Loading...
HomeMy WebLinkAboutAQ_F_1900134_20221013_EI_Apprd-EI (4) Inventory Certification Form(Title V) Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 These forms must be completed and returned even if the facility did not operate or emissions were zero The legally defined "Responsible Official" of record for your facility is Issa Zarzar This person or one that meets the definition below must sign this certification form. The official submitting the information must certify that he/she complies with the requirements as specified in Title I5A NCAC 2Q.0520(b)which references and follows the federal definition. 40 CFR Part 70.2 definesa responsible as meaning one of the following: 1. For a corporation: a president, secretary, treasurer, or vice-president of the corporation in chargeof a principal business function, or any other person who performs similar policy or decision makingfunctions for the overall operation of one or more manufacturing,production, or operatingfacilities applying for a or subject to a permit and either the facilities employ more than 250 persons or have gross annual sales or expenditures exceeding$25 million(in second quarter 1980 dollars); orthe delegation of authority to such representatives is approved in advance by the permittingauthority; 2. For partnership or sole propietorship; a general partner or the proprietor,respectively; 3. for a muncipality, state, federal, or other public agency includes the chief executive officerhaving responsibility for the overall operations of a principal geographic unit of the a enc e. ., a Regional Administrator of EPA). CERTIFICATION STATEMENT: (Important:Legally Responsible Official,read and sign after all submissions are final.) I certify that I am the responsible official for this facility, as described above, and hereby certify that the information contained in this air emissions report, including attached calculations and documentation, is true, accurate and complete. (Subject to legal penalties of up to $25,000 per occurrence and possible imprisonment as outlined in G.S. § 143-215.3(a)(2)) Responsible Official's Signature Below (use blue ink): Date Signed: Printed Name: Issa Zarzar Signature: This form applies to Title V facilities. If this facility is not classified asTitle V,please telephone your regional office Emission Inventory Contact at once for proper forms. Email address of Responsible Official: Issa.Zarzar@duke-energy.com Information on this Form cannot be held confidential 1 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh Listing of Emission Sources and Control Devices on Permit. See instructions *ES ID on *ES Description *CS ID *CS Description *CD ID's Air Permit ES-15 Ash Basin Crusher diesel-fired engine(300 ES-23 horsepower) [NSPS IIII,GACT ZZZZ] STARAO(Staged Turbulent Air Reactor)ash beneficiation process with a 140 million Btu per hour total maximum firing rate,processing feedstock(fly ash and other ingredient materials)into commercial Dry FGD scrubber with a to be determined ES-5 products and equipped with propane CS-3 minimum lime-to-sulfur ratio,Baghouse CD-5A,CD-5B low-NOx start-up burners(60 million (26,790 square feet of surface area), Btu per hour maximum total capacity)for use during start-up or when necessary to maintain the desired reactor temperature;an integral cyclone and bagfilter for product recovery External heat exchanger A with 70 Baghouse(20,925 square feet of surface ES-8 tons per hour nominal capacity CS-2 area),Baghouse(20,925 square feet of surface CD-8,CD-9 area), External heat exchanger B with 70 Baghouse(20,925 square feet of surface ES-9 tons per hour nominal capacity CS-2 area),Baghouse(20,925 square feet of surface CD-8,CD-9 area), I-1 Wet ash receiving(transfer to shed and hopper) EHE silo with a maximum 125 tons Bin vent filter(259 square feet of surface per hour filling rate and maximum 75 CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- tons per hour unloading rate, area),Bin vent filter(2,260 square feet of 11 controlled by a bin vent filter surface area), Product storage dome with a Bin vent filter(259 square feet of surface I-11 maximum 75 tons per hour filling CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- rate and maximum 275 tons per hour area),Bin vent filter(2,260 square feet of 11 unloading rate surface area), Loadout silo with a maximum 75 tons Bin vent filter(259 square feet of surface per hour filling rate and maximum CS I area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- I-12 100 tons per hour unloading rate, area),Bin vent filter(2,260 square feet of 11 controlled by a bin vent filter surface area), Bin vent filter(259 square feet of surface Truck loadout spout with a bin vent CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- filter area),Bin vent filter(2,260 square feet of 11 surface area), Bin vent filter(259 square feet of surface Truck loadout spout with a bin vent CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- filter area),Bin vent filter(2,260 square feet of 11 surface area), I-16 Ash Handling 2 I-19a One screener,200 tons per hour nominal fly ash processing rate I-19b One screener,200 tons per hour nominal fly ash processing rate I-20 Crusher with 165 tons per hour nominal fly ash processing rate I-21 Haul Roads One screener diesel-fired engine(225 I-22a horsepower) [NSPS IIII,GACT ZZZZ] One screener diesel-fired engine(225 I-22b horsepower) [NSPS IIII,GACT ZZZZ] Ball mill classifier with a process rate Bin vent filter(259 square feet of surface I-24 B l tons per hour,with a process bagho a CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- area),Bin vent filter(2,260 square feet of 11 inherent to the process surface area), Ball mill feed silo with a maximum Bin vent filter(259 square feet of surface I-25 15 tons per hour filling rate with a bin CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- vent filter area),Bin vent filter(2,260 square feet of 11 surface area), I-26a One telestacker,with 200 tons per hour nominal fly ash processing rate I-26b One telestacker,with 200 tons per hour nominal fly ash processing rate I-26c One telestacker,with 200 tons per hour nominal fly ash processing rate 1-26d One telestacker,with 200 tons per hour nominal fly ash processing rate I-26e One telestacker,with 200 tons per hour nominal fly ash processing rate I-26f One telestacker,with 200 tons per hour nominal fly ash processing rate One telestacker diesel-fired engine I-27a (74 horsepower) [NSPS IIII,GACT ZZZZ] One telestacker diesel-fired engine 1-27b (74 horsepower) [NSPS IIII,GACT ZZZZ] One telestacker diesel-fired engine I-27c (74 horsepower) [NSPS IIII,GACT ZZZZ] One telestacker diesel-fired engine I-27d (74 horsepower) [NSPS IIII,GACT ZZZZ] One telestacker diesel-fired engine I-27e (74 horsepower) [NSPS IIII,GACT ZZZZ] One telestacker diesel-fired engine I-27f (74 horsepower) [NSPS IIII,GACT ZZZZ] I-3 Unloading pile Feed silo with a maximum 125 tons Bin vent filter(259 square feet of surface per hour filling rate and maximum 75 CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- tons tons per hour unloading rate, area),Bin vent filter(2,260 square feet of 11 controlled by a bin vent filter surface area), Bin vent filter(259 square feet of surface I-6 FGD byproduct silo(capacity to be CS-1 area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- determined) area),Bin vent filter(2,260 square feet of 11 surface area), 3 FGD hydrate lime silo with a Bin vent filter(259 square feet of surface maximum 25 tons per hour filling CS area),Bin vent filter(259 square feet of surface CD-6,CD-7,CD- rate and maximum 0.475 tons per area),Bin vent filter(2,260 square feet of 11 hour unloading rate surface area), 4 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh Emission Source & Operating