Loading...
HomeMy WebLinkAboutAQ_F_1200038_20220613_CMPL_InspRpt (4) NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY Maymead Materials, Inc. - Hildebran Plant NC Facility ID 1200038 Inspection Report County/FIPS: Burke/023 Date: 06/14/2022 Facility Data Permit Data Maymead Materials, Inc. - Hildebran Plant Permit 03746/R12 4398 Johnson Bridge Road Issued 11/19/2015 Hickory,NC 28602 Expires 10/31/2023 Lat: 35d 41.2620m Long: 81 d 27.1840m Class/Status Synthetic Minor SIC: 2951 /Paving Mixtures And Blocks Permit Status Active NAICS: 324121 /Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Sean Mackey Wiley Roark Sean Mackey NSPS: Subpart I Secretary President Secretary (423)727-2005 (423)727-2000 (423)727-2005 Compliance Data Comments: Inspection Date 06/13/2022 Inspector's Name Michael Koerschner Inspector's Signature: Operating Status Operating Compliance Status Compliance- inspection Action Code FCE Date of Signature: t L2 Inspection Result Compliance r✓( Total Actual emissions in TONS/YEAR: TSP SO2 NOX VOC CO PM10 * HAP 2014 --- --- --- --- 2009 0.7700 4.68 1.89 0.9000 2.65 0.5900 117.00 * Highest HAP Emitted inpounds) Five Year Violation History: None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE: None Date Test Results Test Method(s) Source(s)Tested Directions: From Asheville take 1-40 to exit 116(Old NCIO) and turn right. Travel about I mile West on NC 10 and then turn left onto Johnson Bridge Road Travel about 2 miles South on Johnson Bridge Road and then turn right on a paved road just before crossing the river(look for sign at the entrance to the facility). Facility is located at the end of'this road. Safety Equipment: Hardhat, safety glass, safety shoes, earplugs. 1. Facility Overview Discussion/Introduction On June 13,2022 1 arrived at the site to verify that the facility is not in operation. The gate at the entrance was padlocked and it did not appear that there had been any recent traffic. According to letters,annual reports,and recent inspection reports,the facility has not operated since the permit was issued to Maymead in December 2010. The air permit was renewed November 19,2015. 1 walked to the aggregate piles and observed several aggregate piles and a pile of shingles still on-site. However, there was no asphalt producing equipment on-site during my visit(no silos/conveyors/dryers etc). Facility Contacts The facility contacts are up to date in IBEAM. No one was on site to escort me for an inspection. Facility Description The facility is a hot mix asphalt batch plant rated at 100 tons per hour maximum capacity. 2. Compliance with specific permit conditions and limitations Compliance with the permit conditions will be verified if the plant begins operating(visible emissions, I&M logs, production,fuel,etc.). Specific Condition 10 of the permit requires a notification within 15 days of the start-up and Specific Condition 8 requires Methods 5 and 202 stack testing within 60 days of the start-up. 3. Compliance History Review The facility was issued a Notice of Deficiency(NOD)on March 10,2022,for a late annual report. There have been no other documented violations by the facility in the past five years. 4. Stack Test Review Specific Conditions 8 of the permit requires Methods 5 and 202 stack tests within 60 days of start-up to demonstrate compliance with NSPS, Subpart I and 2D .0506. Based on the last tests conducted,the facility is expected to be capable of passing the required stack tests. The results of the September 2005 stack test are shown below. Pollutant Standard Emission Limit Test Results Compliance Indicated? Filterable PM Subpart I 90 mg/dscm 9 mg/dscm Yes Visible Emissions Subpart I 20%Opacity* 0%Opacity* Yes Filterable PM N/A 0.39 lb/hr Yes Condensible PM 15A NCAC 2D .0506 N/A 0.25 lb/hr Yes Total PM 37.1 lb/hr 0.64 lb/hr Yes * Highest six-minute average opacity 5. 112r Review This facility does not appear to be subject to 12(r). 5: Compliance Statement during this visit this facility appears to be in compliance with the Air Quality standards and Based on observations du g y pp p Q y regulations by shut-down.