Loading...
HomeMy WebLinkAboutAQ_F_1900077_20221115_EI_Apprd-EI Inventory Certification Form(Title V) Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 These forms must be completed and returned even if the facility did not operate or emissions were zero The legally defined "Responsible Official" of record for your facility is Howard Brown,Jr. This person or one that meets the definition below must sign this certification form. The official submitting the information must certify that he/she complies with the requirements as specified in Title I5A NCAC 2Q.0520(b)which references and follows the federal definition. 40 CFR Part 70.2 definesa responsible as meaning one of the following: 1. For a corporation: a president, secretary, treasurer, or vice-president of the corporation in chargeof a principal business function, or any other person who performs similar policy or decision makingfunctions for the overall operation of one or more manufacturing,production, or operatingfacilities applying for a or subject to a permit and either the facilities employ more than 250 persons or have gross annual sales or expenditures exceeding$25 million(in second quarter 1980 dollars); orthe delegation of authority to such representatives is approved in advance by the permittingauthority; 2. For partnership or sole propietorship; a general partner or the proprietor,respectively; 3. for a muncipality, state, federal, or other public agency includes the chief executive officerhaving responsibility for the overall operations of a principal geographic unit of the a enc e. ., a Regional Administrator of EPA). CERTIFICATION STATEMENT: (Important:Legally Responsible Official,read and sign after all submissions are final.) I certify that I am the responsible official for this facility, as described above, and hereby certify that the information contained in this air emissions report, including attached calculations and documentation, is true, accurate and complete. (Subject to legal penalties of up to $25,000 per occurrence and possible imprisonment as outlined in G.S. § 143-215.3(a)(2)) Responsible Official's Signature Below (use blue ink): Date Signed: Printed Name: Howard Brown, Jr. Signature: This form applies to Title V facilities. If this facility is not classified asTitle V,please telephone your regional office Emission Inventory Contact at once for proper forms. Email address of Responsible Official: HowardB@TriangleBrick.com Information on this Form cannot be held confidential 1 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh Listing of Emission Sources and Control Devices on Permit. See instructions *ES ID on *ES Description *CS ID *CS Description *CD ID's Air Permit CG-1 Clay Feeder CG-10 Finish Screen[NSPS 000] CG-11 Finish Screen[NSPS 000] CG-12 Finish Screen[NSPS 000] CG-13 Belt to Storage Bins [NSPS 000] CG-14 Belt over Storage Bins [NSPS 000] CG-15 Feeders under Bins [NSPS 000] CG-16 Feeders under Bins [NSPS 000] CG-17 Feeders under Bins [NSPS 000] CG-18 Feeders under Bins [NSPS 000] CG-19 Feeders under Bins [NSPS 000] CG-2 Belt to Scalping Screen[NSPS 000] CG-20 Feeders under Bins [NSPS 000] CG-22 Feeders under Bins [NSPS 000] CG-23 Feeders under Bins [NSPS 000] CG-24 Feeders under Bins [NSPS 000] CG-25 Conveyor from Storage Bin[NSPS 000] CG-26 Conveyor from Storage Bin[NSPS 000] CG-27 Conveyor to Pug Mill[NSPS 000] CG-28 Conveyor to Pug Mill[NSPS 000] CG-29 Clay Feeder CG-3 Scalping Screen[NSPS 000] CG-30 Belt to Scalping Screen[NSPS 000] CG-31 Scalping Screen[NSPS 000] CG-32 Return Belt from Oversize Screen [NSPS 000] CG-33 Belt to Hammermill[NSPS 000] CG-34 Hammermill[NSPS 000] CG-35 Belt to Screens [NSPS 000] CG-36 Belt over Finish Screens[NSPS 000] CG-37 Finish Screen[NSPS 000] CG-38 Finish Screen[NSPS 000] CG-39 Finish Screen[NSPS 000] CG-4 Return Belt for Oversizes from Screens [NSPS 000] CG-40 Finish Screen[NSPS 000] CG-41 Belt to Storage Bins [NSPS 000] 2 CG-42 Belt over Storage Bins [NSPS 000] CG-43 Feeders under Bins [NSPS 000] CG-44 Feeders under Bins [NSPS 000] CG-45 Feeders under Bins [NSPS 000] CG-46 Feeders under Bins [NSPS 000] CG-47 Feeders under Bins [NSPS 000] CG-48 Conveyor from Storage