Scenario List- See Instructions *ES Group ID *ES ID SOS ID *OS Description ES-5 6 STAR-Fly Ash 5 STAR Reactor Propane I-19a,I-19b,I-21,ES-15,I- Ash Basin,Ash Handling,Unloading Pile, GRl 16,1-1,I-3,1-26a,I-26b,I- 1 Wet Ash Receiving, Screeners, 26c,1-26d,1-26e,1-26f Telestackers,Haul Roads I-27a,1-27b,1-27c,1-27d,I- GR2 27e,I-27f,I-22a,1-22b,ES- 2 Screener EnginesTelestacker Engines 23 GR3 I-13,I-14,I-6,I-7,I-24,I- 3 Silos and Storage 25,I-10,I-11,I-12,I-4 GR4 ES-8,ES-9 4 EHE A and EHE B I-20 NONE NONE 5 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) ES-5 or Emission Source Group ID 2. Emission Source Description : STARAO (Staged Turbulent Air Reactor) ash beneficiation process with a 140 million Btu per hour total maximum firing rate,processing feedstock (fly ash and other ingredient materials) into commercia 3. Operating Scenario ID/ OS - 6/STAR- Fly Ash Description: 4. SCC Number/Description: 39999994/Miscellaneous Industrial Processes ; Other Not Classified 5. Throughput/units in 2021: 204534 TON/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP5 VERTICAL 140 5.25 200 57.7 74943.77 STAR Reactor STAR STACK 6 Operating Scenario: OS - 6 Emission Source/Group ID: ES-5 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 17 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb +Dec y March-Ma June-Aug. ° Sept.-Nov. ° 2021 25% 2021 25% 2021 25/0 2021 25/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code ( Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emissions- Emission Criteria pollutant Criteria Control Emission EF (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 CO CO 48.9 08 NOx NOx 26 08 TSP TSP 27.6 08 PM10 PM10 27.6 08 PM2.5 PM2.5 27.3 08 S02 S02 214 08 VOC VOC 4.89 08 Emissions Emission Control HAP/TAP CAS Estimation Emission EF Pollutants (In alphabetical order) (see instructions) HAP/TAPS Efficiency Factor Control (Pounds/Year) Method Code (Net after all controls) (See Instructions) 2021 Arsenic Unlisted Compounds - Specify ASC-Other 4.35 08 Compound (Component of ASC) Beryllium Unlisted Compounds - Specify BEC-Other 1.12 08 Compound (Component of BEC) Cadmium Metal, elemental, unreacted 7440-43-9 0.475 08 (Component of CDC) Chromic acid(VI) (Component of So1CR6 & 7738-94-5 0.451 08 CRC) 7 Chromium Unlisted Compounds - Specify CRC- 4.1 08 Compound (Component of Other CRC) Cobalt Unlisted Compounds - Specify COG 2.05 08 Compound (Component of Other COC) Hydrogen chloride 7647-01-0 856 08 (hydrochloric acid) Lead Unlisted Compounds - Specify Compound PBC-Other 4.75 08 (Component of PBC) Manganese Unlisted Compounds - Specify MNC- Compound (Component of Other 6.72 08 MNC) Mercury,vapor 7439-97-6 0.0245 08 (Component of HGC) Nickel metal (Component 7440-02-0 4.71 08 of NIC) Sulfuric acid 7664-93-9 609 08 8 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) ES-5 or Emission Source Group ID 2. Emission Source Description : STARAO (Staged Turbulent Air Reactor) ash beneficiation process with a 140 million Btu per hour total maximum firing rate,processing feedstock (fly ash and other ingredient materials) into commercia 3. Operating Scenario ID/ OS - 5/STAR Reactor Propane Description: 4. SCC Number/Description: 39999996/Miscellaneous Industrial Processes ; Other Not Classified 5. Throughput/units in 2021: 364048 E3GAL/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 100 to Control Device or Stack): 8. Control Device Information Order CS-ID CD ID Control Device Description (as listed in permit) 1 CS-3 CD-5A Dry FGD scrubber with a to be determined minimum lime-to-sulfur ratio 2 CS-3 CD-5B Baghouse (26,790 square feet of surface area) 9. Emission Release Point (ERP) Information: (Sources vented to more than one EPP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) EP5 VERTICAL 140 5.25 200 57.7 74943.77 STAR Reactor STAR STACK 9 Operating Scenario: OS - 5 Emission Source/Group ID: ES-5 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 4 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb + Dec y March-Ma June-Aug. Sept.