Loading...
HomeMy WebLinkAboutAQ_GEN_PLNG_20221219_SIP_O3-NAAQS_Appendix CAppendix C Public Notice and U.S. EPA No-Comment Documents FINAL This page intentionally left blank. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AL QUALITY PUBLIC NOTICE PURPOSE: COMMENT PROCEDURES: REQUESTS FORA PUBLIC HEARING: INFORMATION: Date: The North Carolina Department of Environmental Quality, Division of Air Quality (DAQ), hereby gives notice regarding its pre-hearing draft of the State hnplementation Plan (SIP) revision for Supplement Ill to the Revised Maintenance Plan for the Charlotte-Gastonia-Salisbury, North Carolina 2008 8-Hour Ozone Marginal Nonattainment Area. The U.S. Environmental Protection Agency designated the area attainment of the 2008 8-hour ozone National Ambient Air Quality Standards (NAAQS) effective August 27, 2015 (80 FR 44873). Transportation conformity in the maintenance area ensures that federal transportation actions do not interfere with maintaining compliance with the 2008 ozone NAAQS. As such, the level of emissions estimated for Transportation Improvement Programs and Metropolitan Transportation Plans must not exceed the motor vehicle emission budgets (MVEBs) as defined in the maintenance plan. Historically, the DAQ has allocated no more than 50% of the total safety margin to the MVEBs for nitrogen oxides (NOx) and volatile organic compounds (VOC) to ensure on-going attainment of the NAAQS. In this submittal, North Carolina is proposing to increase the amount of the total safety margin allocated to the 2026 MVEBs from 9.4% to 21.4% for NOx and from 37.4% to 49.7% for VOC. The proposed revisions to the 2026 MVEBs will accommodate updates to the MOtor Vehicle Emissions Simulation (MOVES) model (released January 2021) used to calculate onroad and nonroad emissions ofNOx and VOCs. In addition, the Charlotte- Gastonia-Salisbury area is currently attaining the 2008 and 2015 8-hour ozone NAAQS based on ambient monitoring data collected through October 31, 2022. Therefore, the DAQ concludes that the proposed revisions to the MVEBs will not interfere with any applicable requirement concerning the attainment and maintenance of the NAAQS . Persons wishing to submit comments or request a public hearing are invited to do so. Any person wishing to comment may submit a written statement for inclusion in the record of proceedings regarding the pre-hearing draft of the Supplement Ill to the Revised Maintenance Plan for the Charlotte-Gastonia-Salisbury, North Carolina 2008 8-Hour Ozone Margi.nal Nonattainment Area. Written comments should be submitted electronically or postmarked no later than Monday, December 12, 2022. Requests for a public hearing must be in writing and include a statement supporting the need for such a hearing, an indication of your interest in the subject, and a brief summary of the information intended to be offered. A public hearing will be scheduled if requested. A separate notice will be announced for the hearing including the date, time, location, and other details. Written requests for a public hearing should be postmarked or submitted electronically no later than Monday, December 12, 2022. Copies of the pre-hearing draft of the Supplement Ill to the Revised Maintenance Plan for the Charlotte-Gastonia-Salisbury, North Carolina 2008 8-Hour Ozone Marginal Nonattainment Area may be downloaded from the DAQ website at h llp s://deq .nc.gov/about/divisions/air-guality/air-gualitv- p lanning/state-imp lementation-plans/charlotte-gastonia-salisbury -nc-2008-8-hour-ozone-area. Comments or requests for a public hearing can be submitted to: dag .publiccomment (@,ncdenr.gov (Please type "MVEB Revision" in the subject line) Alternatively, comments or requests for a public hearing can be mailed or faxed to: Randy Strait Fax: (919) 715-0718 NC Division of Air Quality 1641 Mail Service Center Raleigh, NC 27699-1641 Based on the current guidance to minimize the spread of COVID-19, all DAQ office locations are limiting public access to appointments only. As such, the Pre-Hearing Draft of the demonstration may only be reviewed in person after making an appointment at the following DAQ offices: Raleigh Central Office, Planning Section (919) 707-8403 Mooresville Regional Office LJ.A (104) 663-1699 I\ li/12-rnr.?.l_J Q, Din~--·--...;::::,,,. Michael A. Abraczinskas, DA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 December 9, 2022 Mr. Michael Abraczinskas Director Division of Air Quality North Carolina Department of Environmental Quality 1641 Mail Service Center Raleigh, North Carolina 27699-1641 Dear Mr. Abraczinskas: Thank you for your letter dated November 