RE: Send-Annual Summary January 1, 2022 -June 30, 2022
Permit No. 03937T26
Facility ID: 6600041
West Fraser, Inc. -Seaboard Mill
Dear Mr. Stewart:
NC Dept of Environmental Quality
~ 1JG 1 e 207.7
~\i:::J-,l.012 m~J ·
Raleigh Regional Office J-l(_.,
West Fraser Seaboard Lumber Mill (West Fraser) is submitting the 1st 2022 calendar year (CY) semi-annual
summary report required by the Title V Permit No. 03937T26 for the Seaboard facility. Permit No. 03937T26
became effective September 5, 2017. This summary report is being submitted on or before the required
postmark date ofJuly 30. 2022. The report includes the monitoring and recordkeeping data required by
multiple permit conditions for the period from January 1, 2022 -June 30, 2022.
This report has been developed to address the reporting requirements in Permit No. 03937T26. In accordance
with General Condition 3.D per 2Q .0507(c), two (2) copies of the Title V permit semi-annual summary report
are included.
► Permit Condition 2.1.A.1. band c -West Fraser conducted monitoring and recordkeeping as recommended
by the manufacturer for the cyclones (CD-Pl and CD-P2).
o Monthly external inspections of the system ductwork noting the structural integrity were performed.
The integrity of the ductwork and cyclone was intact and in good condition. Records are on file at the
facility.
► Permit Condition 2.1.A.2.c-. -West Fraser conducted weekly observations of the emission sources, ES-Pl,
as required by 15A NCAC 02D .0521.
o All inspections are complete and are on file at the facility. No excess visible emissions were
observed during the reporting period; thus the emission sources are in compliance with the permit
condition.
NOTE: ES-Pl and CD-PC1 are still in operation. ES-Pl and CD-PC2 have not been built.
• Please terminate Application(s) for ES-P2 and CD-PC2, West Fraser Inc. is no longer financially
committed to the development of these construction projects.
► Permit Condition 2.1.B.4.c -West Fraser is in compliance with the BACT limits for the two direct wood-
fired continuous double track lumber kilns (ID No. ES-DK). Emissions of VOC shall be no more than 3.76 lb
VOC/1000 bf). Total board production shall not exceed 200 million bf per consecutive 12 month period
from the two direct wood-fired continuous double track lumber kilns (ID No. ES-DK).
Page 2
West Fraser -Seaboard
1st CY 2021 SAR
West Fraser is required to calculate and report monthly production for the kilns for the previous 17 months
as well as each 12-month period over the previous 17 months. Please see Attachment 1 which contains the
summary of the data, -for compliance with the permit condition.
Based on information and belief formed after reasonable Inquiry, the statements and information in this report
are true, accurate and complete.
If you have any questions or comments about the information presented in this letter, please do not hesitate to
call me at (252) 589-8202 or Ronnie Sweet, EHS Supervisor, at (252) 589-8210.
Sincerely,
WEST FRASER,..INC.
I . '
'/ ,-, I j, . '.:~, ,,.-.,,.
Greg Anthony
General Manager
West Fraser Timber
Seaboard
Company Name:
Faclllty Name
Air Pe rmit Number:
Site Number:
RePortlng Period:
Permit COndition:
Source IDs:
Month Year
February 2021
March 2021
April 2021
Mav 2021
June 2021
July 2021
August 2021
September 2021
October 2021
November 2021
December 2021
January 2022
Februarv 2022
March 2022
April 2022
Mav 2022
June 2022
Attachment 1 -12 Month Rolling Production Rates
West Fraser
Seaboard Lumber Mill
03937T26
6600041
January 1, 2022 -June 30, 2022
2.1.B.4.c
ES-OK
Total Production (BF)
9,921,403
12,654,184
11,460,264
10,979 786
10,401773
10.838,011
11,231,648
10,546,645
10,706.539
10,641966
8,919 099
7,590,596
8,477 730
12,438,368
10,783 370
10,567,024
11,084,167
NC Dept of Environmental Quality
AUG 16 2022
Raleigh Regional Office
cumulative Annual Production
llmonth
Period rolling• Umlt
Board Feet Board Feet
per year
Mar 20 -Feb 21 133,979,197 200,000,000
Apr 20 -Mar 21 133,586,329 200,000,000
May 20 -Apr 21 132,522,222 200,000,000
Jun 20 -May 21 133,089,250 200,000,000
Jul 20 -Jun 21 132 659,278 200,000,000
Aug 20 -Jul 21 131183,206 200,000,000
Sept 20 • Aug 21 131,314,053 200,000000
Oct 20 • Sept 21 129,860,499 200,000000
Nov 20 • Oct 21 128,634,355 200,000,000
Dec 20 • Nov 21 129,417,665 200,000000
Jan 21 • Dec 21 128158,897 200,000,000
Feb 21 • Jan 22 12SJl91,914 200,000,000
Mar 21 • Feb 22 124,448,241 200,000,000
Apr 21-Mar 22 124,232,425 200000,000
May 21-Apr 22 123,555,531 200.000.000
Jun 21 • May 22 123,142,769 200,000.000