Loading...
HomeMy WebLinkAboutAQ_F_3200223_20220614_EI_Cmb-EI-FileV 2020 Emissions Inventory Review / Data Tracking Form Facility Name: Holcim (US) Inc. -Durham Terminal Facility C lassification: Synthetic Minor rsJ' Enter date received into ED. Assigned to: Data Entry: Dawn Reddix Initial Review / Data Entry Date Received: J./).5 ()<>:).~ Facility ID: 3200223 Durham County Confidential Copy Submitted? D YES ist'NO □ Assigned to appropriate individual. Date Assigned: _______ Date Due: ~ Paper copy submitted: One copy received with supporting documentation, certification form signed by responsible official, and appears generally complete; OR □ Electronic copy submitted: All supporting documentation and certification fonn (with time/date stamp) signed by responsible official has been received. Comments: _ ..... e'-----H __ .fu-__ ..... p __ e_,,r_M"") __ , _+-_r'"_e_~_e_..,..J_J _______________ _ Inventory Review M All forms and supporting documentation appear to be complete if paper submission (check ED OS data if electronic). rsJ Contact, address, phone number changes entered into I-Beam/Facilities if necessary. GY All known operating scenarios, control devices, and emission release points have been entered for each emission source (permitted, insignificant, and unpermitted) or note that the emission source was not operated or not required to report. liJ"' Check ifSCC codes for each OS are accurate and update if needed. lit' Evaluate "U" sources for significance and address according to policy. Iii!' Calculations / forms appear to add up correctly. O' All compliance issues are being addressed (e.g. Toxics limits, above TV thresholds, large emissions increase/decrease, installation without a penn it). lil All volatile HAPs/TAPs were included in the VOC total. !if Calculations and control efficiencies appear correct. Emission factors are the best available and most current factors appropriate for the reporting facility (e.g. stack testing, AP-42, etc.). !!!'.I Review facility comments and address any issues. 0' Update ED (Data Entry Main) if additional information is requi red (corrections due date and date received). 51" Check all ED QA/QC reports. of Comparison with previous emission inventory must be made and outliers(> 10%) must be investigated and explained. ~ Put inventory review comments and summarize any changes in ED -Data Entry Main "DAQ internal comments". Date Info Requested: Dale Info Received: Total Days on Hold: Date Review Complete: ~\ 29 1 202-L Signature: ~dq Date Submitted to El Coor~inator: Hll--4 201 lOZ,;2., DateApp,oved: [; /4·1/zpv£ Initials: ,. ac111ty total LY .lU.lU t...m1ss1on ~ummary Kecoraea m ~v .t acuny w ff: JLVVLLJ Facility Name: Holcim (US) Inc. -Durham Terminal Permit #(s): 05699R09 Green House Gases Pollutants (GHG) Actual Emissions Tons/Yr % Pollutant C AS Demini-Change mus Not Not N IA Reported Reported CO2 equivalent (sum of individ ual