-Nov. o 2021 25% 2021 25% 2021 25% 2021 25/a 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 2021 Criteria Emissions- Emission Control Emission EF Pollutant Criteria (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 CO CO 1.37 08 0 NOx NOx 2.37 08 0 TSP TSP 0.13 08 99 PM10 PM10 0.13 08 99 PM2.5 PM2.5 0.13 08 99 S02 S02 0 08 95 VOC VOC 0.15 08 0 Emissions Emission Control HAP/TAP CAS Estimation Emission EF Pollutants (In Alphabetical Order) (See instructions) HAP/TAPS Method Code Efficiency Factor Control (Pounds/Year) (Net after all controls) (See Instructions) 2021 10 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) Group GR1 Consisting of I-19a, I-19b, I-21, ES-15, I-16, I-1, I-3, I-26a, I- or Emission Source Group ID 26b, I-26c, I-26d, I-26e, I-26f 2. Emission Source Description : Fugitive Emissions 3. Operating Scenario ID/ OS - 1/Ash Basin, Ash Handling, Unloading Pile, Wet Ash Receiving, Description: Screeners, Telestackers, Haul Roads 4. SCC Number/Description: 39999992/Miscellaneous Industrial Processes ; Other Not Classified 5. Throughput/units in 2021: 8760 HR/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) FUGITI FUGITIVE (NO 1 72 Area= 1 Plant Fugitives VES STACK) 11 Operating Scenario: OS - 1 Emission Source/Group ID: GR1 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb +Dec y March-Ma June-Aug. ° Sept.-Nov. ° 2021 25% 2021 25% 2021 25/0 2021 25/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code ( Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emissions- Emission Criteria pollutant Criteria Control Emission EF (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 TSP TSP 16.23 08 PM10 PM10 7.82 08 PM2.5 PM2.5 1.15 08 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical order) (see instructions) HAP/TAPS Method Code Efficiency Factor Control eo oe (Pounds/Year) (Net after all controls) (See Instructions) 2021 Arsenic Unlisted Compounds - Specify ASC-Other 1.809 08 Compound (Component of ASC) Beryllium Unlisted Compounds - Specify BEC-Other 0.385 08 Compound (Component of BEC) Cadmium Unlisted Compounds - Specify CDC- 0.109 08 Compound (Component of Other CDC) Chromium (VI) Non- Specific Unlisted NSCR6- Compounds - Specify Other 0.371 08 Compound (Component of NSCR6 & CRC) Chromium Unlisted Compounds - Specify CRC- 3.369 08 Compound (Component of Other CRC) 12 Cobalt Unlisted Compounds - Specify COC- 1.398 08 Compound (Component of Other COC) Lead Unlisted Compounds - Specify Compound PBC-Other 1.465 08 (Component of PBC) Manganese Unlisted Compounds - Specify MNC- 3.335 08 Compound (Component of Other MNC) Mercury Unlisted Compounds - Specify HGC- 0.00842 08 Compound (Component of Other HGC) Nickel Unlisted Compounds (Component NIC-Other 3.07 08 of NIC - Specify) 13 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) Group GR2 Consisting of I-27a, I-27b, I-27c, I-27d, I-27e, I-27f, I-22a, I- or Emission Source Group ID 22b, ES-23 2. Emission Source Description : Engines 3. Operating Scenario ID/ OS - 2/Screener EnginesTelestacker Engines Description: 4. SCC Number/Description: 20200102/Distillate Oil (Diesel) ; Reciprocating 5. Throughput/units in 2021: 4727 HR/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) 0.0015 140000 Btu/gallon (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 0 to Control Device or Stack): 8. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (Acfm) Rectangle(L x W) (in 0.1 feet) ENGIN VERTICAL 8 0.5 900 135 1590.43 Engine Stack ES STACK 14 Operating Scenario: OS - 2 Emission Source/Group ID: GR2 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 13 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb +Dec y March-Ma June-Aug. ° Sept.