0
Services Rendered: �•
!�'� .•':!cam f� �llsi..v;=�ic-.�-1,S'�'rs /l�C.Q{'�'�C'f /jS'. l�ffCc:��t �'I� r/�G�•/!�J 1:61 //✓�� .>r. G:G",!'C
1 fA1" /+"Cz,« —4_PC'r r^�R f lm5oe e:' 4�✓!'C f/q5 fe� I.nA�,yrr �// �r44,
` C� E,•o,r-� r�GnlS. G`C�v �;� -h �lc *t!%,�i,^•r. C!. r[i
rn �:c1ff3� '7,' i.A� 4r i?roa'JC� / V� /, / ..CnG� ]` C /y t /rr. �J/4r'I fn'1"F
A. f r /V
�;Af, tl 1r4'-p ;/O'. �ff�ln r C'!� rrr,ns 1AiR �ci C .� lrn `rlr/ �!,,n; ci.
cn
DATE
TIME FROM-TO MILES TRAVEL TIME JOB TIME
Start Finish RT j OT RT OT
QTY PART NO. MATERIAL UNIT PRICE
SIGNATURE:
Revised 3110 TECHNICIAN'S REPORT
N--inn