Bin[NSPS 000] CG-49 Conveyor to Pug Mill[NSPS 000] CG-5 Belt to Hammermill[NSPS 000] CG-6 Hammermill [NSPS 000] CG-7 Belt to Screens [NSPS 000] CG-8 Belt over Finish Screen[NSPS 000] CG-9 Finish Screen[NSPS 000] IS-1.1 conveyor to loam/sawdust system IS-1.2 conveyor to loam/sawdust system IS-2.1 loam screen IS-2.2 loam screen IS-3.1 loam crusher IS-3.2 loam crusher IS-4.1 oversize return conveyor from loam screen IS-4.2 oversize return conveyor from loam screen IS-5.1 oversize loam return shoot IS-5.2 oversize loam return shoot IS-6.1 sawdust screen IS-6.2 sawdust screen IS-7.1 conveyor to storage bin IS-7.2 conveyor to storage bin IS-8.1 oversize conveyor from sawdust screen IS-8.2 oversize conveyor from sawdust screen IS-CD-50 Conveyor from extruder to pug mill IS-CL1 Cosmetic loam operation area IS-CL2 Cosmetic loam operation area IS-EXTRI Extrusion and setting line IS-EXTR2 Extrusion and setting line IS-LS 1 loam/sawdust feeder IS-LS2 loam/sawdust feeder IS-Tankl 24,000 gallon No.6 fuel oil storage tank IS-Tank2 24,000 gallon No.2 fuel oil storage tank IS-Tank3 24,000 gallon No.2 fuel oil storage tank IS-Tank4 24,000 gallon highway diesel fuel storage tank IS-Tanks 24,000 gallon additive"A" storage tank IS-Tank6 3,000 gallon gasoline storage tank [GACT CCCCCC] 3 Kiln 1-Natural gas/No.2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln(14.5 One dry lime cascade adsorber unit(52,000 K-1 tons per hour fired-brick production CS-2 CD-K1K2 capacity,21.4 million Btu per hour acfin air flow) maximum heat input rate) Kiln 2-Natural gas/No.2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln(14.5 K-2 tons per hour fired-brick capacity, 21.4 million Btu per hour heat input rate) Kiln 3-Natural gas/No.2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln(29 One dry lime cascade adsorber unit(52,000 K-3 tons per hour fired-brick capacity, CS-1 acfm air flow) CD-K3 42.8 million Btu per hour heat input rate) PC-1 Shale Feeder PC-2 Scalp Screen[NSPS 000] PC-3 Jaw Crusher[NSPS 000] PC-4 Conveyor under PC-2 and PC-3 [NSPS 000] PC-5 Cross over Conveyor[NSPS 000] PC-6 Shuttle Conveyor(Enclosed in Clay Storage Building) [NSPS 000] Natural gas-fired rotary coatings SD-1 dryer(0.3 million Btu per hour maximum heat input)[NSPS UUU] 4 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh Emission Source & Operating Scenario List- See Instructions *ES Group ID *ES ID SOS ID *OS Description SD-1 20 Natural Gas Combustion IS-Tank2 22 No.2 fuel oil tank-standing and working emissions IS-Tank3 23 No.2 fuel oil tank-standing and working emissions IS-Tank4 24 Highway diesel fuel storage tank-standing and working emissions IS-LS1 NONE NONE IS-LS2 NONE NONE IS-CL1 NONE NONE IS-CL2 NONE NONE IS-EXTRI NONE NONE IS-EXTR2 NONE NONE IS-CD-50 NONE NONE IS-1.1 NONE NONE IS-1.2 NONE NONE IS-2.1 NONE NONE 1 Natural gas combustion-primary K-1 2 Distillate fuel and NG combustion- secondary 17 Residual Oil and NG combustion-tertiary IS-2.2 NONE NONE 4 Distillate fuel and NG combustion- secondary K-2 3 Natural gas combustion-primary 18 Residual Oil and NG combustion-tertiary IS-3.1 NONE NONE IS-3.2 NONE NONE 5 NG combustion-primary K-3 6 Distillate and Natural gas combustion- secondary 19 Residual Oil and NG combustion-tertiary IS-4.1 NONE NONE IS-4.2 NONE NONE IS-5.1 NONE NONE IS-5.2 NONE NONE IS-6.1 NONE NONE IS-6.2 NONE NONE IS-7.1 NONE NONE IS-7.2 NONE NONE IS-8.1 NONE NONE 5 IS-8.2 NONE NONE PC-I,PC-2,PC-3,PC-4, G-72 PC-5,PC-6 15 Primary Crusher and associated crushers CG-I,CG-2,CG-3,CG-4, CG-5,CG-7,CG-8,CG-9, CG-10,CG-11,CG-12,CG- 13,CG-14,CG-15,CG-16, CG-17,CG-26,CG-27,CG- 29,CG-30,CG-31,CG-32, G-73 CG-33,CG-34,CG-35,CG- 16 Final Crushing and Grinding Operation 37,CG-38,CG-39,CG-40, CG-41,CG-42,CG-43,CG- 44,CG-18,CG-19,CG-20, CG-22,CG-23,CG-24,CG- 25,CG-45,CG-46,CG-47, CG-48,CG-49,CG-36,CG- 6,CG-28 IS-Tanks 13 24,000 gallon Additive A. storage tank IS-Tankl 12 24,000 gallon No. 6 fuel oil storage tank 21 No. 6 fuel oil tank-standing emissions IS-Tank6 14 3,000 gallon gasoline storage tank 6 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) SD-1 or Emission Source Group ID 2. Emission Source Description : Natural gas-fired rotary