Loading...
HomeMy WebLinkAboutAQ_F_6600016_20221024_CMPL_CompRpt~ BAKELITE Certified Mail -7019 0160 00011456 1532 October 21, 2022 Mr. Ray Stewart Regional Supervisor NortJ1 Carolina DEQ Division of Air Quality 3800 Barrett Drive, Suite IO I Raleigh, NC 27609 Re: Air Pem1it o. 042431'26 / 04243T27 Facility ID 6600016 Quarterly Title V Deviation Report Reporting Period: JuJy 01 -eptembcr 30, 2022 Dear Mr. Stewart: Bakelite Chemicals LLC P.O. Box 368 Conway, NC 27820 Telephone: {252) 585-1232 Fax: (252) 585-1754 NC Dept of Environmental Qualit) GCT 2 4 2022 Ralei~ Regional Office Bakelite Chemicals LLC, located in Conway, NC is required to submit quarterly deviation reports for those deviations not covered under I SA NCAC 2D.0535 in accordance with Section 3: General Conditions, J.A.3.a of the faci lity's Title V pcnnit. As such, GP has enclosed duplicate copies of the referenced quarterly deviation report intended to satisfy the above quarterly reporting requirements. Should you have any questions regarding the submittal, please feel free to call Tim Riddick at (252) 585-3819. Certification: Based on information and belief formed after reasonable inquiry, the statements and information in the document including any attachments are true, accurate, and complete. Ronald Bazinet Director, Manufacturing Attached: Attachment B -Resin Thennal Oxidizer Bakelite Chemicals LLC -Conway, NC Plant Quarterly Deviation Report Page 1 of 1 Attachment 8: Resin Thermal O,:idizer {Q3 -2022) Total Corrective Action Permit Condition Date Start Time Event Duration Description of SSM Event (if applicable) Ll!!.!!!.l Thermal Oxidizer bypass valve opened for a total of four (4) Plant personnel immediately confirmed the thermal oxidizer minutes while three (3) batch reactors were in operation as the continued to run at compliance temperature based on the result of a faulty temperature probe. Based on the firebox probe and a certified Fluke. Once this determination 2.2.A. l.g.iv.C 08/24/22 14:50 4 investigation at the time of the of the incident, the actual was made, the bypass probe was manually closed to stop the thermal firebox temperature did not fall below compliance excess emissions. The faulty probe was replaced prior to temperature. however, the open bypass valve did result in resuming normal operation. excess emissions from the unit and process. NC Dept of Environmental Qua\itY GCT 2 ~ 2022 Ralci~~ Regional Office Attachment B Attachment B: Resin Thermal 0:1.idizcr (Q3 -2022} Total Date Start Time Event Duration Descriplion of SSi\l Event Corrective Action .l.ml!!J (if a1rnlicahle} Permit Condition Thermo! Oxidizer bypass valve opened for a total of four (4) Plant personnel immediately confirmed the thermal oxidizer minutes while three (3) batch reactors were in operation as the 08/24/22 result of a faulty temperature probe. Based on the continued to run at compliance temperature based on the 14:50 4 investigation at the time of the of the incident. the actual firebox probe and a certified Fluke. Once this determination thermal firebox temperature did not fall below compliance was made, the bypass probe was manually closed to stop the 2.2.A. I .g.iv.C temperature. however, the open bypass valve did result in excess emissions. The faulty probe was replaced prior to excess emissions from the unit and process. resuming normal operation. Attachment B