HomeMy WebLinkAboutAQ_F_3200059_20220110_CMPL_CompRptJanuary 7, 2022
Ms. Taylor Hartsfield
NC Dept ofEnviro1U11ental Quality
JAN f o 2'J22
.Raleigh Regional Office
DAQ Regional Supervisor
NCDEQ Raleigh Regional Office
3 800 Barrett Drive
Raleigh, NC 27609
Re: 2021 Annual Pennit Reporting Requirements
Hanson Aggregates Southeast -Rougemont Quarry
••• ••• ···Hanson
HEIDELBERGCEMENTGroup
Hanson Aggregates Southeast LLC
South Region
North Carolina Territory Office
3825 Barrett Drive, Suite 300
Raleigh, NC 27609
Tel 919 380 2500
Fax 919 380 2616
www.lehiQhlJimSofl, com
Permit Conditions A.l 8(b)(i -iii), A.20(c)(iXA&B), and A.21(d)(i -ii), NC Air Permit No. 06154Rl 9
Fee Class: Synthetic Minor, Site No. 05/32/00059
Dear Ms. Hartsfield:
To date the asphalt plant subject to the above referenced pennit conditions has not been constructed, and
the following reporting requirements are stated below.
A.l 8(b)(i.): Total tons of asphalt produced in 2021 = 0.
A.18(b)(ii): Total tons of asphalt produced and hours of operation in 2021 = 0.
A. l 8(b )(iii): There was no production rate in 2021.
A.20(c)(i.A): Total tons of asphalt produced in 2021 = 0.
A.20(c)(i.B): There were no tons of SO2 and CO produced in 2021.
A.21 ( d)(i): There was no fuel received or combusted in 2021, and therefore, no analytical testing.
A.21 ( d)(ii): There were no gallons of recycled fuel oil received or combusted in 2021.
Should you have any questions or need additional information, please call me: (919) 380-2746 or send an
email to Jack.Garvey(a),lehighhanson.com .
Sincerely,
Garvey
Environmental Manager
cc: Daren McMorris, NC Operations Manager
Kelly Tackett, Plant Manager