GHG pollutant emissio1 NoGHGs times their 1995 IPCC Global Wam1ing Potential (GWP). Reported converted to metric tons) Criteria Pollutants Actual Emissions (Tons/Year) Pollutant CAS CY2020 CY2013 Demini-% from ED from Fees mus Change PM(TSP) TSP 0.207000 0.084000 0.5 146.4% PMI O PM IO 0.178000 0.084000 0.5 111.9% Largest Individual HAP Total HAP Emissions Largest Individual CAP PMI0 0.18 tons Total CAP Emissions 0.18 tons Total TAP Emissions Total Aggregate 0.18 tons Emissions DAO's Comments Regarding Inventory Increases in emissions arc attributed to an increase in throughput from 2013 to 2020. P ::i<YP 1 nf 1 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTME T OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF AIR QUALITY AIR PERMIT NO. 05699R08 fssue Date: June 12, 2014 Expiration Date: May 31, 2022 Effective Date: June 12, 2014 Replaces Permit: 05699R07 To construct and operate air emission source(s) and/or air cleaning device(s), and for the discharge of the associated air contaminants into the atmosphere in accordance with the provisions of Article 21 B of Chapter 143, General Statutes of North Caroli na (NCGS) as amended, and other applicable Laws, Rules and Regul ations, Holcim (US) Inc. -Durham Terminal 308 South Plum Street Durham, Durham County, North Carolina Permit Class: Synthetic Minor Facility ID# 3200223 (the Permittee) is hereby authorized to construct and operate the air emissions sources and/or air cleaning devices and appurtenances described below: Emission I Source ID [EUOI T !Emission Source I Description Control I System ID I Control ystem Description ~ar unloading system for cement COO I bagfiltir (358 square feet of filter area, air !<200 ton/hr capacity) jclotMatio not to exceed I 0: I) EU02 / ~t storage silo (500 ton capacity) -C00_2 __ -lbagti'; (358 square feet of filter area, air J V J ____ I !clot atio not to exceed I 0: I) EU03 J !cement storage silo (500 ton capacity)-CD03 --bagfilte/(358 square feet of filter area, ai,--- 1 ____ [cloth Mti~ not to exceed I 0: I) IEU04 -j cement storage silo (980 ton capacity-) -~ 1 coM--[ba'"gfil e~ 358 square feet of filter area, ai-r - cloth io not to exceed I 0: I) I EU05 J !cement truck loading system (250 ton/l1r !coos cartridge pe fabric filter (330 square feet of I capacity) filter a>e , air cloth ratio not to exceed I 0: I) in accordance with the completed appli cation 3200223.14A received April 30, 2014 including any plans, specifications, previous applications, and other supporting data, all of which are filed with the Department of Environment and atural Resources. Division of Air Quality (DAQ) and are incorporated as part of this permit. Facility Name: Facility ID: Pollutant OSID Facility Emissions -Operating Scenarios Per Pollutant Holcim (US) Inc. -Durham Terminal 2020 Inventory Holcim (US) [nc. -Durham :rcrmi nal 3200223 Permit Number(s): 05699R09 Emission Source ID Emission