-Nov. ° 2021 25% 2021 25% 2021 25/0 2021 25/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code ( Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emissions- Emission Criteria pollutant Criteria Control Emission EF (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 CO CO 4.7 08 NOx NOx 5.28 08 TSP TSP 0.28 08 PM10 PM10 0.28 08 PM2.5 PM2.5 0.28 08 S02 S02 0.01 08 VOC VOC 2 08 Emissions Emission Control HAP/TAP CAS Estimation Emission EF Pollutants (In alphabetical order) (see instructions) HAP/TAPS Efficiency Factor Control (Pounds/Year) Method Code (Net after all controls) (See Instructions) 2021 Arsenic Unlisted Compounds - Specify ASC-Other 0.044 08 Compound (Component of ASC) Benzene 71-43-2 10.371 08 Beryllium Unlisted Compounds - Specify BEC-Other 0.033 08 Compound (Component of BEC) Cadmium Unlisted Compounds - Specify CDC- 0.033 08 Compound (Component of Other CDC) Chromium Unlisted Compounds - Specify CRC- 0.033 08 Compound (Component of Other CRC) 15 Formaldehyde 50-00-0 13.117 08 Lead Unlisted Compounds - Specify Compound PBC-Other 0.1 08 (Component of PBC) Manganese Unlisted Compounds - Specify MNC- 0.067 08 Compound (Component of Other MNC) Mercury Unlisted Compounds - Specify HGC- 0.033 08 Compound (Component of Other HGC) Nickel Unlisted Compounds (Component NIC-Other 0.033 08 of NIC - Specify) 16 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) Group GR3 Consisting of I-13, I-14, I-6, I-7, I-24, 1-25, 1-10, 1-11, 1-12, 1-4 or Emission Source Group ID 2. Emission Source Description : Silos/ Storage 3. Operating Scenario ID/ OS - 3/Silos and Storage Description: 4. SCC Number/Description: 39999994/Miscellaneous Industrial Processes ; Other Not Classified 5. Throughput/units in 2021: 400000 TON/yr (e.g.production or fuel use): 6. Fuel Information %sulfur %Ash Heat content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 100 to Control Device or Stack): 8. Control Device Information Order CS-ID CD ID Control Device Description (as listed in permit) 1 CS-1 CD-6 Bin vent filter(259 square feet of surface area) 2 CS-I CD-7 Bin vent filter(259 square feet of surface area) 3 CS-1 CD-11 Bin vent filter(2,260 square feet of surface area) 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/see) Rate(`4cfm) Rectangle(L x W) (in 0.1 feet) SILO VERTICAL 50 8.75 70 2.5 9019.8 Representative Silo STACK Stack 17 Operating Scenario: OS - 3 Emission Source/Group ID: GR3 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb +Dec y March-Ma June-Aug. ° Sept.-Nov. ° 2021 25% 2021 25% 2021 25/0 2021 25/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code ( Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emissions- Emission Criteria pollutant Criteria Control Emission EF (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 TSP TSP 4 08 99.9 PM10 PM10 3.6 08 99.9 PM2.5 PM2.5 0.929 08 99.9 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical order) (see instructions) HAP/TAPS Method Code Efficiency Factor Control eo oe (Pounds/Year) (Net after all controls) (See Instructions) 2021 Arsenic Unlisted Compounds - Specify ASC-Other 0.389 08 0 Compound (Component of ASC) Beryllium Unlisted Compounds - Specify BEC-Other 0.0828 08 0 Compound (Component of BEC) Cadmium Unlisted Compounds - Specify CDC- 0.0237 08 0 Compound (Component of Other CDC) Chromium (VI) Non- Specific Unlisted NSCR6- Compounds - Specify Other 0.0794 08 0 Compound (Component of NSCR6 & CRC) Chromium Unlisted Compounds - Specify CRC- 0.726 08 0 Compound (Component of Other CRC) 18 Cobalt Unlisted Compounds - Specify COC- 0.303 08 0 Compound (Component of Other COC) Lead Unlisted Compounds - Specify Compound PBC-Other 0.317 08 0 (Component of PBC) Manganese Unlisted Compounds - Specify MNC- 0.752 08 0 Compound (Component of Other MNC) Mercury Unlisted Compounds - Specify HGC- 0.00181 08 0 Compound (Component of Other HGC) Nickel Unlisted Compounds (Component NIC-Other 0.752 08 0 of NIC - Specify) 19 