coatings dryer(0.3 million Btu per hour maximum heat input) [NSPS UUU] 3. Operating Scenario ID/ OS - 20/Natural Gas Combustion Description: 4. SCC Number/Description: 30500301 /Brick Manufacture - Dryer ; Raw Material Drying 5. Throughput/units in 2021: 9330 TON/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 7 Operating Scenario: OS - 20 Emission Source/Group ID: SD-1 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 4 ) Days per Week ( 3 ) Weeks per Year ( 10 ) 11. Typical Start & End Times For Operating Scenario: Start: 800 End: 1200 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec 0% March-May 500/t, June-Aug. 50% Sept.-Nov. 0% 2021 2021 1 2021 2021 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 TSP TSP 0.09 08 0.02 PM10 PM10 0.09 08 0.02 PM2.5 PM2.5 0.09 08 0.02 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 Formaldehyde 50-00-0 0.00013 09 Hexane, n- 110-54-3 0.00303 08 8 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) IS-Tank2 or Emission Source Group ID 2. Emission Source Description : 24,000 gallon No. 2 fuel oil storage tank 3. Operating Scenario ID/ OS - 22/No. 2 fuel oil tank- standing and working emissions (OS Not Description: Operated) 4. SCC Number/Description: 39090003 /Fuel Storage - Fixed Roof Tanks ; Distillate Oil (No. 2): Breathing Loss 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area 1 ERP for Fugitive STACK) sources 9 Operating Scenario: OS - 22 Emission Source/Group ID: IS-Tank2 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 10 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) IS-Tank3 or Emission Source Group ID 2. Emission Source Description : 24,000 gallon No. 2 fuel oil storage tank 3. Operating Scenario ID/ OS - 23/No. 2 fuel oil tank- standing and working emissions (OS Not Description: Operated) 4. SCC Number/Description: 39090003 /Fuel Storage - Fixed Roof Tanks ; Distillate Oil (No. 2): Breathing Loss 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area 1 ERP for Fugitive STACK) sources 11 Operating Scenario: OS - 23 Emission Source/Group ID: IS-Tank3 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 12 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) IS-Tank4 or Emission Source Group ID 2. Emission Source Description : 24,000 gallon highway diesel fuel storage tank 3. Operating Scenario ID/ OS - 24/Highway diesel fuel storage tank- standing and working emissions Description: 4. SCC Number/Description: 39090003 /Fuel Storage - Fixed Roof Tanks ; Distillate Oil (No. 2): Breathing Loss 5. Throughput/units in 2021: 221672 GAL/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 13 Operating Scenario: OS - 24 Emission Source/Group ID: IS-Tank4 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 VOC VOC 0.01 08 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 14 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-1 or Emission Source Group ID 2. Emission Source Description : Kiln 1-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (14.5 tons per hour maximum brick production capacity, 21.4 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 1/Natural gas combustion-primary Description: 4. SCC Number/Description: 30500335 /Brick Manufacture - Curing &Firing ; Curing and Firing: Dual Fuel-fired Kiln, Other Type 5. Throughput/units in 2021: 2051000 FT3/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 100 to Control Device or Stack): 8. Control Device Information Order CS-ID CD ID Control Device Description (as listed in permit) 1 CS-2 CD-K1K2 One d1y lime cascade adsorber unit(52,000 acfm air flow) 9. Emission Release Point (ERP) Information: (Sources y'entcd to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) lk-1 VERTICAL 57.5 4 488 39.8 30008.49 ERP for Kiln 1 STACK 15 Operating Scenario: OS - 1 Emission Source/Group ID: K-1 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb +Dec y March-Ma June-Aug. ° Sept.