Rate -2020 Emission Rate (Prev) -2013 PM(TSP) OS-I 0.I0 I000Tons 0.026000 Tons EU0I EU0I OS-2 0.019000 Tons 0.002000 Tons EU02 EU02 OS-3 0.023000 Tons 0.001000 Tons EU03 EU03 OS-4 0.041000 Tons 0.023000 Tons EU04 EU04 OS-5 0.023000 Tons 0.032000 Tons EU05 EU05 TOTAL in Current Inventory: 0.21 Tons TOTAL in Previous Inventory: 0.08 Tons PMIO OS-I 0.086000 Tons 0.026000 Tons EU0I EU0I OS-2 0.017000 Tons 0.002000 Tons EU02 EU02 OS-3 0.020000 Tons 0.00 J 000 Tons EU03 EU03 OS-4 0.035000 Tons 0.023000 Tons EU04 EU04 OS-5 0.020000 Tons 0.032000 Tons EU05 EU05 TOTAL in Current Inventory: 0.18 Tons TOTAL in Previous Inventory: 0.08 Tons 5/20/2022 Page I of2 Facility ame: Holcim (US) Inc. -Durham Terminal 308 South Plum Street Durham, NC 27703 North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory -Calendar Year 2020 Facility ID : 3200223 Permit : 05699 County : Durham DAQ Region : Raleigh These forms must be completed and returned even if the facility did not operate or emissions were zero The legally defined "Responsible Official" of record for your facility is Greg Pyrtle This person or one that meets the definition below must sign this certification form. The official submitting the infonnation must certify that he/she complies with the requirements as specified in Title 15A NCAC 2Q .0304(j) which define the responsible official as the following: 1. For corporations, by principal executive officer of at least the level of vice-president, or his duly authorized representative, if such representative is responsible for overall operation of the facility from which the emissions described in the permit application form originates 2. for partnership or limited partnership, by a general partner 3. for a sole proprietorship, by the proprietor 4. for municipal, state federal, or other public entity, by a principal executive officer, ranking elected official, or other duly authorized employee CERTIFICATION STATEMENT: (Important: Legally Responsible Official, read and sign after all submissions are final.) I certify that I am the responsible official for this facility, as described above, and hereby certify that the information contained in this air emissions report, including attached calculations and documentation, is true, accurate and complete. (Subject to legal penalties of up to $25,000 per occurrence and possible imprisonment as outlined in G.S. § I 43-2 I 5.3(a)(2)) Signature This form applies to Non facilities. If this facility is classified as Title V, please telephone your regional office Emission Inventory C tact at once for proper fo1ms and classification. Email address of Responsible Official: greg.pyrtle@ holcim.com Information on this Form cannot be held confidential FORM A GENERAL FACILITY INFORMATION REVISED 0-1/18/19 NCDEQ/01vl:olon of Air Quality • Application for Air Permit to Construct/Operato I A NOTE• APPLICATION WILL NOT BE PROCESSED WITHOUT THE FOLLOWING: □ Local Zcnng ~'1CI' Dlllern.nal<On 0 ~ Nur,,:,er of eoi,,.s of Aporic:it or Application FM 1please cl\oock ont 01>lon 1:4,b,.l (ne,,, or n,odi6cat,on Ottf ra RHpo~s ble OfT""11-AJ,h0hUd Contact S,g'WIIJ'e □ P E. Seal l f requ red I □ ~I Rc-q~rt."'1 O ePa,..