HomeMy WebLinkAboutAQ_F_0900009_20220103_CMPL_CompRpt 0910?
The Chemours Company 011311 Zo Z.-Z
9 Chemours Fayetteville Works
22828 NC Highway 87 W
Fayetteville,NC 28306
January 20, 2022
Heather Carter RECEIVED
Fayetteville Regional Supervisor
Division of Air Quality 1
225 Green Street, Suite 714 J�N 2 Z0�
Fayetteville,NC 28301
DES-FAYETTEVILLE REt�tONAL OFFICE
Re: Continuous Compliance Report
Title V Permit No: 03735T48
Facility ID: 0900009
Chemours Company—Fayetteville Works
Dear Ms.Carter,
This submittal is intended to satisfy Section 2.2 D.1 j of the facility's Title V Air Permit,which requires
Chemours to submit quarterly continuous compliance reports.
Please find in Table 1 on the following page a summary of the GenX Compounds emissions for the 12-
month period ending December 31,2021. The 12-month rolling calculation for HFPO-DA emissions
continued to be exceeded due to the calculation which still includes the March 2021 increase in emissions
from the carbon adsorber testing on VE-North unit;however,the monthly GenX emissions for this
quarter remain at low levels. Details of the second quarter exceedance is explained further in the 2Q21
report.
The spreadsheet file with the calculations underlying the GenX Compounds emissions presented in Table
1 was prepared by our consultant,ERM NC,Inc. ("ERM"). The spreadsheet file also provides the
emissions test data,control device data,and production data underlying the calculations,as well as notes
on the calculation methodologies. Because the spreadsheet file contains confidential business information
of Chemours,we will send that spreadsheet file under separate cover directly to you, and the spreadsheet
file will not be further distributed or posted on Chemours' website.
The control device operating parameters for the thermal oxidizer/scrubber system are provided under
separate cover in the quarterly Thermal Oxidizer report and control device operating parameters for the
carbon beds are provided under separate cover in the quarterly Carbon Bed report. The monitoring data is
maintained onsite and available for review upon request. If you have any questions,please contact me at
christel.e.compton chemours.com.
Sincerely,
C,pn I -Y
C-91
Christel Compton
Environmental Manager
Chemours—Fayetteville Works
Table 1
Chemours-Fayetteville Works GenX Emissions Summary
12-Month Rolling Emissions
(Per Permit Condition2.2.D.1)
Equipment/ Accidental 12-Month Rolling
Thermal Oxidize OtherProcess Monthly Facility-
Fugitive Release Sum of Facility-Wide
Month Notes Emissions Emissions Wide Emissions
Emissions Emissions Emissions
(lbs) (lbs) (lam) (1�) (lam) Emissions
January 2020 Actual 1.287 0.010 0.003 0.080 1.380 --
February 2020 Actual 0.498 0.000 0.001 0.157 0.656 --
March 2020 Actual 1.465 0.035 0.006 0.048 1.554 --
A n12020 Actual 1.086 0.000 0.004 0.136 1.226 May 2020 Actual 1.280 0.391 0.004 0.086 1.761 --
June 2020 Actual 1.626 0.084 0.007 0.037 1.754 --
July 2020 Actual 1.292 0.009 0.004 0.106 1.411 August 2020 Actual 0.309 0.000 0.001 0.018 0.328 September 2020 Actual 2.054 0.002 0.002 0.063 2.121 --
October 2020 Actual 0.000 0.000 0.000 0.020 0.020 --
November 2020 Actual 1.388 0.136 0.006 0.234 1.764 --
December 2020 Actual 1.152 0.029 0.007 0.200 1.389 15.366
January 2021 Actual 2.277 0.000 0.002 0.357 2.636 16.622
February 2021 Actual 1.220 0.122 0.005 0.309 1.656 17.622
March 2021 Actual 12.426 0.098 0.006 0.107 12.637 28.705
April 2021 Actual 2.299 0.000 0.002 0.102 2.403 29.881
May 2021 Actual 2.657 0.191 0.006 0.194 3.049 31.168
June 2021 Actual 2.287 0.195 0.007 0.122 2.611 32.025
July 2021 Actual 0.806 0.000 0.003 0.119 0.928 31.542
August 2021 Actual 1.963 0.000 0.002 0.123 2.088 33.301
September 2021 Actual 1.180 0.078 0.005 0.103 1.365 32.546
October 2021 Actual 0.250 0.006 0.002 0.053 0.311 32.837
November 2021 Actual 0.945 0.090 1 0.007 0.105 1.147 32.220
December 2021 Actual 0.297 0.00 1 0.002 0.069 0.368 31.199
2