-Nov. ° 2021 25% 2021 25% 2021 25/0 2021 25/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code ( Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emissions- Emission Criteria pollutant Criteria Control Emission EF (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 CO CO 0.09 08 90 0.000084 AFTER NOx NOx 0.1 08 0.0001 AFTER VOC VOC 0.01 08 0.0000055 AFTER Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical order) (see instructions) HAP/TAPS Method Code Efficiency Factor Control eo oe (Pounds/Year) (Net after all controls) (See Instructions) 2021 Acetaldehyde 75-07-0 0.00003 08 1.52E-11 AFTER Acrolein 107-02-8 0.00004 08 1.8E-11 AFTER Ammonia (as NH3) 7664-41-7 6.5632 08 0.0000032 AFTER Arsenic Unlisted Compounds - Specify ASC-Other 0.00041 08 2E-10 AFTER Compound (Component of ASC) Benzene 71-43-2 0.00431 08 2.1E-9 AFTER Beryllium Metal (unreacted) (Component 7440-41-7 0.00002 08 1.2E-11 AFTER of BEC) Cadmium Metal, elemental, unreacted 7440-43-9 0.00226 08 1.1 E-9 AFTER (Component of CDC) Chromium (VI) Non- Specific Unlisted NSCR6- Compounds - Specify Other 0.00287 08 1.4E-9 AFTER Compound (Component of NSCR6 & CRC) 16 Cobalt Unlisted Compounds - Specify COC- 0.00017 08 8.4E-11 AFTER Compound (Component of Other COC) Formaldehyde 50-00-0 0.15382 08 7.5E-8 AFTER Hexane, n- 110-54-3 3.6918 08 0.0000018 AFTER Lead Unlisted Compounds - Specify Compound PBC-Other 0.00103 08 5E-10 AFTER (Component of PBC) Manganese Unlisted Compounds - Specify MNC- 0.00078 08 3.8E-10 AFTER Compound (Component of Other MNC) Mercury,vapor 7439-97-6 0.00053 08 2.6E-10 AFTER (Component of HGC) Naphthalene (Component 91-20-3 0.00125 08 6.1E-10 AFTER of 83329/POMTV) Nickel metal (Component 7440-02-0 0.00431 08 2.1E-9 AFTER of NIC) Selenium Compounds SEC 0.00005 08 2.4E-11 AFTER Toluene 108-88-3 0.00697 08 3.4E-9 AFTER 17 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-1 or Emission Source Group ID 2. Emission Source Description : Kiln 1-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (14.5 tons per hour maximum brick production capacity, 21.4 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 2/Distillate fuel and NG combustion-secondary (OS Not Operated) Description: 4. SCC Number/Description: 30500331 /Brick Manufacture - Curing &Firing ; Curing and Firing: Dual Fuel Fired Tunnel Kiln 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) lk-1 VERTICAL 57.5 4 488 39.8 30008.49 ERP for Kiln 1 STACK 18 Operating Scenario: OS - 2 Emission Source/Group ID: K-1 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 19 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-1 or Emission Source Group ID 2. Emission Source Description : Kiln 1-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (14.5 tons per hour maximum brick production capacity, 21.4 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 17/Residual Oil and NG combustion-tertiary (OS Not Operated) Description: 4. SCC Number/Description: 30500331 /Brick Manufacture - Curing &Firing ; Curing and Firing: Dual Fuel Fired Tunnel Kiln 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) lk-1 VERTICAL 57.5 4 488 39.8 30008.49 ERP for Kiln 1 STACK 20 Operating Scenario: OS - 17 Emission Source/Group ID: K-1 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 21 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-2 or Emission Source Group ID 2. Emission Source Description : Kiln 2-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (14.5 tons per hour maximum brick production capacity, 21.4 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 4/Distillate fuel and NG combustion-secondary (OS Not Operated) Description: 4. SCC Number/Description: 30500331 /Brick Manufacture - Curing &Firing ; Curing and Firing: Dual Fuel Fired Tunnel Kiln 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) 1K-2 VERTICAL 57.5 4 488 39.8 30008.49 ERP for kiln 2 STACK 22 Operating Scenario: OS -4 Emission Source/Group ID: K-2 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 23 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-2 or Emission Source Group ID 2. Emission Source Description : Kiln 2-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (14.5 tons per hour maximum brick production capacity, 21.4 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 3/Natural gas combustion-primary (OS Not Operated) Description: 4. SCC Number/Description: 30500311 /Brick Manufacture - Curing &Firing ; Curing and Firing: Gas- fired Tunnel Kilns 