Loading...
HomeMy WebLinkAboutAQ_F_0400061_20220712_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Catawba Biogas,LLC NC Facility ID 0400061 Inspection Report County/FIPS: Anson/007 Date: 07/15/2022 Facility Data Permit Data Catawba Biogas, LLC Permit 10593 /ROI 1133 Blewett Falls Rd. Issued 8/18/2021 Lilesville,NC 28091 Expires 9/30/2027 Lat: 34d 58.2580m Long: 79d 54.9294m Class/Status Small SIC: 1311 /Crude Petroleum&Natural Gas Permit Status Active NAICS: 211111 /Crude Petroleum and Natural Gas Extraction Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Bill Parmentier Bill Parmentier Bill Parmentier NSPS: Subpart Dc Manager Manager Manager (877)382-8671 (877)382-8671 (877)382-8671 Compliance Data Comments: Inspection Date 07/12/2022 Inspector's Name Mike Thomas Inspector' Signature: Operating Status Operating Compliance Status Compliance- inspection „ Action Code FCE Date of Signature: Inspection Result Compliance s 2Z Total Actual emissions in TONSIYEAR: TSP SO2 NOX VOC CO PM10 * HAP No emissions inventory on record.The emissions inventory is due 07/02/2027. * Highest HAP Emitted inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE: None Date Test Results Test Method(s) Source(s)Tested I. DIRECTIONS: From FRO,head south on Green St toward Maiden Ln. At the traffic circle,take the 2nd exit onto Gillespie St. Turn right onto W Russell St. Turn left onto Robeson St. Use the left 2 lanes to turn left onto Raeford Rd and continue for 10 miles. Just past Wagram,turn right onto Old Wire Road(NC Hwy 144).Turn right onto Old Wire Road(Hwy 144)and go— 11 1/2 miles to Laurel Hill. Turn right onto US 74 West and continue for—25 miles until you enter Anson County,just after crossing the Pee Dee River.Continue approximately 6 miles and turn right onto Blewett Falls Road. The location of the facility is on the left. II. SAFETY: Standard DAQ safety equipment required. M. FACILITY PROCESS DESCRIPTION: Catawba Biogas,LLC is a greenfield biogas production operation located in Lilesville,Anson County. The facility will receive used poultry bedding from surrounding farms to use as feedstock for an anaerobic digester system to produce biogas. The facility will utilize fermentation to remove nitrogen from the used poultry bedding prior to anaerobic digestion. During normal operation,the biogas will leave the anaerobic digesters and flow through a fixed bed media vessel containing activated carbon media known as the Carbon Adsorber Hydrogen Sulfide Removal System. The biogas will be upgraded to natural gas quality and injected into an existing natural gas pipeline. The undesirable(non-methane)constituents of the biogas will be combusted using a shrouded flare utilizing natural gas as the pilot fuel. The shrouded flare will be used to combust the biogas on-site during facility startup and at times when the upgrading system is temporarily out of operation.A natural gas-fired boiler will be used to produce process heat. A storage bunker capable of storing a five-day supply of used poultry bedding will be used to receive solid material at the facility. The used poultry bedding will be treated in three receiving pits that act to homogenize the material. The used poultry bedding will then enter a biomass liquefaction system where it is mixed with hot water and large inorganic particles are removed. The used poultry bedding will be heated to minimize the heating that is needed in the fermenters. The gases from the biomass liquefaction system, which will include ammonia,will be collected, and routed to the natural gas-fired boiler's intake which will control emissions from the biomass liquefaction system when used as a thermal oxidizer. The facility will be staffed full-time,24 hours per day, 7 days per week, by a trained operator. The operator will monitor operations, including biogas production and the shrouded flare,to ensure the facility is operating within acceptable operating limits. IV. PERMITTED EMISSION SOURCES: Emission Source Emission Source Control Control System ID Description System ID Descr iption, .......... ES- Natural gas-fired Boiler (NSPS) (19.02 mmBtu/hr maximum heat input) N/A N/A Shrouded Biogas Flare CD-1 (using natural as for pilot flame with a ( g g Biogas Production Equipment 28.06 mmBtu/hr maximum heat input) ES-2 (consisting of three(3)identical 70,629 ft3 fermenters and two(2)identical and and 2.28 million-gallon anaerobic digesters) Carbon Adsorber CD-2 Hydrogen Sulfide Removal System* ES-3 Natural gas-fired Boiler Biomass Liquefaction System N/A (ID No.ES-1)used as a thermal oxidizer INSIGNIFICANT/EXEMPT ACTIVITIES: Source Exemption Regulation Source of Source of Title TAPs? V Pollutants? IES-1 Two Lean Ammonia Water Pits 2Q.0102(g)(14)(B) Yes F No (each 3,770 ft3 in volume) IES-2 Rich Ammonia Water Tank equipped with 2Q.0102(g)(4) Yes € No Activated Carbon Filter V. INSPECTION SUMMARY: On 12 July 2022,I Mike Thomas of FRO DAQ conducted a compliance evaluation inspection of Catawba Biogas,LLC. This facility has not yet been constructed. VI. NON-COMPLIANCE HISTORY SINCE 2010: None. VII. 112R STATUS: This facility does not store any of the listed chemicals above the threshold quantities,and is not required to maintain a written risk management plan(RMP). VIII. COMPLIANCE STATEMENT AND RECOMMENDATION: Catawba Biogas,LLC appeared to be in compliance with the conditions in their current air permit on 12 July 2022. Pink Sheet:No comments. /mst v�- %�7 % I, OC ;,IT 7 2­1�1�''�­;l T­. At 51�11_ 7 �v iy� 7'.13k RPM nei g- ,AS", .4 Al 4Ak� Wlii A' ','54 A: Fu Iv rnl 11%, mntf% s mImp, Vr 3 f ("FIR g, 54- "W,`R'4 i ;S v �o x .5 W-ii-ww LL Ne 'p low, -di ZY"Ma,�U,it_�� wm XEli -1 v �7,2 M i4A ,. '1 501, --nl N11 gg J,Y,1416 %Ilrl MIN O'S 4. wAgnj g,f, .eZ­ �Ally TI M gh It X- R WE 11111,RM n2tm