9, 2022, transmitting a prehearing package regarding the Supplement III to the Revised Maintenance Plan for the Charlotte-Gastonia-Salisbury, North Carolina 2008 8-Hour Ozone Marginal Nonattainment Area. To the extent possible, we have reviewed this submission and note that because of a delay in transmission, we did not have a full opportunity to review the associated MOVES files before the close of the public comment period. We do not have any comments at this time but we may have comments once the MOVES files are fully reviewed. We look forward to continuing to work with you and your staff. If you have any questions, please contact Mr. Joel Huey, Chief, Air Regulatory Management Section at (404) 562-9104, or your staff contact Mr. Evan Adams at (404) 562-9009. Sincerely, Lynorae Benjamin Chief Air Planning and Implementation Branch . From:Benjamin, Lynorae To:Adams, Evan; Abraczinskas, Michael Cc:Leslie Rhodes; Manning, Tammy; Strait, Randy P; Pjetraj, Michael; Manning, Tammy; Blackman, Daniel; Freeman, Caroline; Hartsfield, Taylor; Myers, Dianna; LaRocca, Sarah; Huey, Joel Subject:[External] RE: Prehearing Draft of Supplement III to the Revised Maintenance Plan for the Charlotte-Gastonia- Salisbury, North Carolina 2008 8-hour Ozone Marginal Nonattainment Area Date:Friday, December 16, 2022 4:10:35 PM Attachments:image002.png CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Afternoon, Just wanted to circle back to let you know that we have had the opportunity to look at the MOVES files and do not have any additional comments at this time. Thanks so much for your hard work on this. Have a great rest of today and weekend. Lynorae From: Adams, Evan <adams.evan@epa.gov> Sent: Friday, December 9, 2022 11:25 AM To: michael.abraczinskas@ncdenr.gov Cc: Leslie Rhodes <leslie.rhodes@mecklenburgcountync.gov>; Manning, Tammy <tammy.manning@ncdenr.gov>; Randy Strait <randy.strait@ncdenr.gov>; Michael Pjetraj <michael.pjetraj@ncdenr.gov>; Manning, Tammy <tammy.manning@ncdenr.gov>; Blackman, Daniel <Blackman.Daniel@epa.gov>; Freeman, Caroline <Freeman.Caroline@epa.gov>; Hartsfield, Taylor <taylor.hartsfield@ncdenr.gov>; Benjamin, Lynorae <benjamin.lynorae@epa.gov>; Myers, Dianna <Myers.Dianna@epa.gov>; LaRocca, Sarah <Larocca.Sarah@epa.gov>; Huey, Joel <Huey.Joel@epa.gov> Subject: RE: Prehearing Draft of Supplement III to the Revised Maintenance Plan for the Charlotte- Gastonia-Salisbury, North Carolina 2008 8-hour Ozone Marginal Nonattainment Area Good morning Mr. Abraczinskas, Thank you for the opportunity to review the prehearing submittal for the Supplement III to the Revised Maintenance Plan for the Charlotte-Gastonia-Salisbury, North Carolina 2008 8-hour Ozone Marginal Nonattainment Area. EPA has reviewed the files provided and offers the attached comments. Thank you, Evan Evan Adams (He/Him) | Environmental Engineer | U.S. Environmental Protection Agency Region 4 | Air and Radiation Division | Air Regulatory Management Section 61 Forsyth St. SW | Atlanta, GA 30303 404.562.9009 | adams.evan@epa.gov From: Manning, Tammy <tammy.manning@ncdenr.gov> Sent: Wednesday, November 9, 2022 10:33 AM To: Blackman, Daniel <Blackman.Daniel@epa.gov>; Freeman, Caroline <Freeman.Caroline@epa.gov>; michael.abraczinskas@ncdenr.gov; Michael Pjetraj <michael.pjetraj@ncdenr.gov>; Hartsfield, Taylor <taylor.hartsfield@ncdenr.gov>; Adams, Evan <adams.evan@epa.gov>; Benjamin, Lynorae <benjamin.lynorae@epa.gov>; Spann, Jane <Spann.Jane@epa.gov>; Myers, Dianna <Myers.Dianna@epa.gov>; LaRocca, Sarah <Larocca.Sarah@epa.gov> Cc: Leslie Rhodes <leslie.rhodes@mecklenburgcountync.gov>; Manning, Tammy <tammy.manning@ncdenr.gov>; Randy Strait <randy.strait@ncdenr.gov> Subject: Prehearing Draft of Supplement III to the Revised Maintenance Plan for the Charlotte- Gastonia-Salisbury, North Carolina 2008 8-hour Ozone Marginal Nonattainment Area Dear Mr. Blackman, This morning, the NC Division of Air Quality (NCDAQ) uploaded the prehearing draft of Supplement III to the Revised Maintenance Plan for the Charlotte-Gastonia-Salisbury, North Carolina 2008 8-hour Ozone Marginal Nonattainment Area to the USEPA’s State Planning Electronic Collaboration System (SpeCS) for SIPs interface for your review. The transmittal letter for this submittal is attached. The NCDAQ team would like to express our gratitude to you and your staff for your help and support in completing this submission. Please let us know if you have any questions. Thank you, Tammy Tammy Manning Attainment Planning Branch Supervisor, Division of Air Quality North Carolina Department of Environmental Quality Office: (919) 707-8717 tammy.manning@ncdenr.gov