-,ert 0 Chu..!< Endosw GENERAL INFORMATION legal Corporare/Ow,,... Namo, 11,,k,m (\ ::-1 Inc s,,., Namo: Durham Terminal ),Jr, "A-· -"~ . " S.t~ Addro,,s (911 Aadrou) uno 1. 308 South Plum Street -f" V l.Jil Y V '••·-···-· , ..... '\..1 s.,,. Addr;,s,, Lino 2 c11v:Durham S1a1u: North Carolina tt~ 7 " "/1117 Z.,pCoo. 27703 Coi.ny. DurhcJm CONTACT INFORMATION Responsible Official!Author/1ed Contact: C,r..'.\!,,r,. P, n h: lnvoir:e Cont•ct. Grecory Pyrtle .l'\.U1' .. ll;ll 1'.\;~1vna1 VII!CC Na,.,. TIJe T ,-nnirul \l:m.1c~-r Nan-.e. T ,11e Terminal Manager \IMr\J Aodress L.ne 1: 30S S.>1.oth Plum .._, •.:a,1org Adell~, L ne 1 308 South Plum St \!;,J.r,g Attoress Lne 2, Matltr<J Adorus, L,ne 2; Clly Ourhlm State::--<: Zc> Cade 1;;0, Coty: Ourh:1111 Slate: --:c Zip Code: !770., PnmaryPhone No (Qt9) 596-91-'1 I Fax No. P"mary Phontl No.:(9) 9) 59(,-9 I -l I IFax No .. Sccoro:uy Phone No. I Socondary Pho~o No.: I Eroa.1 Adoress: J.!TC'J.! pyrtle.,1 !afarl!dll.>l, 1111 , om Email Addres, crcl! tl\Mlc" bfarl!d1nkim.n1111 l'acility/ln$peclion ContKt' lire tor,. P\ n k Porrrnl/Tec.h111cal Canracl.' Grcc,1r,. r>, nk Nanw T,U,;i; T cnnin31 '.'-llnal!cr Nar,,e Hlu I C'rtninal ~ lan.ig..:r •.1a.w,g Aaelress Lne , 30l! South Plum St \la brg Aod1eu Lne · :oR South l'lum St \.l&.ltrQ AJ<J<ess lJNt 2 '.la Lrg Aodres~ ure 2 Coty Ourh.un Stale '\( Zip CO<lo 2-70; c,ty Du1h.1111 Stale o'\C Z,pCode Puna,y Phone No.· (QI Q) 596-Q I~ l I Fax No· Prtmary Phano No .. (9191 5%-CJl-l I lrax No. 1ro~ Seconda,y Phone No.. I Sucond.'V)' Phcne No I EmDLI l\ddross:,!n,•1.:.1>}rtlc1<1 luf,1r)!Choki111 u,m EmadAddluss gr.:)! ())llk,,1 l:tf.trg..:h11kim <'11111 APPLICATION IS BEING MADE FOR 0 NttN Non1)ef'r-rteo facl.C,, G,-,f,elcJ □ Moo,So,1.,,, d far., II) ~,:ted) LJ Renewzl T Ille V l!:J q""',waf Non-T lie './ n Name Change n 0.-.'00t5""' Cnango n Admlrr..:onb,-e A"lll.'fldmer1 □ Renewal , •. ,,h l.1oCJ1f,ca1,on FACILITY CLASSIFICATION AFTER APPLICATION (Check Only One) I 1 Ge.-.,., r 1 srr-.aa I I Prah.bllor)• Smal 1, I S)"1£.-..tic ',l'11lr I 1r111ev FACILITY {Plant Site) INFORMATION ~scrht natured (plarl Sile) ope1aaorjs); Ccm..:nt material, strrngc and d"1nh111111n tcnnin:o> Fx,Wy ID NQ. l:t00223 Pn.-.ary SIC NNCS CO<le: S032 '~23320 CurrL-nl Pr~•·•O\.~ A·r Perm t 'lo. 0Sfi9<;R08 E>p.r.11 on Dahi: S.'31 ·n Fatiity Coart>nl!es Lal tude 35 58'57 €2 LOl'Ql!ude 78 52'59.95 Does thls application contain confidential d~t.a7 0 YES 0 NO -•11 yes, please contact lhe DAO Regional Offtce prior ta subm1ll1ng this apphcation."' {See Instructions) PERSON OR FIRM THAT PREPARED APPLICATION Person Name.