HomeMy WebLinkAboutAQ_F_6600041_20220727_CMPL_CompRptJuly 27, 2022 NCDEQ-DAQ West fraser. Inc. Attn: Ray Stewart, Regional Air Quality Supervisor Raleigh Regional Office 3800 Barrett Drive PO Box 27687 Raleigh, NC 27609 RE: Send-Annual Summary January 1, 2022 -June 30, 2022 Permit No. 03937T26 Facility ID: 6600041 West Fraser, Inc. -Seaboard Mill Dear Mr. Stewart: NC Dept of Environmental Quality ~ 1JG 1 e 207.7 ~\i:::J-,l.012 m~J · Raleigh Regional Office J-l(_., West Fraser Seaboard Lumber Mill (West Fraser) is submitting the 1st 2022 calendar year (CY) semi-annual summary report required by the Title V Permit No. 03937T26 for the Seaboard facility. Permit No. 03937T26 became effective September 5, 2017. This summary report is being submitted on or before the required postmark date ofJuly 30. 2022. The report includes the monitoring and recordkeeping data required by multiple permit conditions for the period from January 1, 2022 -June 30, 2022. This report has been developed to address the reporting requirements in Permit No. 03937T26. In accordance with General Condition 3.D per 2Q .0507(c), two (2) copies of the Title V permit semi-annual summary report are included. ► Permit Condition 2.1.A.1. band c -West Fraser conducted monitoring and recordkeeping as recommended by the manufacturer for the cyclones (CD-Pl and CD-P2). o Monthly external inspections of the system ductwork noting the structural integrity were performed. The integrity of the ductwork and cyclone was intact and in good condition. Records are on file at the facility. ► Permit Condition 2.1.A.2.c-. -West Fraser conducted weekly observations of the emission sources, ES-Pl, as required by 15A NCAC 02D .0521. o All inspections are complete and are on file at the facility. No excess visible emissions were observed during the reporting period; thus the emission sources are in compliance with the permit condition. NOTE: ES-Pl and CD-PC1 are still in operation. ES-Pl and CD-PC2 have not been built. • Please terminate Application(s) for ES-P2 and CD-PC2, West Fraser Inc. is no longer financially committed to the development of these construction projects. ► Permit Condition 2.1.B.4.c -West Fraser is in compliance with the BACT limits for the two direct wood- fired continuous double track lumber kilns (ID No. ES-DK). Emissions of VOC shall be no more than 3.76 lb VOC/1000 bf). Total board production shall not exceed 200 million bf per consecutive 12 month period from the two direct wood-fired continuous double track lumber kilns (ID No. ES-DK). Page 2 West Fraser -Seaboard 1st CY 2021 SAR West Fraser is required to calculate and report monthly production for the kilns for the previous 17 months as well as each 12-month period over the previous 17 months. Please see Attachment 1 which contains the summary of the data, -for compliance with the permit condition. Based on information and belief formed after reasonable Inquiry, the statements and information in this report are true, accurate and complete. If you have any questions or comments about the information presented in this letter, please do not hesitate to call me at (252) 589-8202 or Ronnie Sweet, EHS Supervisor, at (252) 589-8210. Sincerely, WEST FRASER,..INC. I . ' '/ ,-, I j, . '.:~, ,,.-.,,. Greg Anthony General Manager West Fraser Timber Seaboard Company Name: Faclllty Name Air Pe rmit Number: Site Number: RePortlng Period: Permit COndition: Source IDs: Month Year February 2021 March 2021 April 2021 Mav 2021 June 2021 July 2021 August 2021 September 2021 October 2021 November 2021 December 2021 January 2022 Februarv 2022 March 2022 April 2022 Mav 2022 June 2022 Attachment 1 -12 Month Rolling Production Rates West Fraser Seaboard Lumber Mill 03937T26 6600041 January 1, 2022 -June 30, 2022 2.1.B.4.c ES-OK Total Production (BF) 9,921,403 12,654,184 11,460,264 10,979 786 10,401773 10.838,011 11,231,648 10,546,645 10,706.539 10,641966 8,919 099 7,590,596 8,477 730 12,438,368 10,783 370 10,567,024 11,084,167 NC Dept of Environmental Quality AUG 16 2022 Raleigh Regional Office cumulative Annual Production llmonth Period rolling• Umlt Board Feet Board Feet per year Mar 20 -Feb 21 133,979,197 200,000,000 Apr 20 -Mar 21 133,586,329 200,000,000 May 20 -Apr 21 132,522,222 200,000,000 Jun 20 -May 21 133,089,250 200,000,000 Jul 20 -Jun 21 132 659,278 200,000,000 Aug 20 -Jul 21 131183,206 200,000,000 Sept 20 • Aug 21 131,314,053 200,000000 Oct 20 • Sept 21 129,860,499 200,000000 Nov 20 • Oct 21 128,634,355 200,000,000 Dec 20 • Nov 21 129,417,665 200,000000 Jan 21 • Dec 21 128158,897 200,000,000 Feb 21 • Jan 22 12SJl91,914 200,000,000 Mar 21 • Feb 22 124,448,241 200,000,000 Apr 21-Mar 22 124,232,425 200000,000 May 21-Apr 22 123,555,531 200.000.000 Jun 21 • May 22 123,142,769 200,000.000 Jul 21 -Jun 22 123,825,163 200,000,000