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) 1K-2 VERTICAL 57.5 4 488 39.8 30008.49 ERP for kiln 2 STACK 24 Operating Scenario: OS - 3 Emission Source/Group ID: K-2 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 25 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-2 or Emission Source Group ID 2. Emission Source Description : Kiln 2-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (14.5 tons per hour maximum brick production capacity, 21.4 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 18/Residual Oil and NG combustion-tertiary (OS Not Operated) Description: 4. SCC Number/Description: 30500331 /Brick Manufacture - Curing &Firing ; Curing and Firing: Dual Fuel Fired Tunnel Kiln 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) 1K-2 VERTICAL 57.5 4 488 39.8 30008.49 ERP for kiln 2 STACK 26 Operating Scenario: OS - 18 Emission Source/Group ID: K-2 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 27 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-3 or Emission Source Group ID 2. Emission Source Description : Kiln 3-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (29 tons per hour maximum brick production capacity, 42.8 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 5/NG combustion-primary Description: 4. SCC Number/Description: 30500331 /Brick Manufacture - Curing & Firing ; Curing and Firing: Dual Fuel Fired Tunnel Kiln 5. Throughput/units in 2021: 182535 TON/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 100 to Control Device or Stack): 8. Control Device Information Order CS-ID CD ID Control Device Description (as listed in permit) 1 CS-1 CD-K3 One d1y lime cascade adsorber unit(52,000 acfm air flow) 9. Emission Release Point (ERP) Information: (Sources y'entcd to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) 1K-3 VERTICAL 75 5 450 51 60082.9.5 ERP for Kiln 3 STACK 28 Operating Scenario: OS - 5 Emission Source/Group ID: K-3 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb +Dec y March-Ma June-Aug. ° Sept.-Nov. ° 2021 25% 2021 25% 2021 25/0 2021 25/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code ( Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emissions- Emission Criteria pollutant Criteria Control Emission EF (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 CO CO 52.66 08 90 0.577 AFTER NOx NOx 11.5 08 0.126 AFTER TSP TSP 68.45 08 0.75 AFTER PM10 PM10 68.45 08 0.75 AFTER PM2.5 PM2.5 68.45 08 0.75 AFTER S02 S02 5.72 08 0.0627 AFTER VOC VOC 5.18 08 0.0568 AFTER Emissions Emission Control HAP/TAP CAS Estimation Emission EF Pollutants (In alphabetical order) (see instructions) HAP/TAPS Efficiency Factor Control (Pounds/Year) Method Code (Net after all controls) (See Instructions) 2021 Antimony Unlisted Compounds - Specify SBC-Other 4.93 08 AFTER Compound (Component of SBC) Arsenic Unlisted Compounds - Specify ASC-Other 5.66 08 AFTER Compound (Component of ASC) Benzene 71-43-2 529.35 08 AFTER Beryllium Metal (unreacted) (Component 7440-41-7 0.077 08 AFTER of BEC) Cadmium Metal, elemental, unreacted 7440-43-9 2.74 08 AFTER (Component of CDC) Carbon disulfide 1 75-15-0 1 7.85 1 08 1 1 1 AFTER Chlorine 7782-50-5 237.3 08 AFTER 29 Chromium Unlisted Compounds - Specify CRC- 9.31 08 AFTER Compound (Component of Other CRC) Cobalt Unlisted Compounds - Specify COG 0.38 08 AFTER Compound (Component of Other COC) DEHP (Di(2- 117-81-7 365.07 08 AFTER ethylhexyl)phthalate) Dibutylphthalate 84-74-2 25.55 08 AFTER Dichlorobenzene(p), 1,4- 106-46-7 8.76 08 AFTER Ethyl benzene 100-41-4 8.03 08 AFTER Ethyl chloride 75-00-3 104.04 08 AFTER (chloroethane) Fluorides (sum of all fluoride compounds as 16984-48-8 4592.64 08 AFTER mass of F ion) Formaldehyde 50-00-0 21.501 08 AFTER Hydrogen chloride 7647-01-0 1811.42 08 AFTER (hydrochloric acid) Hydrogen fluoride (hydrofluoric acid as mass 7664-39-3 2870.4 08 AFTER of HF) (Component of 16984488/Fluorides) Lead Unlisted Compounds - Specify Compound PBC-Other 27.38 08 AFTER (Component of PBC) MEK(methyl ethyl 78-93-3 40.16 08 AFTER ketone, 2-butanone) MIBK(methyl isobutyl 108-10-1 15.52 08 AFTER ketone) Manganese Unlisted Compounds - Specify MNC- 52.94 08 AFTER Compound (Component of Other