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 1.Emission Source ID (from permit) Group GR4 Consisting of ES-8, ES-9 or Emission Source Group ID 2. Emission Source Description : External Heat Exchangers 3. Operating Scenario ID/ OS - 4/EHE A and EHE B Description: 4. SCC Number/Description: 39999992/Miscellaneous Industrial Processes ; Other Not Classified 5. Throughput/units in 2021: 10873.27 HR/yr (e.g.production or fuel use): 6. Fuel Information %sulfur %Ash Heat content (If fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented 100 to Control Device or Stack): 8. Control Device Information Order CS-ID CD ID Control Device Description (as listed in permit) 1 CS-2 CD-9 Baghouse (20,925 square feet of surface area) 2 CS-2 CD-8 Baghouse (20,925 square feet of surface area) FAF 9. Emission Release Point (ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ft (F) (Feet/sec) Rate (,1cfm) Rectangle(L x W) (in 0.1 feet) EHE VERTICAL 95.5 3.5 250 74.5 43006.43 EHE Stack STACK 20 Operating Scenario: OS - 4 Emission Source/Group ID: GR4 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2021) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb +Dec y March-Ma June-Aug. ° Sept.-Nov. ° 2021 25% 2021 25% 2021 25/0 2021 25/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef Pollutants CAS Efficiency Pollutants Method Code ( Factor Control (Tons/Year) (See Instructions) all controls) 2021 Emissions- Emission Criteria pollutant Criteria Control Emission EF (NAAQS) Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons/Year) (See Instructions) all controls) 2021 TSP TSP 6.64 08 99.9 PM10 PM10 6.31 08 99.9 PM2.5 PM2.5 4.76 08 0 Emission HAP/TAP CAS Emissions Estimation Control Emission EF Pollutants (In Alphabetical order) (see instructions) HAP/TAPS Method Code Efficiency Factor Control eo oe (Pounds/Year) (Net after all controls) (See Instructions) 2021 Arsenic Unlisted Compounds - Specify ASC-Other 0.712 08 0 Compound (Component of ASC) Beryllium Metal (unreacted) (Component 7440-41-7 0.152 08 0 of BEC) Cadmium Metal, elemental, unreacted 7440-43-9 0.0431 08 0 (Component of CDC) Chromic acid (VI) (Component of So1CR6 & 7738-94-5 0.146 08 0 CRC) Chromium Unlisted Compounds - Specify CRC- 1.33 08 0 Compound (Component of Other CRC) Cobalt Unlisted Compounds - Specify COC- 0.55 08 0 Compound (Component of Other COC) 21 Lead Unlisted Compounds - Specify Compound PBC-Other 0.577 08 0 (Component of PBC) Manganese Unlisted Compounds - Specify MNC- 1.31 08 0 Compound (Component of Other MNC) Mercury, vapor 7439-97-6 0.00332 08 0 (Component of HGC) Nickel metal (Component 7440-02-0 1.21 08 0 of NIC) 22 Facility Total CY 2021 Emissions Summary Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2021 Record Facility-Wide Totals From all Permitted and Non-Permitted Air Pollutant Emission Sources Green house Gases Pollutants(GHG) Actual Emissions(Tons/Year) Pollutant I CAS 12021 12020 %Change Criteria Pollutants Actual Emissions(Tons/Year) Pollutant CAS 2021 2020 %Change CO CO 54.97 11.28 387.3227% NOx NOx 33.65 12.46 170.06422% PM(TSP) TSP 54.88 20.86 163.08725% PM 10 PM 10 45.74 12.04 279.90033% PM2.5 PM2.5 34.549 2.76 1151.7754% S02 IS02 1214.01 .02 11069950.0% VOC I VOC 17.04 4.52 155.752213% Hazardous Air Pollutants(HAPS) and/or Toxic Air Pollutants(TAPs) Actual Emissions(Pounds/Year) Pollutant I CAS 12021 12020 1%Change Pollutant Group:Arsenic&Compounds(total mass of elemental AS,arsine and all inorganic compounds)Group Sum:7.304 Arsenic Unlisted Compounds- Specify Compound(Component of ASC-Other 7.304 2.30674 7216.63733% ASC) Pollutant Group:Beryllium&compounds(Total mass)Group Sum:1.7728 Beryllium Metal(unreacted) 7440-41-7 .152 .0008 18900.0% (Component of BEC) Beryllium Unlisted Compounds- Specify Compound(Component of BEC-Other 1.6208 .469 245.58635% BEC) Pollutant Group:Cadmium&compounds(total mass includes elemental metal)Group Sum:.6838 Cadmium