~-e,.,..,.. Fvm Nruno: SP('drum En,nnmrtat s...,..,.,. INC. Ma,t,rg Addfess Lme 1: 97 Thomas Johnson Dnvo. Su,te 2:>o Mrufing Addres~ Lino 2. c.r,:F,_ I ISta1e•l\.tD Lp Cod11. 21702 leo..nty F<ederc_~ f>hor.e 'lo : (301 ) 620-1200 / I Fax No .. Err.al Am vu . ..-bro-,,~pec!rur'l".er ,. ca..- /l I SIGNATURE OF RESPONSIBLE OFFICIALJAUTHORIZED CONTACT -w.f,,, /1 r.-1,. Greo JPvrtle T 1te Terminal Manaqer '~ µ~~•r'I r ~ Dale: :2/2.1 /:;:l .,.11 ,-t Attach Additional Sheets As Necess~ I Page 1 of 2 RE\;ISEDG-; "IW!i Holcim IUSl Inc FORM A (continued, page 2 of 2) GENERAL FACILITY INFORMATION NCOEO,Olv1Mon of AJJ Quahly • Application for Au Porm1t lo Const1uct/Opor1te SECTION AA1 • APPLICATION FOR NON-TITLE V PERMIT RENEWAL (Company Namo) hereby formally rcq~ts ,_.,al of A• Pum>d No Tncru hose t,e,,n no mooif,c,,toons lo lhe or,gllllllly peur,::ed f.oc,hry or \NI o;',!<a:,ons the'l'"' tral -..o.Jld requ,,e •" a• ix•m~ s.,ce lne ~, .. , ""'"' l was -ssued ts yo,., bo:il) SJ,,,..C: lo 40 CFR Pan 6S -p,....,,,.,,, of .Acooen!M Re~.,..•· Seeton '1211} ol lhlt Clea, Ae Ac,.? Q YES 0 NO ~ ~•• hil.e yo., a~ea.,1 s.br ~a~< l,'arl'iJ9 P.:>n Rl.'P 10 EPA~ Q YES 0 ,o Oa:e S..!>rr,"led O d you allacl' a c..nent e,n~= r,~n:ol), 0 YES Q NO H no. God you Wbmil lhe i,,venlaly -AERO or bf m,v? D ViaA.ERO 0 Maiod Dato t,lailed SECTION AA2· APPLICATION FOR TITLE V PERMIT RENEWAL In 110COf.Jance -...ill!'-pro,,-o1 Trte "5A 20 051' l'le ,.Sl>O'IS i,le of• "'I hereby fo,m111!y req<Asli teNto'.al ol M Pe<'T'tl i-.o (Al ~rr-d ~.:O.J an:! furtho.< ,-crbfes Iha:. I A (l'\(,(l<)l{():S I 1Con-p11ry NIIIT'o) Pl The ~r.e,: a~ oenr, toert1r.c.s an.1 des.cnDCs •~ N'l"USNnnS e..t\ls a, d !t atx..t' \IJt'lfeel facil :y o,ceipl v.tw e sa..c:h vr,h. :-,,. t:xemnf♦-d undtr u c l\o,..h Carohr II T .;1~ V re{;Ulattons al 15A NCAC 20 0500: (2) The curreni aw qua~ty perm,1 citl's 1111 apphr: a:>le requ,remo>nls and 11roVK1es l™! m('lhOd or melhods for c1o1erm1n1ng comnhanc:c w11h lh<l ap11l1cahlo rP<1u~emen1s: (3) The fac:.ldy is c:urrond) 1ncompl,ance and sh.JI conlln<IC lo c.o<n:,ly "'th al apelle.allle roou,remcnls. (Note As :irovdcd unde< 15A 'ICAC 20 .0512 C<>IT'l)Qncc _,,,~ lhc conc,tJOrs of the pcr'l>ol sna t 011 "'-"'"T>ed ccmpl a-...o " :h lhO appl ut>lc reqvr.rre,is specrf,calty ,d:nti',cd n the perr-111 i.:, For a:idicable teqJ~ lhaC ooeonc c'fccs.,o our~ l~c ·,,,,.-ol lhe renowcd ;;cm-.i tra: :t-o fao<,fy shall =npl', o, a :,riet, bas,s {51 Tho lll0loly shol fulfil ;ippiicablc cMancc,J m;,n1lonog roq,wcm<:nlS and suom.1 a compi<11rcc ccr11'\ca1,on as rcq~ red by JO CFR Pai, 6-l Tho ,_Ille olfo091 s,gn.>fu•o 011 page • 1 c0t11flC!S und« Inc ponally al law lhal all informa1icn and siau,,..,cn1s pn>Vldcd above. based on •ilormat,on ard bcLd formed anc, roasonablo ,nquiry o,c 1,uo. acc:urote. and complete SECTION AA3-APPLICATION FOR NAME CHANGE N..,Fao.,,ty Name Former Fac1l1ty Nnn,e, A, o'f-C>al faot.ty n:,mo cl'.ang<' os rt'QIJOSled as dcscnbed abo-,e fo, tllC .i r I><""'' rron:,oocd on p.,g,. 