MNC) Mercury,vapor 7439-97-6 1.37 08 AFTER (Component of HGC) Methyl chloride 74-87-3 122.3 08 AFTER (chloromethane) Methyl chloroform 71-55-6 0.86 08 AFTER Methyl iodide 74-88-4 16.98 08 AFTER (iodomethane) Naphthalene (Component 91-20-3 11.86 08 AFTER of 83329/POMTV) Nickel metal (Component 7440-02-0 13.14 08 AFTER of NIC) Perchloroethylene 127-18-4 0.51 08 AFTER (tetrachloroethylene) Phenol 108-95-2 15.7 08 AFTER Selenium Compounds SEC 41.98 08 AFTER Styrene 100-42-5 3.65 08 AFTER Toluene 108-88-3 29.21 08 AFTER Xylene (mixed isomers) 1330-20-7 22.82 08 AFTER 30 31 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-3 or Emission Source Group ID 2. Emission Source Description : Kiln 3-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (29 tons per hour maximum brick production capacity, 42.8 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 6/Distillate and Natural gas combustion-secondary (OS Not Operated) Description: 4. SCC Number/Description: 30500312/Brick Manufacture - Curing &Firing ; Curing and Firing: Oil- fired Tunnel Kilns 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) 1 K-3 VERTICAL 75 5 450 51 60082.95 ERP for Kiln 3 STACK 32 Operating Scenario: OS - 6 Emission Source/Group ID: K-3 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 33 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) K-3 or Emission Source Group ID 2. Emission Source Description : Kiln 3-Natural gas/No. 2 fuel oil/No. 6 fuel oil-fired brick tunnel kiln (29 tons per hour maximum brick production capacity, 42.8 million Btu per hour maximum heat input rate) 3. Operating Scenario ID/ OS - 19/Residual Oil and NG combustion-tertiary (OS Not Operated) Description: 4. SCC Number/Description: 30500331 /Brick Manufacture - Curing &Firing ; Curing and Firing: Dual Fuel Fired Tunnel Kiln 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) 1 K-3 VERTICAL 75 5 450 51 60082.95 ERP for Kiln 3 STACK 34 Operating Scenario: OS - 19 Emission Source/Group ID: K-3 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 35 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) Group G-72 Consisting of PC-1, PC-2, PC-3, PC-4, PC-5, PC-6 or Emission Source Group ID 2. Emission Source Description : Primary Crusher and associated crushers 3. Operating Scenario ID/ OS - 15/Primary Crusher and associated crushers Description: 4. SCC Number/Description: 30500340/Brick Manufacture - Material Prep ; Primary Crusher 5. Throughput/units in 2021: 240178 TON/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 36 Operating Scenario: OS - 15 Emission Source/Group ID: G-72 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 8 ) Days per Week ( 4 ) Weeks per Year ( 28 ) 11. Typical Start & End Times For Operating Scenario: Start: 800 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 17% 2021 33% 2021 33% 2021 17/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 TSP TSP 7.09 08 0.059 PM10 PM10 7.09 08 0.059 PM2.5 PM2.5 7.09 08 0.059 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 37 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) Group G-73 Consisting of CG-1, CG-2, CG-3, CG-4, CG-5, CG-7, CG-8, or Emission Source Group ID CG-9, CG-10, CG-11, CG-12, CG-13, CG-14, CG-15, CG-16, CG-17, CG- 26, CG-27, CG-29, CG-30, CG-31, CG-32, CG-33, CG-34, CG-35, CG-37, CG-38, CG-39, CG-40, CG-41, CG-42, CG-43, CG-44, CG-18, CG-19, CG- 20, CG-22, CG-23, CG-24, CG-25, CG-45, CG-46, CG-47, CG-48, CG-49, CG-36, CG-6, CG-28 2. Emission Source Description : Final Crushing and Grinding Operation 3. Operating Scenario ID/ OS - 16/Final Crushing and Grinding Operation Description: 4. SCC Number/Description: 30500302/Brick Manufacture - Material Prep ; Raw Material Grinding& Screening 5. Throughput/units in 2021: 240178 TON/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 38 Operating Scenario: OS - 16 Emission Source/Group ID: G-73 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 8 ) Days per Week ( 5 ) Weeks per Year ( 28 ) 11. Typical Start & End Times For Operating Scenario: Start: 800 End: 1600 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 15% 2021 35% 2021 35% 2021 15/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 TSP