Loading...
HomeMy WebLinkAboutAQ_F_0800109_20130103_CMPL_Ext-Rqst 0 •1 Perdue AgriBusiness Inc. Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office(252)348-4364 12/31/2012 Robert Fisher,Regional DAQ Supervisor North Carolina Division of Air Quality Washington Regional Office 943 Washington SquareMall Washington,NC 27889 SUBJECT: 40 CFR 63 Subpart ZZZZ(RICE NESHAP)Compliance Date Extension Request Air Quality Permit No. 10265R00 Perdue Farms-Lewiston Facility ID: 0800109 Lewiston,Bertie County Facility Classification: Synthetic Minor Dear Mr.Fisher: With this letter Perdue Farms-Lewiston is requesting a one year extension for compliance with the above referenced regulation. This request is in accordance with 40 CFR 63.6(i)(4). This request applies to the following engine(s): • ES-22A, ES 22B • Make&Model—CAT 3 516 • Serial#-BDP00370—Serial#-BDP00386 • 2628 HP Diesel Fired Generators As required by 40 CFR 63.6(i)(6)(i),the following information is being provided to obtain the extension: 1. A description of the controls to be installed to comply with the standard: Catalytic control to reduce HAP emissions. 2. A compliance schedule, including the date by which each step toward compliance will be reached. At a minimum,the list of dates shall include: (1)The date by which on-site construction, installation of emission control equipment, or a process change is planned to be initiated; and (2)The date by which final compliance is to be achieved. (3)The date by which on-site construction, installation of emission control equipment,or a process change is to be completed; and - (4)The date by which final compliance is to be achieved; "! I a JAN 3 2013 Fill V a •1 ., Cp since 1920 DAQ V ARO 9 0 0 1 Perdue AgriBusiness Inc. Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office(252)348-4364 Compliance Schedule as follows. 1.Installation of emission control equipment, or process change. December 31, 2013 2.Final compliance date. December 31, 2013 Should you have any questions or need any additional information, please contact me at(252-348-4326) Sincerely, Wayne Black, Director Perdue Agribusiness Environmental M 6 IN—T, r ` r nta`P Perdue AgriBusiness Inc. Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office(252)348-4364 12/31/2012 Robert Fisher,Regional DAQ Supervisor North Carolina Division of Air Quality Washington Regional Office 943 Washington SquareMall Washington,NC 27889 SUBJECT: 40 CFR 63 Subpart ZZZZ(RICE NESHAP)Compliance Date Extension Request Air Quality Permit No. 10265R00 Perdue Farms-Lewiston Facility ID: 0800109 Lewiston,Bertie County Facility Classification: Synthetic.Minor Dear Mr. Fisher: With this letter Perdue Farms-Lewiston is requesting a one year extension for compliance with the above referenced regulation. This request is in accordance with 40 CFR 63.6(i)(4). This request applies to the following engine(s): • ES-22A, ES 22B • Make&Model—CAT 3 516 • Serial#-BDP00370—Serial#-BDP00386 • 2628 HP Diesel Fired Generators As required by 40 CFR 63.6(i)(6)(i),the following information is being provided to obtain the extension: 1. A description of the controls to be installed to comply with the standard: Catalytic control to reduce HAP emissions. 2. A compliance schedule, including the date by which each step toward compliance will be reached. At a minimum,the list of dates shall include: (1)The date by which on-site construction, installation of emission control equipment, or a process change is planned to be initiated;and (2)The date by which final compliance is to be achieved. (3)The date by which on-site construction, installation of emission control equipment, or a process change is to be completed; and (4)The date by which final compliance is to be achieved; a n. 9 0 Perdue AgriBusiness Inc. Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com' Office(252)348-4364 Compliance Schedule as follows. 1.Installation of emission control equipment, or process change. December 31, 201 2.Final compliance date. December 31, 2013 Reason for Requesting Compliance Date Extension Perdue Farms of Lewiston respectfully request this extension for the following reason. .Due to the fact that the RICE NESHAP ruling has not been finalized management does not have the information needed to make a determination to continue as permitted(Emergency/Peak Shaving)and spend capital on modifications to meet RICE NESHAP emission limits or use the generators as Emergency only. If this ruling were finalized this month,management may not have enough time to have the modifications performed by the May 3,2013 compliance date. Should you have any questions or need any additional information, please contact me at(252-348-4326) Sincerely, Wayne Black, Director Perdue Agribusiness Environmental ' au . 6 T� •