1 al this 'orrr eo,,,;,1c1c lhc OO>cr socoors rf lhc<e .,.,, . ., -'T'od ':ators 10 the crs ...it} PC'TI :tcd fa:aty lhal "''OUCI reqaro an AU qu.ll :,, ~err-11t s1r-ce :t~ Ll '•' pern1t \,a-.. 1:116,tff'Pd n,1J t U'ero ha!> be(I" an o,,,"Tle,.S~tp i-r,.wge as•;«: a:~ ,•,dh t--i,.,, r~rT"e cnc,·)t1,. SECTION AAA-APPLICATION FOR AN OWNERSHIP CHANGE B~ this appl,ca!IOfl we hereby re.quest transfe, of Pvt 01.alr.y Permd fl.o. hom Ille former owner lo U,e new ovmer a, described below ne transfer of p(.'fn"ft r,,spens,t,111:y caverage 11nd tiab,l~V shal be e"l!<"t ,e lrmmed,atefy or mer\ d:tlc ) The liogal o,.nt.<shrp of Ille fae1111y oescnbe<I °" l)a!;e • of :hs fOfll" ~as bffn 01 "a t>t, traMf.,,.e<I"" 1dl1h?) Tt>ere ha, e been no rroc,fi::11:K>ns 10 u,e on91rall), ;,e<r-1'fe<1 fa""tt IN! wc1.;fo 1 1.,11e :.n 4,1r Ot;11i •t pe,n,tt ~,ce the last p,•rn t.,. ,~ rS.sued $,gMltn ol New /Sy)..-1 Btl:l'Of'Stble Offic,al Aulhorg!'(I CoNact (as l)('!'tl "" p.,ge 1 l X Srgnalu.-e (6'.e tnktc Dara New Fac,l,ty N,ure Fo,me, Fac:ildy Name :i!:il!::11!!.!l ol Fgm:1! !ltt!!:t ! R£:,~•IJ!2 Q!f~!lf AL:!::2!1;e<1 ~n!a::J· Name (typoo or pnnt). T11c X Sigr.atL~e ,~ lnq. Dale Forner Legal Corporak Ov.notr Natrtt In lieu of the seller's signature on this form, a lotter may be submitted with the seller's signature indicating the ownership change SECTION AAS-APPLICATION FOR ADMINISTRATIVE AMENDMENT Descri::;e th& 1e:,,.,sled adrN"lsva""" •"'en:t,r..-· r,e,e ,&::3C" addr ona' d0c¥--n~nl5 as ~ce~aryl .. Attach Add1t1onal Sheets As Necessary Page 2 of 2 Holcim (US) Inc. Durham Terminal 308 South Plum Street Durham, NC 27703 Control Device Description Process Rate (mton/hr) Air Flow (adm) PM Loading Reporting Year 2020 2021 Reporting Year 2020 2021 Reporting Year 2020 2021 Reporting Year 2020 2021 Notes: CDOl Rail Unload 200 1000 0.02 CDOl 77,323 68,709 CDOl 0.101 0.088 CDOl 0.086 0.075 CDOl 0.030 0.026 2020 and 2021 Actual E1 CD02 C003 CD04 coos Silo 1 Load-in Silo 2 Load-in Silo 3 Load-in Truck Load-out 200 200 200 250 1000 1000 1000 1500 0.02 0.02 0.02 0.02 Throughput (mtons/year) C002 CD03 C004 coos 14,842 17,834 31,379 64,054 30,829 14,832 23,048 68,709 PM Emissions (tons/year) C002 CD03 C004 coos 0.019 0.023 0.041 0.023 0.040 0.019 0.030 0.024 PMlO Emissions (tons/year) CD02 CD03 C004 coos 0.017 0.020 0.035 0.020 0.034 0.016 0.025 0.021 PM2.S Emissions (tons/year) C002 CD03 C004 coos 0.006 0.007 0.012 0.007 0.012 0.006 0.009 0.007 Outlet PM Loading = 0.02 gr/acf = Inlet loading of 20 gr/acf x 99.9% control efficiency PM Emissions (ton/yr)= Air Flow (acfm) x outlet PM Loading (gr/cf)/ 7000 (gr/lb) x 60 (min/hr) x Hours of o PMlO and PM2.5 calculated based on AP-42 Appendix 8-2, Category 4 assuming PMlO is 85% of PM and Pl\ 1 short ton= 0.9072 metric ton missions Calculations Annual Throughput (stons/year) CD0l 85,233 75,738 Facility Total 0.209 0.201 Facility Total 0.177 0.171 