TSP 3 08 0.025 PM10 PM10 0.28 08 0.0023 PM2.5 PM2.5 0.28 08 0.0023 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 39 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) IS-Tank5 or Emission Source Group ID 2. Emission Source Description : 24,000 gallon additive "A" storage tank 3. Operating Scenario ID/ OS - 13/24,000 gallon Additive A. storage tank Description: 4. SCC Number/Description: 40714698 /Fixed Roof Tanks - Miscellaneous ; Specify In Comments: Working Loss 5. Throughput/units in 2021: 113172 GAL/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 40 Operating Scenario: OS - 13 Emission Source/Group ID: IS-Tanks 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 VOC VOC 0.53 08 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 41 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) IS-Tank1 or Emission Source Group ID 2. Emission Source Description : 24,000 gallon No. 6 fuel oil storage tank 3. Operating Scenario ID/ OS - 12/24,000 gallon No. 6 fuel oil storage tank (OS Not Operated) Description: 4. SCC Number/Description: 39090006/Fuel Storage - Fixed Roof Tanks ; Oil No. 6: Working Loss 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 42 Operating Scenario: OS - 12 Emission Source/Group ID: IS-Tankl 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 43 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) IS-Tank1 or Emission Source Group ID 2. Emission Source Description : 24,000 gallon No. 6 fuel oil storage tank 3. Operating Scenario ID/ OS - 21/No. 6 fuel oil tank- standing emissions (OS Not Operated) Description: 4. SCC Number/Description: 39090001 /Fuel Storage - Fixed Roof Tanks ; Residual Oil: Breathing Loss 5. Throughput/units in 2021: (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 44 Operating Scenario: OS - 21 Emission Source/Group ID: IS-Tankl 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 45 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) IS-Tank6 or Emission Source Group ID 2. Emission Source Description : 3,000 gallon gasoline storage tank 3. Operating Scenario ID/ OS - 14/3,000 gallon gasoline storage tank Description: 4. SCC Number/Description: 39090004/Fuel Storage - Fixed Roof Tanks ; Distillate Oil (No. 2): Working Loss 5. Throughput/units in 2021: 4149 GAL/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP-FUG FUGITIVE (NO 1 72 Area= 1 ERP for Fugitive STACK) sources 46 Operating Scenario: OS - 14 Emission Source/Group ID: IS-Tank6 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 VOC VOC 0.22 08 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 47 Facility Total CY 2021 Emissions Summary Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 Record Facility-Wide Totals From all Permitted and Non-Permitted Air Pollutant Emission Sources Green house Gases Pollutants(GHG) Actual Emissions(Tons/Year) Pollutant I CAS 12021 12020 1% Change Criteria Pollutants Actual Emissions(Tons/Year) Pollutant CAS 2021 2020 %Change CO CO 52.75 45.94 14.823687% NOx NOx 11.6 10.12 14.624511% PM(TSP) TSP 78.63 68.49 14.80508% PM 10 PM 10 75.91 66.12 14.806414% PM2.5 PM2.5 75.91 66.12 14.806414% S02 IS02 15.72 4.98 114.859433% VOC I VOC 15.95 5.35 111.214952% Hazardous Air Pollutants(HAPS) and/or Toxic Air Pollutants(TAPs) Actual Emissions(Pounds/Year) Pollutant I CAS 12021 12020 1%Change Pollutant Group:Antimony&Compounds(total mass,inc elemental SB)Group Sum:4.93 Antimony Unlisted Compounds- Specify Compound(Component of SBC-Other 4.93 4.29 14.918411% SBC) Pollutant Group:Arsenic&Compounds(total mass of elemental AS,arsine and all inorganic compounds)Group Sum:5.66041 Arsenic Unlisted Compounds- Specify Compound(Component of ASC-Other 5.66041 4.9304 14.806306% ASC) Pollutant Group:Beryllium&compounds(Total mass)Group Sum:.07702 Beryllium Metal(unreacted) 7440-41-7 .07702 .06702 14.920916% (Component of BEC) Pollutant Group:Cadmium&compounds(total mass includes elemental metal)Group Sum:2.74226 Cadmium Metal,elemental, 7440-43-9 2.74226 2.38221 15.114116% unreacted(Component of CDC) Pollutant Group:Chromium(VI)Non-Specific Compounds,as Chrom(VI)(Component CRC)Group Sum:.00287 48 Chromium(VI)Non-Specific Unlisted Compounds- Specify NSCR6-Other .00287 .00281 2.135231% Compound(Component of NSCR6&CRC) Pollutant Group:Chromium-All/Total(includes Chromium(VI)categories,metal and others)Group Sum:9.31287 Chromium Unlisted Compounds- Specify Compound(Component of CRC-Other 9.31 8.11 14.796557% CRC) Chromium(VI)Non-Specific Unlisted Compounds- Specify NSCR6-Other .00287 .00281 2.135231% Compound(Component of NSCR6&CRC) Pollutant Group:Cobalt&compounds Group Sum:.38017 Cobalt Unlisted Compounds- Specify Compound(Component of I COC-Other 38017 .33017 15.143708% COC) Pollutant Group:Lead&compounds Group Sum:27.38103 Lead Unlisted Compounds- Specify Compound(Component of PBC-Other 27.38103 23.851 14.800341% PBC) Pollutant Group:Manganese&compounds Group Sum:52.94078 Manganese Unlisted Compounds- Specify Compound(Component of MNC-Other 52.94078 46.10076 14.837108% MNC) Pollutant Group:Mercury&Compounds-all total mass includes Hg Vapor Group Sum:1.37053 Mercury,vapor(Component of 7439-97-6 1.37053 1.19052 15.120279% HGC) Pollutant Group:Nickel&Compounds,sum total mass includes elemental Group Sum:13.14431 Nickel metal(Component of NIC) 7440-02-0 13.14431 111.45422 114.755175% Pollutant Group:Polycyclic Organic Matter(Specific Compounds from OAQPS for TV)Group Sum:11.86125 Naphthalene(Component of 91-20-3 11.86125 10.33122 14.809773% 83329/POMTV) Acetaldehyde 75-07-0 .00003 .00003 0.0% Acrolein 107-02-8 .00004 .00004 0.0% Ammonia(as NH3) 7664-41-7 6.5632 6.4256 2.1414335% Benzene 71-43-2 529.35431 461.03422 14.818878% Carbon disulfide 75-15-0 7.85 6.84 14.766078% Chlorine 7782-50-5 237.3 206.67 14.820731% DEHP(Di(2-ethylhexyl)phthalate) 117-81-7 365.07 317.95 14.819938% Dibutylphthalate 84-74-2 25.55 22.26 14.77987% Dichlorobenzene(p), 1,4- 106-46-7 8.76 7.63 14.809962% Ethyl benzene 100-41-4 8.03 6.99 14.878398% Ethyl chloride(chloroethane) 75-00-3 104.04 90.62 14.80909% Fluorides(sum of all fluoride 16984-48-8 4592.64 3999.86 14.82002% compounds as mass of F ion) Formaldehyde 50-00-0 21.65495 20.54072 5.4244895% Hexane,n- 110-54-3 3.69483 3.6144 2.2252665% Hydrogen chloride(hydrochloric 7647-01-0 1811.42 1577.61 14.820523% acid) Hydrogen fluoride(hydrofluoric acid as mass of HF)(Component 7664-39-3 2870.4 2499.91 14.820134% of 16984488/Fluorides) Methyl chloride(chloromethane) 74-87-3 122.3 106.51 14.8249% Methyl chloroform 71-55-6 .86 .75 14.666669% MEK(methyl ethyl ketone,2- 78-93-3 40.16 34.97 14.841289% butanone) Methyl iodide(iodomethane) 74-88-4 116.98 114.78 114.884979% 49 MIBK(methyl isobutyl ketone) 108-10-1 15.52 13.51 14.877871% Perchloroethylene 127-18-4 .51 .45 13.333334% (tetrachloroethylene) Phenol 108-95-2 15.7 13.67 14.850035% Selenium Compounds SEC 41.98005 36.56005 14.82492% Styrene 100-42-5 3.65 3.18 14.779875% Toluene 108-88-3 29.21697 25.44683 14.815754% Xylene(mixed isomers) 1330-20-7 22.82 19.87 14.846496% 50 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh DAQ Internal Comments: —15% increase in CO,NOx, PM, VOC, & S02, and combustion products (metals, POM, HCI, Hf, etc.) due to 15% increase in throughput for OS5/Kiln 3.Correction:As with 2020, the PM emissions factors for Kiln 3 do not incorporate the condensable fraction, resulting in a—44% decrease in PM with a roughly 15% increase in production compared to the 2020 inventory. DAQ made the same correction as last year to incorporate the condensable fraction:1) 2017-02-09 Source test for Kiln 3 reports PM emissions of 0.16 pounds per ton of fired brick.2) AP-42 Section 11.3, Table 11.3.1 cites EF of 0.48 lb/ton inorganic condensable PM and 0.11 lb/ton organic condensable PM for Natural Gas-fired Brick Kilns. 3) Summing these (0.16+0.48+0.11) gives an EF for TSP of 0.75 pounds per ton of fired brick.4)Assume TSP=PMI0=PM2.5 51 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh Comments From Reviewer: 52 Approved COR Date Submitted: 11/15/2022 09:34:48 Facility Name: Triangle Brick Company-Merry Oaks Brick Facility ID : 1900077 Manufacturing Plant Permit : 06897 294 King Rd County : Chatham Moncure,NC 27559 DAQ Region : Raleigh AERO Comments From Facility: 6/14/2022 - Operating Scenario Comments, 1. OS OS5 : 2. Methyl isobutyl ketone not listed as applicable pollutant in AP-42 53