Loading...
HomeMy WebLinkAboutAQ_F_0100010_20221228_ENF_SOC-Corr_Unit1Rpt ® K I L PA T R I C K ? I" �3/ KILPATRICK TOWNSEND&STOCKTON LLP �® 'TOWNSEND NC Department of www.kilpatricktownsend.com ATTORNEYS AT LAW Environmental 0-Halite Suite 1400,4208 Six Forks Road DEC 8 2 2? Raleigh,NC 27609 t 919 420 1700 f 919 420 1800 Winston--Salem Regional Ufiiice December 22 2022 direct dial 919 420 1726 direct fax 919 510 6121 troessler@kilpatricktownsend.com kilpatricktownsend.com Mr. Ray Stewart Regional Air Quality Supervisor N.C. Dept. of Environmental Quality 450 West Hanes Mill Rd, Suite 300 Winston Salem, North Carolina 27105 Re: Stericycle Facility—Haw River, North Carolina Dear Mr. Stewart: Please find attached written confirmation that the upgrades of Unit 1 at Stericycle's Haw River facility were completed by November 30, 2022. Please let me know if you have any questions or need additional information." Sincerely, Todd S. Roessler Attachment 21194904V.1 ANCHORAGE ATLANTA AUGUSTA BEIJING CHARLOTTE DALLAS DENVER HOUSTON LOS ANGELES NEW YORK RALEIGH SAN DIEGO SAN FRANCISCO SEATTLE SHANGHAI SILICON VALLEY STOCKHOLM TOKYO WALNUT CREEK WASHINGTON WINSTON-SALEM ELDORADO ENGINEERING INC. 9089 South 1300 West,Suite 150•West Jordan,UT 84088•Tel:(801)966-8288•Fax:(801)966-8499 www.eldoradoengineering.com 14 NC Department of December 20, 2022 Environmental Quality Received P C 2 RE: Unit 1 Upgrades at Stericycle Haw River Facility Winston-Salem Regional Office El Dorado Engineering can confirm that we completed the upgrades of Unit 1 at the Stericycle Haw River facility, including: • Wiring redone including consideration of wire routing to bypass critical components; more robust DC power supply, including separation of power sources to bypass critical components and non-critical components; redundant power supplies for all 24VDC devices; power supplies with selective fuse break technology; redundant AC power supply; new control panels; new electrical components(fuses, circuit breakers, power supplies, etc.); and new uninterruptible power supply. • Redundant pump for evaporative cooler brine recirculation; acid gas absorber and evaporative cooler pumps switched from belt driven to direct driven; replace piping between the new pumps and the system components; new,stainless steel pipe supports; convert emergency bypass system from hydraulic to pneumatic; and replace limit switches and add new switches to certain locations. • New instruments;thermocouples replaced with duplex thermocouples; and redundant duplex thermocouples in bypass critical locations. • New HMI control and process monitoring screens; redundant HMI computers and screens; and new control logic (automatic switching to redundant pumps, comparative logic between redundant thermocouples, more robust alarming and interlocks, active control of process related equipment, etc.). All work, as described above,was completed by 11/30/22. Please feel free to contact us with any questions. Sincerely, Rick O. Frandsen, P.E. Vice President