Facility Total 0.063 0.060 CD02 CD03 16,360 19,658 33,983 16,349 peration / 2000 (lb/ton) ,12.5 is 30% of PM. CD04 34,589 25,406 Hours of Operation (hours/year) coos CDOl CD02 CD03 CD04 CD0S 70,607 1,184 227 273 480 180 75,738 1,030 462 222 345 190 112(r) APPLICABILITY INFORMATION I Is your facility subject to 40 CFR Part 68 "Prevention of Accidental Releases" • Section 112(r) of the Federal Clean A,r Act? If No, please specify in detail how your facihty avoided applicab1hty: The Holcim Durham Terminal does not store or use regulated toxic and/or flammable substances at quanbties equal to or greater th, described ,n 40 CFR Part 68. If your fac,hty is Subject to 112(r). please complete the following A. Have you already submitted a Risk Management Plan (RMP) to EPA Pursuant to 40 CFR Part 68.10 or Part 68.150? Yes No Specify required RMP submittal date: If submitted, RMP submittal date. __ B. Are you usmg administrative controls to sub1ect your facility to a lesser 112{r) program standard? Yes No If yes. please specify: c. List the processes subject to 112(r) at your facility: PROCESS LEVEL {1 , PROCESS DESCRIPTION 2, or 31 HAZARDOUS CHEMICAL 2020 and 2021 Actual E1 Holcim (US) Inc. Durham Terminal 308 South Plum Street Durham, NC 27703 Control Device Description Process Rate (mton/hr) Air Flow (acfm) PM Loading Reporting Year 2020 2021 Reporting Year 2020 2021 Reporting Year 2020 2021 Reporting Year 2020 2021 Notes: CDOl Rail Unload 200 1000 0.02 COOl 77,323 68,709 COOl 0.101 0.088 CDOl 0.086 0.075 CDOl 0.030 0.026 CD02 CD03 CD04 Silo 1 Load-in Silo 2 load-in Silo 3 Load-in 200 200 200 1000 1000 1000 0.02 0.02 0.02 ThrouRhPut (mtons/year) C002 CD03 CD04 14,842 17,834 31,379 30,829 14,832 23,048 PM Emissions (tons/year) CD02 CD03 CD04 0.019 0.023 0.041 0.040 0.019 0.030 PM10 Emissions (tons/year) CD02 CD03 CD04 0.017 0.020 0.035 0.034 0.016 0.025 PM2.S Emissions (tons/year) CD02 CD03 C004 0.006 0.007 0.012 0.012 0.006 0.009 Outlet PM Loading = 0.02 gr/acf = Inlet loading of 20 gr/acf x 99.9% control efficiency coos Truck Load-out 250 1500 0.02 coos 64,054 68,709 coos 0.023 0.024 CDOS 0.020 0.021 coos 0.007 0.007 PM Emissions (ton/yr)::: Air Flow (acfm) x outlet PM Loading (gr/cf)/ 7000 (gr/lb) x 60 (min/hr) x Hours of o PMlO and PM2.5 calculated based on AP-42 Appendix B-2, Category 4 assuming PMlO is 85% of PM and Ptl 1 short ton= 0.9072 metric ton missions Calculations Annual Throughput (stons/year) CDOl 85,233 75,738 Facility Total 0.209 0.201 Facility Total 0.177 0.171 Facility Total 0.063 0.060 CD02 CD03 16,360 19,658 33,983 16,349 peration / 2000 (lb/ton) 112.5 is 30% of PM. CD04 34,589 25,406 Hours of Operation (hours/year) CDOS CDOl CD02 CD03 CD04 CDOS 70,607 1,184 227 273 480 180 75,738 1,030 462 222 345 190 r I Holcim Durham Terminal 2020 Inventory Calculations Notes: Outlet PM loading: .02gr/acf; inlet loading 20 gr/acf; 99.9% control efficiency PM emissions (ton/yr)= airflow(acfm) x outlet PM loading (gr/cf) /7000 (gr/lb) x 60 (min/hr) x hours of o CY2020 units Rail unload 051 silo 1 load i 052 silo 2 load i 053 silo 3 load i 054 truck load 1 055 CY 2021 units Rail unload 051 silo 1 load i 052 silo 2 load i 053 silo 3 load i 054 truck load 1 055 CY 2021 units Rail unload 051 silo 1 load i 052 silo 2 load i 053 silo 3 load i 054 truck load 1 055 mton/yr mton/hr throughput I process rate 77323 200 14842 200 17834 200 31379 200 64054 250 mton/yr mton/hr acfm gr/cf air flow I PM loading min/hr 1000 1000 1000 1000 1500 acfm gr/cf 0.02 0.02 0.02 0.02 0.02 0.999 0.001 op. hr/yr gr/lb 60 1184 7000 60 227 7000 60 273 7000 60 480 7000 60 180 7000 0.001 throughput I process rate I air flow I PM loading min/hr op. hr/yr gr/lb 68709 200 1000 0.02 60 1184 7000 30829 200 1000 0.02 60 227 7000 14832 200 1000 0.02 60 273 7000 23048 200 1000 0.02 60 480 7000 68709 250 1500 0.02 60 180 7000 mton/yr mton/hr acfm gr/cf throughput I process rate , air flow I PM loading min/hr op. hr/yr gr/lb 68709 200 1000 30829 200 1000 14832 200 1000 23048 200 1000 68709 250 1500 0.02 60 1030 7000 0.02 60 462 7000 0.02 60 222 7000 0.02 60 345 7000 0.02 60 190 7000 Uncontrolled Potential Emissions: PM = 0. 73 lbs/t * 657,000 t/yr /2000 lb/t ' PM IO = 0.4 7 lb/t * 657,000 t/yr / 2000 lb/1 Controlled Potential Emissions: ,. / peration lb/yr 202.971429 38.9142857 46.8 82.2857143 46.2857143 lb/yr 202.971429 38.9142857 46.8 82.2857143 46.2857143 lb/yr 176.571429 79.2 38.0571429 59.1428571 48.8571429 = 236.5 t/yr t = 15 I.I I t/yr efficiency 0.1 0.1 0.1 0.1 0.1 efficiency 0.1 0.1 0.1 0.1 0.1 efficiency 0.1 0.1 0.1 0.1 0.1 factor(lb/ton) 0.73 0.47 total tons/yr 0.010148571 0.001945714 0.00234 0.004114286 0.002314286 total tons/yr 0.010148571 0.001945714 0.00234 0.004114286 0.002314286 lton = .9072 metric tons calc thru: mton/hr x hr/yr 236800 45400 54600 96000 45000 PM .85*PM PMlO tons/year tons/yr air flow x pm loading x 1/7000 gr/ 202.9714 0.101486 0.086263 38.91429 0.019457 0.016539 46.8 0.0234 0.01989 82.28571 0.041143 0.034971 46.28571 0.023143 0.019671 tons/year .30*PM PM2.5 CY2020 Rail unload silo 1 load i silo 2 load i silo 3 load i truck load 1 tons/yea r2. 5 2.5 0.030446 0.005837 0.00702 0.012343 0.006943 total tons/yr 0.008828571 air flow x pm loading x 1/7000 gr/lb x 60 min/ 176.5714 0.088286 0.00396 0.001902857 0.002957143 0.002442857 79.2 0.0396 38.05714 0.019029 59.14286 0.029571 48.85714 0.024429 throughput(tons) lb to ton emissions ( Double emissions to account for si 657000 0.0005 239.805 479.61 0.0005 0 0 657000 0.0005 154.395 308.79 0.0005 0.0005 0 0 0 0 . . CY2013 units mton/yr throughput (mton/yr) %change 051 85233 67640 -0.2601 052 16360 5856 -1.79372 053 19658 1718 -10.4424 054 34589 60065 0.424141 055 70607 67927 -0.03945 hr x hours of operation lo unload to trucks 0.260098 26.00976 1.793716 179.3716 10.44237 1044.237 -0.42414 -42.4141 0.039454 3.945412