HomeMy WebLinkAboutAQ_F_0400053_20220525_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Boggs Materials,Inc.-Pee Dee Asphalt Plant NC Facility ID 0400053 Inspection Report County/FIPS: Anson/007 Date: 05/26/2022 Facility Data Permit Data Boggs Materials,Inc. -Pee Dee Asphalt Plant Permit 09882/R04 481 Pee Dee Road Issued 11/17/2017 Lilesville,NC 28091 Expires 10/31/2025 Lat: 34d 56.0450m Long: 79d 53.2263m Class/Status Synthetic Minor SIC: 2951 /Paving Mixtures And Blocks Permit Status Active NAICS: 324121 /Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Tim Melton Tim Melton Tim Melton NSPS: Subpart I Asphalt Plant Manager Asphalt Plant Manager Asphalt Plant Manager (704)634-3491 (704)634-3491 (704)634-3491 Compliance Data Comments: Inspection Date 05/25/2022 Inspector's Name Mike Turner Inspector's Signature: Operating Status Operating Compliance Status Compliance-inspection �r Action Code FCE Date of Signature: 1 4 Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PMIO *HAP 2016 --- --- --- --- --- 2011 2.00 3.69 2.60 2.00 5.50 1.10 262.00 *Highest HAP Emitted(in pounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested I. DIRECTIONS From FRO,take Green St. and at the roundabout continue onto Gillespie St., continue for 1.3 miles and merge onto NC 87 N and continue for 0.21 miles and take the exit for US 401 south and continue 37 miles towards Wagram;just outside of Wagram take a right onto NC144 and drive 12 miles through Laurel Hill. Just past Laurel Hill,take US74 west—36 miles into Anson County. Less than 1 mile into Anson County,turn south(left) onto NC 145. After 0.3 miles,turn left onto County Road 1842 at the Boggs Paving sign; it later becomes Pee Dee Road. The plant is on left just past the railroad tracks. II. SAFETY All standard FRO safety gear is required. Be aware of the various trucks, loading equipment, overhead conveyors, and hot equipment surfaces used in production around the facility. III. FACILITY/PROCESS DESCRIPTION The facility consists of a 3 85 ton per hour portable continuous drum type hot mix asphalt plant. The facility is permitted to combust natural gas,No. 2 and No. 4 fuel oil,and recycled No. 2 and No. 4 fuel oil,with a maximum heat input rate of 120 mmBtu/hr. The facility is also permitted to use asbestos-free post-consumer recycled asphalt shingles(PRAS), and has a screening/conveying operation for recycled asphalt pavement(RAP). IV. PERMITTED EMISSION SOURCES Permit Sources: No sources were on site at the time of the inspection. j J ortable Continuous Drum Type Hot Mix Asphalt Plant,385 tons per hour capacity,consisting of: 1 f Natural gas/No. 2 fuel oil/No. 2 1CD2 Horizontal cyclone recycled fuel oil/No. 4 fuel oil/No. 4 y In (120 inch wide ES 1 recycled fuel oil-fired aggregate 108 inch high) series in series with (NSPS) drum dryer/mixer with ba house t 3 (120 mmBtu/hr maximum heat input : bag house 1 (12'390 square feet of filter area rate) f ES3 Surge bin g N/A N/A F-T-17 Truck loadout operation N/A N/A ES4 Lime Silo CD3 Bagfilter 60 Ton Capacity 265 square feet of filter area Portable Recycled Asphalt Pavement System193 tons per hour capacity,consisting of: F2 Three RAP conveyors f N/A N/A F3 Two RAP screens N/A N/A V. INSPECTION SUMMARY On 28 March 2022,I,Mike Turner, of the Fayetteville Regional Office of DAQ, spoke with Mr. Tim Melton,Asphalt Plant Manager for Boggs Materials,Inc.,and confirmed the facility did operate in 2021 and there are no plans for it to operate in the near future.I drove by this facility on 25 May 2022 and confirmed there is no equipment on site. VI. 112r APPLICABILITY This facility does not store any of the listed chemicals above the threshold quantities, and therefore is not required to maintain a written Risk Management Plan(RMP). VII. NON-COMPLIANCE HISTORY SINCE 2010 17 February 2017—NOD for late reporting. 25 February 2014—NOD for late reporting. VIII. CONCLUSIONS AND RECOMMENDATIONS Boggs Materials,Inc. -Pee Dee Asphalt Plant appeared to be operating IN COMPLIANCE with their current air permit as the facility was not operating at the time of the inspection on 25 May 2022. PINK SHEET NOTE None. /wmt