Metal,elemental, 7440-43-9 .5181 .07523 588.68805% unreacted(Component of CDC) Cadmium Unlisted Compounds- Specify Compound(Component of CDC-Other .1657 .133 24.586468% CDC) Pollutant Group:Chromium(VI)Non-Specific Compounds,as Chrom(VI)(Component CRC)Group Sum:.4504 23 Chromium(VI)Non-Specific Unlisted Compounds- Specify NSCR6-Other .4504 .451 -0.1330399511,0 Compound(Component of NSCR6&CRC) Pollutant Group:Chromium(VI)Soluble Chromate Compounds(Component of CRC)Group Sum:.597 Chromic acid(VI)(Component of 7738-94-5 I.597 .08273 621.6246% So1CR6&CRC) Pollutant Group:Chromium-All/Total(includes Chromium(VI)categories,metal and others)Group Sum:10.6054 Chromic acid(VI)(Component of 7738-94-5 .597 .08273 621.6246% So1CR6&CRC) Chromium Unlisted Compounds- Specify Compound(Component of CRC-Other 9.558 3.483 174.41861% CRC) Chromium(VI)Non-Specific Unlisted Compounds- Specify NSCR6-Other .4504 .451 -0.13303995% Compound(Component of NSCR6&CRC) Pollutant Group:Cobalt&compounds Group Sum:4.301 Cobalt Unlisted Compounds- Specify Compound(Component of COC-Other 4.301 1.70489 152.27435% COC) Pollutant Group:Lead&compounds Group Sum:7.209 Lead Unlisted Compounds- Specify Compound(Component of PBC-Other 7.209 2.01403 257.93906% PBC) Pollutant Group:Manganese&compounds Group Sum:12.184 Manganese Unlisted Compounds- Specify Compound(Component of MNC-Other 12.184 Not reported N/A MNC) Pollutant Group:Mercury&Compounds-all total mass includes Hg Vapor Group Sum:.07105 Mercury,vapor(Component of 7439-97-6 .02782 .07502 -62.916557% HGC) Mercury Unlisted Compounds- Specify Compound(Component of HGC-Other .04323 FOO-179 1787.7731% HGC) Pollutant Group:Nickel&Compounds,sum total mass includes elemental Group Sum:9.775 Nickel metal(Component of NIC) 7440-02-0 5.92 .08134 7178.0923% Nickel Unlisted Compounds NIC-Other 3.855 3.739 3.102432% (Component of NIC-Specify) Benzene 71-43-2 10.371 23.337 -55.55984% Formaldehyde 50-00-0 13.117 29.515 -55.55819% Hydrogen chloride(hydrochloric 7647-01-0 856 Not reported N/A acid) Sulfuric acid 7664-93-9 1609 Not reported N/A 24 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh DAQ Internal Comments: Change to emissions requested by Erin W. (Duke) on OS-6 - 609 pounds styrene submitted- should be sulfuric acid. Added Unit type and SCC code to OS-6 then changed styrene emissions to 0 pounds and added H2SO4 as a pollutant and 609 pounds emitted. Changed the form of combustion metals on OS-4 and OS-6 for regional consistency - discussed with facility. Emission factors on OS-3 for the I-11 Dome and ES-6 -byproduct silo and hours of operation were updated in calculations which changed the emissions; updated per request by facility. The emissions increases from 2020 to 2021 for particulates, CO,NOx, S02, arsenic,beryllium, cadmium, chromium, cobalt, lead, manganese, mercury, and nickel are related to the fact that the initial startup of the STAR facility was in December of 2020. The emissions from CY 2021 are representative of what should be AZnormal k� operations. VOC increases are due to a combination of the fuel usage and the startup of the STAR facility. Changes in S02 emissions in particular are shown as+1,069,950%. This is from the CEMS data AZ S02 emissions are greatly influenced by use of flyash in the STAR; flyash usage began in 2021. HCl and H2SO4 have 0 emissions reported in 2020; the % change is shown on the facility totals report as N/A because there was no value to compare to,but the increase in emissions is due to the fact that the STAR ran on flyash in 2021. The emissions of benzene and formaldehyde decreased by 56%because the engines operated less in 2021. 25 Approved COR Date Submitted: 10/13/2022 09:47:50 Facility Name: Duke Energy Progress, LLC - Cape Fear STAR Facility Facility ID : 1900134 500 C P and L Road Permit : 10583 Moncure,NC 27559 County : Chatham DAQ Region : Raleigh Comments From Reviewer: 26 27